Attachment 2 - Statement of Work (SOW).pdf

PDF 172 KB Posted

Attached to
Phase 1 4FL Forest Housing Deferred Maintenance
Solicitation number
1240LT24R0063
Issued by

About this file

This document is a Statement of Work (SOW) that provides details for the Phase 1 4FL Forest Housing Deferred Maintenance project on the Payette National Forest. The scope of work includes installation of new site utilities, building demolition, tree removal, and construction of a new laundry building. The base bid covers construction of an access road, buried utilities, and new water/sewer/electrical lines. Two optional bid items are included - demolition of four bunkhouse buildings, and construction of a new laundry building.

The project is subject to various site limitations and requirements, including maintaining access to the Fawn Hall Barracks, providing temporary utilities and toilet facilities, and pressure washing construction equipment. The contract has a start date of Fall 2024 and a period of performance of 180 calendar days for the base bid and optional items. The contract is a 100% Small Business Set-Aside, with a site visit scheduled for August 27, 2024.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-1

Section C - Description/Specifications/Statement of Work

PAYETTE NF FOREST HOUSING DEFERRED MAINTENANCE PHASE 1

Final – 6/03/2024

1.1 SCOPE OF CONTRACT

A. This project includes installation of new site utilities, building demolition, tree removal, and construction of a new laundry building at the McCall Administrative site housing complex on the Payette National Forest.

B. Base Bid: The work includes:

1. Constructing construction access road, tree removal, buried HDPE waterline, new water meter, sanitary sewer lines and electrical lines.

C. Optional work that may be awarded includes all work described above associated with:

1. Optional Bid Item 1: This option includes the demolition of four (4) bunkhouse buildings located at McCall Administrative Site on the Payette National Forest. All utilities to the buildings to be demolished shall be capped at their respective main lines.

Demolition and remove building including concrete foundation and some furnishings. Work will include disconnection and capping of utilities (water, sewer, electrical), and importing backfill material to fill void from building removal, including compacting and finish grading. Forest service will seed area upon completion.

2. Option 2: Construct laundry building. The construction work will include including concrete footings, foundation and slab, wood framing, sheathing, trusses, weather barriers, fiber-cement siding and soffit, sheet metal roofing and trim, insulation, sealants, insulated hollow metal doors and hardware, fiberglass framed windows, ceramic tile, FRP, gypsum board, painting, coatings, toilet accessories, appliances, plumbing, fixtures, instantaneous water heaters, fans, ductwork, heaters, wiring, lights, grounding, and power. This option also includes the demolition of the existing laundry facility as shown on the plans.

D. Quantities associated with these options are identified in the Schedule of Items.

1.2 PROJECT LOCATION

A. The project site is located within the city of McCall Idaho at 500 North Mission Street on Forest Service Property (Krassel Yard). It is within the Payette National Forest in Valley County. Located in T.18N., R.3E., Section 8, Boise Meridian.

1.3 SITE INFORMATION AND LIMITATIONS

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-2

A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:

1. Except as noted herein, the construction sites will be closed to the public during construction. The Contractor will be responsible for signing and limiting public access. Access shall be maintained to the Fawn Hall Barracks through construction except as approved by the Contracting Officer for the purpose of reconstructing the access roads and parking areas.

2. The Contractor needs to be aware the Krassel District Office and Day Care Facility Yard will be open for use during construction. This use will include work by Forest Service Employees, operation of a Child Day Care facility, general office business use by the public. The contractor shall take special care to adequately sign and protect areas of work and construction from persons using these areas.

3. The Contractor shall not disrupt existing utility service (water, power, telecom, sewer, etc.) to and within the administrative site and existing living facilities without coordination and approval from the Contracting Officer’s Representative.

4. Water is available at the site for construction purposes.

5. Utilities are not available at the site for construction purposes. The Contractor will be responsible for coordinating the installation of temporary power for the site and the cost for the service.

6. The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work. Toilet facilities shall be provided at a rate of one stool for every 10 workers assigned or working on site with a minimum of one required.

7. All construction equipment shall be pressure washed before entering the Site. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.

1.4 TRAFFIC CONTROL AND CONSTRUCTION SIGNING

A. No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the CO and Local Transportation Authority.

Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.

Signing and barricades shall be adequate enough to protect Forest Service employees and public. Again, the Fawn Hall Barracks will be open for use during construction. The contractor shall take special care to adequately sign and protect areas of work and construction from persons using these areas.

1.5 WORK CAMPS, STAGING AND STORAGE AREAS

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-3

A. Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage work trailers on site.

Overnight camping on site will not be allowed.

B. Confine storage of materials and equipment as approved by the Contracting Officer.

C. Contractor shall maintain access to the facilities for Forest Service contracting personnel.

1.6 INSPECTION OF WORKSITE

A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.

1.7 START DATE

A. Fall 2024.

1.8 CONTRACT TIME

A. Base Bid: 180 Calendar Days

B. Option #1: 180 Calendar Days

1.9 SPECIFICATIONS

A. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to, or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.

SECTION 000501 - LAUNDRY BUILDING

SECTION 010250 - CONSTRUCTION STAKING

SECTION 011250 - MEASUREMENT AND PAYMENT

SECTION 011900 - MOBILIZATION

SECTION 012500 - UTILITY COMPANY COORDINATION

SECTION 013300 - SUBMITTAL PROCEDURES

SECTION 014100 - QUALITY CONTROL

SECTION 022210 - BUILDING DEMOLITION

SECTION 022450 - GRADING

SECTION 023701 - SEDIMENT AND EROSION CONTROL MEASURES

SECTION 024100 - WASTE MATERIAL DISPOSAL

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-4

SECTION 024102 - REMOVAL AND DISPOSAL OF STRUCTURES AND

OBSTRUCTIONS

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 061000 - ROUGH CARPENTRY

SECTION 061600 - SHEATHING

SECTION 061753 - SHOP-FABRICATED WOOD TRUSSES

SECTION 071113 - DAMPPROOFING SYSTEMS

SECTION 072100 - THERMAL INSULATION

SECTION 074113 - FORMED METAL ROOF PANELS

SECTION 074646 - FIBER-CEMENT SIDING

SECTION 076200 - SHEET METAL FLASHING AND TRIM

SECTION 079200 - JOINT SEALANTS

SECTION 081113 - HOLLOW METAL DOORS AND FRAMES

SECTION 085413 - FIBERGLASS WINDOWS

SECTION 087100 - DOOR HARDWARE

SECTION 089119 - FIXED LOUVERS

SECTION 092900 - GYPSUM BOARD

SECTION 096613 - CONCRETE FLOOR COATING

SECTION 097700 - SPECIAL WALL FINISHES

SECTION 099113 - EXTERIOR PAINTING

SECTION 099123 - INTERIOR PAINTING

SECTION 099600 - HIGH-PERFORMANCE COATINGS

SECTION 113100 - RESIDENTIAL APPLIANCES

SECTION 220517 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

SECTION 220518 - ESCUTCHEONS FOR PLUMBING PIPING

SECTION 220523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING

SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING

SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND

EQUIPMENT

SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND

EQUIPMENT

SECTION 221100 - WATER DISTRIBUTION SYSTEMS

SECTION 221102 - CURB VALVES AND BOXES

SECTION 221116 - DOMESTIC WATER PIPING

SECTION 221300 - SEWER SYSTEMS

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-5

SECTION 221316 - SANITARY WASTE AND VENT PIPING

SECTION 221319 - SANITARY WASTE PIPING SPECIALTIES

SECTION 223400 - FUEL-FIRED, DOMESTIC-WATER HEATERS

SECTION 224100 - RESIDENTIAL PLUMBING FIXTURES

SECTION 224216.16 - COMMERCIAL SINKS

SECTION 260000 - COMMON WORK RESULTS FOR ELECTRICAL

SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND

CABLES

SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 260533.13 - CONDUITS FOR ELECTRICAL SYSTEMS

SECTION 260533.16 - BOXES AND COVERS FOR ELECTRICAL SYSTEMS

SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION 262413 - SWITCHBOARDS

SECTION 262416 - PANELBOARDS

SECTION 262726 - WIRING DEVICES

SECTION 262816 - ENCLOSED SWITCHES

SECTION 311000 - CLEARING AND GRUBBING

SECTION 312000 - EARTHWORK

SECTION 312100 - PROJECT SITE PREPARATION AND GRADING

SECTION 312225 - EXCAVATION & EMBANKMENT

SECTION 321204 - CRUSHED AGGREGATE BASE OR SURFACE COURSE

END OF SECTION C

August 2024

Section C - Description/Specifications/Statement of Work
1. Optional Bid Item 1: This option includes the demolition of four (4) bunkhouse buildings located at McCall Administrative Site on the Payette National Forest. All utilities to the buildings to be demolished shall be capped at their respective main...
Demolition and remove building including concrete foundation and some furnishings. Work will include disconnection and capping of utilities (water, sewer, electrical), and importing backfill material to fill void from building removal, including comp...
2. Option 2: Construct laundry building. The construction work will include including concrete footings, foundation and slab, wood framing, sheathing, trusses, weather barriers, fiber-cement siding and soffit, sheet metal roofing and trim, insulation...
1. Except as noted herein, the construction sites will be closed to the public during construction. The Contractor will be responsible for signing and limiting public access. Access shall be maintained to the Fawn Hall Barracks through construction ...
2. The Contractor needs to be aware the Krassel District Office and Day Care Facility Yard will be open for use during construction. This use will include work by Forest Service Employees, operation of a Child Day Care facility, general office busine...
3. The Contractor shall not disrupt existing utility service (water, power, telecom, sewer, etc.) to and within the administrative site and existing living facilities without coordination and approval from the Contracting Officer’s Representative.
4. Water is available at the site for construction purposes.
5. Utilities are not available at the site for construction purposes. The Contractor will be responsible for coordinating the installation of temporary power for the site and the cost for the service.
6. The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work. Toilet facilities shall be provided at a rate of one stool for every 10 workers assigned or working on site with a minimum of one requ...
7. All construction equipment shall be pressure washed before entering the Site. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, an...