This is a Specification document for dockside repairs of USCGC FIR (WLB-213), a 225-foot Coast Guard cutter, during Fiscal Year 2026. The specification encompasses 42 distinct work items organized across maintenance, repair, preservation, and upgrade categories for a vessel homeported in Cordova, Alaska (District 17).
The work items include critical maintenance tasks such as fire prevention system setup, potable and grey water tank cleaning/inspection, sewage system cleaning and piping renewal, and comprehensive preservation of interior/exterior surfaces including decks, compartments, and specialized equipment foundations. Major equipment services involve inspection and servicing of hydraulic systems (chain stoppers, winches, davits, cranes), mechanical systems (capstans, commissary hoist, anchor windlass), electrical systems (power circuit breakers, steering system PLC upgrade, thruster motor replacement), and auxiliary systems (air conditioning foundations, shower pan renewal, deck covering installation). Specialized work includes replacing a steering gear heat exchanger, upgrading a directional control valve on the buoy chain winch, renewing electrical cable stuffing tubes, and installing expansion joints in cooling systems. The specification mandates compliance with multiple Surface Forces Logistics Center (SFLC) Standard Specifications for preservation, welding, electrical work, and auxiliary machine systems, with emphasis on critical-coated surface quality control requiring an independent NACE Level 3 inspector. Temporary services must be provided including parking, duty section berthing, electrical power, potable/cooling water, firemain system, refuse and hazardous waste disposal, and refrigerated storage. The contract requires qualified technical representatives for specialized equipment (PLCs, DC motors, directional control valves, coating inspection), with all work performed at a contractor-operated facility subject to environmental protection, confined space entry, and OSHA compliance requirements. No specific pricing, completion dates, or award information is provided in this specification document.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC FIR (WLB 213)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2026
Developed By: GS IBCTPL
(Rev-0, 9 February 2026)
USCGC FIR (WLB-225B) DOCKSIDE AVAILABILITY FY2026
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. xi Consolidated List of Critical Inspection Items ........................................................................................... xiv Principal Characteristics .............................................................................................................................. xv General Requirements WORK ITEM 1: Fire Prevention Requirements WORK ITEM 2: Tanks, Potable Water, Clean and Inspect WORK ITEM 3: Hydraulically Operated Cargo Hatch, Inspect and Service WORK ITEM 4: Vent Ducts, Engine And Motor Room, All, Commercial Cleaning WORK ITEM 5: Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning WORK ITEM 6: Vent Ducts, Laundry Exhaust, Commercial Cleaning WORK ITEM 7: Vent Ducts, All Other, Commercial Cleaning WORK ITEM 8: Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift WORK ITEM 9: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test WORK ITEM 10: Hydraulic Chain Stoppers, Inspect And Service WORK ITEM 11: Crossdeck Winches, Inspect and Service WORK ITEM 12: Hydraulic Inhaul Winch, Inspect And Service WORK ITEM 13: Mechanical Chain Stoppers, Inspect and Service WORK ITEM 14: Warping Capstan, Inspect and Service WORK ITEM 15: Single Point Davit, Inspect and Service WORK ITEM 16: Commissary Hoist, Inspect and Service WORK ITEM 17: Buoy Crane, Appleton EB600-60-40, Inspect and Service WORK ITEM 18: Grey Water Holding Tanks, Clean and Inspect WORK ITEM 19: Sewage Holding Tanks, Clean and Inspect WORK ITEM 20: Sewage Piping, Clean and Flush WORK ITEM 21: Tanks, Grey Water Holding, Preserve, Partial WORK ITEM 22: Tanks (Sewage Holding), Preserve, Partial WORK ITEM 23: SORS Cargo Rail Remove WORK ITEM 24: Tanks, Potable Water, Preserve, Partial, WORK ITEM 25: Temporary Services, Provide - Cutter WORK ITEM 26: Steering System PLC, Upgrade WORK ITEM 27: Thruster Motor, Replace WORK ITEM 28: Compartment Deck, Preserve WORK ITEM 29: Air Conditioning Unit Foundations, AMR, Preserve WORK ITEM 30: Shower Pan Renew WORK ITEM 31: Sewage Piping, Renew WORK ITEM 32: Deck Covering (Carpeting), Renew WORK ITEM 33: Focsle Kickpipe Stuffing Tube, Renewal WORK ITEM 34: Foc’sle Deck, Preserve WORK ITEM 35: Power Circuit Breakers, Inspect, Maintain & Test WORK ITEM 36: Independent NACE Inspector (Level 3), Provide WORK ITEM 37: Tenting, Provide WORK ITEM 38: Main Reduction Gear PTO’s Seal, Renew WORK ITEM 39: Steering Gear Heat Exchanger, Modify WORK ITEM 40: Directional Control Valve, Upgrade WORK ITEM 41: Single Point Davit Ladder, Renew WORK ITEM 42: Port Anchor Windlass, Inspect and Service iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 225-WLB 320-1, Rev. AR, Electrical One-Line Diagram
Coast Guard Drawing (CGDWG) 225-WLB-561-202, Rev B, JAN 2021, Steering Control Wiring Diagram
Coast Guard Drawing 225B WLB 581-001, Rev C, Anchor Handling System Arrangement
Coast Guard Drawing (DWG) 225B-WLB-180-011, Rev B, Bow & Stern Thruster
Coast Guard Drawing (DWG) 225B-WLB-201-2, Rev D, Access Removal Routes
Coast Guard Drawing (DWG) 225B-WLB-320-1, Rev AK, Electrical One Line Diagram
Coast Guard Drawing (DWG) 225B-WLB-437-3, Rev D, Thruster Control System Block & Elem Wrg Diag Modifications
Coast Guard Drawing (DWG) 225B-WLB-568-001, Rev B, Bow Thruster A & D
Coast Guard Drawing (DWG) 225B-WLB-568-002, Rev B, Stern Thruster Arrangement and Detail
Coast Guard Drawing (DWG) 225B-WLB-74-5, Rev A, Guideline for Field Cut Penetrations
Coast Guard Drawing 225 WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940
Coast Guard Drawing 225B WLB 573-001, Rev E, Buoy Handling System Arrangement
Coast Guard Drawing 225B WLB 505-1, Rev D, General Requirements for Piping Systems
Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram
Coast Guard Drawing 225B WLB 512-007, Rev B, HVAC A&D, Fr 66-92, Innerbttm & 1st Platform
Coast Guard Drawing 225B WLB 528-001, Rev G, Plumbing and Interior Deck Drains
Coast Guard Drawing 225B WLB 528-002, Rev D, Weather Deck Drains Diagram
Coast Guard Drawing 225B WLB 549-001, Rev A, Onboard Lubrication Requirements
Coast Guard Drawing 225B WLB 549-001, Rev C, Onboard Lubrication Requirements
Coast Guard Drawing 225B WLB 551-001, Rev G, Compressed Air System Diagram
Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram
Coast Guard Drawing 225B WLB 556-005, Rev D, Aft Hydraulic System A/D, Fr 66 Aft, Block 950, 970
Coast Guard Drawing 225B WLB 573-002, Rev -, Weight Handling System Arrangement
Coast Guard Drawing 225B WLB 573-009, Rev E, Bi-Dir Ch Stopper With Retractable Roller Stopper
Coast Guard Drawing 225B WLB 573-012, Rev -, Rising Sheave Chain Stopper Ripout Incidental to Upgrade
Coast Guard Drawing 225B WLB 573-013, Rev B, Rising Sheave Chain Stopper Mechanical Mods Incidental to Upgrade v (Rev-0)
Coast Guard Drawing 225B WLB 573-014, Rev -, Rising Sheave Chain Stopper Hydraulic Mods Incidental to Upgrade
Coast Guard Drawing 225B WLB 573-11, Rev G, ATON Tie Downs
Coast Guard Drawing 225B WLB 593-001, Rev D, Sewage and Waste Water System Diagram
Coast Guard Drawing 225B WLB 593-001, Rev E, Sewage and Waste Water System
Coast Guard Drawing 225B WLB 593-009, Rev B, Sewage Holding Tank
Coast Guard Drawing 225B WLB 593-1, Rev E, Sewage and Waste Water System Diagram
Coast Guard Drawing 225B WLB 601-001, Rev F, General Arrangement Inboard & Outboard Profiles
Coast Guard Drawing 225B WLB 601-001, Rev M; General Arrangement Inboard and Outboard Profiles
Coast Guard Drawing 225B WLB 672-001, Rev C, Storerooms, Cargo Stowage and Ship Store Arrangement and Details
Coast Guard Drawing 225B WLB_601_002, Rev. Y, Booklet Of General Drawings
Coast Guard Drawing 225B-WLB 549-1, Rev -, Onboard Lubrication Requirements
Coast Guard Drawing 225B-WLB 556-1, Rev B, Hydraulic System Diagram
Coast Guard Drawing 225B-WLB 573-1, Rev -, Buoy Handling System Arrangement
Coast Guard Drawing 225B-WLB 573-2, Rev -, Weight Handling System Arrangement
Coast Guard Drawing 225B-WLB 256-001, Rev P; Seawater Cooling Sys Diagram
Coast Guard Drawing 225B-WLB 505-1, Rev D; General Requirements for Piping Systems
Coast Guard Drawing 225B-WLB 528-8, Rev D Plumbing & Deck Drains A/D, Fr 76, Fwd Abv Mn Dk, Block 960a
Coast Guard Drawing 225B-WLB 528-9, Rev C, Plumbing & Deck Drains A/D, FR-76, Aft Abv Mn Dk, Block 970
Coast Guard Drawing 225B-WLB 532-13, Rev B, Potable Water System A/D, FR-76, Aft Abv Mn Dk
Coast Guard Drawing 225B-WLB 561-001, Rev C, Steering Gear Hydraulic Diagram
Coast Guard Drawing 225B-WLB 561-005, Rev E; Steering Gear Heat Exchanger Replacement
Coast Guard Drawing 225B-WLB 601-01, Rev J, General Arr Inboard and Outboard Profiles
Coast Guard Drawing 225B-WLB 601-01, Rev P, General Arr Inboard and Outboard Profiles
Coast Guard Drawing 225B-WLB 631-02, Rev G, Painting Schedule
Coast Guard Drawing 225B-WLB 634-01, Rev F, Deck Cover Schedule
Coast Guard Drawing 225B-WLB 634-1, Rev F, Deck Covering Schedule
Coast Guard Drawing 225B-WLB 644-1, Rev D, Sanitary & Laundry Spaces & Arrgt & Details
Coast Guard Drawing 225B-WLB 801-15, Rev B, Scantlings, Decks & Platforms
Coast Guard Drawing 225B-WLB_330_002, Rev M, Lighting System Forward of FR. 30 Hill Block 910/901
Coast Guard Drawing 225B-WLB_330_007, Rev T, Lighting System 02 Level & Above Hull Block 960B/975 & 970 Partial
Coast Guard Drawing 225B-WLB-180-005, Rev G, Foundations Hull Block 940
Coast Guard Drawing 225B-WLB-185-010, Rev D, Foundations to Suit Chiller Unit Installation Incidental to MMA
Coast Guard Drawing 225B-WLB-201-001, Rev D, Machinery Spaces Arrangement
Coast Guard Drawing 225B-WLB-438-002, Rev C, Buoy Deck Controls Install to Suit MMA Aton Crane
Coast Guard Drawing 225B-WLB-514-008, Rev A, MMA Chilled Water System Diagram vi (Rev-0)
Coast Guard Drawing 225B-WLB-514-009, Rev A, MMA Chilled Water System A&D Below Main Deck
Coast Guard Drawing 225B-WLB-597-051, Rev A, SORS Hold Stowage and Handling Fittings
Coast Guard Drawing 225B-WLB-601-001, Rev P, General Arrangements, Inboard and Outboard Profiles
Coast Guard Drawing 225B-WLB-623-001, Rev H, Ladders - Vertical
Coast Guard Drawing 225-WLB _320_1, Rev AT, Electrical One-Line Diagram
Coast Guard Drawing 225-WLB 243-001, Rev B; PROPULSION SHAFTING ARRANGEMENT
Coast Guard Drawing 225-WLB 256-001, Rev U; Seawater Cooling Sys Diagram
Coast Guard Drawing 225-WLB 505-1, Rev D; General Requirements for Piping Systems
Coast Guard Drawing 225-WLB 561-001, Rev E Steering Gear Hydraulic Diagram
Coast Guard Drawing 225-WLB 561-005, Rev H; Steering Gear Heat Exchanger Replacement
Coast Guard Drawing 225-WLB 601-001, Rev AC, General Arrangements Inboard and Outboard Profiles
Coast Guard Drawing 225-WLB-437-210, Rev D, Buoy Deck Equipment Electrical Control System Mods Blk & Elem Wiring Diagram
Coast Guard Drawing 225-WLB-438-002, Rev D, Buoy Deck Controls Install to Suit MMA Aton Crane
Coast Guard Drawing 225-WLB-573-207, Rev -, Replacement DCV Amplifier Card Wiring Diagram
Coast Guard Drawing 225-WLB-597-020, Rev B, SORS Hold Stowage and Rail System
Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Chain
Coast Guard Drawing FL 2605-034, Rev D, Mechanical Chain Stopper Repair Kit: 1-7/8", 1-5/8" & 1- 1/4"
Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1
Coast Guard Drawing FL-1702-11, Rev -, Inspection of Sheaves
NAVSEA Drawing 803-1385866, Rev E, Penetration, Bulkhead and Deck
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) 9077.1 (series), Equipment Lockout/Tags-Plus Instruction
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 3559, SWBS 581B, Anchor Windlass, P/S - Model BMD-478
Coast Guard Technical Publication (CGTP) 3555, SWBS 561, Section A, Jan 2021, Steering Gear System- Model 990192-1
Coast Guard Technical Publication (TP) 10512, Section 573-A, July 2018, Buoy Handling Crane – Model
EB600-60-40
Coast Guard Technical Publication (TP) 10996, Manufacturers Instruction Book-SWBS Group(s) 514, Section A, Chilled Water Air Conditioning Plant – Model AMC-334-2Q – Installation & Operating Manual
Coast Guard Technical Publication (TP) 11101, SWBS 583, Section A (SWBS 583A), Davit, Single Point Slewing Arm Model - RAD30 - 15.5 (BMD-710)
Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3498, SWBS 573, Feb 2021, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3534A_SWBS 324_A, Switchboards, Ship Service and Emergency Diesel Generator – Model D213041-M1.
vii (Rev-0)
Coast Guard Technical Publication (TP) 3555, 21-May-1996, Steering Gear Systems
Coast Guard Technical Publication (TP) 3556, SWBS 568, Section A, Feb 2021, Bow and Stern Thrusters
Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS Group(s) 573, Section B, Cross Deck Winch – Model BMD-471
Coast Guard Technical Publication (TP) 3559, Section 582B, Apr 2009, Aft Capstan, 21” - Model BMD-
Coast Guard Technical Publication (TP) 3562, Sep 2013, SWBS 589, Section C, Dumbwaiter, Model –F-
WK-806
Coast Guard Technical Publication (TP) 3717, Jun 2003, Hydraulic Cargo Hatch
Coast Guard Technical Publication (TP) 3720, 01-AUG-2024, Single Point Slewing Arm Davit Model RAD30 – 15.5, Operation, Maintenance, & Repair Instructions, Appleton Marine
Coast Guard Technical Publication (TP) 3749, 26-APR-05, 1-7/8 Inch ATON Mechanical Chain Stopper
Coast Guard Technical Publication (TP) 3750, SWBS 573-A, Dec 2012, Rising Sheave Chain Stopper
Coast Guard Technical Publication (TP) 3796, Section A, Aug 2006, Galley Hood – Model NBDL-60 (13’-4”)
Coast Guard Technical Publication (TP) IB-H2-0002-V0, Nov 2024, ROPULSION SHAFTING AND
BEARINGS - MODEL 01-BCP, 587.55TS-94365A & 1K571500 - TECHNICAL MANUAL
Fire Prevention and Response
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, 2022, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators & Motors
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3041, 2022, Shipboard Electrical Cable Test
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3042, 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6310, 2022, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2022, General Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Requirements for Welding and Allied Processes viii (Rev-0)
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2012, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 0850 (SFLC Std Spec 0850), Jun 2009, General Requirements for Drawing Preparation
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2020, Overhaul AC Electrical Motors
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2020, Shipboard Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2020, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2020, Clean Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Preserve Ship Structures
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install New Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary Hull Accesses ix (Rev-0)
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American National Standards Institute/National Electrical Manufacturers Association (ANSI/NEMA) AB 4, Mar 2011, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects
American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects
American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services
American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and Welding End
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component Adhesives (AN)
Code of Federal Regulations (CFR) Title 29, Part 1910, Occupational Safety and Health Standards
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 40, Protection of the Environment
Federal Specification (Fed Spec) DDD-C-95, Mar 1972, Carpets and Rugs, Wool, Nylon, Acrylic, Modacrylic
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2019 Edition, Pressure Testing Of Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2019 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL-A-46106, Jun 1992, Adhesive-Sealants, Silicone, Rtv, One-Component
MIL-D-18873, Jul 1982, Deck Covering Magnesia Aggregate Mixture
MIL-D-21631, Dec 1990, Deck Covering, Latex Concrete
MIL-D-23134, Jul 1999, Deck Underlay and Covering, Insulating, Magnesia Aggregate Mixture
Mil-DTL-24643/15, Power and Lighting, Watertight, Circuit Integrity
MIL-I-3064, Mar 1991, Insulation, Electrical, Plastic-Sealer
MIL-PRF-24176 , Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric)
MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-PRF-3135, Nov 1986, Deck Covering Underlay Materials x (Rev-0)
Mil-S-24235/9E, 1992, Stuffing Tubes, Metal, And Packing Assemblies For Electric Cables, Brass and Steel, for Decks and Bulkhead With Pipe Protection.
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-1689, Nov 1990, Fabrication, Welding and Inspection of Ships Structure
MIL-STD-2003, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships and Submarines (Cable)
MIL-STD-2003-3A, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships & Submarines (Penetrations)
Naval Ship's Technical Manual (NSTM) Chapter 634, Dec 2001, Deck Covering
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2013, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), Power Tool Cleaning)
The Society for Protective Coatings (SSPC), Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
Underwriters Laboratories Inc. (UL) 1066, Low-Voltage AC and DC Power Circuit Breakers Used in Enclosures, Aug. 2022 xi (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
10 N Repair Kit, HYD
Chain Stopper Rising Sheave (for Para. 3.2, Tasks #2 and #3)
NSN: 2040-01-483-3947 2 ea. 2,631.46
10 N Cylinder, Actuating Linear
NSN: 3040-01-483-3373 2 ea. 1,777.71
11 N Hand Pump SS NSN: 4320-01-517-1444 1 ea 1,499.66 11 N Pressure Gauge -
Model BMD-471 NSN: 6685-01-437-2519 4 ea 43.79
11 N Wire Rope Assembly NSN: 4010-01-643-2077 4 ea 900.00 11 N Hydraulic Brake
Repair Kit - Model
BMD-471
NSN: 3950-01-526-9090 4 ea. 913.00
11 N Counterbalance Valve
- Model BMD-471
NSN: 4810-01-353-0586 4 ea. 150.00
11 N Shuttle Valve - Model
BMD-471
NSN: 4820-01-317-2748 4 ea. 35.00
11 N Hydraulic Motor Seal Kit - Model BMD-471
NSN: 5330-01-475-4566 8 ea. 84.00
11 N Clutch Shoe - Model
BMD-471
NSN: 4910-01-475-4125 4 ea. 56.90
11 N Drum Bushing - Model
BMD-471
NSN: 3950-01-631-0884 8 ea. 272.00
11 N Shaft Bushing - Model
BMD-471
NSN: 3950-01-631-0771 4 ea. 298.00
11 N Gearbox Seal Kit (For Winch Gearbox
Assemblies) - Model
BMD-471
NIIN: XFC343225 PN: YMD-
8194-R
4 ea. 70.00
11 N Control Station Repair Parts. Kit
NSN: 6110-01-644-9898 4 ea. 438.00
11 N Flag Block Pivot Bearing
NSN: 3110-01-644-9905 4 ea. 675.00
11 N Flag Block Bearing Cup, Sheave
NSN: 3110-01-644-9670 4 ea. 231.00
11 N Flag Block Bearing Cone, Sheave
NSN: 3110-01-013-4036 4 ea. 182.00
11 N Seal NSN: 5330-01-287-2826 4 ea. 104.00 11 N Manifold Repair Kit PN: YMD-8192-R 4 ea. 551.00 12 N Roller bearing Unit NSN: 3130-01-504-4363 2 ea. 4,012.00 12 N Grease seal NSN: 5330-01-462-5544 4 ea. 79.25 12 N Level wind pivot NSN: 3120-01-621-2293 1 ea. 1,139.00 xii (Rev-0) bushing 12 N Level wind thrust bearing NSN: 3120-01-621-2300 2 ea. 483.30
12 N Rexroth DCV NSN: 4810-01-507-0037 1 ea. 208.29 12 N Rexroth Sandwich
Flow Control NSN: 4810-01-505-9289 1 ea. 250.00
12 N Sun Sandwich Relief Valves
NSN: 4820-01-439-2451 2 ea. 900.00
12 Y Level Wind Hydraulic Cylinder
NSN: 3040-01-441-3721 1 ea. 7,423.00
12 N 3:1 Pilot Ratio, Vented Counterbalance Valve
Assembly
NSN: 4820-01-563-5841 1 ea 98.70
12 N Fully Adjustable Needle Valve
NSN: 4820-01-416-0579 1 ea 48.75
12 N Wire Rope Assembly NSN: 4010-01-646-6972 1 ea. 500.00 12 Y **Hydraulic Motor NSN: 4320-01-445-2248 1 ea 23,998 12 N **Pump, Hydraulic
Ram, Hand Driven NSN: 4320-01-286-4065 1 ea. 419.77
12 N **Cylinder Pin NSN: 5315-01-515-9847 1 ea 500.00 12 N **Cylinder Pin NSN: 5315-01-515-9912 1 ea 520.00 13 N Hardware Kit, Pins NSN: 2030-01-485-7209 2 ea. 528.47 13 N Hardware Kit, Mechanical NSN: 2030-01-485-7215 2 ea. 538.91
15 N Swing Brake Seal Kit NSN: 5330-01-390-3514 PN:
90-016-2011
2 ea 68.45
15 N Swing Brake Disc Kit NSN: 3010-01-464-1040 PN:
90-016-2131
2 ea 187.20
15 N Swing Holding Valve NSN: 4820-01-466-4918 PN:
CBEA-LHV-YHL (Sun
Hydraulics)
1 ea 251.50
15 N Wire Rope Assembly NSN: 4010-01-620-9604 PN:
JWCG062100PL
1 ea 660.00
17 N Main Fall Wire Rope NSN: 4010-01-486-0047 PN:
JWCG13001919PL
1 2,642.00
17 N Aux Fall Wire Rope NSN: 4010-01-594-2228 PN:
JWCG75200637PL
1 805.32
26 N Siemens CPU 1214 NSN: 7042-01-693-4330 PN:
6ES7214-1AG40-0XB0
2 ea. 400.00
26 N Siemens Memory Card, S7-1200, 4MB
NSN: 7050-12-414-4763 PN:
6ES7954-8LC03-0AA0
2 ea. 60.00
26 N Siemens Expansion Module, S7-1200, 8
DI, 8 DO
NSN: 5998-01-693-4347 PN:
6ES7223-1BH32-0XB0
2 ea. 255.00
27 Y Thruster Motor, DC NSN: 6105-01-687-0855 2 ea. 97,200.00 27 Y Thruster Motor, Blower NSN: 6105-01-461-8718 2 ea. 623.29
27 Y Coupling, Shaft, Assembly
NSN: 3040-01-F23-6730 2 ea. 25,900.00 xiii (Rev-0)
38 N Oil Seal, Split PN: 6001-2378 Drawing 010170-0353; 80 .
2 ea. 250
40 N Directional Control Valve (DCV)
NSN: 4810-01-F19-5719 PN:
4WRE10E75-2X/G24K4/V
1 ea. 1137.00
40 N Amplifier Card NSN: 5996-01-F19-5720 PN:
VT-VRPA2-2-1X/V0/T1
1 ea. 958.21
40 N Amplifier Card Holder NSN: 5996-01-F19-5721 PN:
VT3002-1-2X/48F
1 ea. 367.50
40 N Mating Connector, 4P
G4WIF PG7 SW
NSN: 5935-01-F19-5722 PN:
R900023126
1 ea. 150.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xiv (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item
Title
3 Hydraulically Operated Cargo Hatch, Inspect and Service
8 Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift
10 Hydraulic Chain Stoppers, Inspect And Service
11 Crossdeck Winches, Inspect and Service
12 Hydraulic Inhaul Winch, Inspect And Service
13 Mechanical Chain Stoppers, Inspect and Service
14 Warping Capstan, Inspect and Service
15 Single Point Davit, Inspect and Service
16 Commissary Hoist, Inspect and Service
17 Buoy Crane, Appleton EB600-60-40, Inspect and Service
26 Steering System PLC, Upgrade
28 Compartment Deck, Preserve
29 Air Conditioning Unit Foundations, AMR, Preserve
31 Sewage Piping, Renew
34 Foc’sle Deck, Preserve
35 «Type» Circuit Breakers, Inspect, Maintain & Test
40 Directional Control Valve, Upgrade xv (Rev-0)
PRINCIPAL CHARACTERISTICS
225' WLB (B-CLASS)
PHYSICAL
Length overall 225' 0" Length between perpendiculars 206' 0" Maximum beam 46' Designed draft 13' 0" Full load displacement 1905.6 Long Tons SW Light ship displacement 1500.7 Long Tons SW Minimum operating displacement 1869.2 Long Tons SW Mast height (above 12' waterline) 67' 5" Anchor Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-
3/8 die lock chain
HULL
Bilge keels (port & starboard) Frames 42-79 Frame spacing FR 0 to 12 21" FR 12 to 30 22" FR 30 to 102 24"
MACHINERY
Main propulsion Diesel Reduction Diesel engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM Number of propellers 1 Number of blades 4 Diameter 10' Pitch Controllable
RPM 254
Ship's service diesel generators Two Caterpillar 3508 TA, 450 KW Emergency diesel generator One Caterpillar 3406 DITA, 280 KW Shore tie Two 450 VAC, 400 Amp, 3-wire Shaft bearing, forward Cooper Bearing 01-BCP-1400-EX-TL Shaft bearing, aft Water Lubricated Cutless Bearing
TANK CAPACITIES
Diesel oil 76,498 gal.
Fresh water capacity 8056 gal.
Hydraulic oil capacity 2785 gal.
Lube oil storage 764 gal.
Grey water tank 2700 gal.
Sewage holding tank 1700 gal.
1 (Rev-0)
00000_0725_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
2 (Rev-0)
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire Protection and Response work item, as applicable, during the performance of this availability.
3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety Plan with the Contractor’s bid when work will be conducted in a Contractor–owned facility. Include any MOA(s) with local firefighting facilities.
3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan, as requested in the Fire Protection and Response work item, seven (7) days before the Arrival Conference.
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
3 (Rev-0)
ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:
SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Strenx 900 are considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
4 (Rev-0)
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).
3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.
3.7.1 SFLC Standard Specification 5550: Replace paragraph 3.11.3 to state, “Material supporting imminent work shall be brought on the cutter and stored where the work is being performed. Material that appreciably contributes to fire load shall be removed at the end of each work shift when personnel are not present. Trash, debris, and packaging materials shall be promptly removed from the vessel at the end of each work shift and not allowed to accumulate.” Advance the paragraph numbering of the Fire Prevention and Safety Inspection form to 3.11.4.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
7 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /
TIME
8 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):
Mean Reading (mils)
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
11 (Rev-0)
4.2 Tank and Void Assessment form.
12 (Rev-0)
13 (Rev-0)
55500_ACC_0323_IBCT
WORK ITEM 1: Fire Prevention Requirements
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to minimize shipboard fire risk and to clarify the Contractors’ role in fire prevention and response.
NOTE
This work item is not separately priced. Factor fire prevention and response costs into bid of affected work items.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Fire Plan. The Contractor must develop and implement a written fire plan in accordance SFLC Std Spec 5550. The Contractors Fire Plan must address Fire Protection and Response specifics as required in this Work Item.
3.1.1 The availability’s specific Fire Plan must always address the following:
material condition and fire…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .