Attachment_2_Quote_Schedule.pdf

PDF 225 KB Posted

Attached to
PINEDALE FIELD OFFICE VAULT TOILET PUMPING (BASE +
Solicitation number
140L6226Q0032
Issued by

About this file

This document is a pricing template for vault pumping services under a federal contract with a base year and three option years (2026-2029). The contract requires bidders to provide unit costs and total costs for pumping services at eleven distinct locations across what appears to be a recreation area managed by the federal government. The locations include Scab Creek (single and double vault units), Stokes Crossing, North Boulder Lake Campground, Boulder Lake Boat Ramp, Boulder Dam Day Use Area, New Fork, Warren Bridge, Upper Green, and New Fork/East Fork Site. Additionally, bidders must provide pricing for dump station services at Warren Bridge and associated dump fees.

The pricing schedule is structured identically across all four contract periods with the same service locations and quantities. Single vault units total 5 locations with 1 each, double vault units total 5 locations with quantities ranging from 1 to 3 each, and Upper Green consists of 11 single vault units. The Warren Bridge Dump Station and dump fees are priced as lump sum (LS) items. Bidders must complete all unit cost and total cost fields for each year: Base Year 2026, Option Year 1 (2027), Option Year 2 (2028), and Option Year 3 (2029), with running totals calculated for each period. The document provides blank fields for all pricing entries but does not specify pricing constraints, escalation allowances, or evaluation criteria.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCATION/VAULT UNIT COST TOTAL COST

SCAB CREEK SINGLE $

SCAB CREEK DOUBLE $

STOKES CROSSING SINGLE $

NORTH BOULDER LAKE CG DOUBLE $

BOULDER LAKE BOAT RAMP DOUBLE $

BOULDER DAM DAY USE AREA SINGLE $

NEW FORK DOUBLE $

WARREN BRIDGE DOUBLE $

DUMP STATION AT WARREN BRIDGE $

UPPER GREEN SINGLE $

NEW FORK/EAST FORK SITE SINGLE $

DUMP FEES $

LOCATION/VAULT UNIT COST TOTAL COST

SCAB CREEK SINGLE $

SCAB CREEK DOUBLE $

STOKES CROSSING SINGLE $

NORTH BOULDER LAKE CG DOUBLE $

BOULDER LAKE BOAT RAMP DOUBLE $

BOULDER DAM DAY USE AREA SINGLE $

NEW FORK DOUBLE $

WARREN BRIDGE DOUBLE $

DUMP STATION AT WARREN BRIDGE $

UPPER GREEN SINGLE $

NEW FORK/EAST FORK SITE SINGLE $

DUMP FEES $

LOCATION/VAULT UNIT COST TOTAL COST

SCAB CREEK SINGLE $

SCAB CREEK DOUBLE $

STOKES CROSSING SINGLE $

NORTH BOULDER LAKE CG DOUBLE $

BOULDER LAKE BOAT RAMP DOUBLE $

BOULDER DAM DAY USE AREA SINGLE $

NEW FORK DOUBLE $

WARREN BRIDGE DOUBLE $

DUMP STATION AT WARREN BRIDGE $

UPPER GREEN SINGLE $

NEW FORK/EAST FORK SITE SINGLE $

1 EA

1 EA

1 EA

2 EA

QUANTITY UNITS

VAULT PUMPING QUOTE SCHEDULEFOR PFO OPTION YEAR 2 2028

1 EA

1 EA

1 EA

1 EA

11 EA

3 EA

1 LS

1 EA

1 EA

1 EA

1 EA

1 EA

1 EA

QUANTITY UNITS

2 EA

1 EA

EA

EA1

VAULT PUMPING QUOTE SCHEDULE FOR PFO OPTION YEAR 1 2027

VAULT PUMPING QUOTE SCHEDULE FOR PFO BASE YEAR 2026

QUANTITY UNITS

2 EA

1 EA

EA

EA

EA

LS

EA

EA

3 EA

11 EA

1 EA

TOTAL COST BASE YEAR 1 2026

TOTAL COST OPTION YEAR 1 2027

EA

1 EA

DUMP FEES $

LOCATION/VAULT UNIT COST TOTAL COST

SCAB CREEK SINGLE $

SCAB CREEK DOUBLE $

STOKES CROSSING SINGLE $

NORTH BOULDER LAKE CG DOULBE $

BOULDER LAKE BOAT RAMP DOUBLE $

BOULDER DAM DAY USE AREA SINGLE $

NEW FORK DOUBLE $

WARREN BRIDGE DOUBLE $

DUMP STATION AT WARREN BRIDGE $

UPPER GREEN SINGLE $

NEW FORK/EAST FORK SITE SINGLE $

DUMP FEES $

1 EA

1 EA

1 EA

1 EA

1 EA

VAULT PUMPING QUOTE SCHEDULE FOR PFO OPTION YEAR 3 2029

QUANTITY UNITS

2 EA

1 LS

TOTAL COST OPTION YEAR 2 2028

TOTAL COST OPTION YEAR 3 2029

1 EA

1 EA

3 EA

11 EA

1 LS

File details come from the government source that posted it. Updated .