Attachment 2 SOO Statement of Objectives.pdf
PDF 130 KB Posted
- Attached to
- Synopsis-Command Post Badging System Federal contract opportunity
- Solicitation number
- FA3099-25-Q-1020
About this file
This Statement of Objectives (SOO) outlines a requirement for an access control badging system installation at Laughlin Air Force Base in Texas. The project focuses on securing restricted areas within Building 344, specifically targeting Suite 129 and its entrapment area for the 47 FTW Command Post. The system must control access to two interior doors and have the capability to expand to additional locations, including the alternate Emergency Operations Center and Command Post in Building 121.
Key requirements include installing a fully functional access control system that allows installation and ongoing service by any licensed access control professional, ensuring vendor flexibility. The project timeline mandates complete installation and training within 60 days of the service request. The facility is a two-story building with 6 exterior entrances, and the system must meet or exceed the specified salient characteristics. A facility map is referenced as Attachment 3 to provide additional context for the installation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA3099-25-Q-1020 QA.pdf | ||
| FA099-25-Q-1020 Amendment Signed.pdf | ||
| Attachment 3 Bldg 344 1st Floor Badging Request.pdf | ||
| Notice of Proposed Contract Action FA3099-25-Q-1020.pdf | ||
| Attachment 1 Salient Characteristics.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA3099-25-Q-1020
Attachment 2
STATEMENT OF OBJECTIVES – SOO
FOR PREMISE WIRING
Within Building 344
AT
Laughlin AFB TX
8 September 2025
Prepared By: MSgt Edward J. Whittle
• Objective: Install a fully functional access control badging system to secure 47 FTW Command Post restricted areas within Bldg 344.
• Scope: System will control access to:
• Entrance to the entrapment area for Suite 129
• Access to Suite 129 itself
• With the ability to expand to additional doors and locations, including the alternate EOC and Command Post (Bldg. 121), as needed.
• Facility Description: Two-story building with 6 exterior entrances. Two interior doors require access control: entrance to the entrapment area in Suite 129 and entrance to Suite 129. Facility map/layout attached (Attachment 3).
• Requirements: System meets or exceeds the salient characteristics listed above.
• Service Flexibility: Allows for installation and ongoing service by any licensed access control professional, ensuring no dependency on a single vendor.
• Timeline: Installation and training to be completed no later than 60 days after service request.