Attachment 2- SOW.pdf

PDF 3 MB Posted

Attached to
Test Cell Pump, Waste Removal, Cleaning, and Inspection
Solicitation number
70Z03825QK0000030
Issued by

About this file

This Statement of Work (SOW) details a contract for removal, cleaning, analysis, and disposal of waste from a Test Cell Sump located at the U.S. Coast Guard Aviation Logistics Center (ALC) in Elizabeth City, North Carolina. The contractor will perform four primary tasks: (1) waste removal from the Test Cell Sump in the Pump Room, (2) water analysis including Toxicity Characteristic Leaching Procedure (TCLP) for metals and pesticides, (3) cleaning the Test Cell Sump using a high-pressure steam jenny, and (4) inspection to ensure compliance with federal, state, and local laws. The work is to be completed by certified technicians over a maximum of five days, with work hours restricted to 6:00 a.m. to 4:30 p.m. ET, Monday through Friday. The contractor is responsible for proper waste containerization, analysis, potential hazardous waste transportation to a RCRA-certified facility, and comprehensive safety and environmental compliance, with all replaced parts meeting original equipment manufacturer (OEM) specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .