This document is a set of drawings and specifications for a repair project at the Portland, OR VA Medical Center. The project includes structural and waterproofing repairs to the connections between Buildings 102 and 103. The base scope includes drainage and waterproofing improvements, while Alternate No. 1 includes structural repair and corrosion mitigation. The drawings provide details for temporary walls, ICRA requirements, demolition, floor plans, and construction details. The related federal contract opportunity is Solicitation 36C26024R0014 for the Y1DA--648-20-113 Structural Repair Bldg. 102 and 103 Connections project, issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 20.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DESCRIPTION GENERAL NOTES
GENERAL
1. CONTRACTOR TO VERIFY ALL CONDITIONS AND DIMENSIONS AND NOTIFY COR / ARCHITECT OF
ANY DISCREPANCIES PRIOR TO ANY WORK.
2. DIMENSIONS ARE TO FACE OR CENTER LINE OF FRAMING OR STRUCTURE AS INDICATED BY
THE DIMENSION LEADER LINE TYPE:
FACE OF FRAMING OR STRUCTURE
CENTER LINE OF FRAMING OR STRUCTURE
CLR - CLEAR DIMENSION IS TO FACE OF FINISHED MATERIAL
3. WHERE EXISTING CONSTRUCTION AND/OR FINISH IS MODIFIED, REPAIR TO MATCH EXISTING
UNLESS NOTED OTHERWISE.
4. CONTRACTOR SHALL COORDINATE WITH OWNER FOR REMOVAL OF ALL OWNER ITEMS IN
EXISTING SPACES FOR NEW CONSTRUCTION
5. PROTECT ALL EXISTING FINISHES FROM DAMAGE, REPAIR ALL DAMAGED AREAS AT NO COST
TO OWNER.
6. IT IS SUGGESTED THAT THE CONTRACTOR VISIT THE PROJECT SITE PRIOR TO BIDDING TO
BECOME FAMILIAR WITH THE EXISTING SITE CONDITIONS, SECURITY PROVISIONS, LAYDOWN
AREA AND OTHER SITE SPECIFIC GENERAL CONDITIONS WHICH MAY AFFECT THE BID VALUE
OF THIS PROJECT.
7. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE SPECIFICATIONS. THE
SPECIFICATIONS FORM A PART OF THE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL
INFORMATION REQUIRED TO CONSTRUCT THE WORK OF THIS CONTRACT. IN THE EVENT OF A
CONFLICT BETWEEN THE DRAWINGS AND THE SPECS, NOTIFY THE COR FOR CLARIFICATION
SEVEN DAYS BEFORE BEGINNING WORK ON THE AFFECTED ACTIVITIES.
8. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND NECESSARY
FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY DESCRIPTION AS MAY BE
NECESSARY TO COMPLETE THE SCOPE OF WORK DEFINED ON THE DRAWINGS AND
SPECIFICATIONS.
9. THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS (CRANE,
HOTWORK, ICRA, SATURDAY, SHUTDOWN, ETC.), CERTIFICATES, INSPECTIONS, DEPARTMENT
APPROVALS, ETC. FOR WORK PERFORMED UNDER THIS CONTRACT. PROVIDE COPIES OF ALL
REQUIRED PERMITS, CERTIFICATES, INSPECTIONS AND AGENCY APPROVALS TO THE
ENGINEER INCLUDING BUT NOT LIMITED TO ICRA AND IFLS.
10. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, ALL
APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL AND SUPPLEMENTARY CONDITIONS
OF THE CONTRACT.
11. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR THE PROPER
PERFORMANCE OF THEIR WORK, COORDINATING WITH OTHER TRADES, MEANS AND METHODS
OF CONSTRUCTION, SAFETY AND SECURITY ON SITE.
12. CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR THE
PERFORMANCE AND INSTALLATION OF THEIR WORK. CUTTING AND PATCHING SHALL BE
PERFORMED IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS FOR
FINISHES AND SUBSTRATES AFFECTED.
13. THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN SECURITY
DURING ALL CONSTRUCTION WORK.
14. THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE A/E AND ALL GOVERNMENT
EMPLOYEES 14 DAYS IN ADVANCE OF BEGINNING EACH CONSTRUCTION ACTIVITY.
15. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE
PROVIDED OR FURNISHED BY OTHERS, THEY SHALL BE PROVIDED UNDER THIS CONTRACT.
16. ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND
PROFESSIONAL MANNER CONSISTENT WITH INDUSTRY STANDARDS.
17. MATERIALS AND COMPONENTS AS SPECIFIED CONSTITUTE A STANDARD OF QUALITY, UNLESS
OTHERWISE NOTED. EQUAL SUBSTITUTES WILL BE ACCEPTABLE ONLY WITH WRITTEN PRIOR
APPROVAL BY THE CONTRACTING OFFICER SEVEN DAYS BEFORE BIDS ARE DUE. DO NOT
ASSUME EQUALITY AND SUBMIT SHOP DRAWINGS FROM ALTERNATE VENDORS WHO HAVE NOT
BEEN APPROVED IN WRITING BY THE ENGINEER. IN THE EVENT THIS HAPPENS, THE
CONTRACTOR SHALL PROVIDE THE SYSTEM USED IN THE BASIS OF DESIGN AT NO ADDITIONAL
COST TO THE OWNER.
18. THE CONTRACTOR SHALL LEAVE THE SITE IN PROPER WORKING ORDER AND SHALL, WITHOUT
ADDITIONAL CHARGE, REPLACE ANY WORK, MATERIALS, OR EQUIPMENT FURNISHED AND
INSTALLED UNDER THE CONTRACT WHICH DEVELOPS DEFECTS, EXCEPT FROM ORDINARY
WEAR AND TEAR, WITHIN ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE
OWNER.
19. CONTRACTOR SHALL PROVIDE TEMPORARY BARRIER SYSTEM TO ENCLOSE THE AREA OF
WORK AS REQUIRED PER ICRA PLAN. TEMPORARY BARRIERS SHALL BE SEALED TO EXISTING
CONSTRUCTION AS REQUIRED TO PREVENT MIGRATION OF CONSTRUCTION RELATED DIRT,
DUST AND DEBRIS TO NON-WORK SPACES AND TO MAINTAIN APPLICABLE FIRE RATINGS.
TEMPORARY WALLS, DOORS AND DOOR HARDWARE SHALL BE OF EQUAL OR GREATER FIRE
RATINGS THAN THE SURROUNDING WALLS.
20. CONSTRUCTION WORK HOURS TO BE OUTSIDE OF 7:00 AM - 4:00 PM, MONDAY - FRIDAY.
WORK MAY BE PERFORMED ON WEEKENDS OR HOLIDAYS, BUT IT SHALL BE COORDINATED
WITH THE VA COR.
COORDINATION AND PHASING
1. CONTRACTOR SHALL COORDINATE W/ OWNER FOR SCHEDULING EACH PHASE OF THE WORK.
2. OWNER WILL OCCUPY ADJACENT AREAS. CONTRACTOR SHALL COOPERATE WITH OWNER TO
PROVIDE MINIMUM INTERRUPTION OF BUILDING OCCUPANTS.
WORK IN: EXISTING BUILDINGS
1. WORK SHALL COMPLY WITH OTHER GENERAL NOTES.
DEMOLITION / CUTTING / DRILLING
1. SEE DEMOLITION SPECIFICATIONS SECTION 02 4100 AND DEMOLITION PLAN.
2. COORDINATE ANY FLOOR PENETRATIONS (SEE DRAWINGS) WITH EXISTING STRUCTURAL
LAYOUT PRIOR TO ANY WALL CONSTRUCTION. NOTIFY ARCHITECT OF ANY DISCREPANCIES.
3. CONTRACTOR SHALL CONTAIN ALL WATER USED IN CUTTING CONCRETE. CONTRACTOR SHALL
BE RESPONSIBLE FOR ALL WATER DAMAGE. CONTRACTOR SHALL BEAR ALL COSTS FOR
REPAIRS AND INVESTIGATIONS DUE TO WATER DAMAGE.
3.1. CONTRACTOR SHALL USE SMALL EXPLORATORY DRILLING TO LOCATE AND AVOID
REINFORCING.
FLOORS/SLABS
1. FILL ALL HOLES, CRACKS, AND RECESSES IN CONCRETE WITH NON-SHRINK GROUT FOR A
SMOOTH FINISH PREPARE TO RECEIVE FLOOR FINISHES.
COORDINATION AND PHASING
1. CONTRACTOR SHALL COORDINATE WITH OWNER FOR SCHEDULING EACH PHASE OF THE
WORK.
2. OWNER WILL OCCUPY ADJACENT AREAS. CONTRACTOR SHALL COOPERATE WITH OWNER TO
PROVIDE MINIMUM INTERRUPTION OF BUILDING OCCUPANTS.
3. THIS PROJECT IS TO BE PHASED TO PERFORM WORK ON THE WEST PEDESTRIAN BRIDGE AND
THE EAST VEHICULAR BRIDGE SEPARATELY, AND THE CENTRAL PEDESTRIAN BRIDGE WORK
CAN BE DONE ALONGSIDE THE WEST PEDESTRIAN BRIDGE OR THE EAST VEHICULAR BRIDGE.
STEEL: STRUCTURE FIREPROOFING
1. SEE PROJECT MANUAL FOR FIREPROOFING. AT EXISTING/DAMAGED FIREPROOFING AND NEW
FIREPROOFING, SEE PROJECT MANUAL AND FOLLOW MANUFACTURER'S RECOMMENDATION.
THIS PROJECT INCLUDES STRUCTURAL AND WATERPROOFING REPAIR OF 3 CONNECTIONS OF BUILDINGS 102 AND 103 AT VA PORTLAND CAMPUS. BASE SCOPE INCLUDES DRAINAGE AND WATERPROOFING IMPROVEMENTS.
ALTERNATE NO. 1 INCLUDES STRUCTURAL REPAIR AND CORROSION MITIGATION. SEE DRAWINGS FOR MORE BASE
SCOPE / ALTERNATE INFORMATION.
VICINITY MAP
SHEET INDEX
GENERAL
GI001 PROJECT INFORMATION
GI002 ICRA PLAN
ARCHITECTURAL
AE101 DEMOLITION PLAN
AE102 FLOOR PLANS / REFLECTED CEILING PLANS -
WEST & CENTRAL BRIDGES
AE103 FLOOR PLAN / REFLECTED CEILING PLAN -
EAST BRIDGE
AE201 DETAILS
STRUCTURAL
S1.0 STRUCTURAL PLANS & DETAILS
BASIC DEFINITIONS
"OWNER": THE OWNER IS UNITED STATES GOVERNMENT - DEPT. OF VETERANS AFFAIRS; VA MEDICAL CENTER, 3710 SW US VETERANS HOSPITAL RD, PORTLAND, OR 97239, AND IS REFERRED TO THROUGHOUT THE CONTRACT DOCUMENTS AS IF SINGULAR IN NUMBER. THE TERM "OWNER" MEANS THE OWNER OR THE OWNER'S AUTHORIZED
REPRESENTATIVE.
"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BETWEEN HOOD RIVER ENGINEERS AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER ACTING WITHIN THE LIMITS OF THEIR
AUTHORITY AS DELEGATED BY THE CONTRACTING OFFICER.
"CONTRACTING OFFICER'S REPRESENTATIVE", "C.O.R.": MEANS THE CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE, IN PART, RESPONSIBLE FOR MONITORING THE CONTRACTOR'S PERFORMANCE.
"WORK": THE TERM "WORK" MEANS THE CONSTRUCTION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR TO FULFILL THE CONTRACTOR'S OBLIGATIONS. THE
WORK MAY CONSTITUTE THE WHOLE OR A PART OF THE PROJECT.
"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE CONTRACT DOCUMENTS "DRAWINGS", "SHOP DRAWINGS" OR "PLANS" THE GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT DOCUMENTS, WHENEVER LOCATED AND WHENEVER ISSUED, SHOWING DESIGN, LOCATION AND DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES AND DIAGRAMS.
"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE ON-SITE SUPERVISION REPRESENTATIVE OF THE
PROJECT.
"ARCHITECT" OR "ENGINEER": MEANS THE PRIME CONTRACTOR'S ARCHITECTS, ENGINEERS AND OTHER DESIGN AND ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND REFERRED THROUGHOUT THE DRAWINGS AS IF
SINGULAR IN NUMBER.
"TRADE CONTRACTOR" OR "CONTRACTORS": MEANS THE ENTITY UNDER CONTRACT AGREEMENT WITH THE PROJECT MANAGER TO PROVIDE THE SPECIFIED GENERAL, MECHANICAL AND/OR ELECTRICAL WORK IN
CONNECTION WITH THIS PROJECT.
"FURNISH" OR "FURNISHED": MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS, TRANSPORTATION, INSURANCE, FIELD MEASUREMENTS, EXPEDITING, SHIPPING, HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND ANY OTHER ACCESSORIES REQUIRED FOR A COMPLETE
INSTALLATION.
"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING, HOISTING, STORAGE HANGARS, SUPPORTS, SLEEVES, SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL, DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLEAN-UP, INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL ACCESSORIES, SERVICE
AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.
"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND OTHER ITEMS REQUIRED TO COMPLETE THE
REFERENCED TASK.
"BY OWNER"; "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED TO THE JOB SITE AND
INSTALLED BY THE OWNER.
"NOT IN CONTRACT" OR "N.I.C." OR "NIC": MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE PROVISIONS IN THE CONSTRUCTION FOR FUTURE INSTALLATION AS SPECIFIED OR SHOWN.
DETAIL INDICATOR
DIMENSION LINE
ELEVATION INDICATOR,
INTERIOR, MULTIPLE VIEW
ELEVATION INDICATOR,
INTERIOR, SINGLE VIEW
KEYNOTE
WALL OR PARTITION TYPE BUILDING SECTION
INDICATOR
TYPICAL SYMBOLS
CODE AND REGULATIONS
C CENTERLINE
Δ DEFLECTION
° DEGREES
⌀ DIAMETER
" INCHES
' FEET
# NUMBER
x BY (i.e. 2x4)
ABS ACRYLONITRILE BUTADIENE STYRENE
A/C AIR CONDITIONING
ACT ACOUSTICAL CEILING TILE
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION
AFF ABOVE FINISH FLOOR
ALT ALTERNATE, ALTERNATIVE
ANSI AMERICAN NATIONAL STANDARD INSTITUTE
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASTM AMERICAN SOCIETY OF TESTING AND MEASUREMENT
AWS AMERICAN WELDING SOCIETY
BATT BATT INSULATION
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BO BOTTOM OF
BOC BACK OF CURB
BOCA BUILDING OFFICIALS CODE ADMINISTRATORS
BOT BOTTOM
CB CATCH BASIN
Ce SNOW EXPOSURE FACTOR
CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CFOI CONTRACTOR FURNISHED OWNER INSTALLED
CG CORNER GUARD
CJ CONTROL JOINT
CL CENTER LINE
CLR CLEARANCE
CMU CONCRETE MASONRY UNIT
CO COMPANY
CO2 CARBON DIOXIDE
CPT CARPET
CS SEISMIC RESPONSE COEFFICIENT
CSC CONVENTION FOR SAFE CONTAINERS
CT SNOW THERMAL FACTOR
CTR CENTER
d PENNY
DEMO DEMOLITION
DF DOUGLAS FIR
DIA DIAMETER
DIM DIMENSION
DN DOWN
DW DISHWASHER
DOR DESIGNER OF RECORD
(E) EXISTING
EA EACH
EIT ENGINEER IN TRAINING
EJ EXPANSION JOINT
EL ELEVATION
EXT EXTENSION OR EXTERIOR
F&I FURNISH AND INSTALL
FA FIRE ALARM
Fa SEISMIC SITE COEFFICIENT Fb BENDING STRENGTH OF WOOD f'c COMPRESSIVE STRENGTH OF CONCRETE
FE FIRE EXTINGUISHER AND BRACKET
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FND FOUNDATION
FO FACE OF
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FT FEET
FT3 CUBIC FEET
Fv BASE SHEAR Fy YIELD STRENGTH OF STEEL
G GRAVITY
GA GAUGE
GALV GALVANIZED
GCPI INTERNAL PRESSURE COEFFICIENT
GYP GYPSUM
GYP SH GYPSUM SHEATHING
HP HELICAL PIER
HSS HOLLOW STEEL SECTION
HT HEIGHT
HVAC HEATING, VENTILATION, & AIR CONDITIONING
I INERTIA
IBC INTERNATIONAL BUILDING CODE
ICBO INTERNATIONAL COMMITTEE OF BUILDING OFFICIALS
IN INCHES
ISO INTERNATIONAL ORGANIZATION FOR STANDARDIZATION
ƪW WELD LENGTH
JAN JANITOR
JC JANITOR'S CLOSET
k STIFFNESS
KG KILOGRAM
KGS KILOGRAMS
KIP 1000 POUNDS
KSI KIPS PER SQUARE INCH
LAV LAVATORY
LBS POUNDS
MAX MAXIMUM
MFR MANUFACTURER
MI MIRROR
MIN MINIMUM, MINUTE
MINS MINUTES
MM MILLIMETER
MPH MILES PER HOUR
(N) NEW
NER NATIONAL EVALUATION REPORT
NES NATIONAL EXPORT SYSTEM
NIC NOT IN CONTRACT
NO. NUMBER
NSF NET SQUARE FEET
NTS NOT TO SCALE
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OVERFLOW DRAIN
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFOI OWNER FURNISHED OWNER INSTALLED
OH OVERHEAD
OR OREGON
OSB ORIENTED STRAND BOARD
OSSC OREGON STRUCTURAL SPECIALTY CODE
PCS PIECES
PE PROFESSIONAL ENGINEER
Pf SNOW LOAD FLAT ROOF Pg SNOW LOAD GROUND
PL PLATE OR PROPERTY LINE
PLS PROFESSIONAL LAND SURVEYOR
Ps SNOW LOAD SLOPED ROOF
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PWD PLYWOOD
QTY QUANTITY
R RADIUS, RIGIDITY, RESISTANCE
RD ROOF DRAIN
REF REFERENCE
REQD REQUIRED
RF RESILIENT FLOORING
RHO REDUNDANCY FACTOR
RM ROOM
RO ROUGH OPENING
SBCI SUSTAINABLE BUILDINGS AND CONSTRUCTION INITIATIVE
SDS DESIGN SPECTRAL ACCELERATION, 0.2 SEC
SEC SECONDS
SIM SIMILAR
SPEC SPECIFICATION
SF SQUARE FEET
SQMM SQUARE MILLIMETER
Ss MAPPED ACCELERATION PARAMETER
SS STAINLESS STEEL
SYM SYMBOL OR SYMETRICAL
T&G TONGUE AND GROOVE
TD TRENCH DRAIN
THK THICK(NESS)
TO TOP OF
TOD TOP OF DECK
TOP TOP OF PARAPET
TOS TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
U ULTIMATE CAPACITY
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITE TILE
VERT VERTICAL
VIF VERIFY IN FIELD
W/ WITH
WD WOOD
WH WATER HEATER
WPS WELDED PROCEDURE SPECIFICATION
WWF WELDED WIRE FABRIC
TYPICAL ABBREVIATIONS
A. APPLICABLE CODES:
ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES, STANDARDS AND GOVERNING AUTHORITIES
INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
LIFE SAFETY: NFPA 101 LIFE SAFETY CODE, 2018
BUILDING: INTERNATIONAL BUILDING CODE, 2016
MECHANICAL: INTERNATIONAL MECHANICAL CODE, NFPA 90A
FIRE PREVENTION: NFPA NATIONAL FIRE CODES, EXCEPT NFPA 5000 & NFPA 900
ELECTRICAL: NATIONAL ELECTRICAL CODE (NEC)
ACCESSIBILITY: ABAAS INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
VA PUBLICATIONS: VA DIRECTIVES, DESIGN MANUALS, & OTHER GUIDANCE ON THE
TECHNICAL INFORMATION LIBRARY (TIL)
B. OCCUPANCY USE: NFPA 101 2018: CHAPTER 19 EXISTING HEALTH CARE OCCUPANCIES
IBC:INSTITUTIONAL I-2
C. CONSTRUCTION TYPE: IBC: TYPE III-A
PORTLAND VA MEDICAL CENTER
REPAIR B102/B103 BRIDGES
VA PROJECT NO. 648-20-113
U.S. Department of Veterans Affairs Veterans Health Administration VA Portland Health Care System
GI 001
PROJECT INFORMATION
SAIGF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h 3/
/2
1:
:2
PM
100% FINAL DESIGN
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
Approved: Infect. Cont. Approved: Safety Mgr. Approved: P&O Chief Approved: M&R Chief
Approved: Service Chief Approved: FMS Chief Approved: VAMC Director
A/E:
GDM
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 David Clem
Architect:
SURROUND ARCHITECTURE, INC.
150 SW Harrison Street, Suite 100 Portland, OR 97201
(503) 224-6484 Mark VanderZanden
STRUCTURAL REPAIR
BLDG 102 & 103 CONNECTIONS
PORTLAND, OR VA MEDICAL CTR
648-20-113
03/31/2023
102/103 ofSheet 6
DROP CEILING
CLEAN
ZONE
OR
EXTERIOR
WHERE
POSSIBLE
HEPA
FILTERED
AIR
CONTAMINATED
AIR
CONTAMINATED CONTAINMENT
AREA
DROP CEILING
HEPA FILTERED
AIR
CONTAMINATED AIR
CONTAMINATED
CONTAINMENT
AREA
CLEAN ZONE
OR EXTERIOR
WHERE
POSSIBLE
DROP CEILING
CONTAMINATED
AIRCONTAMINATED
CONTAINMENT
AREA
HEPA-FILTERED
AIR
CLEAN
ZONE
OR
EXTERIOR
WHERE
POSSIBLE
DROP CEILING
HEPA-FILTERED
AIR
CLEAN
ZONE
OR
EXTERIOR
WHERE
POSSIBLE
FIRE CAULK AS REQUIRED
CEILING DECK
SUSPENDED CEILING
2X4 FIRE RATED BRACE 4'-0" O.C.
TAPE/SEAL ALL PENETRATIONS
THROUGH TEMPORARY WALLS
2" FIRE RATED PLYWOOD, EXTEND CEILING
HEIGHT OR FIRE RESISTANT 10 MIL
POLYETHYLENE SHEETING CONTINUOUS
WITH ALL SEAMS TAPED
2X4 FIRE RATED STUD WALL 16" O.C.
EXISTING SLAB
SEAL POLYETHYLENE SHEETING
TO FLOOR WITH BLUE PAINTERS
TAPE
NOTES:
1. THIS DETAIL IS FOR NON-STRUCTURAL APPLICATIONS. SUBMIT RFI FOR CLARIFICATIONS AT ALL STRUCTURAL WALLS IF
NOT MARKED ON DEMOLITION PLANS.
2. INSTALL A PLASTIC SHEETING BARRIER BEFORE ERECTING OR DEMOLISHING TEMPORARY WALLS. THESE ARE LABELED
THROUGH OUT THE DOCUMENTS AS "TEMP-TEMP" WALLS. PLASTIC SHEETING BARRIER SHALL NOT BE REMOVED UNTIL
AFTER THE COR HAS APPROVED AND ACCEPTED THE TEMPORARY WALL.
3. THE USE OF POLYETHYLENE IS ONLY UPON AGREEMENT WITH THE COR AND INFECTION PREVENTION.
4. REPAIR ALL EXISTING FLOOR, WALL, AND CEILING FINISHES AFTER REMOVAL OF TEMPORARY WALLS. WALL, DOOR AND
HARDWARE TO BE EQUAL RATING TO HIGHEST RATED ADJACENT WALL. SUBMIT SHOP DRAWING WITH ILSM APPLICATION.
SCALE: 3/4"=1'-0"
TEMPORARY WALL DETAIL (non-structural)1
THE UNIT PULLS IN CONTAMINATED AIR, FILTERS OUT CONTAMINANTS AND PROPELS THE
FILTERED AIR OUTSIDE THE CONTAINMENT ZONE THROUGH FLEXIBLE DUCTING TO
NEGATIVELY PRESSURIZE THE WORK AREA.
INLET DUCTING IS USED TO PULL CONTAMINATED AIR OUT OF THE ZONE TO NEGATIVELY
PRESSURIZE IT. CONTAMINANTS ARE REMOVED BY THE UNIT WHICH IS TYPICALLY LOCATED
ADJACENT TO CONTAINMENT BARRIER SO CONTAMINATED AIR CAN BE FED DIRECTLY INTO
THE INLET. FILTERED AIR IS DUCTED OUTSIDE OR TO ANOTHER AREA AS REQUIRED.
THE UNIT IS LOCATED WITHIN THE CONTAINMENT ZONE WITH NO INLET OR EXHAUST DUCTING, SO THERE IS NO AFFECT ON ROOM PRESSURIZATION. THE PAS ACCELERATES THE REMOVAL
RATE OF AIRBORNE CONTAMINANTS.
HEPA-AIRE PORTABLE AIR SCRUBBERS CAN ALSO BE USED TO CREATE AND MAINTAIN POSITIVE
PRESSURE ZONES.
SCALE: NTS
NEGATIVE PRESSURE MODE WITH THE UNIT LOCATED INSIDE 2 SCALE: NTS
NEGATIVE PRESSURE MODE WITH THE UNIT LOCATED OUTSIDE 3
SCALE: NTS
CONTINUOUS AIR CLEANING AND RECIRCULATION4 SCALE: NTS
POSITIVE PRESSURE5
SCALE: NTS
HEPA FILTER6
SCALE: NTS
FIRE RATED TENT7
SCALE: NTS
ADHESIVE WALK OFF MAT8 SCALE: NTS
COVERED RUBBAGE CART9
FOR THE PURPOSE OF THE RENOVATION, THE CONSTRUCTION WORK IS CONSIDERED LOW RISK. THE DUST
CONTROL PLAN SHALL BE DISTRIBUTED AND REVIEWED BY ALL CONTRACTORS PERFORMING WORK ON THIS
CONSTRUCTION PROJECT.
A. EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES
· DETERMINE IF THE IMPACTED AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED
AlR IF FEASIBLE SEAL OFF ADJACENT AIR INTAKES AND PROVIDE TEMPORARY AIR FILTERS AT ALL
LOUVERS AS IS REQUIRED. IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY FILTER
BANKS FREQUENTLY AND REPLACE AS NEEDED TO AVOID BUILDUP OF PARTICULATE.
· SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN
DOORS IN STAIRWELLS AND CORRIDORS) ESPECIALLY IN PROTECTIVE ENVIR0MMENT (PE) AREAS.
B. INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
· BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT REQUIRES. SMALL, SHORT
DURATION PROJECTS GENERATING MINIMAL DUST MAY USE FIRE RATED PLASTIC SHEETING. BUT SHOULD
BE SEALED AT FULL CEILING HEIGHT WITH AT LEAST 2-FOOT OVERLAPPING FLAPS FOR ACCESS TO ENTRY.
PROJECT THAT PRODUCE MODERATE TO HIGH LEVELS OF DUST REQUIRE RIGID, DUST-PROOF. AND
FIRE-RATED BARRIER WALLS, DOORS AND HARDWARE (E.G. DRYWALL) WITH CAULKED SEAMS FOR A TIGHT
SEAL EXTENDING FLOOR TO CEILING. SEAL OFF AND BLOCK RETURN AIR VENTS IF RIGID BARRIERS ARE
USED FOR CONTAINMENT. LARGE DUSTY PROJECTS NEED AN ENTRY VESTIBULE FOR CLOTHING CHANGES
AND TOOL STORAGE AND TIGHT SEALS SHOULD BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND
WALL PENETRATIONS. AN INTERIM PLASTIC DUST BARRIER (MINIMUM 4-MlL) MAY BE REQUIRED TO PROJECT
THE AREA WHILE THE RIGID IMPERVIOUS BARRIER IS BEING CONSTRUCTED. ANY DUST SHALL BE
IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF
THE CONSTRUCTION PROJECT DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING
OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL
OF A PERMANENT BARRIER. CONTRACTOR PERSONNEL SHALL MONITOR AND PERFORM BARRIER
MAINTENANCE AND BE EDUCATED TO NOTICE SIMPLE CLUES SUCH AS ACCUMULATIONS OF VISIBLE DUST
EVIDENCED BY FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED BY PRESENCE OF INSECTS AND FLIES.
WET CEILING TILES, ETC.
· TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS
SHOULD BE FREE OF OF DEBRIS: DESIGNATED ELEVATORS SHOULD BE USED DURING SCHEDULED TIMES;
AND ONLY AUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE
SHOULD DIRECT PEDESTRIANS TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
· DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING
DESIGNATED TRAFFIC ROUTES. WET DOWN RUBBISH WITH FINE MIST OF WATER AS IS REQUIRED TO
REDUCE DUST. EFFORTS SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON
TRANSPORT DURING THE LOWEST PERIOD OFF ACTIVITY. DEBRIS SHOULD BE MADE TO MINIMIZE DAILY
AND AT TIMES SPECIFIED BY VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHOULD BE USED, AND THE CHUTE OPENING
SHOULD BE SEALED WHEN NOT IN USE. FILTERS SHOULD BE BAGGED AND SEALED BEFORE BEING
TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONSTRUCTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR WRITTEN APPROVAL OF THE VAMC.
· EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT
EXCAVATION DEBRIS. DO NOT REMOVE ANY SECURITY SCREENS.
GENERAL NOTES
GI 002
ICRA PLAN
SAIGF
C. VENTILATION AND ENVIRONMENTAL CONTROLS
· AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA USES
FRESH/OUTSIDE OR RECIRCULATED AIR; FILTER SHOULD BE ADDED OR RETURN VENTS
COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN
10 DIRTY AREAS.
· NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA MUST BE NEGATIVE
WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF
ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE
ENCLOSURE TO REMOVE DUST SHOULD PASS AIR THROUGH AN INDUSTRIAL GRADE,
PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER
MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF
EXHAUST MUST BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA
FILTER SHOULD BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUST.
· ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHOULD
BE VERIFIED DAILY.
· AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC, AND CONTRACTOR Will
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION
ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM
THE CONSTRUCTION AREA ELSEWHERE. VAMC WILL MAKE DETERMINATION ON
PROVIDING FOR THE ACCOUNTABILITY AND FREQUENCY OF TESTING AIR PRESSURE
THROUGHOUT THE PROJECT.
D. CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS
· WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHOULD BE FREE OF' LOOSE
SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL
IS NOT WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM
SHOULD BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE.
IF PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA).
ALL EQUIPMENT, TOOLS, TOOL CARTS, MATERIALS, ETC. TRANSPORTED THROUGH
OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND
WET WIPING BEFORE THEIR REMOVAL THE CONSTRUCTION ZONE OR WORK AREA.
· CONTRACTOR CLEANING; THE CONSTRUCTION ZONE SHOULD BE MAINTAINED IN A CLEAN
MANNER BY CONTRACTORS AND SWEPT OR HEPA-VACUUMED DAILY OR MORE
FREQUENTLY AS NEEDED TO MINIMIZE DUST. ADJACENT AREAS THAT MAY BE IMPACTED
BY THE CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE FREQUENTLY AS
NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD BE UTILIZED TO
MINIMIZE TRACKING OF HEAVY DIRT AND DUST FROM CONSTRUCTION AREAS. USE
MOPPING SOLUTIONS APPROVED FOR MEDICAL FACILITIES WHICH DO NOT CONTAIN
FRAGRANCE, IRRITANTS, ODORS OR OTHER ENVIRONMENTAL FACTORS WHICH MAY
CAUSE PATIENT INJURY OR IRRITATION. COORDINATE WITH GEMS AND HOUSEKEEPING AS
IS REQUIRED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h 3/
/2
1:
:2
PM
100% FINAL DESIGN
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
Approved: Infect. Cont. Approved: Safety Mgr. Approved: P&O Chief Approved: M&R Chief
Approved: Service Chief Approved: FMS Chief Approved: VAMC Director
A/E:
GDM
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 David Clem
Architect:
SURROUND ARCHITECTURE, INC.
150 SW Harrison Street, Suite 100 Portland, OR 97201
(503) 224-6484 Mark VanderZanden
STRUCTURAL REPAIR
BLDG 102 & 103 CONNECTIONS
PORTLAND, OR VA MEDICAL CTR
648-20-113
03/31/2023
102/103 ofSheet 6
DEMOLITION GENERAL NOTESDEMOLITION LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h 3/
/2
1:
:4
PM
100% FINAL DESIGN
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
Approved: Infect. Cont. Approved: Safety Mgr. Approved: P&O Chief Approved: M&R Chief
Approved: Service Chief Approved: FMS Chief Approved: VAMC Director
A/E:
GDM
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 David Clem
Architect:
SURROUND ARCHITECTURE, INC.
150 SW Harrison Street, Suite 100 Portland, OR 97201
(503) 224-6484 Mark VanderZanden
STRUCTURAL REPAIR
BLDG 102 & 103 CONNECTIONS
PORTLAND, OR VA MEDICAL CTR
648-20-113
03/31/2023
102/103 ofSheet 6
AE 101
DEMOLITION PLAN
SAIGF
3/32"=1'-0"
BASE SCOPE: OVERALL DEMOLITION PLAN - ENTRY PLAZA LEVEL
17.9 17 16.3 15.1 14.1 13.5 12.5 11.5 10.8 10.5 10.2 9.8 9.5 9.2 8.5 7.5 6.1 5.3 4.5 3.8 3
X
X'
Y
V
WEST
PEDESTRIAN
BRIDGE
CENTRAL
PEDESTRIAN
BRIDGE
EAST
VEHICULAR
BRIDGE
1/4"=1'-0"
BASE SCOPE: FLOOR PLAN - ENTRY PLAZA LEVEL - WEST PEDESTRIAN BRIDGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h 3/
/2
1:
:4
PM
100% FINAL DESIGN
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
Approved: Infect. Cont. Approved: Safety Mgr. Approved: P&O Chief Approved: M&R Chief
Approved: Service Chief Approved: FMS Chief Approved: VAMC Director
A/E:
GDM
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 David Clem
Architect:
SURROUND ARCHITECTURE, INC.
150 SW Harrison Street, Suite 100 Portland, OR 97201
(503) 224-6484 Mark VanderZanden
STRUCTURAL REPAIR
BLDG 102 & 103 CONNECTIONS
PORTLAND, OR VA MEDICAL CTR
648-20-113
03/31/2023
102/103 ofSheet 6
AE 102
FLOOR PLANS & REFLECTED
CEILING PLANS
SAIGF
16.3
10.2 9.8
X X
1/4"=1'-0"
BASE SCOPE: FLOOR PLAN - ENTRY PLAZA LEVEL - CENTRAL PEDESTRIAN BRIDGE
BUILDING ENTRY
ENTRY DRIVE PLAZAENTRY DRIVE PLAZA
1/4"=1'-0"
ALTERNATE 1: REFLECTED CEILING PLAN - LOWER LEVEL - WEST PEDESTRIAN BRIDGE
16.3 10.2 9.8
X
1/4"=1'-0"
ALTERNATE 1: REFLECTED CEILING PLAN - LOWER LEVEL - CENTRAL PEDESTRIAN BRIDGE
PARKING GARAGE
PARKING GARAGEPARKING GARAGE
PEDESTRIAN BRIDGE
PEDESTRIAN BRIDGE
15.1
15.117
PLANS GENERAL NOTES
PLANS LEGEND
X
10.5 9.5
10.5 9.5 9.210.8
V V
VV
BUILDING ENTRY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h 3/
/2
1:
:4
PM
100% FINAL DESIGN
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
Approved: Infect. Cont. Approved: Safety Mgr. Approved: P&O Chief Approved: M&R Chief
Approved: Service Chief Approved: FMS Chief Approved: VAMC Director
A/E:
GDM
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 David Clem
Architect:
SURROUND ARCHITECTURE, INC.
150 SW Harrison Street, Suite 100 Portland, OR 97201
(503) 224-6484 Mark VanderZanden
STRUCTURAL REPAIR
BLDG 102 & 103 CONNECTIONS
PORTLAND, OR VA MEDICAL CTR
648-20-113
03/31/2023
102/103 ofSheet 6
AE 103
FLOOR PLAN & REFLECTED CEILING
PLAN - EAST BRIDGE
SAIGF
4.5 3.8
X
1/4"=1'-0"
BASE SCOPE: FLOOR PLAN - ENTRY PLAZA LEVEL - EAST VEHICULAR BRIDGE
VEHICULAR BRIDGE
4.5 3.8
X
1/4"=1'-0"
ALTERNATE 1: REFLECTED CEILING PLAN - LOWER LEVEL - EAST VEHICULAR BRIDGE
PARKING GARAGE
PLANS GENERAL NOTES
PLANS LEGEND
V
V
3"=1'-0"
SECTION DETAIL - EXPANSION JOINT - PEDESTRIAN BRIDGE
3"=1'-0"
SECTION DETAIL - EXPANSION JOINT - VEHICULAR BRIDGE
3"=1'-0"
SECTION DETAIL - TILE @ BRIDGE EDGE
3"=1'-0"
SECTION DETAIL - TILE @ WINDOW WALL SILL
3"=1'-0"
SECTION DETAIL - TILE @ CONCRETE PAVERS
3"=1'-0"
SECTION DETAIL - TILE @ TYP COLUMN/GUARDRAIL POST BASE
3"=1'-0"
SECTION DETAIL - TILE @ DOOR THRESHOLD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h 3/
/2
1:
:5
PM
100% FINAL DESIGN
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
Approved: Infect. Cont. Approved: Safety Mgr. Approved: P&O Chief Approved: M&R Chief
Approved: Service Chief Approved: FMS Chief Approved: VAMC Director
A/E:
GDM
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 David Clem
Architect:
SURROUND ARCHITECTURE, INC.
150 SW Harrison Street, Suite 100 Portland, OR 97201
(503) 224-6484 Mark VanderZanden
STRUCTURAL REPAIR
BLDG 102 & 103 CONNECTIONS
PORTLAND, OR VA MEDICAL CTR
648-20-113
03/31/2023
102/103 ofSheet 6
AE 201
DETAILS
SAIGF
03/30/2023
06/30/2023 03/30/2023
| Sheets and Views |
| 1 GI001 project information |
| 2 GI002 ICRA plan |
| 1 AE101 demo plan |
| 2 AE102 floor plans + RCPs - west & central |
| 3 AE103 floor plan + RCP - east |
| 4 AE201 details |