Attachment_1-_Statement_of_Work.pdf
PDF 214 KB Posted
- Solicitation number
- 140L6226Q0032
About this file
This is a Statement of Work for vault pumping services at Pinedale Field Office Recreation Sites. The contract covers a one-year base period with three optional years and requires the contractor to provide all labor, supplies, supervision, materials, equipment, mileage, and transportation for cleaning, pumping, and waste disposal of vault-type toilets at remote recreation locations. Facilities include Boulder Lake Area (3 sites), Stokes Crossing, Scab Creek (3 sites), New Fork, New Fork East Fork, Upper Green Rec Locations, and Warren Bridge, with specific quantities listed in the bid schedule.
The contractor must complete pumping services within 72 hours of notification from an authorized Government Representative during the service period of May 15 through October 30. Service frequency is at least once per year, with additional services paid at the bid price if usage demands more than one pumping per year. All pumping procedures must include complete removal of liquid and solid waste, vault washdown leaving approximately 5% fresh water capacity, disinfection, cleanup, and debris removal. The contractor must furnish all required equipment including a septic tank truck with minimum 1,000-gallon capacity, vacuum pump, three-inch intake valve and hose, water supply, long-handled grappling device, and backup warning device. The contractor bears full responsibility for waste disposal at designated Government off-site locations in compliance with all federal, state, and local regulations, and must manage all work control procedures, scheduling, and quality assurance to meet established standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_Addressed_140L6226Q0032_0001.docx | DOCX document | |
| Sol_140L6226Q0032_Amd_0001.pdf | ||
| Attachment_3_Maps.pdf | ||
| Sol_140L6226Q0032.pdf | ||
| Attachment_2_Quote_Schedule.pdf | ||
| Attachment_4_-_Wage_Determination_2015-5409_Rev_30_posted_8-22-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK/SPECIFICATIONS FOR VAULT PUMPING FOR
PINEDALE FIELD OFFICE RECREATION SITES
Part 1: Work Statement
The intention of this contract is to obtain vault pumping services for the Pinedale Field
Office Recreation Sites for 1 base year with 3 option years according to these specifications.
Contractor shall provide all labor, supplies, supervision, materials, equipment, mileage, and transportation necessary to provide cleaning and pumping of vault type toilets and dispose of the waste in a designated disposal area off of Government property as per pumping procedures and disposal procedures in accordance with these specifications and all federal, state and local law.
Part 2: Work Location/Facilities
All sites are remote locations. Contractors must have the ability to successfully work in remote locations and meet the requirements of this statement of work. No water or power hookups are available or are allowed (Warren Bridge only) to the contactor.
Facilities to be pumped according to these specifications include:
Shown on PFO Vault Map 2
• Boulder Lake Area (3 Sites)
• Stokes Crossing
• Scab Creek (3 Sites)
• New Fork
• New Fork East Fork
Shown on PFO Vault Map 1
• Upper Green Rec Locations
• Warren Bridge
See bid schedule for quantities associated with each location.
Part 3: Definitions
As used herein, the following terms shall have the meaning set forth below
a) Clean. “Clean” shall be defined as free of dirt, dust, spots, streaks, stains, smudges, litter, debris, and other residue.
b) Contracting Officer. The Contracting Officer is a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the
Contracting Officer acting within the limits of their authority as delegated by the
Contracting Officer
c) Contracting Officers Representative (COR). The Government employee designated by the Contracting Officer to be responsible for monitoring
Contractor’s performance
d) Disinfect. Cleaning to destroy any harmful microorganisms by application of an approved chemical agent.
e) Facility. A structure or assembly of units of equipment designated for a specific function
f) Contractor. Contractor refers to both the prime Contractor and any
Subcontractors; the prime Contractor shall ensure that his/her Subcontractors comply with the provisions of this contract.
g) Frequency of Service. Once per year
h) Regular Working Hours. The Government’s regular working hours are from
8.am to 4 pm Mondays through Fridays except Federal Holidays or other days specifically designated by the Contracting Officer
i) Response Time. Response time is defined as the time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work location, with the appropriate tools, equipment, personnel, and materials ready to perform the required work.
Part 4: Contractor furnished Materials
The Contractor shall provide all facilities, equipment, materials, supplies and services to perform the requirements of this contract. Unless otherwise stated, the Government will not provide any materials to the Contractor. The Contractor will furnish commercially available products to disinfect and deodorize toilets and clean up the recreation sites. The disposal, transportation, and use of chemicals shall be in accordance with local, state and federal regulations.
Part 5: Management
The Contractor shall manage the total work effort associated with the custodial and maintenance services required herein to assure fully adequate and timely completion of these services. Included in this function will be a full range of management duties including, but not limited to, planning, scheduling, and quality control. The Contractor shall provide an adequate staff of personnel with the necessary management expertise to assure the performance of the work in accordance with the sound and efficient practices.
The Contractor shall employ an adequate work force to complete the work in accordance with the time and quality standards specified herein.
Part 6: Work Control/Response Time
The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress.
The Contractor shall plan and schedule work to assure material, labor, personnel, and equipment are available to complete work requirements within the specified time limits and in accordance with the quality standards established herein. Verbal scheduling and reports on the status of service calls shall be provided when requested by the Contracting
Officer’s Representative.
Services will be requested during the period May 15 through October 30. The Contractor shall complete pumping within 72 hours after receiving a request from an authorized
Government Representative. The Government will be responsible for notifying the
Contractor of which vaults are to be pumped and when they will need the service. Service to be provided at least once per year. If any vault needs pumping more than once a year due to heavy usage, the contractor will be paid at the bid price for the vault needing pumped.
Part 7: Pumping Procedures
• All liquid and solid waste will be removed from each vault whether by pumping or other approved methods
• The work will include washdown of the vaults, leaving approximately 5% of the vault capacity with fresh water, and cleanup incidental to the pumping operation
• All toilet vaults pumped shall be left in a clean condition.
• Any debris generated during the cleaning and pumping process will be thoroughly cleaned, and all debris will be promptly removed by the contractor.
• Add disinfectant to vaults for any unpleasant odors.
Part 8: Required Equipment
Contractor equipment specifications
• Septic Tank Truck or equal with clean water storage and the capability to spray in order to clean the vault and clean and disinfect any residue created by the vault pumping operation: Minimum capacity of 1,000 gallons.
• Vacuum pump
• Minimum three-inch intake valve and hose
• Water for properly cleaning vault
• Long handled grappling device
• Backup warning device
• Must be able to operate in remote locations