Attachment 2- Requirement Questionnaire_ Audit Managment System Services.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
OIG Audit Management System Services
Solicitation number
693JK425Q700004
Issued by

About this file

This document is a detailed Requirement Questionnaire for an Audit Management System (AMS) for the U.S. Department of Energy. The comprehensive requirements document outlines extensive technical, functional, and security specifications for a commercial off-the-shelf document management system specifically designed to manage federal audit and review processes. Key requirements include scalability for 1-200 concurrent users, compatibility with Windows 11, Microsoft Office 365, and Azure services, robust security features complying with federal standards like FISMA and NIST, and advanced capabilities such as global collaboration tools, risk management integration, and comprehensive user role management.

The system must support complex audit documentation management, including unlimited write-ups and attachments, multi-level reviewer workflows, recommendation tracking, time and expense reporting, and advanced reporting capabilities. Additional desired capabilities include data migration from existing systems, natural language search, artificial intelligence documentation assistance, customizable dashboards, risk-based planning tools, and the ability to create and track engagement plans across multiple planning cycles. The system is intended to support the Department of Energy's Office of Inspector General's audit management processes, with a focus on flexibility, security, and comprehensive project management functionality.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lookup

<Select a response>
Met
Partially met
Not met
N/A

&"Calibri"&17&K000000 CUI//SP-SSEL&1#_x000D_

_x000D_&1#&"Calibri"&10&K000000 Controlled by: The U.S. Department of Energy, DOECUI@hq.doe.gov

Definitions

Definitions of Terms Used in Requirements and Desired Capabilities Questionnaire
TermDefinition
cross-indexingProcess in which an auditor, inspector, or evaluator adds references to evidencearrangement that an auditor has with a client to perform an audit of the client's accounting records and financial statements
engagementAn audit, inspection, evaluation, agreed-upon procedures, or review.a type of engagement that provides a limited level of assurance that a company's financial statements comply with the applicable financial reporting framework.
planning cycleTimeframe during which engagements are planned.
reference (or index)A citation of a source of information
referencingProcess in which an experienced auditor, inspector, or evaluator who is independent of the project checks that:

- Statements of facts, figures, and dates are correctly reported;

- The findings are adequately supported by the evidence in the project documentation; and

- The conclusions and recommendations flow logically from the evidence.

work paper (or work paper attachment) Document prepared or obtained during the course of an audit, inspection, evaluation, agreed-upon procedures, or review used to provide a basis for the conclusions and opinions. A work paper or work paper attachment is typically created or obtained externally and typically saved in MS Word, MS Excel, or Adobe PDF file formats, among other commonly-used file formats.

&"Calibri"&17&K000000 CUI//SP-SSEL&1#_x000D_

_x000D_&1#&"Calibri"&10&K000000 Controlled by: The U.S. Department of Energy, DOECUI@hq.doe.gov

Requirements

AUDIT MANAGEMENT SYSTEM (AMS) REQUIREMENTS QUESTIONNAIRE
Please respond to the following requirements by selecting a response in the column labeled 'Response' (column D) and providing any comments in the column labeled 'Comment' (column E). If your response in the column labeled 'Response' (column D) is 'N/A' or 'Partially Met', please provide an explanation in the column labeled 'Comment' (column E).
SectionRequirement NumberRequirement DescriptionResponseComment
1.General Requirements1.1Commercial, off-the-shelf document management information system specifically designed to manage audits and reviews such as the type performed by the U.S. Federal government Offices of Inspect.ors General with proven audit usage within the past three years<Select a response>
1.2Must provide names and contact information for three current audit customers, preferably in the federal, state, or local government field.<Select a response>
1.3User-friendly, intuitive graphical interface, preferably following a well-established modern click and attach, copy/paste, save, highlight, and link schema across industry in the United States.<Select a response>
1.4Scalable from 1 user to 200 concurrent users. (Initial licensing is anticipated to be approximately 100 users.)<Select a response>
1.5Include ongoing support services including, but not limited to, security updates/patches, bug fixes, and updates/patches to address compatibility with operating systems, browsers, and complementary applications for the duration of the licensing period or agreement.<Select a response>
1.6Must provide controls to prevent data loss when multiple users concurrently modify a document while working online.<Select a response>
1.7Must provide the ability for users to work with project documentation offline when a network or VPN connection is not available, including ability to create write-ups and add attachments offline, process to synchronize offline changes to the project, ability to review and resolve conflicts from offline production, add and utilize links, save all created offline project documentation, and provide controls to prevent data loss while modified offline.<Select a response>
1.8Ability to provide a read-only copy for use by computer that has never been connected to the network.<Select a response>
1.9If the product relies upon third-party tools or applications, support for those tools or applications must extend throughout the support lifecycle of the product.<Select a response>
1.10Must comply with Section 508 of the Rehabilitation Act of 1973, as amended (29 U.S.C. § 794d).<Select a response>
1.11Must provide Section 508 compliant visual indicators to indicate the signoff status (for 'Prepared', 'Reviewed', and 'Edited', at a minimum) of write-ups, recommendations, and attachments.<Select a response>
2. Infrastructure & Security Requirements2.1Ability to test prior to patch/upgrade installations in production environment<Select a response>
2.2Compatible with Windows 11 and higher<Select a response>
2.3Compatible with Microsoft Office 365 (O365), including Word and Excel; and, if the product requires O365 Click-to-Run versions to be installed, the solution must be compatible with both the 32-bit and 64-bit versions.<Select a response>
2.4Support for and compatible with current and future Acrobat PDF files<Select a response>
2.5API and Azure Integration: The system must provide robust API capabilities for integration with other enterprise systems, and it should support native integration with Microsoft Azure services to enhance scalability, security, and global reach.<Select a response>
2.6Compatible with latest OIG Windows Server build.<Select a response>
2.7Ability for agency to produce audit performance metrics from system.<Select a response>
2.8Support load balancing.<Select a response>
2.9Perform well in Virtual Machines and/or Virtual Desktop Infrastructure (VDI).<Select a response>
2 . 10Support for single user sign-on/PIV cards.<Select a response>
2.11Ability to handle slow or latent connections through VPN or remote connections.<Select a response>
2.12Ability to install client software with single installation package distributed via System Center Configuration Manager (SCCM) or other widely used software deployment mechanisms.<Select a response>
2.13Provides granular access control to include projects, user roles and security groups.<Select a response>
2.14If the solution is hosted, the following requirements must be met: a.The solution must be available for use 24 hours per day, 7 days per week, without disruption except during system updates which must be scheduled at least 6 weeks in advance and must occur on Saturdays, Sundays, and/or United States federal holidays, unless a newly identified security vulnerability is identified that requires immediate attention, in which case as much advance notice as possible must be provided.
b.Data must reside in United States.
c.Follow Federal Risk and Authorization Management Program (FedRAMP).<Select a response>
2.15Comply with the following U.S. federal government security requirements when appropriate, at a minimum:
a.Federal Information Security Management Act (FISMA);
b.National Institute of Standards and Technology (NIST) Special Publication 800-53 REV5; and
c.Federal Information Processing Standards (FIPS) 199.<Select a response>
2.16FIPS 140-3 Encryption Capable.<Select a response>
2.17Advanced Encryption Protocols: Implement advanced encryption (e.g., Quantum-safe algorithms) for data in transit and at rest, specifically tailored to protect highly sensitive information on a global scale.<Select a response>
2.18Time Zone Management: The system should automatically adjust deadlines, notifications, and scheduling based on the user’s local time zone.<Select a response>
2.19Cross-Border Data Transfer Compliance: Ensure that any cross-border data transfers adhere to international standards and local laws, such as GDPR for Europe and CCPA for California.<Select a response>
2.2Global Audit Trail: Provide a comprehensive, centralized, accessible audit trail for those with the role of Administrator that logs all user activities, changes, and accesses across different jurisdictions and regions. This includes the ability to perform logging/capture of user activity, including deletions.<Select a response>
2.21Risk Management Integration: Implement a global risk management framework that supports risk assessments across multiple regions, integrating local risk factors and global risk trends.<Select a response>
2.22Global Scalability: The system must support a scalable architecture that can handle the increased load from global operations, including high-traffic scenarios in specific regions.<Select a response>
2.23Performance Optimization for Remote Locations: The system should optimize performance for auditors operating in remote or bandwidth-constrained environments globally.<Select a response>
2.24Compliance with International Standards. ISO/IEC 27001 Compliance: Ensure the system adheres to international standards for information security management systems.<Select a response>
2.25Anti-Bribery and Anti-Corruption Compliance: Include features that support compliance with international anti-bribery and anti-corruption laws, such as the Foreign Corrupt Practices Act (FCPA) and the UK Bribery Act.<Select a response>
2.26Global Collaboration Tools: Incorporate tools that enable real-time collaboration and communication among teams across different regions, including secure messaging, video conferencing, and document sharing.<Select a response>
2.27Knowledge Management System: Implement a global knowledge management system that allows for the sharing of audit best practices, lessons learned, and guidance documents across regions.<Select a response>
2.28Global Disaster Recovery Plan: Develop a robust disaster recovery plan that ensures business continuity in the event of natural disasters, cyber-attacks, or other crises affecting global operations.<Select a response>
2.29Data Redundancy Across Regions: Ensure data redundancy across multiple geographic locations to safeguard against data loss due to regional outages.<Select a response>
2. 30Region-Specific User Interfaces: Design user interfaces that are customizable for different regions, accommodating local preferences and practices while maintaining a consistent user experience globally.<Select a response>
2.31Accessibility Compliance Globally: Ensure that the system complies with accessibility standards not just in the U.S. (e.g., Section 508) but also in other regions, such as the European Accessibility Act (EAA).<Select a response>
3. System Configurability & Centralized Administration3.1Role of 'Administrator' (or similar) with privileges to add/edit/approve/delete projects, configure application settings, create/remove/enable/disable/update user accounts, and perform other administrative tasks<Select a response>
3.2Ability for users with Administrator role to see history/audit trail to project status<Select a response>
3.3Ability for users with Administrator role to create, update, and archive multiple project templates to ensure new projects include predefined project structure and content including all required steps, based on the project type.<Select a response>
3.4Ability for users with Administrator role to create and assign permissions based on custom user roles such as admin, director, manager, independent referencer, reviewer, preparer, or combination of roles<Select a response>
3.5Ability for users with Administrator role to add/edit/remove projects<Select a response>
3.6Ability to limit project view based on user roles/permissions defined by the those with Administrator role<Select a response>
3.7Ability to assign users to different projects at any phase with role permissions specific to each project<Select a response>
3.8Centralized software policy management including user preferences and project settings.<Select a response>
3.9Ability to create workflows.<Select a response>
3 . 10Ability to copy existing projects as new projects and write-ups as new write-ups.<Select a response>
3.11Configurable fields and labels for project information, recommendations, attachments, write-ups, etc.<Select a response>
3.12Ability to generate standard and custom data reports across entire database in MS Word, MS Excel, and/or Adobe PDF formats (as appropriate) and within specific projects on current, real-time data for the purposes of resource management, project management, and recommendation tracking, at a minimum.<Select a response>
3.13Ability to create data reports for tracking milestones - initial and revised dates compared to actual - and ability to capture number of days spent in each milestone<Select a response>
3.14Ability to automate creation of regularly produced reports.<Select a response>
3.15Ability to create data reports for tracking recommendation status - initial and revised dates compared to actual, recommendations resolved in a date range, recommendations opened and closed in a date range.<Select a response>
3.16Ability to generate time and expense reports based on criteria such as time charged by user, project, or specified groups, specified time frames, specified milestones, etc.<Select a response>
3.17Ability to generate reports on any database field, including entities.<Select a response>
3.18Ability to create ad hoc reports and queries, with data limits guided by user role.<Select a response>
3.19Ability to identify content such as Controlled Unclassified Information (CUI).<Select a response>
3 . 20Ability to add identifying information beyond title to each attachment.<Select a response>
3.21Ability to support Agency records management requirements of retention and destruction.<Select a response>
3.22Ability for users to access completed and closed projects by other teams based on role defined by users with Administrator role<Select a response>
3.23Ability for users with Administrator role to grant users read-only access to projects after project closeout.<Select a response>
3.24Ability for each project to maintain a status of “Open”, “suspended,” “cancelled”, or “Closed.”<Select a response>
3.25Ability to limit re-open a project (in other words, reverting a project with a 'Status' of "Suspended", "Cancelled", or "Closed" back to "Open") to those with the 'Administrator' role to ensure the integrity of project records.<Select a response>
3.26Once a project is suspended, closed, cancelled, or suspended, all project fields and data entry changed to ‘read only’<Select a response>
3.27Controls to require project approval before work can begin<Select a response>
3.28Ability to train in simulated production environment using previous work<Select a response>
3.29Robust training for administrators<Select a response>
3. 30Train the trainers option available<Select a response>
3.31Extensive Training documentation<Select a response>
3.32Detailed reference materials for system support<Select a response>
4. Project Management Requirements4.1Self-contained projects with unique permissions and roles (including custom roles such as read only roles)<Select a response>
4.2Custom fields for individual projects, minimally 15 project-level fields available which can be edited throughout the project duration for limited roles<Select a response>
4.3Unique identifier for each project<Select a response>
4.4Ability to establish, monitor, revise, and track unlimited number of administrator defined milestones for each project<Select a response>
4.5Milestones tracker for each project must capture three date fields - initial, revised, and actual dates.<Select a response>
4.6Revised milestone date field must allow for multiple revisions.<Select a response>
4.7Milestones variable by type of project<Select a response>
4.8Ability to add, edit, and archive unlimited number of project entities linkable to each open project.<Select a response>
4.9Preparer signoffs indicating write-up ready for review including date/time and username<Select a response>
4. 10Multi-level reviewer signoffs indicating write-up ready for review including date/time and reviewer name<Select a response>
4.11Controls to prevent users from reviewing document they prepared.<Select a response>
4.12Control to prevent reviewer signoff prior to preparer signoff for each write-up.<Select a response>
4.13Ability for reviewers to add comments on individual write-ups and for preparers to respond to the comments prior to reviewer final approval, and to retain those comments.<Select a response>
4.14Ability to notify reviewers and preparers when comments are pending review or response.<Select a response>
4.15Provide reviewer comments in different sections of the write-up.<Select a response>
4.16Ability for reviewers to mark comment as resolved or complete, even if they didn’t initially author the comment.<Select a response>
4.17Ability to see complete history of user activity including name, action (create, edit, prepare, and review) and date/time for each action taken by user in project.<Select a response>
4.18Ability to see when write-ups are modified/updated (e.g. days/times write-ups were modified).<Select a response>
4.19Ability to identify changes made after supervisory review.<Select a response>
4 . 20Ability for users to logically organize project documentation in a manner of their choosing in sections, folders, or other organizing schema.<Select a response>
5. Audit Documentation Requirements5.1Support for and compatible with alternative office file types (GoogleDocs, open-source office files, etc.).<Select a response>
5.2Support for and compatible with industry-standard media files (audio, video, image).<Select a response>
5.3Support for and compatible with large-scale, complex data and analysis files.<Select a response>
5.4Unique identifier for each attachment visible to project team in the project.<Select a response>
5.5Ability to create, edit, and delete an unlimited number of write-ups (that includes fields to contain title, purpose, source, scope, methodology, results, conclusion, and recommendations) until a project is closed, suspended, or terminated even if a reviewer has approved the write-up.<Select a response>
5.6Ability for users with Administrator role to retrieve deleted write-ups and attachments.<Select a response>
5.7Ability to limit recommendation deletions to users with Administrator role.<Select a response>
5.8Ability to add an unlimited number of attachments and rename, update/replace, export, and print attachments.<Select a response>
5.9Ability to print individual write-ups, attachments, or selection of write-ups/attachments.<Select a response>
5.10Ability to print from projects in every status.<Select a response>
5.11Support for unlimited number of and unlimited file size attachments in each project (e.g., several hundred attachments per project).<Select a response>
5.12Ability to restrict access to attachments to a specific project (limit/lock so cannot change original data/data integrity).<Select a response>
5.13Ability to easily share selected attachments across projects<Select a response>
5.14Ability to retain/recover multiple versions of attachments, including the original document that was added to the AMS<Select a response>
5.15Ability to link to external sites such as websites and email addresses.<Select a response>
5.16Ability to link write-ups to supporting attachments or other write-ups.<Select a response>
5.17Ability to link attachments to each field of write-ups as well as other attachments (e.g., Word, Excel, and Acrobat).<Select a response>
5.18Ability to efficiently handle unlimited number of links within individual attachments (e.g., several hundred links within a single Word or Excel file) and across the audit file while maintaining document integrity (e.g., multiple Word files with several hundred links).<Select a response>
5.19Ability for user to review and verify links within Word, utilizing visual cues indicating that links are correct or incorrect (e.g., tickmarks, highlighting, comment boxes).<Select a response>
5 . 20Ability for other team members to view user’s review work in the attachment, as the work occurs in real time (e.g., comments or reviewer notes are visible as they are written even though the document is open by another user).<Select a response>
5.21Monitor what changes were last made/what is being worked on to individual write-up.<Select a response>
6. Recommendation and Audit Follow Up Requirements6.1Ability to create, view, and report on recommendations, all custom fields, and their updates based on audit work within a single project after a project is closed.<Select a response>
6.2Ability to link recommendations to supporting attachments and write-ups.<Select a response>
6.3Ability to create and update custom fields for recommendation tracking to meet reporting requirements (minimum of 5 monetary fields, 5 date fields, 4 dropdown fields, 4 text fields, assignment of 3 users) with the option to make fields mandatory.<Select a response>
6.4Ability to record and update response text and drop-down options for each recommendation even after project is closed.<Select a response>
6.5Ability to associate recommendations with offices and department organizations.<Select a response>
6.6Ability to mark and select individual recommendations for reporting (i.e., for tracking or information only).<Select a response>
6.7Status indicator for each recommendation, with a minimum of 5 status agency defined options (e.g., unresolved, resolved, closed).<Select a response>
6.8Ability to update individual recommendation status, including target action dates, and attach supporting documents for both open and ofr follow-up on closed projects, including date controls to prevent backdating from date of entry.<Select a response>
6.9Ability to export all recommendation data fields into an Excel format and/or CSV format, with filter options for date ranges, types of recommendations, organization, status of recs, etc.<Select a response>
6 . 10Ability to see audit trail of changes including edited field by user, date, and time indicators for each audit.<Select a response>
6.11Ability to limit recommendation updates to specific roles or users.<Select a response>
7. Usability7.1Ability to quickly locate information within attachments and write-ups within a project using text-based search of titles and contents.<Select a response>
7.2Ability to filter search results for projects, write-ups, and attachments based on custom metadata or custom tags such as Personally Identifiable Information (PII) or Controlled Unclassified Information (CUI).<Select a response>
7.3Word search ability within a single write-up as well as across the project file.<Select a response>
7.4Ability for access of entire project file for external agency employees without access to internal network.<Select a response>
7.5Easily accessible reports for users indicating completion, review status, and review notes.<Select a response>
7.6Visual reminders for pending deadlines and open items (e.g., projects, write-ups, recommendation tracking etc.).<Select a response>
7.7Provides project management dashboards displaying real-time information for project such as percentage of project work completed, document review status percentage, status of milestone phases, time and expenses charged to projects, status of assigned recommendations, etc.<Select a response>
7.8Shortcut access to project, time and expense, and recommendation data directly from dashboards.<Select a response>
7.9Ability to create notifications within the system for administer-defined triggers such as pending deadlines, review status, recommendation dates, and required actions.<Select a response>
7 . 10Ability to create e-mail notifications based on administer-defined triggers.<Select a response>
7.11Support for rich text formatting in write-ups, recommendations, and project information sections (including bold, italics, underline, highlight, text alignment, numbering, bullets, cut/page/copy).<Select a response>
7.12Support for Copy/Cut/Paste from attachments to write-up and move write-up locations.<Select a response>
7.13Support for inline and on-demand spell check, with editable/customizable dictionary.<Select a response>
7.14Ability to create and format tables within a write-up.<Select a response>
7.15Ability for multiple users to collaborate on attachment or write-up creation and edit simultaneously in real-time.<Select a response>
7.16Allow users to copy attachments with all links to a new document and then continue adding more links and other changes to such document.<Select a response>
8. Cost Accounting for Time And Expense8.1Ability for user to report time and expenses on a biweekly basis on all seven days of the week.<Select a response>
8.2Ability for add unlimited number of agency-defined non-project time codes.<Select a response>
8.3Ability for user to charge time to unlimited number of project and non-project codes (e.g., leave, holiday, etc.).<Select a response>
8.4Workflow for supervisory review of all time and expense entries with name, date, and time information, and rejection comments.<Select a response>
8.5Ability to easily re-assign user to a different reviewer for time and expense reporting.<Select a response>
8.6Ability to submit timesheet and expenses to another user when complete, recording date and time of submission.<Select a response>
8.7Ability for each user to edit timesheets and expenses after submission.<Select a response>
8.8Ability to assign billing rates for individual employees and edit those rates upon promotion or demotion.<Select a response>
8.9Ability to report on user time, including for specific users, on specific projects, within phases, or specific time frames.<Select a response>
8 . 10Ability for user with Administrator role to determine which users must submit timesheets, which users are reviewers of timesheets, and to change those reviewers.<Select a response>
8.11Ability for user with Administrator role to input, submit, un-submit, approve, reject, and delete timesheets for all users.<Select a response>
8.12Ability to prevent user from charging negative time or amounts.<Select a response>
8.13Ability to prevent user from submitting with less than 80 hours on timesheet without user with Administrator role waiver.<Select a response>
8.14Ability for user with Administrator role to define, update, and edit hourly pay rates for all users.<Select a response>
8.15Ability for user with Administrator role to define expense categories.<Select a response>
8.16Ability to associate expenses and time with specific projects.<Select a response>
8.17Retention of timesheets for agency-defined time frames, usually about 10 years.<Select a response>

&"Calibri"&17&K000000 CUI//SP-SSEL&1#_x000D_&"Arialri"&12&K000000&"Arialri"&12&K000000CUI//SP-PROCURE

_x000D_&1#&"Calibri"&10&K000000 Controlled by: The U.S. Department of Energy, DOECUI@hq.doe.gov

Desired Capabilities

AUDIT AND INSPECTION MANAGEMENT SYSTEM (AIMS) DESIRED CAPABILITIES QUESTIONNAIRE
Please respond to the following desired capabilities by selecting a response in the column labeled 'Response' (column D) and providing any comments in the column labeled 'Comment' (column E). If your response in the column labeled 'Response' (column D) is 'N/A' or 'Partially Met', please provide an explanation in the column labeled 'Comment' (column E).
SectionCapability NumberCapability DescriptionResponseComment
100Ability to migrate recommendation and project data from the existing audit management software system (s) – TeamMate AM and Ideagen Internal Audit/Pentana.<Select a response>
101Ability to track individual recommendations from migrated projects, including reporting.<Select a response>
102Ability to automatically create project codes based on agency supplied formula.<Select a response>
103Robust ad-hoc reporting that allows reporting on all data points in system.<Select a response>
104Advanced notification abilities via email and pop-ups within system as defined by agency based on all actions taken by users and changes to fields in projects and recommendations.<Select a response>
105Ability to automatically calculate milestones based on agency defined formulas based on audit type.<Select a response>
106Ability for user with Administrator role to override agency defined formulas on specific projects.<Select a response>
107Ability to have multiple levels of reviews defined by user and/or agency on specific project write-ups or attachments.<Select a response>
108Automatically assign numbers to all write-ups and attachments based on agency defined formula.<Select a response>
109Ability to capture and query staff qualifications and availability for resource assignment purposes.<Select a response>
110Natural language search of project documentation contents.<Select a response>
111Use natural language processing and generative artificial intelligence technology within user database to author documentation based on user-supplied questions and prompts with clear labeling and limitations imposed by agency.<Select a response>
112Agency-customized dashboards.<Select a response>
113Ability to create notifications within the system for user-defined triggers such as pending deadlines, review status, recommendation dates, and required actions.<Select a response>
114Ability to create e-mail notifications based on user-defined triggers.<Select a response>
115Ability to set agency-defined holidays by region for timesheets.<Select a response>
116Ability for entities outside of organization to view read-only project documentation contents without installing the product.<Select a response>
117System-generated reports that identify projects scheduled to be disposed.<Select a response>
118Provide integrated data analysis tools that perform analytical tests of full datasets such as (but not limited to) identification of duplicate payments, related party vendors, duplicate expense claims, and employee/vendor matching via a user interface that does not require the user having coding or database knowledge.<Select a response>
119Provide the capability to perform and document risk-based planning on a cyclic basis.<Select a response>
120Provide the capability for administrators to define start and end dates for planning cycles.<Select a response>
121Allow administrators to create an unlimited number of engagement plans for each planning cycle.<Select a response>
122Link projects created to the appropriate (risk-based) engagement plan to facilitate tracking of progress of engagement plan (in other words, planned engagements versus actual engagements).<Select a response>
123Provide the capability to assign a probability and impact to each entity in the audit and inspection universe during each planning cycle.<Select a response>
124Calculate risk using a user-defined formula for each entity in the audit and inspection universe during each planning cycle.<Select a response>
125Provide the capability for users to make adjustments to risk scores during each planning cycle.<Select a response>
126Allow users to change the formula for calculating risk from planning cycle to planning cycle.<Select a response>
127Provide the capability for users to add project proposals which include 'Justification', 'Proposed Objective', 'Proposed Scope/Methodology', and 'Proposed Division' to an engagement plan.<Select a response>
128Provide the capability to include mandatory work (in other words, work required by law or regulation) in engagement plans.<Select a response>
129Identify planned engagements as either 'Mandatory', 'Planned', or 'Unplanned'.<Select a response>
130Provide the capability for risk-based plans to be copied from one cycle to the next cycle.<Select a response>
131Provide the capability for users to define an unlimited number of objectives for each risk-based plan.<Select a response>

&"Calibri"&17&K000000 CUI//SP-SSEL&1#_x000D_&"Arialri"&12&K000000&"Arialri"&12&K000000CUI//SP-PROCURE

_x000D_&1#&"Calibri"&10&K000000 Controlled by: The U.S. Department of Energy, DOECUI@hq.doe.gov

File details come from the government source that posted it. Updated .