Attachment 2 Schedule of items.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- GAOA Grizzly Bear Campground
- Solicitation number
- 127EAX27Q0004
About this file
This is a Schedule of Items document that provides the pricing template for the Grizzly Bear Campground Reconstruction project located in the Black Hills National Forest. The schedule lists 17 line items organized by project phase, including general requirements and mobilization, demolition work (pumphouse building, water system, campground furnishings), site improvements (campground roads, campsites), new construction (pumphouse building, water storage tank, water system, host and volunteer sites), utility connections (wastewater, electrical), facility construction (new toilet building, improved existing toilet building), gates, and signage. All items are listed with zero pricing, indicating this is a blank pricing template requiring offerors to submit cost proposals for each line item.
Offerors must provide pricing on all 17 items to be considered responsive; partial quotations will not be accepted. The document specifies that payment for bond premiums shall be in accordance with FAR 52.232-5 and may be included under the Mobilization line item rather than added to the contract price. Quantities are provided for reference as in-place quantities without shrinkage or swell factors applied, and contractors are required to verify quantities independently. Offerors must provide their name, phone number, address, email, and UEI SAM number with their price quotation submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 127EAX27Q0004 GAOA Grizzly Bear Campground.pdf | ||
| Attachment 5 Drawings.pdf | ||
| Attachment 3 Statement of Work.pdf | ||
| Attachment 4 Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
GRIZZLY BEAR CAMPGROUND RECONSTRUCTION
BLACK HILLS NATIONAL FOREST
PROJECT TITLE: GRIZZLY BEAR CAMPGROUND RECONSTRUCTION
SCHEDULE OF ITEMS
| ITEM | ||||||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY | UNIT COST | TOTAL | |
| 0001 | General Requirements/Mobilization | LS | 1 | $0.00 | ||
| 0002 | Pumphouse Building Demolition | EACH | 1 | $0.00 | ||
| 0003 | Water System Demolition | LS | 1 | $0.00 | ||
| 0004 | General Demolition, Campground Furnishings and Amenities | LS | 1 | $0.00 | ||
| 0005 | Existing Campground Road Improvements | LS | 1 | $0.00 | ||
| 0006 | Site Work for Camp Sites | LS | 1 | $0.00 | ||
| 0007 | New Pumphouse Building | LS | 1 | $0.00 | ||
| 0008 | Water Storage Tank | LS | 1 | $0.00 | ||
| 0009 | Water System | LS | 1 | $0.00 | ||
| 0010 | Host Site Construction | EACH | 1 | $0.00 | ||
| 0011 | Volunteer Site Improvements | EACH | 1 | $0.00 | ||
| 0012 | Host Site Wastewater Connections and Tank | LS | 1 | $0.00 | ||
| 0013 | Electrical | LS | 1 | $0.00 | ||
| 0014 | New Toilet Building | EACH | 1 | $0.00 | ||
| 0015 | Gates | EACH | 1 | $0.00 | ||
| 0016 | Signage | LS | 1 | $0.00 | ||
| 0017 | Improve Existing Toilet Building | LS | 1 | $0.00 | ||
| TOTAL BASE COST | $0.00 |
| NOTES: |
| 1. Offerors must submit pricing on all items to be considered responsive. Must quote on all items. |
2. Payment for bond premiums in accordance with FAR 52.232-5. Payments under Fixed-Price Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.
3. Quantities are provided for information only and are in-place quantities. No shrinkage or swell factors have been applied. Contractor shall verify quantities.
Price Quotation Furnished By:
Name: ______________________________
Phone: ______________________________
Address:_____________________________
E-mail:______________________________
UEI SAM#: __________________________
File details come from the government source that posted it. Updated .