This pre-proposal presentation outlines requirements for a federal construction contract to replace office and housing facilities on Lind Point in the Virgin Islands National Park. The solicitation seeks to construct a new resource management and science building totaling approximately 9,200 square feet, consisting of administrative, conference, and storage space. It will also replace three housing structures including a two-bedroom home, three-bedroom home, and four-plex facility. The deadline for questions is July 12, 2021 and completed proposals are due by July 19, 2021. Award is estimated for September 2021. The contract will be a firm-fixed-price agreement lasting approximately 730 calendar days. Liquidated damages of $1,482 per day will be assessed for delays. Evaluation criteria emphasize experience, technical approach, management plan, safety, and past performance.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Teleconference & Virtual Site Visit
Lind Point Resource Management Facility and Housing
Virgin Islands National Park St. John, USVI
Solicitation: 140P2021R0109
NPS PMIS #: VIIS 251144B
THIS MEETING WILL BE RECORDED
June 24, 2021
E X P E R I E N C E Y O U R A M E R I C A
AGENDA
• INTRODUCTIONS
• Attendees List will be included in an amendment
• PARK INTRODUCTION
• PROJECT PURPOSE
• PROJECT ORIENTATION
• SITE OVERVIEW
• SCOPE OVERVIEW
• KEY SCOPE ITEMS
• PROJECT CONSIDERATIONS
• BID INFORMATION AND CRITERIA
• BID CLINS
• PRE-PROPOSAL CONFERENCE QUESTIONS
• CONCLUSION
Park Introduction
STORY OF THE PARK
Project Purpose
PROJECT LOCATION
PROJECT LOCATION
SITE / PROJECT OVERVIEW
Vehicle Ferry
Passenger Ferry
Site on Lind Point Road
SCOPE OF WORK - OVERALL
• Significant Value Engineering effort after 2019 solicitation (bid bust)
• Hurricane Irma & Maria damage
• Replace biosphere offices and functions
• Replace museum collections storage “Bally
Building”
• Replace archives storage
• Replace and consolidate park housing
PROJECT OVERVIEW
PROJECT OVERVIEW
SCOPE OF WORK - OVERALL
SCOPE OF WORK REVIEW – LIND POINT RMS
Resource Management & Science (RMS) - SCOPE OF WORK
• Approximately 9,200sqft of space
• Administrative Building
• Conference & Archeology
Building
• Storage Building
• Construction Materials
• Building Systems
• Associated Site Work
SCOPE OF WORK REVIEW – LIND POINT HOUSING
• Housing consists of 3 structures:
• One 2-bedroom Home
• One 3-bedroom Home
• One 4-plex (2 studio & 2 2-bedroom)
• Construction Materials
• Building Systems
HOUSING - SCOPE OF WORK
SCOPE OF WORK REVIEW – LIND POINT HOUSING
• Housing consists of 3 structures:
• One 2-bedroom Home
• One 3-bedroom Home
• One 4-plex (2 studio & 2 2-bedroom)
• Construction Materials
• Building Systems
HOUSING - SCOPE OF WORK
SOLICITATION NO.140P2021R0109
SUMMARY OF SOLICITATION INFORMATION
• PRE PROPOSAL MEETING – June 24th, 2021
• PRE PROPOSAL QUESTION CUTOFF DAY– July 12th, 2021
• OFFERS DUE – July 19th, 2021
• SECTION L – 52.216-1 – Type of Contract – Firm Fixed Price
• NAICS Code: 236220
• THIS IS A COMPETIVE PROCUREMENT WITH NO SET-ASIDE FOR SMALL BUSINESS –
OFFERS FROM ALL RESPONSIBLE OFFERORS (LARGE AND SMALL) WILL BE
CONSIDERED
• Notice of award (estimated) to be September 2021
SOLICITATION INFORMATION & CRITERIA
Key Points for Bid content and submission:
• Submission is by electronic mail only due to COVID-19 building closure. The email address for receiving proposals is noted in Section L as: CS_DSC_Proposal_Submission
• Include all information required by Section L when you email your proposal
• Please submit proposals in two separate volumes (Price & Technical)
• Please follow the page number limitations as specified in Section L
• See the file size limitations in Section L
• Proposal Guarantee is required per 52.228-1 (20% or $3M, whichever is less)
• Offerors are encouraged to make their own arrangements to visit the site, which is currently open to the public
Solicitation – Important Clauses Section F – 52.211-10 – Commencement, Prosecution, and Completion of Work (730 Calendar Days after Receipt of the NTP)
Section F – 52.211-12 – Liquidated Damages—Construction ($1,482 per calendar day)
Section H – Special Clause 2: Key Personnel (Project Manager, Superintendent, QC Manager, Safety Manager – No substitutions for 120 days)
Section H – Special Clauses for Key Trades (Structural and Finish Masonry, Stucco Application)
52.219-9 – Small Business Subcontracting Plan
52.228-15 – Performance and Payment Bonds—Construction (Note: Requires resubmittal as contract amount increases)
Solicitation – Important Clauses (continued)
52.232-27 – Prompt Payment for Construction Contracts (14 days)
52.236-5 – Material and Workmanship
52.236-6 -- Superintendence by the Contractor
52.236-01 – Performance of Work by the Contractor Contractor shall perform on-site and with its own organization, work equivalent to at least 15% of the total amount of work to be performed under the contract.
52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
VOLUME I , TECHNICAL PROPOSAL– FORMAT, ORGANIZATION, CONTENTS
1. FORMAT: Submit (1) one electronic copy. No hard copies shall be submitted.
2. ORGANIZATION: Include a Table of Contents with tabs for hard copy formats and folders and files for electronic formats named as follows:
FACTOR 1 – EXPERIENCE
SUBFACTOR 1A – PROJECT EXPERIENCE
SUBFACTOR 1B – KEY PERSONNEL EXPERIENCE
FACTOR 2 – TECHNICAL APPROACH & SCHEDULE
SUBFACTOR 2A – TECHNICAL APPROACH
SUBFACTOR 2B – SCHEDULE
FACTOR 3 –MANAGEMENT APPROACH
SUBFACTOR 3A – MANAGEMENT APPROACH
SUBFACTOR 3B – SAFETY
FACTOR 4 – PAST PERFORMANCE
PAST PERFORMANCE QUESTIONNAIRES
OTHER SUBMITTALS
PROPOSED EQUALS
HAZARDOUS MATERIALS
SOLICITATION INFORMATION & CRITERIA (Refer to the Solicitation for complete information).
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
VOLUME II, BUSINESS AND PRICE PROPOSAL – FORMAT, ORGANIZATION, CONTENTS
1. FORMAT: Submit one Submit one (1) original signed electronic copy. No hard copies shall be submitted.
2. ORGANIZATION: Include a Table of Contents with tabs for hard copy formats and folders and files for electronic formats named as follows:
• SF1442
• AMENDMENTS
• SECTION B PRICE SCHEDULE
• SCHEDULE OF VALUES
• SF 24 BID BOND
• SECTION K REPRESENTATIONS AND CERTIFICATIONS
• GENERAL REFERENCES
• SMALL BUSINESS SUBCONTRACTING PLAN
SOLICITATION INFORMATION & CRITERIA (Refer to the Solicitation for complete information).
SECTION M – EVALUATION FACTORS FOR AWARD
BASIS FOR AWARD:
1. The Government will conduct a source selection using the Best Value Continuum Tradeoff
Process defined at FAR Part 15.1. The Contracting Officer (CO) will obligate and award a contract to the offeror who submits a proposal the Source Selection Authority (SSA) determines conforms to solicitation requirements; is fair and reasonable; and provides the best value to the government considering all evaluation factors combined as detailed below.
For this acquisition, the CO is the SSA.
2. The Government may accept other than the lowest priced proposal when the perceived benefits of a higher priced proposal merit the price differential.
3. Additionally, the Government may award a contract without entering into discussions.
EVALUATION FACTORS
Following is a brief summary of key points in SECTION M of the Solicitation. Refer to the Solicitation for complete information.
RELATIVE IMPORTANCE OF EVALUATION FACTORS:
Technical Proposal:
-Factors 1 – 3 are listed in descending order of importance. Relative importance of subfactors are noted within each related Factor below.
-Factor 4, Past Performance is less important than Factors 1 – 3 when combined.
Overall: All evaluation factors other than price, when combined are significantly more important than price.
EVALUATION FACTORS (Listed in Descending Order of Importance)
FACTOR 1 – EXPERIENCE
SUBFACTOR 1A – PROJECT EXPERIENCE
SUBFACTOR 1B – KEY PERSONNEL EXPERIENCE
FACTOR 2 – TECHNICAL APPROACH & SCHEDULE
SUBFACTOR 2A – TECHNICAL APPROACH
SUBFACTOR 2B – SCHEDULE
FACTOR 3 –MANAGEMENT APPROACH
SUBFACTOR 3A – MANAGEMENT APPROACH
SUBFACTOR 3B – SAFETY
FACTOR 4 – PAST PERFORMANCE
PAST PERFORMANCE QUESTIONNAIRES
CONTRACT PRICE LIST (Refer to the Solicitation for complete information).
Section B – Supplies or Services and Prices Contract Price Schedule
CLIN Description 001 Construction of RMS Office Building on Lind Point 002 Construction of RMS Conference + Archaeology Building on Lind Point 003 Construction of RMS Storage Building on Lind Point 004 Construction of 2BR House on Lind Point 005 Construction of 3BR House on Lind Point 006 Construction of Group Housing on Lind Point 007 Construction of Sitework 008 Plantings & Revegetation (Landscaping) 009 (Option) OPTION A – Photovoltaics for RMS Structure 010 (Option) OPTION B – Photovoltaics + Lithium Ion Batteries for RMS
Structure
QUESTIONS DURING THE SOLICITATION PHASE
• All questions must be submitted in writing (NLT 7 Days prior to proposal due date) via email to both the CO, Tony Jasper, and the CS, Cass Melin as follows:
Tony_Jasper@nps.gov Cass_Melin@nps.gov
• Changes to the Solicitation document shall only be made by written amendment posted as an amendment to the solicitation document. Offerors are required to fill out and sign the acknowledgment of amendments received (SF1442 Section 19) and include this when submitting our offer on the Form 1442.
PRE-PROPOSAL CONFERENCE QUESTIONS
Thank You For Your Interest in This Project