Attachment 2- Statement of Work.docx

DOCX document 4 MB Posted

Attached to
Green Mountain & Finger Lakes Security Gate Repair
Solicitation number
12444325Q0031
Issued by

About this file

The document is a Statement of Work (SOW) for security gate repairs at the Green Mountain & Finger Lakes National Forests Supervisor's Office located in Mendon, Vermont. The project involves replacing the existing security gate operator, which requires the contractor to furnish and install a new gate operator, connect it to existing power and controls, reinforce gate posts, and ensure compatibility with current systems.

Key details include work performance during weekdays from 8:00 am to 4:30 pm, with no weekend or federal holiday work permitted without authorization. The contractor must provide all necessary personnel, materials, and equipment, comply with OSHA regulations, supply personal protective equipment, and perform work according to manufacturer requirements. The work must be completed while accommodating ongoing government operations at the site, with minimal disruption to existing activities. The solicitation number is 12444325Q0031, and the project is under the Department of Agriculture Forest Service R9-Eastern Region.

View the file

Other files

File Type Posted
Attachment 5- Wage Determination.txt TXT text file
Solicitation 12444325Q0031.pdf PDF
Attachment 3 -Specifications .docx DOCX document
Attachment 4- Existing Product Data Sheets.pdf PDF
Attachment 1- Schedule of Items.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GREEN MOUNTAIN & FINGER LAKES

NATIONAL FORESTS

SUPERVISOR’S OFFICE

SECURITY GATE REPAIRS

STATEMENT OF WORK

Project Locations: The GMFL NF Supervisor’s Office, is located 4387 US Route 4, Mendon, VT 05701.

Summary of Work: Replace the security gate operator at the GMFL NF Supervisor’s Office.

Scope of Work: The Contractor shall furnish and install a new gate operator for the existing security gate. The work shall include installing a new gate operator, connecting to existing power and controls, connecting to the existing gate, connecting to existing contact and non-contact devices. Contractor shall level and reinforce the existing gate posts as needed. Contractor shall ensure all new materials are compatible with the existing controls and devices. The Contractor shall be responsible for testing of the gate, operator, and controls.

The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Scope of Work.

Work shall be done in accordance with manufacturer’s requirements and recommendations.

General Notes:

Work Hours - Work days shall be scheduled Monday through Friday, 8:00 am to 4:30 pm. No work is permitted on weekends or on Federal Holidays without written authorization of the COR.

The Government will be occupying the site during the construction. Cooperate with the Government's representatives during construction operations to minimize conflicts and facilitate Government usage. The Contractor shall perform the work in a manner that does not interfere with the Government's operations.

The contractor shall be responsible for providing employees with all required personal protective equipment including but not limited to hard hats, gloves, hearing protection and fall restraint and shall comply with all OSHA regulations.

The Contractor shall limit use of the premises to the work in areas indicated and repair damage caused by installation operations.

Existing Gate & Operator

Existing Keypad Control, Post, and Detector Loop

Existing Gate Operator

Existing Gate Operator

Existing Gate & Operator

Existing Brace to Reset/Replace image5.jpeg image6.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg