Attachment_2_Wage_Determination_Grant_County_Oregon_JODA_600A_Panel_Replace.pdf

PDF 2 MB Posted

Attached to
JOHN DAY FOSSIL BEDS REPLACE 600A PANEL
Solicitation number
140P8325R0020
Issued by

About this file

This document is a Wage Determination for a federal construction contract to replace a 600A Electrical Panel at John Day Fossil Beds National Monument in Oregon. The wage determination covers multiple labor classifications for the project, including electricians (low voltage wiring), operators (backhoe/excavator and crane), laborers (mason tender, concrete saw, pipelayer), and other trades like heat & frost insulators, bricklayers, sheet metal workers, and carpenters. The wage rates are specified with hourly base rates and fringe benefits, ranging from $38.10 for carpenters to $62.02 for heat & frost insulators, effective for various dates in 2024 and 2025.

The document includes details about Executive Orders 14026 and 13658 governing minimum wage rates for federal contractors, requiring workers to be paid at least $17.75 or $13.30 per hour depending on the contract date. It also outlines the process for wage determination appeals and provides information about how to submit requests for survey summaries or review of wage-related matters to the U.S. Department of Labor's Wage and Hour Division. The wage determination covers multiple counties in Oregon and applies to building construction projects, excluding single-family homes and apartments up to 4 stories.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ #140P8325R0020

Replace 600A Electrical Panel John Day Fossil Beds National Monument

File details come from the government source that posted it. Updated .