Attachment 2 PWS Lab Testing.pdf

PDF 851 KB Posted

Attached to
179TH LAB TESTING SERVICE Federal contract opportunity
Solicitation number
W50S8R-24-R-5000
Issued by
Department of the Army Ohio Army National Guard

About this file

This solicitation requests quotations for laboratory testing services. The contractor shall provide personnel, equipment, materials, and quality control to perform testing of stormwater and hazardous waste samples from Mansfield Lahm Air National Guard Base in accordance with EPA and Ohio standards. Services include receiving samples delivered by the government within 12 business days, maintaining chain of custody documentation, and providing test results reports to the Federal Environmental Manager. Pricing is requested for base and option years by contract line item for tests including ignitability, pH, metals, semi-volatile compounds, volatile compounds, halogens, biochemical oxygen demand, chemical oxygen demand, oil and grease, and suspended solids of stormwater and waste. Quotations are due by January 22, 2024. The requirement is set aside for small businesses located within 70 miles of the base in Mansfield, Ohio. The period of performance is one base year and three option years.

View the file

Other files for this federal contract opportunity

Other files attached to 179TH LAB TESTING SERVICE, newest first.
File Type Posted
Attachment 4 Pricing - Rev 1.xlsx XLSX spreadsheet
Question and Answers.pdf PDF
Attachment 4 Pricing.xlsx XLSX spreadsheet
Attachment 3 - Richland County Wage Determination 15-4735.txt TXT text file
Attachment 1 - Provisions and Clauses.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver. June 2021

PERFORMANCE WORK STATEMENT (PWS)

FOR

Laboratory Testing Services

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Laboratory Testing Services, as defined in this PWS.

1.1.1 RESERVED

1.2 Background: Mansfield Lahm Air National Guard Base (hereby referred to as the installation) requires testing of stormwater at three (3) outfalls on base for reporting to the Ohio EPA in accordance with the installation's individual NPDES Permit.

Additionally, annual hazardous waste profile testing is directed by the Installation Hazardous Waste Management Plan. Test facility must be located within 70 miles from the 179th Airlift Wing, 1947 Harrington Memorial Road, Mansfield, Ohio 44903.

1.3 Period of Performance (PoP): The Period of Performance shall be 1 Base Year of 12 months and Three (3) 12-month option years.

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0900 - 1700 on Monday through Friday, except on recognized US holidays. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.1.1 Telework: The Government will permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

Solicitation W50S8R-24-R-5000 Attachment 2: PWS

Dated: 3 January 2024

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.

The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award.

After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP. An existing company QCP that meets the requirements of 40 CFR 260.11, ASTM, and Ohio EPA standards is sufficient.

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It

Solicitation W50S8R-24-R-5000 Attachment 2: PWS defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 RESERVED

1.4.6 RESERVED

1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating test equipment and conducting the tests in the performance of this contract. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.

1.4.7.1 The Contractor must be recognized as a qualified testing agency by the State of Ohio

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.

The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.

The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel

Solicitation W50S8R-24-R-5000 Attachment 2: PWS shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.12 RESERVED

1.4.13 RESERVED

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.15 RESERVED

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

Solicitation W50S8R-24-R-5000 Attachment 2: PWS

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

CM Contract Manager COR Contracting Officer Representative DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense EMO Environmental Management Office FEM Federal Environmental Manager FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HSPD Homeland Security Presidential Directive KO Contracting Officer NGB National Guard Bureau NLT No Later Than POC Point of Contact PQL Practical Quantitation Level PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting

Solicitation W50S8R-24-R-5000 Attachment 2: PWS

SEO State Environmental Officer SSN Social Security Number TE Technical Exhibit

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: NONE

3.2 Materials: NONE

3.3 Equipment: NONE

3.4 Services: NONE

3.5 Utilities: NONE

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.2 RESERVED

4.3 RESERVED

5.0 Requirements:

5.1 The Government shall provide the contractor with a sampling plan detailing parameters to be tested for the base year and all option years. This plan is located in Exhibit 2 “Deliverables Schedule”.

5.1 Contractor shall provide unit pricing for all tests and analyses listed in Exhibit 2 “Deliverables Schedule”.

5.2 Contractor shall provide the Environmental Management Office (EMO) with sample collection containers as requested for scheduled samples within 24 hours of a request from the EMO.

5.2.1 The Government will receive the sample collection containers at the contractor’s test facility and transport them to the installation.

5.4 The Government will collect all samples for testing and analysis and will deliver collected samples to the contractor’s test facility.

Solicitation W50S8R-24-R-5000 Attachment 2: PWS

5.5 Contractor shall receive all collected samples from the EMO and provide proper climate control and packaging for collected samples prior to testing.

5.6 Contractor shall provide the EMO with a sufficient supply of Chain of Custody forms and document the chain of custody between the installation and the contractor’s test facility.

5.7 Contractor shall perform all tests and analyses requested by the EMO in accordance with 40 CFR 260.11, ASTM, and Ohio EPA standards for environmental testing.

5.8 Contractor shall provide a report of test results. Reports shall be delivered electronically to the Federal Environmental Manager (FEM) within twelve (12) business days from receipt of the collected samples. Separate reports for each waste stream or stormwater outfall shall be prepared. Reports shall be in the form of a Certificate of Analysis containing the following information. Any non-applicable items should be marked as “N/A” or documented in a footnote:

5.8.1 Sample Identification: Identify with the waste stream or outfall number for each report.

5.8.2 Date of sample receipt

5.8.3 Date and time of sample collection along with the initials of the person collecting the sample

5.8.4 Sampled matrix

5.8.5 Number of containers

5.8.6 Collection method

5.8.7 For each analysis in the report the contractor shall provide the following:

5.8.7.1 Name of Analyte

5.8.7.2 Analytical Method

5.8.7.3 Preparation Method

5.8.7.4 Quantitative result

5.8.7.5 Units of measurement

5.8.7.6 Practical Quantitation Level (PQL)

Solicitation W50S8R-24-R-5000 Attachment 2: PWS

5.8.7.7 Identification of analyst

5.8.7.8 Analysis start date and time

5.8.7.9 Extraction date

5.8.7.10 Validation date

5.8.8 All reports shall be certified by a company representative with the proper authority to do so.

5.9 RESERVED

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Mandatory or Advisory

Website

Federal Acquisition Regulation Mandatory https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition

Regulation Supplement

Mandatory http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars

40 CFR 260.11 Mandatory https://gov.ecfr.io/cgi-bin/ECFR

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website

NONE

Solicitation W50S8R-24-R-5000 Attachment 2: PWS

Dated: 3 January 2024 https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars https://gov.ecfr.io/cgi-bin/ECFR

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

Performance Objective

Performance Standard Acceptable Quality Levels (AQL)

Surveillance Method / By Whom

5.2 Provide

sample collection containers upon request of the

EMO

Containers shall be prepared for collection and available for pick up by the EMO within 24 hours of request by the EMO.

Zero missing containers upon pick up.

Correction on the spot is acceptable.

Visual Inspection / SEO

5.6 Document the

chain of custody between the installation and the contractor’s test facility.

Completed chain of custody paperwork shall be provided to the EMO upon receipt of collected samples.

100% complete documentation at every drop off.

Record Review / COR

5.8 Provide a

report of test results.

Report shall be sent to the EMO within 12 business days from receipt of collection samples

90% on schedule. Record Review / COR

5.8 Reports shall

be in the form of a Certificate of Analysis with complete information

Report shall contain all items listed in paragraphs 5.6.1 –

5.6.8. Any non-applicable

items should be marked as “N/A” or documented in a footnote.

100% complete documentation on every report.

Record review / COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

1.4.3 Quality

Control Plan

NLT 10 days after contract award.

Electronic

COR

1.4.9 Contract

Manager

Information

NLT 10 days after contract award.

Electronic

5.6 Chain of

Custody

Documentation

Upon receipt of collected samples at the contractor’s test facility.

Electronic / Utilize form created by contractor

5.8 Certificate of

Analysis

Within 10 business days from receipt of collection samples

Electronic / Utilize form created by contractor

TEST PLAN BASE YEAR (2024)

Waste Characterization Test Parameters Number of Analyses Ignitability 12 pH 12 TCLP Metals 17

TCLP SVOC 13

TCLP VOC 13

Total Halogens 2 Total VOC 1

Storm Water Test Parameters Number of Analyses Benzene, Toluene, Ethylbenzene, Xylene 12

Biochemical Oxygen Demand 12 Chemical Oxygen Demand 12

Naphthalene 4 Oil and Grease, Total 36

Phenol 4 Priority Pollutants 1

Total Organic Carbon 12 Total Suspended Solids 36

TEST PLAN OPTION YEAR 1 (2025)

Attachment 2: PWS

Ignitability 8 pH 8

TCLP Metals 13

TCLP SVOC 9

TCLP VOC 9

Total Halogens 1 Total VOC 1

Storm Water Test Parameters Number of Analyses Benzene, Toluene, Ethylbenzene, Xylene 12

Biochemical Oxygen Demand 12 Chemical Oxygen Demand 12

Naphthalene 4 Oil and Grease, Total 36

Phenol 4 Priority Pollutants 1

TEST PLAN OPTION YEAR 2 (2026)

Ignitability 5 pH 5

TCLP Metals 11

TCLP SVOC 7

TCLP VOC 7

Total Halogens 0 Total VOC 2

Storm Water Test Parameters Number of Analyses Benzene, Toluene, Ethylbenzene, Xylene 12

Biochemical Oxygen Demand 12 Chemical Oxygen Demand 12

Naphthalene 4 Oil and Grease, Total 36

Phenol 4 Priority Pollutants 1

TEST PLAN OPTION YEAR 3 (2027)

Ignitability 12 pH 12 TCLP Metals 17

TCLP SVOC 13

TCLP VOC 13

Total Halogens 2 Total VOC 1

Storm Water Test Parameters Number of Analyses Benzene, Toluene, Ethylbenzene, Xylene 12

Biochemical Oxygen Demand 12 Chemical Oxygen Demand 12

Naphthalene 4 Oil and Grease, Total 36

Phenol 4 Priority Pollutants 1

File details come from the government source that posted it. Updated .