Attachment_2_Quote_Schedule.pdf
PDF 225 KB Posted
- Solicitation number
- 140L6226Q0032
About this file
This document is a pricing template for vault pumping services under a federal contract with a base year and three option years (2026-2029). The contract requires bidders to provide unit costs and total costs for pumping services at eleven distinct locations across what appears to be a recreation area managed by the federal government. The locations include Scab Creek (single and double vault units), Stokes Crossing, North Boulder Lake Campground, Boulder Lake Boat Ramp, Boulder Dam Day Use Area, New Fork, Warren Bridge, Upper Green, and New Fork/East Fork Site. Additionally, bidders must provide pricing for dump station services at Warren Bridge and associated dump fees.
The pricing schedule is structured identically across all four contract periods with the same service locations and quantities. Single vault units total 5 locations with 1 each, double vault units total 5 locations with quantities ranging from 1 to 3 each, and Upper Green consists of 11 single vault units. The Warren Bridge Dump Station and dump fees are priced as lump sum (LS) items. Bidders must complete all unit cost and total cost fields for each year: Base Year 2026, Option Year 1 (2027), Option Year 2 (2028), and Option Year 3 (2029), with running totals calculated for each period. The document provides blank fields for all pricing entries but does not specify pricing constraints, escalation allowances, or evaluation criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_Addressed_140L6226Q0032_0001.docx | DOCX document | |
| Sol_140L6226Q0032_Amd_0001.pdf | ||
| Attachment_1-_Statement_of_Work.pdf | ||
| Attachment_3_Maps.pdf | ||
| Sol_140L6226Q0032.pdf | ||
| Attachment_4_-_Wage_Determination_2015-5409_Rev_30_posted_8-22-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION/VAULT UNIT COST TOTAL COST
SCAB CREEK SINGLE $
SCAB CREEK DOUBLE $
STOKES CROSSING SINGLE $
NORTH BOULDER LAKE CG DOUBLE $
BOULDER LAKE BOAT RAMP DOUBLE $
BOULDER DAM DAY USE AREA SINGLE $
NEW FORK DOUBLE $
WARREN BRIDGE DOUBLE $
DUMP STATION AT WARREN BRIDGE $
UPPER GREEN SINGLE $
NEW FORK/EAST FORK SITE SINGLE $
DUMP FEES $
LOCATION/VAULT UNIT COST TOTAL COST
SCAB CREEK SINGLE $
SCAB CREEK DOUBLE $
STOKES CROSSING SINGLE $
NORTH BOULDER LAKE CG DOUBLE $
BOULDER LAKE BOAT RAMP DOUBLE $
BOULDER DAM DAY USE AREA SINGLE $
NEW FORK DOUBLE $
WARREN BRIDGE DOUBLE $
DUMP STATION AT WARREN BRIDGE $
UPPER GREEN SINGLE $
NEW FORK/EAST FORK SITE SINGLE $
DUMP FEES $
LOCATION/VAULT UNIT COST TOTAL COST
SCAB CREEK SINGLE $
SCAB CREEK DOUBLE $
STOKES CROSSING SINGLE $
NORTH BOULDER LAKE CG DOUBLE $
BOULDER LAKE BOAT RAMP DOUBLE $
BOULDER DAM DAY USE AREA SINGLE $
NEW FORK DOUBLE $
WARREN BRIDGE DOUBLE $
DUMP STATION AT WARREN BRIDGE $
UPPER GREEN SINGLE $
NEW FORK/EAST FORK SITE SINGLE $
1 EA
1 EA
1 EA
2 EA
QUANTITY UNITS
VAULT PUMPING QUOTE SCHEDULEFOR PFO OPTION YEAR 2 2028
1 EA
1 EA
1 EA
1 EA
11 EA
3 EA
1 LS
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
QUANTITY UNITS
2 EA
1 EA
EA
EA1
VAULT PUMPING QUOTE SCHEDULE FOR PFO OPTION YEAR 1 2027
VAULT PUMPING QUOTE SCHEDULE FOR PFO BASE YEAR 2026
QUANTITY UNITS
2 EA
1 EA
EA
EA
EA
LS
EA
EA
3 EA
11 EA
1 EA
TOTAL COST BASE YEAR 1 2026
TOTAL COST OPTION YEAR 1 2027
EA
1 EA
DUMP FEES $
LOCATION/VAULT UNIT COST TOTAL COST
SCAB CREEK SINGLE $
SCAB CREEK DOUBLE $
STOKES CROSSING SINGLE $
NORTH BOULDER LAKE CG DOULBE $
BOULDER LAKE BOAT RAMP DOUBLE $
BOULDER DAM DAY USE AREA SINGLE $
NEW FORK DOUBLE $
WARREN BRIDGE DOUBLE $
DUMP STATION AT WARREN BRIDGE $
UPPER GREEN SINGLE $
NEW FORK/EAST FORK SITE SINGLE $
DUMP FEES $
1 EA
1 EA
1 EA
1 EA
1 EA
VAULT PUMPING QUOTE SCHEDULE FOR PFO OPTION YEAR 3 2029
QUANTITY UNITS
2 EA
1 LS
TOTAL COST OPTION YEAR 2 2028
TOTAL COST OPTION YEAR 3 2029
1 EA
1 EA
3 EA
11 EA
1 LS