ATTACHMENT 2_QL4 Delivery Order Schedule blank.doc

DOC document 42 KB Posted

Attached to
Overhaul of Motoren Und Turbinen-Union (MTU) 20V4000M93L Main Diesel Engines used on Coast Guard 154' Cutters
Solicitation number
70Z08021R15001B00
Issued by

View the file

Other files

File Type Posted
70Z08021R15002B00 Changes.pdf PDF
SF 30_70Z08021R15001B00-0001.pdf PDF
Combined Synopsis-70Z08021R15001B00.pdf PDF
ATTACHMENT 1 SPEC_MTU 20V4000M93L QL4 with appendix.pdf PDF
ATTACHMENT 3 Contractor Pricing List.xlsx XLSX spreadsheet
JA MTU Overhauls_Redacted.pdf PDF
ATTACHMENT 4 - PPQ.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

OFFEROR’S PROPOSED DELIVERY SCHEDULE

CLIN
DESCRIPTION
WITHIN DAYS AFTER
1-O
Labor to receive the engine and uncrate; prepare a Receiving Inspection Report with photographs, SOW 3.2.a
Submit Appendix (A) ___ days after receipt of engine
2-O
Labor, materials, and equipment to reassemble and prepare for shipment any engine not repaired, SOW 3.2.c
Ship “F” condition engine ___ days of written approval
3-O
Disassemble and inspect engine, report findings, SOW 3.2.b
Submit Appendix (B) ___ days after submission of appendix A
4-O
Parts and Labor to overhaul, test, paint, preserve, package, shipment, commission, and warranty, SOW 3.2
Submit within ___ days of written approval of appendix (B)

Submit Appendix (C) ___ days after dynamometer testing

Provide Technical representative to commission engine seven (7) days after written notification.

Submit Appendix (E) ____ days upon completion of engine commissioning

5-O
Engine wear analysis, SOW 3.3
Submit ___ days after contract award analysis plan methodology

Submit ____ days after approval of analysis plan submit Report of Engine Wear Analysis

6-O
Technical Support, SOW 3.5
Remote technical support within ___ hour(s) upon notification

On-site technical support within ___ hours of written approval

7-O
Root Cause Failure analysis, SOW 3.6
Submit ____ days after receipt of engine
Notification of Coast Guard witness testing, SOW 3.1.i
Fourteen (14) day notice required
Check Sheet for Preservation, SOW 3.2.f
Submit with check sheet with dynamometer testing report
Cumulative Tracking Report, SOW 3.2.i
Submit Appendix (D) 15th of each month
Project Manager and Alternate Project Manager resume, SOW 3.1.q
Due at contract award