attachment-2-rfb-dncr-2027-03-workbook.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- RFB DNCR 2027-03
- Issued by
- Coos County, New Hampshire
About this file
This is a Request for Bid (RFB) workbook for soil and groundwater sampling services at Mt. Washington State Park in New Hampshire, prepared by the Department of Natural and Cultural Resources (DNCR). The project encompasses four primary task categories: project management with sampling and analysis planning; well inspection, maintenance, and pump installation or replacement; groundwater and soil sampling with laboratory analysis; and comprehensive reporting. The scope includes 10 soil borings with corresponding soil samples, one groundwater sampling event, well development and purging following low-flow protocols, and multiple laboratory analyses including VOCs, SVOCs, PAHs, metals, TPH, and PFAS testing on soil and groundwater samples. The work requires site access coordination, electrical and mechanical system verification, pump performance testing, proper sample handling with chain-of-custody documentation, and transport of samples to an analytical laboratory.
The bid workbook establishes a line-item format for pricing individual tasks and deliverables across the four work categories, with a final total bid amount required as the sum of all components. Specific technical requirements include low-flow purging and sampling methodologies to minimize turbidity, immediate sample preservation at 4 degrees Celsius, compliance with EPA Method 1633 for PFAS analysis, and adherence to Environmental Organization procedures for off-mountain purge water disposal. Deliverables include a Sampling and Analysis Plan, Quality Assurance Project Plan, Data Usability Summary Report, draft and final reports, and DNCR future use documentation regarding well integrity and pump settings. The workbook does not specify response deadlines, contract award dates, or contract term length in the provided content.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| rfb-dncr-2027-03--1-.pdf | ||
| addendum-1-rfb-dncr-2027-03.pdf | ||
| attachment-1-rfb-dncr-2027-03.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Task | Item | Quantity | Bid | Extended | Sub-total |
| A. Project Management | |||||
| Sampling & Analysis Plan (SAP) | 1 | ||||
| Quality Assurance Project Plan (QAPP) | 1 | ||||
| Pre-Trip Coordination (Access, weather, park notifications) | 1 |
| B. Well (M.E.P) | ||
| Site Arrival & Well Access | 1 | |
| Existing Well Inspection (cap, riser, wiring, fittings) | 1 | |
| Electrical System Check (verify power, circuit safety) | 1 | |
| Static Water Level & Well Depth Measurement | 1 | |
| Pump Removal (if required) | 1 | |
| Supply of Replacement Pump (if required) | 1 | |
| Installation of New Pump (If required) | 1 | |
| Plumbing & Electrical Pump Connections | 1 | |
| Pump/Tubing Setup for Sampling | 1 | |
| Pump Performance Testing & Verification | 1 | |
| Well Securing, Site Cleanup & Waste Removal (Dispose purge water off-mountain per Env-Or 600; restore site) | 1 |
| C. Sampling & Investigation | ||
| Well Development & Purging (Follow low-flow purging until pH, ORP, DO, EC, turbidity stabilize; record drawdown/recovery) | 1 | |
| Groundwater Sampling Event (Use low-flow sampling; minimize turbidity; use dedicated tubing; prevent agitation) | 1 | |
| Soil Borings | 10 | |
| Soil Samples | 10 | |
| Laboratory Analysis – VOCs (Includes all 10 soil samples and 1 groundwater sample) | 11 | |
| Laboratory Analysis – SVOCs (Includes all 10 soil samples and 1 groundwater sample) | 11 | |
| Laboratory Analysis – PAHs (Includes all 10 soil samples and 1 groundwater sample) | 11 | |
| Laboratory Analysis – Metals (Includes all 10 soil samples and 1 groundwater sample) | 11 | |
| Laboratory Analysis – TPH (Includes 10 soil samples; groundwater if required by SAP/QAPP) | 10 | |
| Laboratory Analysis – PFAS (EPA 1633) (Includes groundwater sample and any soil PFAS per SAP/QAPP) | 11 | |
| Sample Handling & Chain-of-Custody Documentation (Preserve immediately; maintain ≤4°C; complete COC forms) | 1 | |
| Sample Transport (Summit to Laboratory) | 1 |
| D. Reporting | ||
| DNCR Future Use Documentation (well integrity, pump settings) | 1 | |
| Data Validation | 1 | |
| Data Usability Summary Report (DUSR) | 1 | |
| Draft Report | 1 | |
| Final Report | 1 |
| Total Bid Amount (A + B + C + D) | 1 |
| Prepared By: | Date: |
| Approved By: | Date: |
File details come from the government source that posted it. Updated .