PERFORMANCE REQUIREMENTS SUMMARY (PRS)

April 2022

ATTACHMENT 1

The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. Performance of a service will be evaluated to determine whether or not it meets the performance threshold. Re-performance is the preferred method of correcting any unacceptable performance. The contractor shall provide the Government written response why the performance threshold was not met, how performance will be returned to acceptable levels, and how recurrence of the cause will be prevented in the future.

Methods of surveillance can change after contract award.

Performance Objective

Standard Performance Threshold Method of Surveillance

PRS # 1.

The Contractor shall replace/repair the C anchor Bottom turnbuckle. SOW Para 2.1.1.1

Ensure turnbuckle is in working condition

Turnbuckle works properly 100% inspection and Review the Contractor’s report

PRS # 2

The Contractor shall service B Anchor safety.

SOW Para 2.1.1.2

Ensure B anchor is serviceable

B anchor is serviceable 100% inspection and Review the Contractor’s report

PRS # 3

The Contractor shall ground 3 light controllers and both mid beacon. SOW Para 2.1.1.3

Ensure all lighting and controllers are properly grounded properly

Grounds are placed per piece of equipment.

100% inspection and Review the Contractor’s report

PRS # 4

The Contractor shall properly fix Mid Beacon service loop SOW Para 2.1.1.4

Properly fix the service loop on the mid beacon

Ensure the service loop is properly located

100% inspection and Review the Contractor’s report

PRS # 5

The Contractor shall replace or add tape to the Hoisting grips.

SOW Para 2.1.1.5

Apply tape to the bottom of the Hoisting grips as needed

Apply tape to the hoisting grips 100% inspection and Review the Contractor’s report