VIIS_251144_Presolicitation_Q_and_A_0003.pdf

PDF 78 KB Posted

Attached to
VIIS 251144b - Replace Office & Housing Space Impa
Solicitation number
140P2021R0109
Issued by

About this file

This document contains questions and answers related to solicitation number 140P2021R0109 for the VIIS 251144b - Replace Office & Housing Space Impa project. The solicitation is for replacing office and housing space at Lind Point and involves several construction requirements including replacing structures, installing solar panels, landscaping, and plumbing and electrical systems. Key clarifications provided in the questions and answers include that a mockup panel is not required, the project does not require a building permit, all plant material will be provided by the owner for installation by the contractor, and specifications are referenced for water treatment equipment, fuel piping material, and door frames.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VIIS 251144B

Lind Point Project

Solicitation Number 140P2021R0109

Solicitation Period RFI's

# Question Govt. Response

Specification section 012700 Identifies and describes CLIN No.0009

Construction of Mockup Panel. The “Contract Price Schedule

Template” included in the Solicitation document

B08_140P2021R0109 describes CLIN #9 as being the Option A for the

PV for RMS Structure. Please clarify intent.

CLIN #9 Mockup Panel is incorrect. There is no dedicated mockup panel for this project.

Specification section 013100 part 1.9.C.4 indicates the potential for a Building Permit from DPNR. This permit would have a significant cost associated with obtaining this permit. Please advise if NPS intends to permit this project under the local building jurisdiction, or if Federal permit or authorization will supersede. Our understanding is that NPS has the authority and jurisdiction over permitting on NPS property. Contractor can obtain DPNR building permit for this project, however, there will be a material cost for permit and plan review fees, so we would like to clarify the intent of NPS.

This project does not require a building permit per coordination with DPNR.

Requirement 013100.1.9.C.4 does not apply.

Drawing L1.01 Note 1 indicates plant material to be furnished by owner and installed by contractor. Please confirm intent

All plant material will be provided by the Owner since plant material can not be imported (this includes trees, shrubs, and stabilization plants). The contractor will be responsible for installation of the plant material.

Drawing L1.01 Notes 1.1 and 1.2 indicate landscape scope associated with Bid Options A and B. The bid price schedule provided with bid docs and amendments indicate Options A and B are associated with the Solar PV system. Please clarify intent.

The landscape installation noted on L1.01 and L1.02 notes 1.1 and 1.2 will be included in the base bid. Also, disregard bid option notes on sheet L1.03 in the plant schedule.

Spec section 260519, paragraph 2.1.H indicates MC Cable shall not be used unless prior approval has been granted by the CO. AS this would have significant cost impacts, we would like to know if NPS would allow MC Cable in areas and conditions permissible by code.

The electrical documents exclude the use of MC Cable per general electrical Note 9 on E0.01.

In detail #3 on drawing P0.04 there is a “Liquid Chlorine Injection and

Monitoring System”. Specification for this equipment are not found, nor a Sequence of Operation for it. Can the Design team please provide?

Refer to Specifications Section 223200 Domestic Water Treatment.

In detail #3 on drawing P0.04 there are 2‐55 Gallon “Treated Water

Storage Tanks”. Specifications are not found for these. Can the

Design team please provide?

The detail referenced shows one treated water storage tank. For specifications refer to Specifications Section 223200 Domestic Water Treatment.

In detail #4 on drawing P0.04 there is a Water Heater Storage Tank.

Tank sizing and specification is not provided. Please provide additional information.

Water Heater Storage Tank is the tank included in the gas‐fired water heater. There are no separate storage tanks.

9 Please provide a detail showing how the Water Heater, Solar HW

Generator, HCP and SCP are piped together. There appears to be 2 separate water heating systems, lacking detail showing how these are to work together.

The gas water heaters include an additional inlet and outlet for solar heating on each unit. These are to be utilized for the solar heating component as shown in

Solar Hot Water System Piping Diagram 4/P0.04, and are shown in Propane and

Electric Water Heater Installation Details 7 & 8/P0.03. The standard inlet and outlet on each unit are to be utilized for the hot water distribution as shown in Propane and Electric Water Heater Installation Details 7 & 8/P0.03.

Please provide specifications for the Fuel piping material to the

Generators.

Refer to Specifications Section 221113 Facility Fuel Oil Piping.

Door schedule on sheet A1.57 indicates ALUM material frame with

ANNO finish for all Type A and A2 doors, which are either FRP or

Wood. Neither spec section 081213 nor 084113 appear to address this condition. Please confirm intent of frames for the RMS Type A and A2 doors.

Updated A1.57, following doors are FRP with FRP Frame: 1021, 1022, 1024, 1114, 1115, 1143, 1146.

Design intent for FRP doors is as shown on updated A1.57. Most FRP will have FRP frames while a few will have aluminum frame utilizing storefront systems listed in

084113

Design intent for wood doors is to have aluminum frame utilizing aluminum storefront systems listed in 084113