This solicitation package seeks proposals to replace office and housing space at Lind Point. The National Park Service will replace structures at Lind Point impacted by shoreline erosion. Offerors should provide design and construction services to build new office and housing facilities. The pre-proposal conference date had not been scheduled as of the solicitation date, but details would be provided in an amendment. Proposals are due in response to Solicitation Number 140P2021R0109 from the Department of the Interior National Park Service National Office to replace impacted structures at Lind Point and provide new office and housing spaces.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Office & Housing Space Impacted by Hurricanes Irma and Maria - Lind Point Project
Virgin Islands National Park
St. John, U.S. Virgin Islands
PMIS #: VIIS 251144B
SPECIFICATIONS
VOL 2
NATIONAL PARK SERVICE
MAY 17, 2021
Electrical Rev. Added 6/25/2021
TABLE OF CONTENTS
VOLUME 1
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 000107 - SEALS PAGE
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 011100 - SUMMARY OF WORK
SECTION 012200 - UNIT PRICES
SECTION 012601 - CONTRACT MOD PROCEDURES
SECTION 012700 - CONTRACT LINE ITEMS
SECTION 013100 - PROJECT MANAGEMENT & COORDINATION
SECTION 013216 - CONSTRUCTION SCHEDULE
SECTION 013323 - SUBMITTAL PROCEDURES
SUBMITTAL LIST
SECTION 013513 22 - ARCHEOLOGICAL PROTECTION
SECTION 013523 - OWNER SAFETY REQUIREMENTS
SECTION 014000 - QUALITY REQUIREMENTS
ACCESSIBILITY INSPECTION REPORT FORM
STATEMENT OF STRUCTURAL TEST & SPECIAL INSPECTIONS
SECTION 014200 - REFERENCE STANDARDS
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS
SECTION 015719 11 - INDOOR AIR QUALITY
SECTION 015719 12 - NOISE ACOUSTICS MANAGEMENT
SECTION 015723 - STORM WATER POLLUTION
SECTION 016700 - PRODUCT REQUIREMENTS
SECTION 017340 - EXECUTION
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SECTION 017700 - CLOSEOUT PROCEDURES
SECTION 017823 - OPERATION AND MAINTENANCE DATA
CLOSEOUT AND O&M REQUIREMENTS
SECTION 017900 - DEMO AND TRAINING
SECTION 018114 - TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
SECTION 024116 - STRUCTURE DEMOLITION
SECTION 024119 - SELECTIVE DEMOLITION
DIVISION 03 - CONCRETE
SECTION 033000 - CAST-IN-PLACE-CONCRETE
DIVISION 04 - MASONRY
SECTION 042000 - UNIT MASONRY
SECTION 042000 - CONCRETE UNIT MASONRY
SECTION 044313.13 - ANCHORED STONE MASONRY VENEER
SECTION 047200 - CAST STONE MASONRY
DIVISION 05 - METALS
SECTION 051200 - STRUCTURAL STEEL
SECTION 053100 - STEEL DECK
SECTION 055000 - METAL FABRICATIONS
SECTION 057300 - DECORATIVE METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
SECTION 061000 - ROUGH CARPENTRY
SECTION 061000.13 - ROUGH CARPENTRY
SECTION 062013 - EXTERIOR FINISH CARPENTRY
SECTION 062023 - INTERIOR FINISH CARPENTRY
SECTION 064113 - WOOD-VENEER-FACED ARCHITECTURAL CABINETS
SECTION 064116 - ALUMINUM COMPOSITE PANEL-CLAD ARCHITECTURAL CABINETS
SECTION 068013 - COMPOSITE FRAMING SUPPORT (CFS) SYSTEM
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 071416 - COLD FLUID-APPLIED WATERPROOFING
SECTION 071600 - POLYMER MODIFIED CEMENT WATERPROOFING
SECTION 072100 - THERMAL INSULATION
SECTION 072600 - VAPOR RETARDERS
SECTION 075600.11 - FLUID-APPLIED MEMBRANE ROOFING, CONCRETE DECK
SECTION 075600.13 - FLUID-APPLIED MEMBRANE ROOFING, INSULATED
SECTION 076200 - SHEET METAL FLASHING AND TRIM
SECTION 077123 - MANUFACTURED GUTTERS
SECTION 077200 - ROOF ACCESSORIES
SECTION 078413 - PENETRATION FIRESTOPPING
SECTION 078443 - JOINT FIRESTOPPING
SECTION 079200 - JOINT SEALANTS
SECTION 079210 - FLUID APPLIED FLASHINGS
SECTION 079513 - EXPANSION JOINT COVER ASSEMBLIES
DIVISION 08 - OPENINGS
SECTION 081213 - HOLLOW METAL FRAMES
SECTION 081416 - FLUSH WOOD DOORS
SECTION 081433 - STILE AND RAIL WOOD DOORS
SECTION 081613 - FLUSH FRP DOORS
SECTION 083113 - ACCESS DOORS AND FRAMES
SECTION 083323 - OVERHEAD COILING DOORS
SECTION 083483 - FLOOR DOORS
SECTION 084113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
SECTION 085113 - ALUMINUM WINDOWS
SECTION 087100 - DOOR HARDWARE
SECTION 088000 - GLAZING
SECTION 089000 - LOUVERS AND VENTS
SECTION 089119 - FIXED LOUVERS
DIVISION 09 - FINISHES
SECTION 092216 - NON-STRUCTURAL METAL FRAMING
SECTION 092400 - CEMENT PLASTERING
SECTION 092900 - GYPSUM BOARD
SECTION 093013 - CERAMIC TILING
SECTION 095123 - ACOUSTICAL TILE CEILINGS
SECTION 096813 - TILE CARPETING
SECTION 099123 - INTERIOR PAINTING
SECTION 099300 - STAINING AND TRANSPARENT FINISHING
SECTION 099600 - HIGH-PERFORMANCE COATINGS
SECTION 099653 - ELASTOMERIC COATINGS
DIVISION 10 - SPECIALTIES
SECTION 101100 - VISUAL DISPLAY UNITS
SECTION 101200 - DISPLAY CASES
SECTION 101423.16 - ROOM-IDENTIFICATION PANEL SIGNAGE
SECTION 102800 - TOILET, BATH, AND LAUNDRY ACCESSORIES
SECTION 104413 - FIRE PROTECTION CABINETS
SECTION 104416 - FIRE EXTINGUISHERS
SECTION 105116 - LOCKERS
SECTION 105143 - WIRE MESH STORAGE LOCKERS
SECTION 105626.13 - MOBILE STORAGE SHELVING UNITS - ARCHIVE
SECTION 105626.13 - MOBILE STORAGE SHELVING UNITS - COLLECTIONS
SECTION 105723.14 - FIXED WIRE SHELVING
DIVISION 11 - EQUIPMENT
SECTION 111313 - LOADING DOCK BUMPERS
SECTION 118129 - HORIZONTAL FALL PROTECTION
DIVISION 12 - FURNISHINGS
SECTION 122113 - LOUVER BLINDS
SECTION 122413 - ROLLER WINDOW SHADES
SECTION 123653 - LABOATORY WORK SURFACES
SECTION 123661.19 - QUARTZ AGGLOMERATE COUNTERTOPS
DIVISION 13 - SPECIAL CONSTRUCTION
NOT APPLICABLE
DIVISION 14 - CONVEYING EQUIPMENT
VOLUME 2
DIVISION 21 - FIRE SUPPRESSION
SECTION 211313 - FIRE SUPPRESSION SYSTEM
DIVISION 22 - PLUMBING
SECTION 220000 - BASIC PLUMBING MATERIALS AND METHODS
SECTION 220510 - PLUMBING COORDINATION
SECTION 220519 - METERS AND GAGES FOR PLUMBING PIPING
SECTION 220523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING
SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220548 - VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND
EQUIPMENT
SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220719 - PLUMBING PIPING INSULATION
SECTION 221006 - FACILITY GAS PIPING
SECTION 221113 - FACILITY FUEL - OIL PIPING
SECTION 221116 - DOMESTIC WATER PIPING
SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES
SECTION 221316 - SANITARY WASTE AND VENT PIPING
SECTION 223400 - FUEL-FIRED, DOMESTIC-WATER HEATERS
SECTION 224000 - PLUMBING FIXTURES
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
SECTION 230000 - BASIC MECHANICAL MATERIALS AND METHODS
SECTION 230510 - MECHANICAL COORDINATION
SECTION 230513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 230548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
SECTION 230713 - DUCT INSULATION
SECTION 230719 - HVAC PIPING INSULATION
SECTION 232300 - REFRIGERANT PIPING
SECTION 233113 - METAL DUCTS
SECTION 233300 - AIR DUCT ACCESSORIES
SECTION 233413 - HVAC FANS
SECTION 233713 - DIFFUSERS, REGISTERS, AND GRILLES
SECTION 237433 - DEDICATED OUTDOOR-AIR UNITS
SECTION 238123 - CRITICAL ZONE AIR-CONDITIONERS
SECTION 238126 - SPLIT-SYSTEM HEAT PUMPS & AIR-CONDITIONERS
DIVISION 25 - INTEGRATED AUTOMATION
DIVISION 26 - ELECTRICAL
SECTION 260500 - COMMON WORK RESULTS FOR ELECTRICAL
SECTION 260502 - ELECTRICAL ACCEPTANCE TESTS
SECTION 260510 - ELECTRICAL SUBMITTALS
SECTION 260511 - ELECTRICAL WORK CLOSEOUT
SECTION 260512 - ELECTRICAL COORDINATION
SECTION 260513 - MEDIUM-VOLTAGE CABLES - 15KV
SECTION 260519 - LOW-VOLTAGE ELECTRICAL CONDUCTORS AND CABLES
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
SECTION 260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
SECTION 260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS
SECTION 260548 - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS
SECTION 260574 - SHORT CIRCUIT, OVERCURRENT PROTECTION, ARC FLASH HAZARD
ANALYSIS
SECTION 260800 - COMMISSIONING OF ELECTRICAL SYSTEM
SECTION 260944 - RMS LIGHTING CONTROLS
SECTION 261200 - MEDIUM-VOLTAGE TRANSFORMERS
SECTION 262400 - SWITCHBOARDS AND PANELBOARDS
SECTION 262726 - WIRING DEVICES
SECTION 262813 - FUSESSECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS
SECTION 263100 - PHOTOVOLTAIC ENERGY EQUIPMENT
SECTION 263200 - PACKAGED GENERATOR ASSEMBLIES
SECTION 263600 - AUTOMATIC TRANSFER SWITCHES
SECTION 264100 - FACILITY LIGHTNING PROTECTION
SECTION 264300 - SURGE PROTECTIVE DEVICES
SECTION 265100 - LIGHTINGSECTION 265600 - EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
SECTION 270500 - COMMON WORK RESULTS FOR COMMUNICATIONS
SECTION 271101 - COMMUNICATION EQUIPMENT RACKS
SECTION 271300 - COMMUNICATIONS BACKBONE CABLING
SECTION 271500 - COMMUNICATIONS HORIZONTAL CABLING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
SECTION 280500 - COMMON WORK RESULTS FOR SAFETY AND SECURITY
SECTION 281300 - ACCESS CONTROL
SECTION 281600 - INTRUSION DETECTION
SECTION 282300 - VIDEO SURVEILLANCE
SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM
DIVISION 31 - EARTHWORK
SECTION 311000 - SITE CLEARING
SECTION 312000 - EARTH MOVING
SECTION 312500 - EROSION AND SEDIMENT CONTROL
SECTION 312216 - ASPHALT PAVING
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 321143 - GRAVEL POROUS PAVEMENT
SECTION 321216 - ASPHALT PAVING
SECTION 321313 - CONCRETE PAVING
SECTION 329300 - PLANTS
DIVISION 33 - UTILITIES
SECTION 333000 - SANITARY SEWER
SECTION 334100 - STORM UTILITY DRAINAGE PIPING
DIVISION 34 - TRANSPORTATION
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
DIVISION 40 - PROCESS INTEGRATION
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND
STORAGE EQUIPMENT
DIVISION 44 - POLLUTION CONTROL EQUIPMENT
DIVISION 45 - INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
DIVISION 48 - ELECTRICAL POWER GENERATION
APPENDICIES - GEOTECHNICAL REPORTS
2021 0506 - Addendum 3 (Shallow Foundation) 8051 - Lind Point Project, St. John, USVI 2021 0505 - (Flexible and Rigid Pavement Update) Design 8051 - Lind Point Project, St. John, USVI 2020 0930 - Underground Utility Survey (UUS) - 8051 - Lind Point Project, St. John, USVI 2020 0928 - Addendum 2 (Road Pavement Design) 8051 - Lind Point Project, St. John, USVI 2020 0928 - (Flexible and Rigid Pavement) Design 8051 - Lind Point Project, St. John, USVI 2019 1213 - Addendum 1 (Shallow Foundation & Corrosion Series) - 8051 - Lind Point Project, St. John, USVI 2019 1120 - Geotechnical Report - 8051 - Lind Point Project, St. John, USVI (RC)
VIIS 251144 000107
SEALS PAGE
CIVIL ENGINEER:
John Prorock, PE
PE # 1711-E
Divisions:
024116 024119 311000 312000 312500 321143 321216 231313 333000 334100
LANDSCAPE ARCHITECT:
Kevin Vollnogle, PLA, ASLA License # 1637-LA Divisions:
329200 329300
RESOURCE MANAGEMENT AND
SCIENCE ARCHITECT:
Elizabeth Corr, AIA License #1628-A Divisions: 01-49 Sections Where indicated as prepared By other design professionals below
HOUSING ARCHITECT:
Aaron Bowman, AIA License # 1639-A Divisions: 01-49 Sections except where indicated as prepared by other design professionals below
STRUCTURAL ENGINEER:
Dean W Ussery, PE
PE #
Divisions:
SEALS PAGE
FIRE PROTECTION ENGINEER
PLUMBING ENGINEER
MECHANICAL ENGINEER:
William Billard, PE
PE # 0-51079-1B
Divisions: 21, 22, 23
S.
U
IR
V
I G N
LA
I S
A G
E E
R
IN
ENL
O R
P
S
EF
N
SIO
. N D
S
WILLIAM
BILLARD II
0-51079-1B
05/17/2021
SEALS PAGE
ELECTRICAL ENGINEER:
Andrew Nolen, PE
PE # 0-51069-1B
Divisions: 26, 27, 28
S.
U
IR
V
I G N
LA
I S
A G
E E
R
IN
ENL
O R
P
SEF
N
SIO
. N D
S
ANDREW
NOLEN
0-51069-1B
05/17/2021
VIIS 251144B 211313 - 1
FIRE SUPPRESSION SYSTEMS
SECTION 211313 – FIRE SUPPRESSION SYSTEMS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Pipes, fittings, and specialties.
2. Fire-protection valves.
3. Sprinklers.
4. Alarm devices.
5. Manual control stations.
6. Control panels.
7. Pressure gages.
8. Clean agent fire suppression system.
1.3 DEFINITIONS
A. Standard-Pressure Sprinkler Piping: Wet-pipe sprinkler system piping designed to operate at working pressure of 175 psig maximum.
1.4 SYSTEM DESCRIPTIONS
A. Wet-Pipe Sprinkler System: Automatic sprinklers are attached to piping containing water and that is connected to water supply through alarm valve. Water discharges immediately from sprinklers when they are opened. Sprinklers open when heat melts fusible link or destroys frangible device. Hose connections are included if indicated.
1.5 PERFORMANCE REQUIREMENTS
A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure.
B. Delegated Design: Design sprinkler system(s) using performance requirements and design criteria indicated.
C. Sprinkler system design shall be approved by authorities having jurisdiction.
1. Margin of Safety for Available Water Flow and Pressure: 10 percent.
2. Sprinkler Occupancy Hazard Classifications: Refer to drawings.
VIIS 251144B 211313 - 2
D. Seismic Performance: Sprinkler piping shall withstand the effects of earthquake motions determined according to NFPA 13D and ASCE/SEI 7-16.
1.6 SUBMITTALS
A. Product Data: For each type of product to be installed.
B. Working Drawings (i.e. Shop Drawings): For wet-pipe sprinkler systems and clean agent suppression system. Include plans, elevations, sections, details, and attachments to other work.
C. Hydraulic Calculations
D. Seismic Calculations
E. Coordination Drawings: Sprinkler systems, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of the items involved:
1. Domestic water piping.
2. Drainage, waste, vent, and storm piping.
3. Items penetrating finished ceiling include the following:
a. Lighting fixtures.
b. Air outlets and inlets.
F. Approved Sprinkler Piping Drawings: Working plans, prepared according to NFPA 13, that have been approved by authorities having jurisdiction, including hydraulic calculations if applicable.
G. Welding certificates.
H. Field Test Reports and Certificates: Indicate and interpret test results for compliance with performance requirements and as described in NFPA 13. Include "Contractor's Material and Test Certificate for Aboveground Piping."
I. Field quality-control reports.
J. Operation and Maintenance Data: For sprinkler specialties to include in emergency, operation, and maintenance manuals.
1.7 QUALITY ASSURANCE
A. Designer Qualifications:
1. Designer's responsibilities include designing sprinkler systems and clean agent suppression system and providing professional engineering services needed to assume engineering responsibility.
a. Engineering Responsibility: Preparation of working plans, calculations, and field test reports by:
VIIS 251144B 211313 - 3
1) A qualified professional fire protection engineer.
2) A NICET Level III technician.
3) Or as approved by the AHJ.
B. Installer Qualifications:
1. Installer's responsibilities include fabricating, installing, and testing fire protection systems, and coordinating inspections and quality control.
a. Sprinkler Systems Installer’s Responsibility: Preparation of working plans, calculations, and field test reports by:
1) State or municipal licensed/certified contractor for NFPA 13D sprinkler systems.
2) NICET Level II technician.
3) Or as approved by the AHJ.
b. Clean Agent Suppression System Installer’s Responsibility: Preparation of working plans, calculations, and field test reports by:
1) State or municipal licensed/certified contractor for clean agent fire suppression systems.
2) Person qualified by the clean agent system’s manufacturer.
3) Or as approved by the AHJ.
C. Welding Qualifications: Qualify procedures and operators according to ASME Boiler and
Pressure Vessel Code.
D. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
E. NFPA Standards: Sprinkler system equipment, specialties, accessories, installation, and testing shall comply with the following:
1. NFPA 13D
2. NFPA 2001
1.8 COORDINATION
A. Coordinate layout and installation of sprinklers with other construction that penetrates ceilings, including light fixtures, HVAC equipment, and partition assemblies.
1.9 EXTRA MATERIALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Sprinkler Cabinets: Finished, wall-mounted, steel cabinet with hinged cover, and with space for minimum of six spare sprinklers plus sprinkler wrench. Include number of
VIIS 251144B 211313 - 4
sprinklers required by NFPA 13 and sprinkler wrench. Include separate cabinet with sprinklers and wrench for each type of sprinkler used on Project.
PART 2 - PRODUCTS
2.1 PIPING MATERIALS
A. Comply with requirements in "Piping Schedule" Article for applications of pipe, tube, and fitting materials, and for joining methods for specific services, service locations, and pipe sizes.
2.2 STEEL PIPE AND FITTINGS
A. Standard Weight, Galvanized- and Black-Steel Pipe: ASTM A 53/A 53M, Type E, Grade B.
Pipe ends may be factory or field formed to match joining method.
B. Schedule 10, Black-Steel Pipe: ASTM A 135 or ASTM A 795/A 795M, Schedule 10 in NPS 5 and smaller; and NFPA 13-specified wall thickness in NPS 6 to NPS 10, plain end.
C. Galvanized and Uncoated, Steel Couplings: ASTM A 865, threaded.
D. Galvanized and Uncoated, Gray-Iron Threaded Fittings: ASME B16.4, Class 125, standard pattern.
E. Malleable- or Ductile-Iron Unions: UL 860.
F. Cast-Iron Flanges: ASME 16.1, Class 125.
G. Steel Flanges and Flanged Fittings: ASME B16.5, Class 150.
H. Steel Welding Fittings: ASTM A 234/A 234M and ASME B16.9.
I. Grooved-Joint, Steel-Pipe Appurtenances:
1. Pressure Rating: 175 psig minimum.
2. Galvanized and Uncoated, Grooved-End Fittings for Steel Piping: ASTM A 47/A 47M, malleable-iron casting or ASTM A 536, ductile-iron casting; with dimensions matching steel pipe.
3. Grooved-End-Pipe Couplings for Steel Piping: AWWA C606 and UL 213, rigid pattern, unless otherwise indicated, for steel-pipe dimensions. Include ferrous housing sections, EPDM-rubber gasket, and bolts and nuts.
2.3 CPVC PIPE AND FITTINGS
A. CPVC Pipe: ASTM F 442/F 442M and UL 1821, SDR 13.5, for 175-psig rated pressure at 150 deg F, with plain ends. Include "LISTED" and "CPVC SPRINKLER PIPE" markings.
B. CPVC Fittings: UL listed or FM approved, for 175-psig rated pressure at 150 deg F, socket type. Include "LISTED" and "CPVC SPRINKLER FITTING" markings.
VIIS 251144B 211313 - 5
1. NPS 3/4 to NPS 1-1/2: ASTM F 438 and UL 1821, Schedule 40, socket type.
2. NPS 2 to NPS 3: ASTM F 439 and UL 1821, Schedule 80, socket type.
3. CPVC-to-Metal Transition Fittings: CPVC, one piece, with dimensions equivalent to pipe; one end with threaded brass insert, and one socket end.
4. CPVC-to-Metal Transition Unions: CPVC, with dimensions equivalent to pipe; one end with threaded brass insert, and one socket end.
5. Flanges: CPVC, one or two pieces.
2.4 PIPING JOINING MATERIALS
A. Pipe-Flange Gasket Materials: AWWA C110, rubber, flat face, 1/8 inch thick or
ASME B16.21, nonmetallic and asbestos free.
1. Class 125, Cast-Iron Flanges and Class 150, Bronze Flat-Face Flanges: Full-face gaskets.
2. Class 250, Cast-Iron Flanges and Class 300, Steel Raised-Face Flanges: Ring-type gaskets.
B. Metal, Pipe-Flange Bolts and Nuts: ASME B18.2.1, carbon steel unless otherwise indicated.
C. Welding Filler Metals: Comply with AWS D10.12M/D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.
D. Solvent Cements for Joining CPVC Piping and Tubing: ASTM F 493, solvent cement recommended by pipe and fitting manufacturer, and made for joining CPVC sprinkler pipe and fittings. Include cleaner or primer recommended by pipe and fitting manufacturer.
1. Use solvent cement that has a VOC content of 490 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
2. Use adhesive primer that has a VOC content of 650 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
E. Plastic, Pipe-Flange Gasket, and Bolts and Nuts: Type and material recommended by piping system manufacturer unless otherwise indicated.
2.5 COVER SYSTEM FOR SPRINKLER PIPING
A. Description: System of support brackets and covers made to protect sprinkler piping.
B. Brackets: Glass-reinforced nylon.
C. Covers: Extruded PVC sections of length, shape, and size required for size and routing of
CPVC piping.
2.6 LISTED FIRE-PROTECTION VALVES
A. General Requirements:
1. Valves shall be UL listed or FM approved.
VIIS 251144B 211313 - 6
2. Minimum Pressure Rating for Standard-Pressure Piping: 175 psig.
B. Ball Valves:
1. Standard: UL 1091 except with ball instead of disc.
2. Valves NPS 1-1/2 and Smaller: Bronze body with threaded ends.
3. Valves NPS 2 and NPS 2-1/2: Bronze body with threaded ends or ductile-iron body with grooved ends.
4. Valves NPS 3: Ductile-iron body with grooved ends.
C. Bronze Butterfly Valves:
1. Standard: UL 1091.
2. Pressure Rating: 175 psig.
3. Body Material: Bronze.
4. End Connections: Threaded.
D. Iron Butterfly Valves:
1. Standard: UL 1091.
2. Pressure Rating: 175 psig.
3. Body Material: Cast or ductile iron.
4. Style: Lug or wafer.
5. End Connections: Grooved.
E. Check Valves:
1. Standard: UL 312.
2. Pressure Rating: 250 psig minimum.
3. Type: Swing check.
4. Body Material: Cast iron.
5. End Connections: Flanged or grooved.
F. Bronze OS&Y Gate Valves:
1. Standard: UL 262.
2. Pressure Rating: 175 psig.
3. Body Material: Bronze.
4. End Connections: Threaded.
G. Iron OS&Y Gate Valves:
1. Standard: UL 262.
2. Pressure Rating: 250 psig minimum.
3. Body Material: Cast or ductile iron.
4. End Connections: Flanged or grooved.
H. Indicating-Type Butterfly Valves:
1. Standard: UL 1091.
2. Pressure Rating: 175 psig minimum.
VIIS 251144B 211313 - 7
3. Valves NPS 2 and Smaller:
a. Valve Type: Ball or butterfly.
b. Body Material: Bronze.
c. End Connections: Threaded.
4. Valves NPS 2-1/2 and Larger:
a. Valve Type: Butterfly.
b. Body Material: Cast or ductile iron.
c. End Connections: Flanged, grooved, or wafer.
5. Valve Operation: Integral electrical, prewired, supervisory switch visual indicating device.
2.7 SPECIALTY VALVES
A. General Requirements:
1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.
2. Pressure Rating:
a. Standard-Pressure Piping Specialty Valves: 175 psig minimum.
b. High-Pressure Piping Specialty Valves: 250 psig minimum.
3. Body Material: Cast or ductile iron.
4. Size: Same as connected piping.
5. End Connections: Flanged or grooved.
B. Automatic (Ball Drip) Drain Valves:
1. Standard: UL 1726.
2. Pressure Rating: 175 psig minimum.
3. Type: Automatic draining, ball check.
4. Size: NPS 3/4.
5. End Connections: Threaded.
2.8 SPRINKLERS
A. General Requirements:
1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.
2. Pressure Rating for Residential Sprinklers: 175 psig maximum.
3. Pressure Rating for Automatic Sprinklers: 175 psig minimum.
B. Automatic Sprinklers with Heat-Responsive Element:
1. Nonresidential Applications: UL 199.
VIIS 251144B 211313 - 8
2. Residential Applications: UL 1626.
3. Characteristics: Nominal 1/2-inch orifice with Discharge Coefficient K of 5.6, and for
"Ordinary" temperature classification rating unless otherwise indicated or required by application.
C. Sprinkler Finishes:
1. Chrome plated.
2. Bronze.
3. Painted.
D. Special Coatings:
1. UL Listed corrosion resistant coating
E. Sprinkler Guards:
1. Standard: UL 199.
2. Type: Wire cage with fastening device for attaching to sprinkler.
2.9 ALARM DEVICES
A. Alarm-device types shall match piping and equipment connections.
B. Electrically Operated Alarm Bell:
1. Standard: UL 464.
2. Type: Vibrating, metal alarm bell.
3. Size: 6-inch minimum diameter.
4. Finish: Red-enamel factory finish, suitable for outdoor use.
C. Pressure Switches:
1. Standard: UL 346.
2. Type: Electrically supervised water-flow switch with retard feature.
3. Components: Single-pole, double-throw switch with normally closed contacts.
4. Design Operation: Rising pressure signals water flow.
D. Valve Supervisory Switches:
1. Standard: UL 346.
2. Type: Electrically supervised.
3. Components: Single-pole, double-throw switch with normally closed contacts.
4. Design: Signals that controlled valve is in other than fully open position.
2.10 MANUAL CONTROL STATIONS
A. Description: UL listed or FM approved, hydraulic operation, with union, NPS 1/2 pipe nipple, and bronze ball valve. Include metal enclosure labeled "MANUAL CONTROL STATION"
VIIS 251144B 211313 - 9
with operating instructions and cover held closed by breakable strut to prevent accidental opening.
2.11 CONTROL PANELS
A. Description: Single-area, two-area, or single-area cross-zoned control panel as indicated, including NEMA ICS 6, Type 1 enclosure, detector, alarm, and solenoid-valve circuitry for operation of valves. Panels contain power supply; battery charger; standby batteries; field-wiring terminal strip; electrically supervised solenoid valves and polarized fire-alarm bell; lamp test facility; single-pole, double-throw auxiliary alarm contacts; and rectifier.
1. Panels: UL listed and FM approved when used with thermal detectors and Class A detector circuit wiring. Electrical characteristics are 120-V ac, 60 Hz, with 24-V dc rechargeable batteries.
2. Manual Control Stations: Electric operation, metal enclosure, labeled "MANUAL
CONTROL STATION" with operating instructions and cover held closed by breakable strut to prevent accidental opening.
3. Manual Control Stations: Hydraulic operation, with union, NPS 1/2 pipe nipple, and bronze ball valve. Include metal enclosure labeled "MANUAL CONTROL STATION" with operating instructions and cover held closed by breakable strut to prevent accidental opening.
2.12 PRESSURE GAGES
A. Standard: UL 393.
B. Dial Size: 3-1/2- to 4-1/2-inch diameter.
C. Pressure Gage Range: 0 to 250 psig minimum.
2.13 CLEAN-AGENT SYSTEMS
A. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on Drawings or comparable product.
B. Description: Clean-agent fire-extinguishing system shall be an engineered system for total flooding of the hazard area including the room cavity above the ceiling, and below the ceiling.
System includes separate zones above and below the ceiling.
C. Delegated Design: Design clean-agent fire-extinguishing system and obtain approval from authorities having jurisdiction. Design system for Class A, B, and C fires as appropriate for areas being protected, and include safety factor. Use clean agent indicated and in concentration suitable for normally occupied areas.
D. Cross-Zoned Detection: Devices located in two separate zones. Sound alarm on activating single-detection device, and discharge extinguishing agent on actuating single-detection device in other zone.
E. System Operating Sequence:
http://www.specagent.com/LookUp/?ulid=1600&mf=04&src=wd
VIIS 251144B 211313 - 10
1. Actuating First Detector: Visual indication on annunciator panel. Energize audible and visual alarms (slow pulse), shut down air-conditioning and ventilating systems serving protected area, close doors in protected area, and send signal to fire-alarm system.
2. Actuating Second Detector: Visual indication on annunciator panel. Energize audible and visual alarms (fast pulse), shut down power to protected equipment, start time delay for extinguishing-agent discharge for 30 seconds, and discharge extinguishing agent.
3. Extinguishing-agent discharge will operate audible alarms and strobe lights inside and outside the protected area.
F. Manual stations shall immediately discharge extinguishing agent when activated.
G. Operating abort switches will delay extinguishing-agent discharge while being activated, and switches must be reset to prevent agent discharge. Release of hand pressure on the switch will cause agent discharge if the time delay has expired.
H. Low-Agent Pressure Switch: Initiate trouble alarm if sensing less than set pressure.
I. Power Transfer Switch: Transfer from normal to stand-by power source.
J. Seismic Performance: Fire-suppression piping and containers shall withstand the effects of earthquake motions determined according to ASCE/SEI 7-16.
1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified and the unit will be fully operational after the seismic event."
2.14 CLEAN AGENT FIRE SUPPRESSION FLUID
A. Agent shall be manufactured at an ISO 9001 and ISO 14001 registered facility.
B. Clean Agent Fluid shall have an Ozone Depletion Potential (ODP) of zero. ODP as defined by the US EPA.
C. Clean Agent Fluid shall have a Global Warming Potential (GWP) of < 1 (100 year ITH). GWP as defined by the Intergovernmental Panel on Climate Change Fifth Assessment Report (IPCC AR5) or in US EPA documentation and approvals.
D. Clean Agent Fluid shall not be one of these greenhouse gases or ozone depleters;
Perfluorocarbons (PFCs), Hydrofluorocarbons (HFCs), and Hydrochlorofluorcarbons (HCFCs).
E. Agents will not be restricted for use in fire protection due to its Ozone Depletion Potential
(ODP) or Global Warming Potential (GWP) and is not targeted for phase-down by the Montreal
Protocol, nor subject to the European F-Gas Regulations targeting the phase-down of production and import of HFCs into Europe; and will not be affected by U.S. EPA SNAP regulations which would render it either unacceptable or acceptable subject to narrow use limits.
F. Clean Agent must have a minimum safety factor 60% between the design concentration percentage and the No Observed Adverse Effect Level (NOAEL) for Class A and C hazards.
For guidance on safety factors for Class B hazards, contact an approved Original Equipment
Manufacturer.
VIIS 251144B 211313 - 11
G. The minimum extinguishing concentration (MEC) determined by test as witnessed per recognized testing laboratory standards (i.e UL 2166, FM 5600) shall be no greater than 3.3%.
H. Equipment shall be UL listed and FM approved and extinguishing agent shall be component recognized by UL or FM for use in the system.
I. System cylinders shall be labeled indicating the system manufacturer and agent brand. System service and refill shall be by an authorized manufacturer’s representative and shall be the agent of the original installation brand.
PART 3 - EXECUTION
3.1 PIPING INSTALLATION
A. Locations and Arrangements: Drawing plans, schematics, and diagrams indicate general location and arrangement of piping. Install piping as indicated, as far as practical.
1. Deviations from approved working plans for piping require written approval from authorities having jurisdiction. File written approval with Architect before deviating from approved working plans.
B. Piping Standard: Comply with requirements for installation of sprinkler piping in NFPA 13.
C. Install seismic restraints on piping. Comply with requirements for seismic-restraint device materials and installation in NFPA 13.
D. Use listed fittings to make changes in direction, branch takeoffs from mains, and reductions in pipe sizes.
E. Install unions adjacent to each valve in pipes NPS 2 and smaller.
F. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 and larger end connections.
G. Install "Inspector's Test Connections" in sprinkler system piping, complete with shutoff valve, and sized and located according to NFPA 13.
H. Install sprinkler piping with drains for complete system drainage.
I. Install alarm devices in piping systems.
J. Install hangers and supports for sprinkler system piping according to NFPA 13. Comply with requirements for hanger materials in NFPA 13.
K. Fill sprinkler system piping with water.
L. Install sleeves for piping penetrations of walls, ceilings, and floors.
M. Install sleeve seals for piping penetrations of concrete walls and slabs.
VIIS 251144B 211313 - 12
N. Install escutcheons for piping penetrations of walls, ceilings, and floors.
3.2 JOINT CONSTRUCTION
A. Install couplings, flanges, flanged fittings, unions, nipples, and transition and special fittings that have finish and pressure ratings same as or higher than system's pressure rating for aboveground applications unless otherwise indicated.
B. Install unions adjacent to each valve in pipes NPS 2 and smaller.
C. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 and larger end connections.
D. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
E. Remove scale, slag, dirt, and debris from inside and outside of pipes, tubes, and fittings before assembly.
F. Flanged Joints: Select appropriate gasket material in size, type, and thickness suitable for water service. Join flanges with gasket and bolts according to ASME B31.9.
G. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:
1. Apply appropriate tape or thread compound to external pipe threads.
2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged.
H. Welded Joints: Construct joints according to AWS D10.12M/D10.12, using qualified processes and welding operators according to "Quality Assurance" Article.
1. Shop weld pipe joints where welded piping is indicated. Do not use welded joints for galvanized-steel pipe.
I. Steel-Piping, Cut-Grooved Joints: Cut square-edge groove in end of pipe according to
AWWA C606. Assemble coupling with housing, gasket, lubricant, and bolts. Join steel pipe and grooved-end fittings according to AWWA C606 for steel-pipe joints.
J. Steel-Piping, Roll-Grooved Joints: Roll rounded-edge groove in end of pipe according to
AWWA C606. Assemble coupling with housing, gasket, lubricant, and bolts. Join steel pipe and grooved-end fittings according to AWWA C606 for steel-pipe grooved joints.
K. Dissimilar-Material Piping Joints: Make joints using adapters compatible with materials of both piping systems.
L. Plastic-Piping, Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:
1. Comply with ASTM F 402 for safe-handling practice of cleaners, primers, and solvent cements. Apply primer.
VIIS 251144B 211313 - 13
2. CPVC Piping: Join according to ASTM D 2846/D 2846M Appendix.
3.3 VALVE AND SPECIALTIES INSTALLATION
A. Install listed fire-protection valves, trim and drain valves, specialty valves and trim, controls, and specialties according to NFPA 13 and authorities having jurisdiction.
B. Install listed fire-protection shutoff valves supervised open, located to control sources of water supply except from fire-department connections. Install permanent identification signs indicating portion of system controlled by each valve.
C. Install check valve in each water-supply connection.
D. Specialty Valves:
1. General Requirements: Install in vertical position for proper direction of flow, in main supply to system.
2. Alarm Valves: Include bypass check valve and retarding chamber drain-line connection.
3. Deluge Valves: Install in vertical position, in proper direction of flow, and in main supply to deluge system. Install trim sets for drain, priming level, alarm connections, ball drip valves, pressure gages, priming chamber attachment, and fill-line attachment.
3.4 SPRINKLER INSTALLATION
A. Install sprinklers in suspended ceilings in center of narrow dimension of acoustical ceiling panels.
3.5 IDENTIFICATION
A. Install labeling and pipe markers on equipment and piping according to requirements in
NFPA 13.
3.6 FIELD QUALITY CONTROL
A. Perform tests and inspections.
B. Tests and Inspections:
1. Leak Test: After installation, charge systems and test for leaks. Repair leaks and retest until no leaks exist.
2. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
3. Flush, test, and inspect sprinkler systems according to NFPA 13, "Systems Acceptance"
Chapter.
4. Energize circuits to electrical equipment and devices.
5. Coordinate with fire-alarm tests. Operate as required.
6. Coordinate with fire-pump tests. Operate as required.
VIIS 251144B 211313 - 14
C. Sprinkler piping system will be considered defective if it does not pass tests and inspections.
D. Prepare test and inspection reports.
3.7 CLEANING
A. Clean dirt and debris from sprinklers.
B. Remove and replace sprinklers with paint other than factory finish.
3.8 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain specialty valves and pressure-maintenance pumps.
3.9 PIPING SCHEDULE
A. CPVC pipe; Schedule 40 or Schedule 80 CPVC fittings; and solvent-cemented joints may be used for light-hazard and residential occupancies.
B. Standard-pressure, wet-pipe sprinkler system, NPS 2 and smaller, shall be one of the following:
1. Schedule 40, black-steel pipe with threaded ends; uncoated, gray-iron threaded fittings;
and threaded joints.
2. Schedule 40, galvanized-steel pipe with threaded ends; galvanized, gray-iron threaded fittings; and threaded joints.
3. Schedule 40, black-steel pipe with cut- or roll-grooved ends; uncoated, grooved-end fittings for steel piping; grooved-end-pipe couplings for steel piping; and grooved joints.
4. Schedule 40, galvanized-steel pipe with cut-grooved ends; galvanized, grooved-end fittings for steel piping; grooved-end-pipe couplings for steel piping; and grooved joints.
5. Schedule 40, black-steel pipe with plain ends; steel welding fittings; and welded joints.
C. Standard-pressure, wet-pipe sprinkler system, NPS 2-1/2 to NPS 4, shall be one of the following:
1. Schedule 40, black-steel pipe with threaded ends; uncoated, gray-iron threaded fittings;
and threaded joints.
2. Schedule 40, galvanized-steel pipe with threaded ends; galvanized, gray-iron threaded fittings; and threaded joints.
3. Schedule 40, black-steel pipe with cut- or roll-grooved ends; uncoated, grooved-end fittings for steel piping; grooved-end-pipe couplings for steel piping; and grooved joints.
4. Schedule 40, galvanized-steel pipe with cut-grooved ends; galvanized, grooved-end fittings for steel piping; grooved-end-pipe couplings for steel piping; and grooved joints.
5. Schedule 40, black-steel pipe with plain ends; steel welding fittings; and welded joints.
6. Schedule 10, black-steel pipe with roll-grooved ends; uncoated, grooved-end fittings for steel piping; grooved-end-pipe couplings for steel piping; and grooved joints.
7. Schedule 10, black-steel pipe with plain ends; welding fittings; and welded joints.
VIIS 251144B 211313 - 15
3.10 SPRINKLER SCHEDULE
A. Use sprinkler types in subparagraphs below for the following applications:
1. Rooms without Ceilings: Upright sprinklers.
2. Rooms with Suspended Ceilings: Concealed sprinklers with flat cover plate.
3. Wall Mounting: Concealed sidewall sprinklers with flat cover plate.
B. Provide sprinkler types in subparagraphs below with finishes indicated.
1. Concealed Sprinklers: Rough brass, with factory-painted cover plate to match ceiling.
2. Upright, Pendent, and Sidewall Sprinklers: Chrome plated in finished spaces exposed to view; rough bronze in unfinished spaces not exposed to view; UL listed corrosion resistant coating where exposed to exterior environment, acids, chemicals, or other corrosive fumes.
3.11 CLEAN-AGENT PIPING INSTALLATION
A. Install clean-agent extinguishing piping and other components level and plumb, according to manufacturers' written instructions.
B. Grooved Piping Joints: Groove pipe ends according to AWWA C606 dimensions. Assemble grooved-end steel pipe and steel, grooved-end fittings with steel, keyed couplings and lubricant according to manufacturer's written instructions.
C. Install extinguishing-agent containers anchored to substrate.
D. Install pipe and fittings, valves, and discharge nozzles according to requirements listed in
NFPA 2001, Section "Distribution."
1. Install valves designed to prevent entrapment of liquid, or install pressure relief devices in valved sections of piping systems.
2. Support piping using supports and methods according to NFPA 13.
3. Install seismic restraints for extinguishing-agent containers and piping systems.
4. Install control panels, detection system components, alarms, and accessories, complying with requirements of NFPA 2001, Section "Detection, Actuation, and Control Systems," as required for supervised system application.
3.12 CONNECTIONS
A. Drawings indicate general arrangement of piping, fittings, and specialties.
B. Where installing piping adjacent to equipment, allow space for service and maintenance.
C. Connect electrical devices to control panel and to building's fire-alarm system.
END OF SECTION 211313
VIIS 251144B 220000 - 1
BASIC PLUMBING MATERIALS AND METHODS
SECTION 220000 - BASIC PLUMBING MATERIALS AND METHODS
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section apply to all sections of Division 22.
B. Definitions:
1. Exposed: Piping and equipment exposed to view in finished rooms.
2. Option or optional: Contractor's choice of an alternate material or method.
1.2 IMPOSED REGULATIONS:
A. Applicable provisions of the State and Local Codes and of the codes and standards listed on the contract documents in addition to those listed elsewhere in the specifications are hereby imposed on a general basis for plumbing work.
1.3 SCOPE OF WORK:
A. Provide all labor, materials, equipment and supervision to construct complete and operable plumbing systems as indicated on the drawings and specified herein. All materials and equipment used shall be new, undamaged and free from any defects.
1.4 RELATED DOCUMENTS AND OTHER INFORMATION:
A. The Drawings and general provisions of the Contract, including General and Supplementary
Conditions and General Requirements and Division 01 Specification Sections, apply to the portions of work specified in each and every Section of this Division, individually and collectively.
1.5 SUMMARY
A. Section Includes:
1. Sleeves.
2. Stack-sleeve fittings.
3. Sleeve-seal systems.
4. Wall sleeve fittings.
5. Grout.
6. Escutcheons.
7. Floor plates.
1.6 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
1.7 QUALITY ASSURANCE SUBMITTALS
A. Welding certificates.
VIIS 251144B 220000 - 2
1.8 EXISTING SERVICES AND FACILITIES:
A. Damage to Existing Services: Existing services and facilities damaged by the Contractor through negligence or through use of faulty materials or workmanship shall be promptly repaired, replaced, or otherwise restored to previous conditions by the Contractor without additional cost to the Owner.
B. Interruption of Services: Interruptions of services necessary for connection to or modification of existing systems or facilities shall occur only at prearranged times approved by the Owner.
Contractor shall provide no less than 14 days notice to owner when scheduling outages.
Interruptions shall only occur after the provision of all temporary work and the availability of adequate labor and materials will assure that the duration of the interruption will not exceed the time agreed upon.
1.9 PRODUCT WARRANTIES:
A. Provide manufacturer's standard printed commitment in reference to a specific product and normal application, stating that certain acts of restitution will be performed for the Purchaser or Owner by the manufacturer, when and if the product fails within certain operational conditions and time limits. Where the warranty requirements of a specific specification section exceeds the manufacturer's standard warranty, the more stringent requirements will apply and modified manufacturer's warranty shall be provided. In no case shall the manufacturer's warranty be less than one (1) year.
1.10 PRODUCT SUBSTITUTIONS:
A. General: Materials specified by manufacturer's name shall be used unless prior approval of an alternate is given by addenda. Requests for substitutions must be received in the office of the Architect/Engineer at least 14 days prior to opening of bids. Refer to the general conditions for the substitution request form and required documentation.
1.11 QUALITY ASSURANCE
A. Products Criteria:
1. Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products for at least 3 years. However, digital electronics devices, software and systems such as controls, instruments, computer work station, shall be the current generation of technology and basic design that has a proven satisfactory service record of at least three years. See other specification sections for any exceptions.
2. All items furnished shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components and overall assembly.
3. Conform to codes and standards as required by the specifications. Conform to local codes, if required by local authorities such as the natural gas supplier, if the local codes are more stringent than those specified. Refer any conflicts to the
Architect/Engineer.
4. Multiple Units: When two or more units of materials or equipment of the same type or class are required, these units shall be products of one manufacturer.
VIIS 251144B 220000 - 3
5. Assembled Units: Manufacturers of equipment assemblies, which use components made by others, assume complete responsibility for the final assembled product.
6. Nameplates: Nameplate bearing manufacturer's name or identifiable trademark shall be securely affixed in a conspicuous place on equipment, or name or trademark cast integrally with equipment, stamped or otherwise permanently marked on each item of equipment.
7. Asbestos products or equipment or materials containing asbestos shall not be used.
B. Welding: Before any welding is performed, contractor shall submit a certificate certifying that welders comply with the following requirements:
1. Qualify welding processes and operators for piping according to ASME "Boiler and
Pressure Vessel Code", Section IX, "Welding and Brazing Qualifications".
2. Comply with provisions of ASME B31 series "Code for Pressure Piping".
3. Certify that each welder has passed American Welding Society (AWS) qualification tests for the welding processes involved, and that certification is current.
C. Manufacturer's Recommendations: Where installation procedures or any part thereof are required to be in accordance with the recommendations of the manufacturer of the material being installed, copies of these recommendations shall be furnished to the Architect/Engineer prior to installation along with the respective product data submittals.
D. Execution (Installation, Construction) Quality:
1. Apply and install all items in accordance with manufacturer's written instructions.
Refer conflicts between the manufacturer's instructions and the contract drawings and specifications to the Architect/Engineer for resolution. Provide manufacturer’s installation instructions along with the respective product data submittals to the
Architect/Engineer at least two weeks prior to commencing installation of any item.
2. All items that require access, such as for operating, cleaning, servicing, maintenance, and calibration, shall be easily and safely accessible by persons standing at floor level, or standing on permanent platforms, without the use of portable ladders.
Examples of these items include, but are not limited to: all types of valves, filters and strainers, transmitters, control devices. Prior to commencing installation work, refer conflicts between this requirement and contract drawings to the Architect/Engineer for resolution.
1.12 SUBMITTALS
A. Submit in accordance with Division 1 specifications.
B. Contractor shall make all necessary field measurements and investigations to assure that the equipment and assemblies will meet contract requirements.
C. If equipment is submitted which differs in arrangement from that shown, provide drawings that show the rearrangement of all associated systems. Approval will be given only if all features of the equipment and associated systems, including accessibility, are equivalent to that required by the contract.
VIIS 251144B 220000 - 4
D. Upon request by Owner, provide lists of previous installations for selected items of equipment. Include contact persons who will serve as references, with telephone numbers and e-mail addresses.
E. Manufacturer's Literature and Data: Submit under the pertinent section rather than under this section.
1. Submit electric motor data and variable speed drive data with the driven equipment.
2. Equipment and materials identification.
3. Hangers, inserts, supports and bracing. Provide load calculations for variable spring and constant support hangers.
4. Wall, floor, and ceiling plates.
F. Maintenance Data and Operating Instructions:
1. Maintenance and operating manuals in accordance with Division 1 specifications for systems and equipment.
2. Provide a listing of recommended replacement parts for keeping in stock supply, including sources of supply, for equipment. Include in the listing belts for equipment:
Belt manufacturer, model number, size and style, and distinguished whether of multiple belt sets.
1.13 DELIVERY, STORAGE AND HANDLING
A. Protection of Equipment:
1. Equipment and material placed on the job site shall remain in the custody of the
Contractor until phased acceptance, whether or not the Owner has reimbursed the
Contractor for the equipment and material. The Contractor is solely responsible for the protection of such equipment and material against any damage.
2. Place damaged equipment in first class, new operating condition; or, replace same as determined and directed by the Architect/Engineer. Such repair or replacement shall be at no additional cost to the Owner.
3. Protect interiors of new equipment and piping systems against entry of foreign matter. Clean both inside and outside before painting or placing equipment in operation.
4. Existing equipment and piping being worked on by the Contractor shall be under the custody and responsibility of the Contractor and shall be protected as required for new work.
B. Cleanliness of Piping and Equipment Systems:
1. Exercise care in storage and handling of equipment and piping material to be incorporated in the work. Remove debris arising from cutting, threading and welding of piping.
2. Piping systems shall be flushed, blown or pigged as necessary to deliver clean systems.
3. Clean interior of all tanks prior to delivery for beneficial use by the Owner.
4. Contractor shall be fully responsible for all…