Attachment_2-_Quote_Schedule.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
NHTIC HEATING COOLING PUMPS 2026
Solicitation number
140L6226Q0034
Issued by

About this file

This is a Quote Schedule for the National Historic Trails Interpretive Center (NHTIC) Pump and VFD Replacement project scheduled for 2026. The document provides a base quote template for the removal and replacement of heating and cooling system components at the facility in Casper, Wyoming. The quote schedule itemizes five line items: four pumps at $5,000 each ($20,000 total), five Variable Frequency Drives (VFDs) at $75 each ($375 total), Johnson Controls Integration (JCI) as a lump sum of $3,000, Testing and Balancing (TAB) services as a lump sum of $400, and Mobilization as a lump sum of $500, for a subtotal base cost of $24,275. The spreadsheet contains formula errors that prevent total cost calculations from displaying properly, indicating this is a template requiring completion by offerors.

The file references Title I Pre-Design and Title II Final Design Services categories with specific guidance on deliverables and cost estimate classifications, though these sections appear to be general reference material rather than requirements specific to this quote. Offerors responding to solicitation 140L6226Q0034 must complete this pricing schedule and submit their signed quote package to crystal_martinez@ios.doi.gov no later than the closing date, including their Unique Entity Identifier (UEI) number and sufficient technical description to support a determination of acceptability. The performance period for the project runs from November 1, 2026, through May 31, 2027, with a mandatory site visit scheduled for October 5, 2026, at 2:00 PM MDT.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quote Schedule

NATIONAL HISTORIC TRAILS INTERPRETIVE CENTER
BASE QUOTE SCHEDULE
Project Name: NHTIC PUMP AND VFD REPLACEMENT 2026#2016 UNIT2016 COST% ofFCIAPI
UNITSUNITCOSTUNIT COSTTOTAL COSTTOTAL
NO.SECTION
1Pumps4EA$5,000$20,000ERROR:#DIV/0!
2VFD,s5EA$75.00$375ERROR:#DIV/0!
3JCI1LS$3,000.00$3,000ERROR:#DIV/0!
4TAB1LS$400.00$400ERROR:#DIV/0!
5Mobilization1LS$500.00$500ERROR:#DIV/0!
$24,275ERROR:#DIV/0!
ERROR:#REF!TOTALERROR:#DIV/0!

&"Times New Roman,Regular"Attachment 7

Title I Pre-Design Services: Services in this category may include, but are not limited to, the preparation of statement or scopes of work, review of BLM in-house or other A/E designs, evaluating and assessing existing conditions, data gathering, conducting field investigations (geotechnical and survey), preparation of feasibility studies… Designs completed during Title I include schematic and conceptual level design services and shall generally be considered to be the equivalent of 35% and up to 65% of the total design process, and have Class C and B cost estimates. During Title I Services, the A/E may be required to participate and make presentations for value engineering/analysis studies (Society of American Value Engineers certified) providing briefings, review materials and attending de-briefings on those projects with a construction value over $1,000,000 Title II Final Design Services: Services in this category may include, but are not limited to, development or review of design development and final construction documents (drawings, specifications, and cost estimates), and/or engineering analysis associated with the design and construction of new/existing infrastructure asset types for traditional design-bid-build or designbuild projects. Services may include preparing detailed drawings, specifications, bid schedules, and Class A cost estimates for construction of facilities, structures, utilities and other appurtenances. The maximum amount that can be paid to the Contractor to produce plans and specifications is 6 percent of the estimated cost of construction (10 U.S.C. 2306 (d) and 41 U.S.C. 254 (b)).

Construction drawings shall be developed from approved preliminary drawings, and they shall embody adequate civil, structural, architectural, environmental, and geotechnical, mechanical, and electrical drawings showing details, dimensions, notational information and other data as applicable to ensure that the construction contractor has a complete understanding of all elements of work