Task Order Summary: FY26 Sandy Battle Heritage Survey
This is a Heritage Cultural Resources Indefinite Delivery Indefinite Quantity (IDIQ) Task Order issued by the Medicine Bow – Routt National Forests, Thunder Basin National Grassland for archaeological survey and site evaluation work in Carbon County, Wyoming. The task order (02-2026-CR-MBRTB-FY26, Reference Number 1168791) requires a Class III archaeological survey of 2,350 acres on the Brush Creek – Hayden Ranger District, located on the western side of the Sierra Madre Mountain Range. The survey area comprises three units accessible via National Forest System Routes, with work to be performed between July 1, 2026 (desired start date) and April 30, 2027 (final report due date), with field work completion targeted for November 30, 2026 and draft report due March 11, 2027. The project is subject to State Certified Apprenticeship (SCA) wage determinations 2015-5411 and 2015-5413.
The contract includes two bid items: MBRTB-003 for Level/Class III Survey at 2,350 acres (unit price per acre), and MBRTB-005 for six Site Evaluations (non-survey) at unit price per evaluation, consisting of two condition reports and four full re-records of previously documented cultural resource sites (48CR4237, 48CR4468, 48CR7872, 48CR7880, 48CR7881, and 48CR7955). Contractors must submit Request for Quote responses to Contracting Officer Shawn Harwood (shawn.harwood@usda.gov) by June 22, 2026 at 3:00 MDT. Task order award will be made to the quoter representing best value to the Government, with contractor ability to meet the desired start date and contract completion time serving as evaluation factors. Responses proposing alternative completion schedules may be deemed not technically acceptable. The Government will furnish electronic databases, current forms, project boundary shapefiles, and Forest Service access permits upon award.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLK-MBR-NEB Heritage Cultural Rscs IDIQ 01-2026- CR-MBRTB
Heritage Cultural Resources IDIQ Task Order
02-2026-CR-MBRTB- FY26 (1168791)
(Contractor to complete yellow highlighted areas)
TASK ORDER NUMBER: 02-2026-CR-MBRTB-FY26
TASK ORDER NAME: FY26 Sandy Battle Heritage Survey
IDIQ Contract No.
TBD Project Name:
02-2026-FY26 Sandy Battle Heritage Survey
Task Order # TBD
Contractor:
UEID#:
Phone:
Email:
Address:
Issuing and Billing Office:
Medicine Bow – Routt National Forests, Thunder Basin National Grassland 3838 East Cherrywood Loop Laramie, WY 82070
Section B2. Quantity
Item # Task Quantity Unit of Measure
Unit Price
Total Price
MBRTB-003 Level/Class III Survey 2,350 Acres $ / Acre $
MBRTB-005 Site Evaluations (non-survey)
6 Each $ / Each $
Task Order TOTAL $
Desired Start Date: July 1, 2026
Completed Field Work by November 30, 2026
Draft Report Due: March 11, 2027
Final Report Due: April 30, 2027
SHPO Consultation, All Deliverables Accepted: July 1, 2027
Work will be performed in Carbon County of Wyoming. SCA Register of Wage Determination No. 2015-5411 (Rev. 28) dated 5/13/2026 and Wage Determination No. 2015-5413 (Rev. 28) dated 5/13/2026 covers the work in this task order.
GENERAL SPECIFICATIONS:
The purpose of this order is to secure services to conduct a Class III Survey (as defined in Section C.6 of the Performance Work Statement) on the Brush Creek – Hayden Ranger District, Medicine Bow – Routt National Forests, Thunder Basin National Grassland. The contractor shall provide all material, personnel, equipment, and supplies to conduct the survey listed under this order.
PROJECT LOCATION:
The project area is located on the western side of the Sierra Madre Mountain Range. The project area is comprised of three units, totaling 2,350 acres. All three of the project area units are accessible by National Forest System Routes (NFSRs). High clearance vehicles or UTVs are required for some access. By road, the easternmost unit (unit 1) of the project are approximately 48 miles from Saratoga, Wyoming via State Highway WY-130 to WY-230 south to Riverside, WY and then west on WY-70.
The project area is adjacent to both state and privately owned lands, and the objective of the contractor will be to survey only within Forest Service land. The GIS data used to create the survey area boundaries for this contract may be slightly different from land markers on the ground or geospatial data on a handheld GPS device. It is the responsibility of the contractor to ensure that all work is performed only on USFS land.
Unit 1:
Unit 1 is the easternmost unit of the project area. This unit is bisected east-west by WY-70 and access is possible directly to the unit from either side of the highway. The northern portion of the unit can also be accessed from NFSR 852, parking on the side of the road and hiking west or south less than 0.5 miles.
Both WY-70 and NFSR 852 are suitable for passenger vehicles, but NFSR 852 is unpaved. Access is also available south of WY-70 on NFSR 850 and 11.1S, which is are Class 2 roads requiring high clearance vehicles or UTVs. NFSR 850 11.1S will both terminate at private property that is adjacent to part of the boundary of this unit. The southern portion of the unit can also be accessed via WY-70 to NFSR 813.
NFSR 850 is a Class 2 road that will require high clearance vehicles or UTVs for access. The southern boundary of this unit abuts Unit 2 at the section line (T13N R88W S23 and 24).
Unit 2:
Unit 2 is the largest unit in the project area and situated west of unit 1 and south of unit 2. The eastern side of the unit is accessible from WY-70 which runs south of the unit for approximately 0.6 miles and then crosses through the unit for 0.8 miles to the southern boundary of the unit. Access is also possible within the unit from WY-70 on NFSR 852.1E, NFSR 813, NFSR 813.1A, and NFSR 813.3A, which all require high clearance or UTVs. The northern boundary of unit 2 is accessible via WY-70 to NFSR 852 and NFSR 852.1E.
Unit 3:
Unit 3 is located north of unit 2. This unit can be accessed from WY-70 to NFSR 852 with a 0.25-mile hike north from the roadside into the southern boundary of the unit. The unit can also be accessed directly via WY-70 to NFSR 852 to NFSR 870 and 870.1C where the project area is on either side of the road.
NFSR 870 and 870.1C are Class 2 roads that will require high clearance vehicles or UTVs for access.
Legal Locations for Bid Items:
Township 13 North, Range 87 West, Sections 7, 18
Township 13 North, Range 88 West, Sections 3, 4, 9, 10, 12, 13, 14, 15, 16, 21, 22, 23, 24
See also Vicinity Map and Project Maps below.
SUPPLEMENTAL INFORMATION:
Item MBRTB-003:
• A Class III Survey will need to be quoted on for this Task Order, which is required for the
FY26 Sandy Battle Heritage Survey on the Brush Creek – Hayden Ranger District, Medicine Bow – Routt National Forests, Thunder Basin National Grassland, as defined in Section C.6 of the Performance Work Statement. The Class III survey for the FY26 Sandy Battle Heritage Survey includes a total of 2,350 acres that require a cultural resource inventory and archeological field survey to identify, record, and evaluate the eligibility of all cultural resources within the survey area for listing on the National Register of Historic Places.
Previous cultural resource inventories and archeological surveys have been conducted in and near the FY26 Sandy Battle Heritage Survey area, and these data can be accessed through WyoTrack with the appropriate permissions. Prior adequate survey will also be provided by the USFS along with other geospatial materials.
Item MBRTB-005:
• There are six (6) Site evaluations (non-survey), including two condition reports with the potential for an update or full re-record, and ten full re-records that are required bidding for this Task Order as defined in section C.6.2.5 of the Performance Work Statement.
1) 48CR4237, Belvidere Ditch – full re-record 48CR4237 is an historic linear resource. This is a non-eligible linear resource with SHPO concurrence and previous adequate documentation. Segments of this site were last updated in 2021. The site will require a full re-record including an updated boundary/GPS data collected following the extent of the linear within the project area, photographs, feature and artifact documentation, and eligibility determination (following Wyoming SHPO guidelines).
Additionally, the contractor shall use LiDAR imagery, historic maps, aerial photographs, and any other tools available to confirm the full extent of the linear outside of the project area and update the site boundary for this resource. The resource is known to extend to the southwest but has not been formally mapped.
2) 48CR4468, Savery-Fireline Stock Drive – condition report 48CR4468 is the historic Savery-Fireline Stock Drive. This linear resource was first recorded in 1986 and last updated in 2022. This is an eligible linear site with SHPO concurrence, the segment within the project area is contributing under Criterion A. Segment 1 (48CR4468_1) was last recorded in 2001 and extends south from WY-70 to the private land boundary. An update on this segment was performed in 2022, and a condition report was performed on part of the segment not within this project area in 2025. Any segment(s) within the survey area shall be revisited during survey and, at minimum, a condition report shall be completed. Please take photos and notes as you intercept the linear resource during survey. If there is additional information discovered during the condition report, the contractor shall complete the necessary documentation (either an update or full re-record) following Wyoming SHPO guidelines.
3) 48CR7872 – full re-record The site was last recorded in 2003 and consists of an historic spring improvement structure known as Stemp Spring. This is an eligible site with SHPO concurrence associated with sheep herding activities along the Savery-Fireline Stock Drive (48CR4468). The site will require a full re-record due to the need for an updated boundary. Additionally, the site may require some or all of the following: photographs, feature and artifact documentation, and eligibility determination (following Wyoming SHPO guidelines).
4) 48CR7880 – full re-record 48CR7880 is an historic arborglyph site within the Savery Stock Driveway Historic District (48CR7881). The site consists of arborglyphs as well as structures related to sheep herding.
Additionally, the site will need to be discussed in terms of its contributing status to the overall District. The site was first recorded in 2003 and a condition report was performed in 2025 to verify that resources from this site were not within a previous project area north of the site boundary. This is an eligible site with SHPO concurrence. The site will require a full re-record due to the age and inadequacy of the 2003 photographs, as well as the high likelihood that the condition of the arborglyphs has changed. Additionally, the site may require some or all of the following: feature and artifact documentation, an updated site boundary, and eligibility determination.
5) 48CR7881 – condition report 48CR7881 is the historic Savery Stock Driveway Historic District which is eligible with SHPO concurrence under Criterions A, B, and D. This historic district is split into two distinct units and only the northern unit of the district is within the project area. The district was first recorded in 2003 and includes five sites and two driveway segments of 48CR4468. The contributing sites/segments include 48CR4468 segment 1, 48CR7872, and 48CR7880. The non-contributing sites/segments include 48CR4468 segment 2, 48CR7700, 48CR7870, and 48CR7874. All of the non-contributing sites are outside of the project area in the southern unit and will not need to be revisited. The portion of the Savery Stock Driveway Historic District (48CR7881) overlapping with the project area will need a condition report to verify existing resources contributing to the district within the project area. If any changes to contributing resources related to 48CR4468_1, 48CR7872, or 48CR7880 are identified during survey, the contractor may need to fully re-record these contributing sties to SHPO standards, including a new site boundary, artifact and feature documentation, photographs, and NRHP evaluation(s).
6) 48CR7955 – full re-record 48CR7955 is the historic Encampment to Wamsutter-Baggs Road. The site was last recorded in 2002 and determined not eligible with SHPO concurrence. The 2002 recording digitized the extent and location of this linear but no GPS data was collected in the field. The site will require a full re-record including an updated boundary/GPS data collected following the extent of the linear within the project area, photographs, feature and artifact documentation, and eligibility determination (following Wyoming SHPO guidelines). If the linear resource appears to extend outside of the project area, the contractor will map out the extent of the resource using historic maps, LiDAR imagery, aerial photography, or any other tools available.
*Additional site data can be accessed through WyoTrack with appropriate permissions.
C.4 – Government Furnished Property will be provided at the Pre-work Meeting.
Special Considerations:
Supplemental Information is included with this package via Sam.gov. All questions must be directed to the Contracting Officer (CO). Contact the CO with any questions or if larger maps are needed.
If the contractor cannot meet the “Desired Start Date” and the “Contract Completion Time” identified in the Task Order, an alternate schedule must accompany your pricing (address under “Comments” section below). Contractors are required to provide pricing on every Task Order.
The contractor’s ability to meet the “Desired Start Date” and the “Contract Completion Time”, is an evaluation factor considered in the procedures used for deciding upon final award of a task order.
Comments:
Contractor's Signature/Company: Date:
TASK ORDER QUOTE INSTRUCTIONS: Submit a Task Order Quote as outlined in Section H.9, Task Order Quote Requirements, of the IDIQ RFQ.
Request for Quote response is due to the CO, shawn.harwood@usda.gov, by June 22, 2026 at
3:00MDT.
AWARD: Task Order awardee will be selected following the criteria in the IDIQ RFQ 1284LL26Q0055. In addition:
1. TO Award: A task order award will be made to the quoter representing the best value to the Government.
2. Technical Acceptability: Responses including an alternative completion timetable may be determined to be not technically acceptable.
SECTION 3: GOVERNMENT-FURNISHED PROPERTY
Contractor will be supplied electronic versions of the database and current forms as well as project boundary shapefiles upon award.
The Forest Service will provide an A212 key and temporary access permit to access behind FS gates if requested.
SECTION 5: SPECIFIC TASKS
Specific tasks include those listed in Section B2 Quantity and defined in the Section
“SUPPLEMENTAL INFORMATION”.
mailto:shawn.harwood@usda.gov ShawnHarwood Highlight
C A
RB
O N
A L
BA
NY
307000 308000 309000 310000 311000 312000 313000
32 33 34 35 36 31
T14N R88W T14N R87W
T13N R88W T13N R87W
5 4 2 1
Unit 3
8 9 10 11 12
16 15
21 22
Unit 2
28 27 26 25
Elk Mountain 30 §̈¦80
FY26 Survey Area Quadrangle Sections 33 Townships
MVUM Roads 1 Roads Open to All Vehicles, Yearlong 2 Roads Open to All
Saratoga
UV130
VU230
Riverside
UV130
Ryan PMarekd ic in e B National Fo
Forest Boundary Vehicles, Seasonal ¬«70 Encampment UV230 31
14 State or US Highway 15 Other Public Roads
Savery
«70
S I E R R A M A D R E
R A N G E
Project Area Map: FY26 Sandy Battle Heritage Survey
¹ 0
Scale: 1:28,000
0.5 1 Miles
0 0.5 1 km
NAD83
Project Specifications (FS# R2026020602004):
Acres to Survey: 2,350 Previously recorded sites: 6 (actions required) 48CR4237, 48CR4468, 48CR7872, 48CR7880, 48CR7881, 48CR7955
USGS 7.5 min Topographic Map References:
Grieve Reservoir, WY 1992, Cottonwood Rim, WY 1992, General Location within the MBRTB
Unit 1
Seminoe Reservoir
Hanna ¬«72 Hanna
¬«72
2UV87
VU7R8a9wlins
FY26 Survey Area
District Boundary
Cities and Towns
State/Federal Highway County
Surface Ownership
R2026020602004 FY26 Sandy Battle Heritage Survey Vicinity Map Project Specifications:
Acres to Survey: 2,350 Previously recorded sites: 6 (actions required) 48CR4237, 48CR4468, 48CR7872, 48CR7880, 48CR7881, 48CR7955
Bureau of Land Management
Bureau of Reclamation US Fish & Wildlife
0 2.5 5 10 Kilometers
USGS 7.5 min Topographic Map References:
Forest Service
State
0 2.5 5 10 Miles
NAD83 1:300,000
Grieve Reservoir, WY 1992, Cottonwood Rim, WY 1992, VU789 VU789
VU789
UV789Ra wRl inas wlins ¬«76
80 ¬«76 ¬«76
£¤287 e
¬«71
Sinclair £¤30 Walcott
§̈¦80
¬«72
CARBON
COUN TY
a 130
SarSaatraotoggaa SaBraRtoUgSaH
CREEK/
HAYDEN
VU130
Ryan Park
¬«70
Encampment
VU230
EncRamivpmeernst ide
UV230
SAVA
RUN
WIL
HUSTON
PARK
WILD.
S I E R R A M A D R E R A N G E
ENCAMPMENT
RIVER
WILD.
Wyoming Colorado
Unit 1 Unit 2
Unit 3 r r pm e t
V k
| Section B2. Quantity |
| GENERAL SPECIFICATIONS: |
| PROJECT LOCATION: |
| Legal Locations for Bid Items: |
| SUPPLEMENTAL INFORMATION: |
| Item MBRTB-003: |
| Item MBRTB-005: |
| 1) 48CR4237, Belvidere Ditch – full re-record |
| 2) 48CR4468, Savery-Fireline Stock Drive – condition report |
| 3) 48CR7872 – full re-record |
| 4) 48CR7880 – full re-record |
| 5) 48CR7881 – condition report |
| 6) 48CR7955 – full re-record |
| SECTION 3: GOVERNMENT-FURNISHED PROPERTY |
| SECTION 5: SPECIFIC TASKS |
| Unit 3 |
| Unit 2 |
| R2026020602004 |
| Sinclair |
| Walcott |
| Ryan Park |
| Encampment |
File details come from the government source that posted it. Updated .