Attachment 2 to Enclosure A - Admin-Office_furniture-8.18.2025_-Markup SG.pdf

PDF 13 MB Posted

Attached to
B400 Directors Office Furniture
Solicitation number
MH469585
Issued by

About this file

These are architectural design drawings for an executive office upgrade project at Brookhaven National Labs, located on the B400 second floor. The project involves furnishing five different administrative and management office spaces with customized modular workstations from HNI Global. Each office layout includes:

  • L-shaped desks with adjustable height bases
  • Multiple drawer storage units in wood-toned finishes
  • Wall-mounted upper cabinets (some with frosted glass doors)
  • Dual monitor mounting attachments
  • Specific dimensional requirements for each office space (ranging from 30x60 to 30x72)

The design documents specify precise installation requirements, including that towers must be attached to SPL FFBB towers in the field using installer-provided hardware. The project date is 8/18/2025, and the drawings emphasize that dealers are responsible for verifying field dimensions to ensure furniture fits the designated office spaces.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWER MUST BE ATTACHED TO

SPL FFBB TOWER IN FIELD WITH

INSTALLER PROVIDED HARDWARE

60-A6 30x60

AD

M

IN

Christina Six

BR

O

O

KH

AV

EN

N

AT

IO

N

AL

L

AB

S

- B

SE

CO

N

D F

LO

O

R

- E

XE

CU

TI

VE

O

FF

IC

E

UP

GR

AD

E

IN

VO

LV

E

| A

LT

IT

UD

E

DEALER RESPONSIBLE FOR FIELD DIMENSIONS TO ENSURE PRODUCT WILL FIT INTO OFFICES. THE BUILDING SHELL IS THE PROVIDED PDF AND HAS BEEN SIZED PER DIMENSIONS SHOWN ON THE PDF. SCALE

8/18/2025

PROJECT NO

DATE

DRAWN BY

NTS

INSTALLER PROVIDED HARDWARE

TOWER MUST BE ATTACHED TO

-A x6

DRAWN BY

BR

O

O

KH

AV

EN

N

AT

IO

N

AL

L

AB

S

- B

SE

CO

N

D F

LO

O

R

- E

XE

CU

TI

VE

O

FF

IC

E

UP

GR

AD

E

IN

VO

LV

E

| A

LT

IT

UD

E

8/18/2025

PROJECT NO

DEALER RESPONSIBLE FOR FIELD DIMENSIONS TO ENSURE PRODUCT WILL FIT INTO OFFICES. THE BUILDING

SHELL IS THE PROVIDED PDF AND HAS BEEN SIZED PER DIMENSIONS SHOWN ON THE PDF.

DATE

Christina Six

AD

M

IN

SCALE NTS

INSTALLER PROVIDED HARDWARE

x6

-A

DEALER RESPONSIBLE FOR FIELD DIMENSIONS TO ENSURE PRODUCT WILL FIT INTO OFFICES. THE BUILDING

SHELL IS THE PROVIDED PDF AND HAS BEEN SIZED PER DIMENSIONS SHOWN ON THE PDF.

PROJECT NO

BR

O

O

KH

AV

EN

N

AT

IO

N

AL

L

AB

S

- B

SE

CO

N

D F

LO

O

R

- E

XE

CU

TI

VE

O

FF

IC

E

UP

GR

AD

E

Christina Six

NTS

8/18/2025

SCALE

AD

M

IN

DRAWN BY

DATE

IN

VO

LV

E

| A

LT

IT

UD

E

INSTALLER PROVIDED HARDWARE

72-A6 30x72

IN

VO

LV

E

| A

LT

IT

UD

E

DATE 8/18/2025

DRAWN BY

AD

M

IN

NTS

BR

O

O

KH

AV

EN

N

AT

IO

N

AL

L

AB

S

- B

SE

CO

N

D F

LO

O

R

- E

XE

CU

TI

VE

O

FF

IC

E

UP

GR

AD

E

SCALE

PROJECT NO

DEALER RESPONSIBLE FOR FIELD DIMENSIONS TO ENSURE PRODUCT WILL FIT INTO OFFICES. THE BUILDING

SHELL IS THE PROVIDED PDF AND HAS BEEN SIZED PER DIMENSIONS SHOWN ON THE PDF.

Christina Six

INSTALLER PROVIDED HARDWARE

x6

-A

IN

VO

LV

E

| A

LT

IT

UD

E

DRAWN BY Christina Six

DATE

AD

M

IN

SCALE

DEALER RESPONSIBLE FOR FIELD DIMENSIONS TO ENSURE PRODUCT WILL FIT INTO OFFICES. THE BUILDING

SHELL IS THE PROVIDED PDF AND HAS BEEN SIZED PER DIMENSIONS SHOWN ON THE PDF.

BR

O

O

KH

AV

EN

N

AT

IO

N

AL

L

AB

S

- B

SE

CO

N

D F

LO

O

R

- E

XE

CU

TI

VE

O

FF

IC

E

UP

GR

AD

E

PROJECT NO

8/18/2025

NTS

BR

O

O

KH

AV

EN

N

AT

IO

N

AL

L

AB

S

- B

SE

CO

N

D F

LO

O

R

- E

XE

CU

TI

VE

O

FF

IC

E

UP

GR

AD

E

IN

VO

LV

E

| A

LT

IT

UD

E

Christina Six

PROJECT NO

8/18/2025

NTSSCALE

DRAWN BYDEALER RESPONSIBLE FOR FIELD DIMENSIONS TO ENSURE PRODUCT WILL FIT INTO OFFICES. THE BUILDING

SHELL IS THE PROVIDED PDF AND HAS BEEN SIZED PER DIMENSIONS SHOWN ON THE PDF.

GU

ES

T O

FF

IC

E

DATE

Upper Cabinets will have frosted glass doors

Add Attachment for Dual Monitors

DATE

Christina Six

IN

VO

LV

E

| A

LT

IT

UD

E | P

RE

SI

D E

BR

O

O

KH

AV

EN

N

AT

IO

N

AL

L

AB

S

- B

SE

CO

N

D F

LO

O

R

- E

XE

CU

TI

VE

O

FF

IC

E

UP

GR

AD

E

SCALE

DEALER RESPONSIBLE FOR FIELD DIMENSIONS TO ENSURE PRODUCT WILL FIT INTO OFFICES. THE BUILDING

SHELL IS THE PROVIDED PDF AND HAS BEEN SIZED PER DIMENSIONS SHOWN ON THE PDF.

M

AN

AG

ER

DRAWN BY

NTS

PROJECT NO

8/18/2025

SCALE

DRAWN BY

O

FF

IC

E

BR

O

O

KH

AV

EN

N

AT

IO

N

AL

L

AB

S

- B

SE

CO

N

D F

LO

O

R

- E

XE

CU

TI

VE

O

FF

IC

E

UP

GR

AD

E

DATE

Christina Six

IN

VO

LV

E

| A

LT

IT

UD

E

8/18/2025

PROJECT NO

DEALER RESPONSIBLE FOR FIELD DIMENSIONS TO ENSURE PRODUCT WILL FIT INTO OFFICES. THE BUILDING SHELL IS THE PROVIDED PDF AND HAS BEEN SIZED PER DIMENSIONS SHOWN ON THE PDF. NTS

Upper Cabinets will have frosted glass doors

File details come from the government source that posted it. Updated .