attachment-2-rfb-dncr-2027-03-workbook.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Mt. Washington State Park Soil & Groundwater Sampling.
Solicitation number
RFB DNCR 2027-03
Issued by
Coos County, New Hampshire

About this file

This is a Request for Bid (RFB) workbook for soil and groundwater sampling services at Mt. Washington State Park in New Hampshire, prepared by the Department of Natural and Cultural Resources (DNCR). The project encompasses four primary task categories: project management with sampling and analysis planning; well inspection, maintenance, and pump installation or replacement; groundwater and soil sampling with laboratory analysis; and comprehensive reporting. The scope includes 10 soil borings with corresponding soil samples, one groundwater sampling event, well development and purging following low-flow protocols, and multiple laboratory analyses including VOCs, SVOCs, PAHs, metals, TPH, and PFAS testing on soil and groundwater samples. The work requires site access coordination, electrical and mechanical system verification, pump performance testing, proper sample handling with chain-of-custody documentation, and transport of samples to an analytical laboratory.

The bid workbook establishes a line-item format for pricing individual tasks and deliverables across the four work categories, with a final total bid amount required as the sum of all components. Specific technical requirements include low-flow purging and sampling methodologies to minimize turbidity, immediate sample preservation at 4 degrees Celsius, compliance with EPA Method 1633 for PFAS analysis, and adherence to Environmental Organization procedures for off-mountain purge water disposal. Deliverables include a Sampling and Analysis Plan, Quality Assurance Project Plan, Data Usability Summary Report, draft and final reports, and DNCR future use documentation regarding well integrity and pump settings. The workbook does not specify response deadlines, contract award dates, or contract term length in the provided content.

View the file

Other files

File Type Posted
rfb-dncr-2027-03--1-.pdf PDF
addendum-1-rfb-dncr-2027-03.pdf PDF
attachment-1-rfb-dncr-2027-03.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TaskItemQuantityBidExtendedSub-total
A. Project Management
Sampling & Analysis Plan (SAP)1
Quality Assurance Project Plan (QAPP)1
Pre-Trip Coordination (Access, weather, park notifications)1
B. Well (M.E.P)
Site Arrival & Well Access1
Existing Well Inspection (cap, riser, wiring, fittings)1
Electrical System Check (verify power, circuit safety)1
Static Water Level & Well Depth Measurement1
Pump Removal (if required)1
Supply of Replacement Pump (if required)1
Installation of New Pump (If required)1
Plumbing & Electrical Pump Connections1
Pump/Tubing Setup for Sampling1
Pump Performance Testing & Verification1
Well Securing, Site Cleanup & Waste Removal (Dispose purge water off-mountain per Env-Or 600; restore site)1
C. Sampling & Investigation
Well Development & Purging (Follow low-flow purging until pH, ORP, DO, EC, turbidity stabilize; record drawdown/recovery)1
Groundwater Sampling Event (Use low-flow sampling; minimize turbidity; use dedicated tubing; prevent agitation)1
Soil Borings10
Soil Samples10
Laboratory Analysis – VOCs (Includes all 10 soil samples and 1 groundwater sample)11
Laboratory Analysis – SVOCs (Includes all 10 soil samples and 1 groundwater sample)11
Laboratory Analysis – PAHs (Includes all 10 soil samples and 1 groundwater sample)11
Laboratory Analysis – Metals (Includes all 10 soil samples and 1 groundwater sample)11
Laboratory Analysis – TPH (Includes 10 soil samples; groundwater if required by SAP/QAPP)10
Laboratory Analysis – PFAS (EPA 1633) (Includes groundwater sample and any soil PFAS per SAP/QAPP)11
Sample Handling & Chain-of-Custody Documentation (Preserve immediately; maintain ≤4°C; complete COC forms)1
Sample Transport (Summit to Laboratory)1
D. Reporting
DNCR Future Use Documentation (well integrity, pump settings)1
Data Validation1
Data Usability Summary Report (DUSR)1
Draft Report1
Final Report1
Total Bid Amount (A + B + C + D)1
Prepared By:Date:
Approved By:Date:

File details come from the government source that posted it. Updated .