This document is a Revision Log for the GAOA – Grizzly Bear Campground Reconstruction project that documents changes made to specifications and plan drawings.
Specification Changes: Section 010250.3.2.L.1 clarifies that Base Item No. 12 for Host Site Wastewater Connections and Tank includes all installation components including excavation, trenching, bedding material, fill, backfill, compaction, vault and sewage line placement, and electrical lines and connections. The term "option" was deleted from Section 010250.3.2.N.1. Section 006200.2.06.A specifies Double Unit Toilet materials as 5/4 x 8 Cedar Lap Siding. Section 260500.2.14.A.3 removes TV/Telephone requirements. Section 262210.1.D.1 establishes that the Contractor must make payments to the power company for work defined as "By Utility." Section 2662210.2.1.A mandates that service conductors from transformer to service entrance be provided and installed by the Contractor. Section 321217 for Hot Mix Asphalt Paving has been removed entirely.
Plan Drawing Changes: Sheet A1.1 removes the term "option" regarding window installation and staining existing toilets. Sheet C7.0 Bid Option Plan has been removed from the sheet index. Sheet MD1.1 verifies the location of the demo septic vault. Sheet M6.0 removes three instances of "option" from the table. Sheet M6.1 removes "optional" from the title block and detail D. Sheet ED1.1 specifies that the existing pedestal must be demolished and replaced with new. Sheet E5.0 indicates a 22K AIC Panelboard for Panel L1. Sheet E5.1 requires mounting a new pump motor minder.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GAOA – Grizzly Bear Campground Reconstruction
Revision Log
Specifications
Sheet 37
Section 010250.3.2.L.1 L. Base Item No. 12 – Host Site Wastewater Connections and Tank
The statement below has been added to this section.
This item includes all installation components including but not limited to excavation and trenching, bedding material, fill, backfill, compaction, providing and placing the vault and sewage lines, and providing alarms and all electrical lines and connections for complete operation.
Sheet 39
Section 010250.3.2.N.1 – Delete the term “option”.
Sheet 90
Section 006200.2.06.A – Double Unit Toilet: 5/4 x 8 Cedar Lap Siding
Sheet 146
Section 260500.2.14.A.3 Delete TV/Telephone
Sheet 151
Section 262210.1.D.1 Payment to Power Company changed to the following
Where work is to be performed by the power company that requires payment to the power company, payment will be made by the Contractor. Work to be performed by the power company is defined as "By Utility".
Sheet 152
Section 2662210.2.1.A – Service Conductors
A. From Transformer to Service Entrance: Provided and installed by. the Contractor.
Sheet 187-191
Section 321217 – Hot Mix Asphalt Paving has been removed.
Plan Drawings
Sheet A1.1 Double Toilet Floor Plan, Elevations, Misc
Removed the term “option” on installing windows and staining existing toilets
Sheet G1.0 Title Sheet
Sheet C7.0 Bid Option Plan has been removed from the sheet index.
Sheet MD1.1 Mechanical/Plumbing Site Demolition Plan
Verified location of demo septic vault.
Sheet M6.0 Mechanical/Plumbing Site Plan
Removed 3 instances of the term “option” from table.
Sheet M6.1 Mechanical Details New Sewage Vault
Removed the term “optional” from title block and detail D.
Sheet ED1.1 Electrical Site Plan Demolition Plan
Demolition Keynotes 5 – Demo existing pedestal and replace with new.
Sheet E5.0 Electrical Details One-Line Diagram
Panel L1 – 22K AIC Panelboard
Sheet E5.1 Electrical Details Pump House Electrical Layout
Mount new pump motor minder.