Attachment 2 - RBPF College Upgrades Design Narrative.pdf

PDF 358 KB Posted

Attached to
RBPF Police Training College Renovation
Solicitation number
19AQMM24R0180
Issued by

About this file

This document is a Design Narrative for the renovation of the Royal Bahamas Police Force Police College in Nassau, Bahamas. The scope of work includes replacing the roof, exterior windows and doors, upgrading interior finishes, refurbishing bathrooms, upgrading the kitchen, and making electrical and HVAC improvements. Key elements include:

The design prioritizes hurricane-rated roof replacement, exterior finish repairs, and critical kitchen and bathroom upgrades within the base bid. Other interior finishes, computer lab upgrades, and electrical/HVAC improvements are proposed as bid alternates due to budget constraints. The project also involves hazardous materials abatement and addressing some potential code compliance issues. The government contract opportunity associated with this design narrative is Solicitation 19AQMM24R0180 for the RBPF Police Training College Renovation, issued by the Department of State Office of Acquisition Management.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Royal Bahamas Police Force Police College (RBPC)

Nassau, The Bahamas

DESIGN NARRATIVE

100% Submission, Design Revisions

2023-01-23

Revised March 2024

Hollingsworth-Pack Corporation

201 Penniman Rd, Suite G

Williamsburg, VA 23185

Royal Bahamas Police Force Police College (RBPC) 100% SUBMITTAL, Design Revisions

23 January 2023

ARCHITECTURAL DESIGN NARRATIVE

A01 – DESIGN OBJECTIVES

1.1 SCOPE OF WORK

The Architectural & Engineering renovation of the Royal Bahamas Police Force Police College in Nassau, Bahamas, results from a need expressed by the RBPC to upgrade and bring to code compliance the two main buildings of their compound. The existing facility is intended for police administration, training and support.

This 100% submittal is made in preparation of design-bid-build construction documents for the renovation of four buildings totaling 19,872 square feet (SF). As identified within the plans, the scope includes the following building areas:

Building #5: 1st floor 6662 SF, 2nd floor 1241 SF.

Building #5A: 1st floor 2041 SF

Building #8: 1st floor 6646 SF, 2nd floor 1241 SF

Building #8A: 1st floor 2041 SF

Elements of the renovation as defined within the scope of work are included below.

1.2 ROOF REPLACEMENT

A new hurricane-rated roof is a priority for the Administration Building, as the aging asphalt shingle roofing, and prior repairs, are reportedly leaking. Many torn shingles and patches were visible during our site visit in January 2019. After inspection of the roofing, the fastener pattern of shingle attachment to plywood decking is deemed inadequate to resist wind loads required by the Bahamas Building Code.

The specifications offer three roofing options, however the cost estimate is based upon roof replacement work recently completed by the College on Building #5 with shingles. You may choose between asphalt shingles made for hurricane force winds, standard asphalt shingles with a nailing pattern to resist hurricane force winds or optional metal roofing. Metal roofing is a better product but a direct hit by a big hurricane will tear it off just the same as asphalt shingles. The standard warranty period for both metal roofing and asphalt shingle roofing is 10 years. The asphalt shingles specified are not intended to match existing, although they could be matched. The new roof assembly includes self-adhered underlayment, not roofing felt, for better protection from wind-driven rain. The performance requirements in the specifications will make it more secure with an enhanced nailing pattern for greater wind resistance.

1.3 EXTERIOR WINDOW AND DOOR REPLACEMENT

Replacement of all exterior windows and doors is not possible with the current construction budget based upon our cost estimate. However, we are proposing to replace all exterior windows and doors within the main (2) buildings closest to the street within the base bid and bid alternate #1. The only caveat is that window and door replacement for rooms 8-15, 8-16 and 8-17 is within Bid Alternate #5, and rooms 8-12 and 8-13 are excluded as work in these rooms is planned to be performed locally by the

RBPF outside of this construction contract.

We have specified all second story windows to be replaced within the base bid package, to take advantage of scaffolding needed for the roof replacement work. With the balance of money in the base bid package we’ve specified windows visible from the street and other windows and doors within those rooms to be replaced. The remainder of windows and doors within buildings 5 and 8 are within bid alternate #1.

1.4 INTERIOR ROOM UPGRADES

Interior room upgrades including all new floor, wall and ceiling finishes are not possible with the current construction budget based upon our cost estimate. As presented to the RBPC during our site visit debrief meeting, we propose to upgrade finishes primarily in the classrooms. This work is designated to be within the construction contractor’s bid alternate #5 as lowest priority.

1.5 EXTERIOR FINISH REPAIRS

Exterior finish upgrades, which includes repair/replacement of damaged masonry have been included within the construction contractor’s base bid package.

1.6 TOILET AND SHOWER ROOM REFURBISHEMENTS

Complete toilet room refurbishments, including fixtures and room finishes, are not possible with the current construction budget based upon our cost estimate. As presented to the RBPC during our site visit debrief meeting, we propose to provide a complete upgrade of the bathrooms serving the mess hall and canteen.

These bathrooms are currently unconditioned and in disrepair with original plumbing pipes. Other building bathrooms have recently had new piping and fixtures replaced and are functioning adequately.

This work is designated to be within the construction contractor’s bid alternate #3.

1.7 KITCHEN UPGRADES

High priority life-safety and health-safety kitchen upgrades, including equipment and room finishes have been included. A new washroom area will be created, a new vent hood with fire suppression installed, new water supply piping installed to replace aging galvanized steel pipes, new electrical wiring installed and a new HVAC unit installed. This work is designated to be within the construction contractor’s base bid package.

1.8 COMPUTER LAB UPGRADE

A computer lab upgrade, including room finishes and network wiring/wifi (but not including new network equipment or computers) was included within the contract scope of work. After discussion with the RBPC, the room finishes are adequate, except a new raised floor system is requested to provide a level floor surface and allow wiring to be concealed for multiple desk configurations. In addition, the offices will be removed and replaced with one central office for ease of instructor use. This work is designated to be within the construction contractor’s bid alternate #5.

1.9 MAIN ELECTRICAL SERVICES UPGRADE

Main electrical service upgrade, including electrical distribution panels was requested. We recommend the replacement of all building mounted electrical distribution panels, branch panels and equipment disconnects that are currently non-code compliant. These pieces of equipment create a life safety issue that should be remedied. It appears the main electrical service is adequate for the building demands.

Upgrade of the service transformer, main disconnect and transfer switch, and generator are not possible with the current construction budget. Those pieces of equipment will remain in service as is. This work is designated to be within the construction contractor’s base bid package.

1.10 ELECTRICAL UPGRADES

Electrical upgrades, including interior and exterior lighting, power outlets, etc. for all rooms are not possible with the current construction budget. We are recommending new lighting within the classrooms primarily. In addition, code required life-safety upgrades for exposed above ceiling wiring and wire splices is being recommended.

Code required life-safety upgrades are designated to be within the construction contractor’s base bid package. New lighting within classrooms is designated to be within the construction contractor’s bid alternate #5 to be performed when ceilings are replaced or repaired.

1.11 HVAC UPGRADES

HVAC upgrades, including spilt system A/C units, exhaust fans, etc. are being recommended for all units that are at or nearing the end of their service life. New exhaust fans are being specified in the bathrooms to provide ventilation. This work is designated to be within the construction contractor’s bid alternate #4.

1.12 HAZARDOUS MATERIALS

Hazardous materials are present in buildings and structures to be selectively demolished. A report on the presence of hazardous materials was received just prior to the release of our 100% documents. This report should be examined by bidders and contractors to become aware of locations where hazardous materials are present.

Laboratory analysis of the samples for suspect materials determined that asbestos is present in the ceiling panels and 9” x 9” vinyl floor tile with black mastic. Toilet room mirrors are assumed to be adhered with asbestos-containing mastic. Ceiling panels and mirror mastic require abatement as described in this report and in Division 02 Specification sections. Vinyl floor tiles, if undisturbed, may remain in place. Lead is present in buildings, though only trace amounts well below EPA allowable levels were found in areas tested.

Hazardous material remediation shall be done in accordance to requirements of the local jurisdiction, removed and disposed of legally, before proceeding with building renovations. Hazardous materials, or items suspected of containing hazardous materials, shall not be disturbed except under procedures specified elsewhere in the Contract Documents. The cost of Hazardous material remediation has been included in the final cost estimate.

1.13 CODE REVIEW, COMPLIANCE AND WAIVERS

Generally, restoration work for building repairs and replacement of roofing, windows and doors does not require code review or code upgrades. Areas of buildings that are expanded or altered are generally required to comply with the International Building Code (IBC), local code jurisdiction and accessibility codes outlined in the IBC and further described in the Americans with Disabilities Act (ADA).

Enforcement of these code requirements is subject to interpretation by the governing code official for any given project. Two areas within the building subject to code review and upgrades are the

Auditorium and Bathroom Addition.

During the 2022 Design Revisions, the Auditorium work was completely removed from the scope of work and our documents. However, if this work is eventually undertaken by the RBPC, the Auditorium alternation proposed would increase the occupant load by 3 persons. With the removal of the projector room, area designated as an Accessory equipment space in the IBC has become part of the auditorium

Assembly area. Assembly area has a much higher occupant load factor than the area in a projector room, increasing the overall occupant load. This would likely be subject to review by a code official.

Potential code upgrades, requiring a waiver if not provided, include the following:

1) An illuminated exit sign is required above relocated exit doors in the area where the projector room was removed. This has been added to the Construction Documents. Existing exit signs shall remain above exit doors on either side of the stage.

2) Exit doors next to the stage may be required to have egress hardware.

3) New wood paneling in area of old projector room, to match existing, is not a Class A rated material

(fire resistant) as required.

4) Fire Protection: Fire extinguisher(s) may be required. Additional fire protection may also be required, such as 2 layers of type-X gypsum board (for 1-hour rating) on the ceiling to protect wood roof construction, or an automatic sprinkler system.

5) Restroom alterations create two rooms in place of one. The addition of one restroom in a building not having accessible toilet rooms might be subject to code review and compliance with IBC and ADA requirements. If so, each restroom would need to be accessible with an accessible route into the building leading to the restrooms. In this case, the following code upgrades shall be waived by the COR.

a) One ADA accessible sink in each restroom.

b) One ADA accessible toilet in each restroom with grab bar.

c) Area for required wheelchair turning radius.

d) ADA accessible door hardware.

e) Accessible route from restrooms to ADA accessible exterior door.

f) Ramp with handrails from exterior door landing to parking level.

- END OF ARCHITECTURAL NARRATIVE -

STRUCTURAL AND CIVIL ENGINEERING NARRATIVE

S01 STRUCTURAL DESIGN NARRATIVE

1.1 GENERAL

The subject buildings are two-story masonry bearing wall structures with concrete framed second-floors and wood-framed roof structures. The lateral force–resisting systems consist of masonry shear walls which receive loads from plywood roof diaphragms and concrete second floor diaphragms.

The existing structural condition of the buildings appears to be in good condition, with no significant visible cracking in concrete or masonry or moisture damage in wood members and decking.

The tenant requested a significant auditorium expansion which is not possible with the current construction budget. As presented to the RBPC during our site visit debrief meeting, we propose a smaller re-configuration which relocates the projector room to create an entry area and slightly increase the seating capacity. During the 2022 Design Revisions, the Auditorium work was completely removed from the scope of work and our documents.

As part of the Kitchen health and food safety upgrades, the exterior trash enclosure is being replaced and enlarged to be relocated away from the kitchen back service door.

C01 – CIVIL DESIGN NARRATIVE

1.1 GENERAL

The site and site grades are to generally remain as is. Existing site utilities are to remain undisturbed and all existing utilities and installations to remain shall be protected during construction.

1.2.1 STORM DRAINAGE GRADING

Based on input from the RBPC, the existing storm drainage is functioning adequately. The island and site are very flat, and no city storm drainage piping exists in this area. There are storm drainage inlets located within the center island of the parking lot, which drain vertically into deep holes that are reported to have been drilled 200-feet into the ground.

1.2.2 POTABLE WATER SERVICE

The existing water service piping is to be reused. The existing water tap sizes from the street are too small to provide adequate pressure to the buildings, however they have been supplemented by water tanks, pumps and pressure tanks for each building.

1.2.5 SANITARY SEWER PIPING

No City sanitary sewer service exists on the street or adjacent to the site. The site is serviced by a series of multi-chamber in-ground septic systems.

- END OF STRUCTURAL AND CIVIL NARRATIVE -

M01 HVAC (MECHANICAL) DESIGN NARRATIVE

1.1 DESCRIPTION

The project consists of the replacement of existing mechanical equipment that has malfunctioned over time due to lack of maintenance, and the replacement of mechanical equipment that has exceeded its life expectancy and requires replacement.

The kitchen ventilation system is nonfunctioning, and the fire suppression system is no longer operating as intended. The ventilation system will be replaced with a kitchen hood, sized to match existing length, with code required minimum overhang requirements and new exhaust fan and make-up air fan.

Existing direct expansion (DX) split systems that have exceeded their lifespan will be replaced with new

DX equipment. Split systems serving multiple rooms/offices shall be replaced with conventional split systems with above ceiling fan coil units, and open classrooms will be replaced with wall mounted “mini-split” units.

Ventilation outside air, as required by code, is not provided to occupied spaces being provided with new mechanical equipment. Existing mechanical unit configurations are not provided with ventilation outside air, and introducing outside air within the buildings would increase the mechanical unit sizing requirements and can cause moisture issues within the buildings.

1.1.1 VENTILATION DUCTS:

All new ductwork within the building envelope shall have a minimum R-6 insulation, with exception for kitchen grease exhaust ductwork

All ductwork shall be fibrous glass duct board and closure system for residential and commercial HVAC rigid duct systems. HVAC duct systems operating at internal air velocities not exceeding rated duct liner limitations, and internal air temperatures between 40°F (4°C) and 250°F (121°C) and air velocities to

6,000 fpm (30.5 m/s). Ductboard shall be constructed of rigid, resin bonded fibrous glass board with a damage-resistant, flame retardant, reinforced aluminum foil (FRK) facing and a veil faced airstream surface

Grease ductwork serving Type I exhaust hoods shall be 16 ga. welded steel ductwork with liquid tight seams and joints. Size ductwork to match hood collar size and to maintain minimum 1500 FPM velocity, unless indicated otherwise on plan. Ductwork conveying grease laden air shall be installed so that grease cannot collect in any portion of the system. Slope all horizontal ductwork back towards the hood per code.

provide duct cleaning access doors on all changes in direction and along straight duct runs per code.

Ductwork shall be insulated with a UL listed grease duct insulation system with code required minimum rating.

Make-Up Air ductwork serving kitchen ventilation hood shall be galvanized steel, rectangular duct with external insulation.

Exhaust ductwork serving toilet rooms shall be round, galvanized metal, duct with Snaplock joints equal to M&M Manufacturing Round Snaplock Pipe.

1.1.2 VENTILATION UNITS:

Kitchen hood exhaust fan shall be provided with manufacturer’s roof curb and maintain code required minimum separation between roof and fan outlet (40” minimum). Fan shall be selected and sized to meet minimum required exhaust flow rate for hood and static pressure losses at hood collar and grease exhaust duct

Kitchen make-up air fan shall be sized to provide a minimum 85% of the design exhaust flow rate. Make-up air shall unconditioned. Provide with manufacturer’s roof curb and shall maintain a minimum of 10-ft clearance from outside air intake to all exhaust outlets and plumbing vents.

All toilet rooms shall be provided with ceiling mounted centrifugal exhaust fans sized to provide a minimum 70 CFM/Fixture. Exhaust fans shall be ducted to the closest exterior wall and terminated at manufacturer provided wall cap. Exhaust fans shall be interlocked with bathroom light switch.

All new roof mounted equipment shall be installed to maintain a minimum of 10-ft clearance from all roof edges for safety during maintenance operations.

1.1.3 VENTILATION HOODS:

The existing original kitchen ventilation hood is to be replaced with a new, stainless steel, kitchen ventilation hood with chemical fire suppression system, lighting, exhaust fan, and make-up air fan.

Equipment shall be UL listed.

Hood length shall be sized to match the existing hood, and the hood depth shall be sized to provide the minimum code required overhang of 12” beyond the footprint of all cooking equipment. Stainless steel back and side panels shall be provided on all semi-combustible walls.

Kitchen ventilation hood exhaust airflow shall be sized for a “Heavy” cooking load, with an average exhaust airflow rate of 300 CFM/FT of hood length. Make-up air shall be introduced through external supply plenums.

Hood manufacturer shall provide separate fan and lighting control switches for hood operation on front left side of hood.

Fire suppression system cabinet and controls shall be provided in wall mounted stainless steel cabinet.

Hood fire suppression nozzles shall be field piped to match equipment layout. Fire suppression system shall be interlocked with exhaust and make-up air fans. Upon detection of increased temperature within the exhaust collar, exhaust fan shall automatically be engaged to remove heat and grease laden air. A line size automatic gas shut off valve shall be provided and interlocked with the fire suppression system to terminate gas supply upon activation of the fire suppression system. Provide manual pull station and code required location for fire suppression system operation.

1.1.4 COOLING:

Cooling is provided by a combination of two system types, both utilizing direct expansion (DX) refrigeration coils.

Office space, and areas with multiple rooms served off a single unit shall be provided with a conventional

DX split system consisting of an air handling unit with evaporator coil located indoors, and an air cooled condensing unit located outdoors. All conventional split systems will be replaced with same capacity as the existing units.

Classrooms and large open areas shall be provided with variable capacity, inverter compressor split systems. Wall mounted fan coil units with evaporator coils will be provided with air cooled condensing units located on the exterior wall of the rooms served.

1.1.5 AUTOMATIC CONTROLS:

- No building automation system exists on the campus. All controls provided are local, programmable thermostats.

- Kitchen ventilation hood shall be provided with manufacturer installed controls and shall be field installed per manufacturer’s written installation instructions.

1.2 DESIGN REFERENCES:

• International Mechanical Code (IMC) 2012

• ASHRAE Handbooks

• ASHRAE 55-2004 Thermal Environmental Conditions for Human Occupancy

• ASHRAE 62.1-2016 Ventilation for Acceptable Indoor Air Quality

• ASHRAE/IES 90.1-2007 Energy Standard for Buildings Except Low Rise Residential Buildings [Current

Applicable Energy Efficiency Standard]

• ASHRAE/IES 90.1-2004 Energy Standard for Buildings Except Low Rise Residential Buildings [for

EPACT 2005 Compliance Calculations]

• ASHRAE 140-2007 Standard Method of Test for Evaluation of Building Energy Analysis Computer

Programs

• Energy Policy Act of 2005

• Energy Independence and Security Act of 2007

• American Refrigeration Institute Standard 550/590

• National Institute of Occupational Safety and Health (NIOSH) Standards

• Occupational Safety and Health Administration (OSHA) Standards

• Sheet Metal and Air Conditioning Design Build Contractors' National Association, Inc. (SMACNA): HVAC

Duct Construction Standards - Metal and Flexible

1.3. LIST DESIGN CONDITIONS / CRITERIA

The building's cooling load is calculated utilizing Trane Trace 700 load software.

1. Building occupancy profile is assumed to match the existing conditions.

2. Indoor design temperatures: Indoor temperature: 75°F Cooling, 70°F Heating, 50% Relative Humidity.

3. Outdoor design temperatures: 91.3°F DB, 78.6°F WB

3. Persons. 250 Btu/h Sensible, 200 Btu/h Latent.

4. Equipment. Assume .33 W/sf.

6. Heating Grant from lighting. 0.8 W/sf.

7. U values

U values of the building structures is input as:

External wall: 0.2945 Btu/h*ft2*°F

Ceiling construction and roof construction: 0.06206 Btu/h*ft2*°F

Window: 0.6 Btu/h*ft2*°F, Shading Coefficient of 0.82

1.4 LIST OF SPECIFICATIONS

- Provided Separately

P01 PLUMBING DESIGN NARRATIVE

1.1 DESCRIPTION

The existing plumbing system consists of septic tanks serving each individual building, a single water meter serving storage tanks. Existing pumps pressurize the water lines serving the building.

Plumbing waste and vent piping is PVC throughout. Domestic cold/hot water piping is a combination of original galvanized steel piping, and PVC piping where renovations and replacement have taken place.

The scope of work consists of the replacement of existing original galvanized steel piping that exists within Building 5, the renovation of the existing toilet rooms serving the mess hall in Building 5 to provide separate men’s/women’s toilet rooms, and the renovation of an existing storage room back to a dish wash room to separate the kitchen cooking area from the dish washing area.

Existing drains within the kitchen shall be provided replaced with new drain fixtures to match the existing pipe size, and all grease drains and piping within the kitchen shall be cleaned to provide a working drainage system.

The existing grease interceptor located near the exterior door of the kitchen shall be removed and replaced with a new concrete grease interceptor sized to meet the demands of the kitchen. The grease interceptor shall be sized larger than code required minimum to reduce the pumping interval requirements. Replacement grease interceptor shall be equal to Park USA model GT-2000 or equivalent.

1.2 DHW HEATING:

Existing domestic water heating is provided by a single electric water heater located outside the kitchen.

No modifications to the existing hot water system are anticipated.

A hot water line is to be extended from the existing overhead hot water line above the kitchen to serve the new washroom sinks.

1.3 DCW COLD WATER

Existing domestic cold water piping is a combination of galvanized steel and PVC piping. All galvanized steel piping shall be replaced with PVC piping, sized to match existing.

All domestic cold water piping within the mess hall toilet rooms shall be demolished and provided as new to serve new fixture layout.

1.3 DESIGN REFERENCES

• 2012 International Building Code

• 2012 International Plumbing Code

• 2012 International Mechanical Code

• 2012 International Energy Conservation Construction Code

1.4 FIXTURES:

Water Closets – Vitreous China, floor mounted, gravity flush. ADA height bowl where indicated. Low-flow

1.28 gallons per flush.

Urinals – Vitreous china, wall mounted, manual flush valve type. Mounted at ADA height as indicated.

Floor Drains – Cast iron bodies, nickel bronze strainers, trap primer connections. All drains shall have trap primer protection if regular drainage is not expected. 6” round floor drain with nickel bronze strainer

Lavatories – Vitreous china, wal-mount as indicated, 4” O.C. faucet kit, 1/4 turn stops, insulation kits per

ADA installations.

Stainless Steel Sinks: Stainless steel commercial kitchen grade sinks, bowl quantity as specified on drawings

1.5 LIST OF SPECIFICATIONS:

Provided separately

1.6 DRAWINGS OF PIPING.

Shown on the drawings

- END OF MECHANICAL AND PLUMBING NARRATIVE -

E01 ELECTRICAL DESIGN NARRATIVE

1.1 GENERAL DESCRIPTION

A. Main Electrical Service Upgrades: At the time of inspection, the building was in use. While some of the electrical equipment disconnects and circuit breakers were exercised to determine connected loads, the majority of the equipment was not exercised. It is clear that over time, equipment has been modified in ways that has left the equipment non-code compliant. In addition, the electrical equipment is near the end of its useful life. As a result, we recommend the replacement of all building mounted electrical branch panels and equipment disconnects that are being bypassed, missing enclosure parts and are currently non-code compliant. These pieces of equipment create a life safety issue that shall be remedied.

This does not include, however, the service transformer, main disconnect, transfer switch, generator or main distribution panels for each building. Those pieces of equipment will remain in service as is.

B. Electrical Upgrades: At the time of inspection, non-code compliant wiring and splices were discovered above accessible ceiling cavities and accessible attics. As a result, we recommend that all Non-Metallic Sheathed cable (NM, NMC and NMS) above accessible ceiling cavities be installed in conduit and all splices be installed in junction boxes. In addition, we recommend that all Non-Metallic Sheathed cable (NM, NMC and NMS) in accessible attics be installed in compliance with NEC 334.23 and all splices be installed in junction boxes.

Interior Lighting and Fans will be replaced in all rooms with ceiling grid replacement. The new fixtures will be LED and include emergency battery backup, as required.

C. Kitchen Upgrades: In addition to replacing HVAC equipment as discussed in the Mechanical

Narrative, all receptacles within the kitchen area will be replaced with GFCI protection in accordance to NEC 210.8 (B). This includes 120V single-phase receptacles, 50A or less and 208V three-phase receptacles, 100A or less.

D. Computer Lab Upgrades: A new raised floor shall be provided for the Computer Lab. As a result, new floorboxes with power and data shall be provided for student desks. In general, existing floorboxes will be utilized to provide power to new floorboxes. This will minimize the need for new branch circuits throughout the space.

E. HVAC Upgrades: Equipment replacements required by the HVAC [MECHANICAL] DESIGN

NARRATIVE shall have the required electrical upgrades. If new equipment is provided in the existing location, existing electrical infrastructure shall be utilized to minimize cost. If new equipment is provided in new location and replaces existing equipment, existing electrical infrastructure shall be spliced and extended to new equipment location, to minimize cost. If new equipment is not replacing existing equipment, such as exhaust fans, new branch circuits shall be provided for new equipment.

1.2 INTERIOR

A. International Electromechanical Code (IEC)

National Electrical Code (NFPA 70) – Current edition

National Fire Prevention Agency (NFPA)

Underwriters Laboratories (UL)

American Standards for Testing and Materials (ASTM)

Manufacturer’s O&M manuals

IESNA Lighting Handbook

ASTM B1 (2001; R 2007) Standard Specification for Hard-Drawn Copper Wire

ASTM B8 (2011) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft

ASTM D 709 (2001; R 2007) Laminated Thermosetting Materials

IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms

IEEE C2 (2012) National Electrical Safety Code

NETA ATS (2009) Standard for Acceptance Testing Specifications for Electrical Power

Equipment and Systems

ANSI C80.1 (2005) American National Standard for Electrical Rigid Steel Conduit (ERSC)

ANSI C80.3 (2005) American National Standard for Electrical Metallic Tubing (EMT)

NEMA 250 (2008) Enclosures for Electrical Equipment (1000 Volts Maximum)

NEMA FU 1 (2002; R 2007) Low Voltage Cartridge Fuses

NEMA ICS 4 (2010) Terminal Blocks

NEMA ICS 6 (1993; R 2011) Enclosures

NEMA KS 1 (2001; R 2006) Enclosed and Miscellaneous Distribution Equipment Switches (600 V

Maximum)

NEMA MG 1 (2011) Motors and Generators

NEMA RN 1 (2005) Polyvinyl-Chloride (PVC) External Coated Galvanized Rigid Steel Conduit and Intermediate Metal Conduit

NEMA TC 2 (2003) Standard for Electrical Polyvinyl Chloride (PVC) Conduit

NEMA TC 3 (2004) Standard for Polyvinyl Chloride (PVC) Fittings for Use With Rigid PVC

Conduit and Tubing

NEMA WD 1 (1999; R 2005; R 2010) Standard for General Color Requirements for Wiring

Devices

NEMA WD 6 (2002; R 2008) Wiring Devices Dimensions Specifications

NEMA Z535.4 (2007; Errata 2007) American National Standard for Product Safety Signs and

Labels

NFPA 70E (2009; Errata 09-1) Standard for Electrical Safety in the Workplace

TIA J-STD-607 (2002a) Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications

IA-568-C.1 (2009) Commercial Building Telecommunications Cabling Standard

IA-569 (2004b; Add 1 2009) Commercial Building Standard for Telecommunications Pathways and Spaces

29 CFR 1910.147 Control of Hazardous Energy (Lock Out/Tag Out)

UL 1 (2005; Reprint Jul 2007) Standard for Flexible Metal Conduit

UL 1063 (2006) Machine-Tool Wires and Cables

UL 1242 (2006; Reprint Jul 2007) Standard for Electrical Intermediate Metal Conduit --Steel

UL 1569 (1999; Reprint Jun 2009) Standard for Metal-Clad Cables

UL 1660 (2004; Reprint Apr 2008) Liquid-Tight Flexible Nonmetallic Conduit

UL 20 (2010) General-Use Snap Switches

UL 4248 (2007) UL Standard for Safety Fuse holders

UL 44 (2010) Thermoset-Insulated Wires and Cables

UL 486A-486B (2003; Reprint Feb 2010) Wire Connectors

UL 486C (2004; Reprint Feb 2010) Splicing Wire Connectors

UL 489 (2009) Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit-Breaker

Enclosures

UL 498 (2001; Reprint Apr 2010) Attachment Plugs and Receptacles

UL 50 (2007) Enclosures for Electrical Equipment, Non-environmental Considerations

UL 510 (2005; Reprint Apr 2008) Polyvinyl Control Equipment Chloride, Polyethylene and Rubber

Insulating Tape

UL 514A (2004; Reprint Apr 2010) Metallic Outlet Boxes

UL 514B (2004; Reprint Nov 2009) Conduit, Tubing and Cable Fittings

UL 6 (2007; reprint Nov 2010) Electrical Rigid Metal Conduit-Steel

UL 651 (2005; Reprint Mar 2010) Standard for Schedule 40 and 80 Rigid PVC Conduit and

Fittings

UL 67 (2009; Reprint Sep 2010) Standard for Panelboards

UL 6A (2008) Electrical Rigid Metal Conduit Aluminum, Red Brass, and Stainless Steel

UL 797 (2007) Electrical Metallic Tubing Steel

UL 817 (2001; Reprint Oct 2009) Standard for Cord Sets and Power-Supply Cords

UL 83 (2008) Thermoplastic-Insulated Wires and Cables

UL 869A (2006) Reference Standard for Service Equipment

UL 870 (2008) Standard for Wireways, Auxiliary Gutters, and Associated Fittings

UL 943 (2006; Reprint May 2010) Ground-Fault Circuit-Interrupters

UL 984 (1996; Reprint Sep 2005) Hermetic Refrigerant Motor-Compressors

B. Electrical characteristics for this project shall be 120/208 volts secondary, three phase, four wire, 60 Hz

C. New LED lighting fixtures will be selected to replace and match existing fixtures that shall be demolished.

D. Wires and cables shall meet applicable requirements of NFPA 70 and UL for type of insulation, jacket, and conductor specified or indicated. Wires and cables manufactured more than 12 months prior to date of delivery to site shall not be used.

Conductors No. 8 AWG and larger diameter shall be stranded. Conductors No. 10 AWG and smaller diameter shall be solid, except that conductors for remote control, alarm, and signal circuits, classes 1, 2, and 3, shall be stranded unless specifically indicated otherwise. Conductor sizes and capacities shown are based on copper, unless indicated otherwise. All conductors shall be copper.

Provide for service, feeder, branch, control, and signaling circuit conductors. Color shall be green for grounding conductors and white for neutrals; except where neutrals of more than one system are installed in same raceway or box, other neutrals shall be white with a different colored (not green) stripe for each. Color of ungrounded conductors in different voltage systems shall be as follows: 208/120 volt, three-phase

Phase A – black

Phase B – red

Phase C - blue

Unless specified or indicated otherwise or required by NFPA 70, power and lighting wires shall be

600-volt, Type THWN/THHN conforming to UL 83 or Type XHHW or RHW conforming to UL 44, except that grounding wire may be type TW conforming to UL 83; remote-control and signal circuits shall be Type TW or TF, conforming to UL 83. Where lighting fixtures require 90-degree

Centigrade (C) conductors, provide only conductors with 90-degree C insulation or better.

E. Emergency lighting is installed using battery backup, in common areas, hallways and stairwells

F. All branch circuit electrical panels shall be replaced, unless otherwise noted on the electrical drawings. Refer to existing and new floor plans for location and quantity.

G. Material selection will take into account the client's wishes. The functions of the electrical installations, including wishes for lighting etc. Determined on the basis of ongoing dialogue with the contractor.

1.3 EXTERIOR

A. ACI SP-66 (2004) ACI Detailing Manual

ASTM B 1 (2001; R 2007) Standard Specification for Hard-Drawn Copper Wire

ASTM B 3 (2001; R 2007) Standard Specification for Soft or Annealed Copper Wire

ASTM B 801 (2007) Standard Specification for Concentric-Lay-Stranded Conductors of 8000

Series Aluminum Alloy for Subsequent Covering or Insulation

IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms

IEEE C2 (2012) National Electrical Safety Code

ICEA S-94-649 (2004) Standard for Concentric Neutral Cables Rated 5 Through 46 KV

NETA ATS (2009) Standard for Acceptance Testing Specifications for Electrical Power

Equipment and Systems

ANSI C119.1 (2011) Electric Connectors - Sealed Insulated Underground Connector Systems

Rated 600 Volts

ANSI/NEMA WC 71/ICEA S-96-659 (1999) Standard for Nonshielded Cables Rated 2001-5000

Volts for use in the Distribution of Electric Energy

NEMA RN 1 (2005) Polyvinyl-Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit and Intermediate Metal Conduit

NFPA 70 (2011; Errata 2 2012) National Electrical Code

UL 44 (2010) Thermoset-Insulated Wires and Cables

UL 486A-486B (2003; Reprint Feb 2010) Wire Connectors

UL 510 (2005; Reprint Apr 2008) Polyvinyl Chloride, Polyethylene and Rubber Insulating Tape

UL 514B (2004; Reprint Nov 2009) Conduit, Tubing and Cable Fittings

UL 6 (2007; reprint Nov 2010) Electrical Rigid Metal Conduit-Steel

UL 83 (2008) Thermoplastic-Insulated Wires and Cables

F. Wires and cables shall meet applicable requirements of NFPA 70 and UL for type of insulation, jacket, and conductor specified or indicated. Wires and cables manufactured more than 12 months prior to date of delivery to site shall not be used.

Conductors No. 8 AWG and larger diameter shall be stranded. Conductors No. 10 AWG and smaller diameter shall be solid, except that conductors for remote control, alarm, and signal circuits, classes 1, 2, and 3, shall be stranded unless specifically indicated otherwise. Conductor sizes and capacities shown are based on copper, unless indicated otherwise. All conductors shall be copper.

Provide for service, feeder, branch, control, and signaling circuit conductors. Color shall be green for grounding conductors and white for neutrals; except where neutrals of more than one system are installed in same raceway or box, other neutrals shall be white with a different colored (not green) stripe for each. Color of ungrounded conductors in different voltage systems shall be as follows: 208/120 volt, three-phase

Phase A – black

Phase B – red

Phase C - blue

Unless specified or indicated otherwise or required by NFPA 70, power and lighting wires shall be

600-volt, Type THWN/THHN conforming to UL 83 or Type XHHW or RHW conforming to UL 44, except that grounding wire may be type TW conforming to UL 83; remote-control and signal circuits shall be Type TW or TF, conforming to UL 83. Where lighting fixtures require 90-degree

Centigrade (C) conductors, provide only conductors with 90-degree C insulation or better.

G. All exterior lighting is existing to remain.

E02 TELECOMMUNICATIONS

A. ASTM D 709 (2001; R 2007) Laminated Thermosetting Materials

IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms

ANSI/NEMA WC 66 (2001; Errata 2003) Performance Standard for Category 6 and Category 7

100 Ohm Shielded and Unshielded Twisted Pairs

NEMA WC 63.1 (2005) Twisted Pair Premise Voice and Data Communications Cables

NFPA 70 (2011; Errata 2 2012) National Electrical Code

TIA J-STD-607 (2002a) Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications

TIA-568-2 (2009c; Errata 2010) Commercial Building Telecommunications Cabling Standard -

Part 2: Balanced Twisted Pair Cable Components

TIA-568-C.1 (2009) Commercial Building Telecommunications Cabling Standard

TIA-569 (2004b; Add 1 2009) Commercial Building Standard for Telecommunications Pathways and Spaces

TIA/EIA-606 (2002a; Errata 2007; R 2007; Adm 1 2008) Administration Standard for the

Telecommunications Infrastructure

FCC Part 68 Connection of Terminal Equipment to the Telephone Network (47 CFR 68)

UL 1286 (2008; Reprint Jan 2011) Office Furnishings

UL 1863 (2004; Reprint Aug 2008) Communication Circuit Accessoires

UL 444 (2008; Reprint Apr 2010) Communications Cables

UL 467 (2007) Grounding and Bonding Equipment

UL 50 (2007) Enclosures for Electrical Equipment, Non-environmental Considerations

UL 514C (1996; Reprint May 2011) Nonmetallic Outlet Boxes, Flush-Device Boxes, and Covers

UL 969 (1995; Reprint Nov 2008) Standard for Marking and Labeling Systems

B. Provide 12 strand single mode fiber from a main splice box to a 24 port panel in the computer lab telecom rooms. Copper cables and equipment shall be and fully compatible with category 6 cable. The telecom room in the computer lab shall have an optical network switch, data/VOIP switching equipment, cable mangers with 100% spare capacity. Provide a minimum of (4) 48 port category 6 horizontal patch panels with hinged panels, with swing out access to the back of the patch panels at each telecom room. Provide one standard two full height racks at the telecom room. The telecom room shall receive a 48 port POE switch (IEEE 802.3af) with a 1000base-T and fiber connections. Provide RJ-46 cat 6 cables between switching equipment and Data, VOIP, CATV and PA switching equipment at each telecom room. The telecom room shall have a UPS power source capable of the full data and telecom load for a minimum of 2 hours.

- END OF ELECTRICAL NARRATIVE -