Attachment 2- Quote Schedule - Fire Alarm Maintenance.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- FA449726Q0037
About this file
This is a Quote Schedule template for Fire Alarm Maintenance services at Dover Air Force Base. The document provides the pricing structure and submission format that vendors must use when responding to solicitation FA449726Q0037. The schedule is designed for contractors to input pricing for fire alarm maintenance and repair services as described in the accompanying Performance Work Statement (PWS). Vendors are required to complete this Excel-based pricing template and submit it by the quote response deadline of 25 June 2026 at 12:00 P.M. EST. The NAICS code 561621 applies to this requirement, with a small business size standard of $25,000,000.00. Questions regarding the solicitation must be submitted by 10 June 2026 at 12:00 P.M. EST and should be directed to Contract Specialist Amn Bryce M. Ganske (bryce.ganske@us.af.mil / 302-677-5215) or Contracting Officer Mr. Dimas Bernacchia (dimas.bernacchia.2@us.af.mil / 302-677-3744).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base
| SOLICITATION #: | CONTRACT #: |
| BID SCHEDULE (Fire Alarm Systems) | |
| SUPPLIES OR SERVICES AND PRICE/COST |
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICES | ESTIMATED | |
| QTY/YR | UNIT | ESTIMATED UNIT PRICE | TOTAL |
AMOUNT
| 0001 | O&M Facility Fire Alarm System Maintenance | ||||
| 0001AA | Perform functional operation tests and corrective maintenance - individual facility | 96 | HR | $0.00 | $0.00 |
| 0001AB | Emergency services | 10 | HR | $0.00 | $0.00 |
| 0001AC | Perform software update/installation on multiple alarm panels | 10 | HR | $0.00 | $0.00 |
| 0001AD | Perform service repairs to include trouble shooting on alarm panel or component to alarm system, replacing parts on a single facility | 74 | HR | $0.00 | $0.00 |
| 0001AE | Perform system updates and applicable installation to enable point-to-point notification capability within individual facilities | 10 | HR | $0.00 | $0.00 |
| 0001AF | Perform update/maintenance to mass notification system - individual facility | 20 | HR | $0.00 | $0.00 |
| 0001AG | Perform complete replacement of outdated/damaged alarm panel | 20 | HR | $0.00 | $0.00 |
| 0001AH | Contractor furnishes all direct materials and mark up 15%. Total line item cost NOT TO EXCEED $6,000.00 | 1 | LO | $0.00 | $0.00 |
| TOTAL CLIN 0001 ESTIMATE | $0.00 |
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICES | ESTIMATED | |
| QTY/YR | UNIT | ESTIMATED UNIT PRICE | TOTAL |
AMOUNT
| 0002 | TWCF Facility Fire Alarm System Maintenance | ||||
| 0002AA | Perform functional operation tests, preventive, and corrective maintenance - individual facility | 126 | HR | $0.00 | $0.00 |
| 0002AB | Emergency services | 14 | HR | $0.00 | $0.00 |
| 0002AC | Perform software update/installation on multiple alarm panels | 14 | HR | $0.00 | $0.00 |
| 0002AD | Perform service repairs to include trouble shooting on alarm panel or component to alarm system, replacing parts on a single facility | 96 | HR | $0.00 | $0.00 |
| 0002AE | Perform system updates and applicable installation to enable point-to-point notification capability within individual facilities | 14 | HR | $0.00 | $0.00 |
| 0002AF | Perform update/maintenance to mass notification system - individual facility | 14 | HR | $0.00 | $0.00 |
| 0002AG | Perform complete replacement of outdated/damaged alarm panel | 25 | HR | $0.00 | $0.00 |
| 0002AH | Contractor furnishes all direct materials and mark up 15%. Total line item cost NOT TO EXCEED $16,000.00 | 1 | LO | $0.00 | $0.00 |
| TOTAL CLIN 0002 ESTIMATE | $0.00 | ||||
| TOTAL GOV ESTIMATE | $0.00 |
Op Yr 1
| SOLICITATION #: | CONTRACT #: |
| BID SCHEDULE (Fire Alarm Systems) | |
| SUPPLIES OR SERVICES AND PRICE/COST |
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICES | ESTIMATED | |
| QTY/YR | UNIT | ESTIMATED UNIT PRICE | TOTAL |
AMOUNT
| 1001 | O&M Facility Fire Alarm System Maintenance | ||||
| 1001AA | Perform functional operation tests and corrective maintenance - individual facility | 96 | HR | $0.00 | $0.00 |
| 1001AB | Emergency services | 10 | HR | $0.00 | $0.00 |
| 1001AC | Perform software update/installation on multiple alarm panels | 10 | HR | $0.00 | $0.00 |
| 1001AD | Perform service repairs to include trouble shooting on alarm panel or component to alarm system, replacing parts on a single facility | 74 | HR | $0.00 | $0.00 |
| 1001AE | Perform system updates and applicable installation to enable point-to-point notification capability within individual facilities | 10 | HR | $0.00 | $0.00 |
| 1001AF | Perform update/maintenance to mass notification system - individual facility | 20 | HR | $0.00 | $0.00 |
| 1001AG | Perform complete replacement of outdated/damaged alarm panel | 20 | HR | $0.00 | $0.00 |
| 1001AH | Contractor furnish all direct materials and mark up 15%. Total line item cost NOT TO EXCEED $6,000.00 | 1 | LO | $0.00 | $0.00 |
| TOTAL CLIN 0001 ESTIMATE | $0.00 |
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICES | ESTIMATED | |
| QTY/YR | UNIT | ESTIMATED UNIT PRICE | TOTAL |
AMOUNT
| 1002 | TWCF Facility Fire Alarm System Maintenance | ||||
| 1002AA | Perform functional operation tests, preventive, and corrective maintenance - individual facility | 126 | HR | $0.00 | $0.00 |
| 1002AB | Emergency services | 14 | HR | $0.00 | $0.00 |
| 1002AC | Perform software update/installation on multiple alarm panels | 14 | HR | $0.00 | $0.00 |
| 1002AD | Perform service repairs to include trouble shooting on alarm panel or component to alarm system, replacing parts on a single facility | 96 | HR | $0.00 | $0.00 |
| 1002AE | Perform system updates and applicable installation to enable point-to-point notification capability within individual facilities | 14 | HR | $0.00 | $0.00 |
| 1002AF | Perform update/maintenance to mass notification system - individual facility | 14 | HR | $0.00 | $0.00 |
| 1002AG | Perform complete replacement of outdated/damaged alarm panel | 25 | HR | $0.00 | $0.00 |
| 1002AH | Contractor furnish all direct materials and mark up 15%. Total line item cost NOT TO EXCEED $16,000.00 | 1 | LO | $0.00 | $0.00 |
| TOTAL CLIN 0002 ESTIMATE | $0.00 | ||||
| TOTAL GOV ESTIMATE | $0.00 |
Op Yr 2
| SOLICITATION #: | CONTRACT #: |
| BID SCHEDULE (Fire Alarm Systems) | |
| SUPPLIES OR SERVICES AND PRICE/COST |
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICES | ESTIMATED | |
| QTY/YR | UNIT | ESTIMATED UNIT PRICE | TOTAL |
AMOUNT
| 2001 | O&M Facility Fire Alarm System Maintenance | ||||
| 2001AA | Perform functional operation tests and corrective maintenance - individual facility | 96 | HR | $0.00 | $0.00 |
| 2001AB | Emergency services | 10 | HR | $0.00 | $0.00 |
| 2001AC | Perform software update/installation on multiple alarm panels | 10 | HR | $0.00 | $0.00 |
| 2001AD | Perform service repairs to include trouble shooting on alarm panel or component to alarm system, replacing parts on a single facility | 74 | HR | $0.00 | $0.00 |
| 2001AE | Perform system updates and applicable installation to enable point-to-point notification capability within individual facilities | 10 | HR | $0.00 | $0.00 |
| 2001AF | Perform update/maintenance to mass notification system - individual facility | 20 | HR | $0.00 | $0.00 |
| 2001AG | Perform complete replacement of outdated/damaged alarm panel | 20 | HR | $0.00 | $0.00 |
| 2001AH | Contractor furnish all direct materials and mark up 15%. Total line item cost NOT TO EXCEED $6,000.00 | 1 | LO | $0.00 | $0.00 |
| TOTAL CLIN 0001 ESTIMATE | $0.00 |
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICES | ESTIMATED | |
| QTY/YR | UNIT | ESTIMATED UNIT PRICE | TOTAL |
AMOUNT
| 2002 | TWCF Facility Fire Alarm System Maintenance | ||||
| 2002AA | Perform functional operation tests, preventive, and corrective maintenance - individual facility | 126 | HR | $0.00 | $0.00 |
| 2002AB | Emergency services | 14 | HR | $0.00 | $0.00 |
| 2002AC | Perform software update/installation on multiple alarm panels | 14 | HR | $0.00 | $0.00 |
| 2002AD | Perform service repairs to include trouble shooting on alarm panel or component to alarm system, replacing parts on a single facility | 96 | HR | $0.00 | $0.00 |
| 2002AE | Perform system updates and applicable installation to enable point-to-point notification capability within individual facilities | 14 | HR | $0.00 | $0.00 |
| 2002AF | Perform update/maintenance to mass notification system - individual facility | 14 | HR | $0.00 | $0.00 |
| 2002AG | Perform complete replacement of outdated/damaged alarm panel | 25 | HR | $0.00 | $0.00 |
| 2002AH | Contractor furnish all direct materials and mark up 15%. Total line item cost NOT TO EXCEED $16,000.00 | 1 | LO | $0.00 | $0.00 |
| TOTAL CLIN 0002 ESTIMATE | $0.00 | ||||
| TOTAL GOV ESTIMATE | $0.00 |
Op Yr 3
| SOLICITATION #: | CONTRACT #: |
| BID SCHEDULE (Fire Alarm Systems) | |
| SUPPLIES OR SERVICES AND PRICE/COST |
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICES | ESTIMATED | |
| QTY/YR | UNIT | ESTIMATED UNIT PRICE | TOTAL |
AMOUNT
| 0001 | O&M Facility Fire Alarm System Maintenance | ||||
| 3001AA | Perform functional operation tests and corrective maintenance - individual facility | 96 | HR | $0.00 | $0.00 |
| 3001AB | Emergency services | 10 | HR | $0.00 | $0.00 |
| 3001AC | Perform software update/installation on multiple alarm panels | 10 | HR | $0.00 | $0.00 |
| 3001AD | Perform service repairs to include trouble shooting on alarm panel or component to alarm system, replacing parts on a single facility | 74 | HR | $0.00 | $0.00 |
| 3001AE | Perform system updates and applicable installation to enable point-to-point notification capability within individual facilities | 10 | HR | $0.00 | $0.00 |
| 3001AF | Perform update/maintenance to mass notification system - individual facility | 20 | HR | $0.00 | $0.00 |
| 3001AG | Perform complete replacement of outdated/damaged alarm panel | 20 | HR | $0.00 | $0.00 |
| 3001AH | Contractor furnish all direct materials and mark up 15%. Total line item cost NOT TO EXCEED $6,000.00 | 1 | LO | $0.00 | $0.00 |
| TOTAL CLIN 0001 ESTIMATE | $0.00 |
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICES | ESTIMATED | |
| QTY/YR | UNIT | ESTIMATED UNIT PRICE | TOTAL |
AMOUNT
| 3002 | TWCF Facility Fire Alarm System Maintenance | ||||
| 3002AA | Perform functional operation tests, preventive, and corrective maintenance - individual facility | 126 | HR | $0.00 | $0.00 |
| 3002AB | Emergency services | 14 | HR | $0.00 | $0.00 |
| 3002AC | Perform software update/installation on multiple alarm panels | 14 | HR | $0.00 | $0.00 |
| 3002AD | Perform service repairs to include trouble shooting on alarm panel or component to alarm system, replacing parts on a single facility | 96 | HR | $0.00 | $0.00 |
| 3002AE | Perform system updates and applicable installation to enable point-to-point notification capability within individual facilities | 14 | HR | $0.00 | $0.00 |
| 3002AF | Perform update/maintenance to mass notification system - individual facility | 14 | HR | $0.00 | $0.00 |
| 3002AG | Perform complete replacement of outdated/damaged alarm panel | 25 | HR | $0.00 | $0.00 |
| 3002AH | Contractor furnish all direct materials and mark up 15%. Total line item cost NOT TO EXCEED $16,000.00 | 1 | LO | $0.00 | $0.00 |
| TOTAL CLIN 0002 ESTIMATE | $0.00 | ||||
| TOTAL GOV ESTIMATE | $0.00 |
Op Yr 4
| SOLICITATION #: | CONTRACT #: |
| BID SCHEDULE (Fire Alarm Systems) | |
| SUPPLIES OR SERVICES AND PRICE/COST |
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICES | ESTIMATED | |
| QTY/YR | UNIT | ESTIMATED UNIT PRICE | TOTAL |
AMOUNT
| 4001 | O&M Facility Fire Alarm System Maintenance | ||||
| 4001AA | Perform functional operation tests and corrective maintenance - individual facility | 96 | HR | $0.00 | |
| 4001AB | Emergency services | 10 | HR | $0.00 | $0.00 |
| 4001AC | Perform software update/installation on multiple alarm panels | 10 | HR | $0.00 | $0.00 |
| 4001AD | Perform service repairs to include trouble shooting on alarm panel or component to alarm system, replacing parts on a single facility | 74 | HR | $0.00 | $0.00 |
| 4001AE | Perform system updates and applicable installation to enable point-to-point notification capability within individual facilities | 10 | HR | $0.00 | $0.00 |
| 4001AF | Perform update/maintenance to mass notification system - individual facility | 20 | HR | $0.00 | $0.00 |
| 4001AG | Perform complete replacement of outdated/damaged alarm panel | 20 | HR | $0.00 | $0.00 |
| 4001AH | Contractor furnish all direct materials and mark up 15%. Total line item cost NOT TO EXCEED $6,000.00 | 1 | LO | $0.00 | $0.00 |
| TOTAL CLIN 0001 ESTIMATE | $0.00 |
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICES | ESTIMATED | |
| QTY/YR | UNIT | ESTIMATED UNIT PRICE | TOTAL |
AMOUNT
| 4002 | TWCF Facility Fire Alarm System Maintenance | ||||
| 4002AA | Perform functional operation tests, preventive, and corrective maintenance - individual facility | 126 | HR | $0.00 | $0.00 |
| 4002AB | Emergency services | 14 | HR | $0.00 | $0.00 |
| 4002AC | Perform software update/installation on multiple alarm panels | 14 | HR | $0.00 | $0.00 |
| 4002AD | Perform service repairs to include trouble shooting on alarm panel or component to alarm system, replacing parts on a single facility | 96 | HR | $0.00 | $0.00 |
| 4002AE | Perform system updates and applicable installation to enable point-to-point notification capability within individual facilities | 14 | HR | $0.00 | $0.00 |
| 4002AF | Perform update/maintenance to mass notification system - individual facility | 14 | HR | $0.00 | $0.00 |
| 4002AG | Perform complete replacement of outdated/damaged alarm panel | 25 | HR | $0.00 | $0.00 |
| 4002AH | Contractor furnish all direct materials and mark up 15%. Total line item cost NOT TO EXCEED $16,000.00 | 1 | LO | $0.00 | $0.00 |
| TOTAL CLIN 0002 ESTIMATE | $0.00 | ||||
| TOTAL GOV ESTIMATE | $0.00 |
File details come from the government source that posted it. Updated .