This document is a Schedule of Items (SOI) for the McCall Admin Site Utilities and Housing Demolition Project. It details the various construction and demolition items and quantities required, including 2" HDPE pipeline, 4" PVC pipeline, sewer systems, electrical work, and demolition of existing structures. The total base bid amount and option item costs are provided.

The related federal contract opportunity is for the Phase 1 4FL Forest Housing Deferred Maintenance project, a 100% Small Business Set-Aside solicitation issued by the United States Forest Service. The project is located on the Payette National Forest in Valley County, Utah. A site visit is scheduled for August 27, 2024 at 12:00 PM Mountain Time. The Point of Contact is Samuel Thompson, samuel.thompson@usda.gov.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM

NO.

SECTION

SUPPLIES/SERVICES

METHOD

OF MEAS

UNIT QTY

UNIT

PRICE

TOTAL

AMOUNT

0001 010250 Construction Staking LSQ LS 1 $ $

0002 011900 Mobilization LSQ LS 11 $ $

0003 221100-1 Pipeline, 2" HDPE, Including Trench and Fittings

DQ LF 530 $ $

221100-2

Pipeline, 4" PVC, C900, Including Trench and Fittings

DQ LF 520

0005 221100-3 Connection to Existing Water Main & 1 1/2"Meter

LSQ LS 1 $ $

0006 221100-4 Abandon Existing Connection to Water Main LSQ LS 1 $ $

0007 221102-1 Curb Valve and Box - 2-Inch Metal AQ EA 8 $ $

221102-2 Curb Valve and Box - 4-Inch Cast Iron AQ EA 2

0009 221300-1 Sewer Systems - 6" PVC Sewerline DQ LF 350 $ $

0010 221300-2 Sewer Systems - Clean Outs AQ EA 10 $ $

260000-1 Power Company Fees LSQ LS 1

0012 260000-2 Electrical Demolition, Site LSQ LS 1 $ $

0013 260000-3 Electrical Service System (3 Switchboards) LSQ LS 1 $ $

0014 260000-4 Electrical Feeder to Fawn Hall LSQ LS 1 $ $

0015 260000-5 Communications Conduit

DQ LF 520 $

311000 Clearing and Grubbing LSQ LS 1

0017 312100 Project Site Preparation and Grading (Roads, Laundry, Etc.)

LSQ LS

TOTAL BASE ITEM AMOUNT PROPOSED:

Schedule of Items (S.O.I.)

McCall Admin Site Utilities and Housing Demolition Project

FINAL - 8/17/2024

1001 000501 Laundry Building LSQ LS 1 $ $

1002 022210-1 Demolition of Wash House LSQ EA 1 $ $ 1003 260000-5 Electrical Feeder to Laundry Building LSQ LS 1 $ $

2001 260000-7 Electrical Feeders to Future Bunkhouses 1 LSQ EA 4 $ $

$TOTAL BASE & OPTION ITEMS AMOUNT PROPOSED:

TOTAL OPTION ITEM A AMOUNT PROPOSED:

TOTAL OPTION ITEM B AMOUNT PROPOSED:

Optional Bid Item A (Laundry Building)

Optional Bid Item B (Future Bunkhouses)

File details come from the government source that posted it. Updated .