Attachment 2 - Pricing Schedule.xls

XLS spreadsheet 58 KB Posted

Attached to
Jefferson Laboratories On-Site Laboratory Equipment Maintenance, Repair, and Fabrication Services
Solicitation number
75F40125R126822
Issued by

About this file

The file is a Pricing Schedule Excel template for Solicitation 75F40125R126822, issued by the Department of Health and Human Services Food and Drug Administration, seeking on-site laboratory equipment maintenance, repair, and fabrication services at Jefferson Laboratories. The pricing worksheet is designed to capture labor rates across a transition-in period and four potential option years, with space for multiple labor positions and a comprehensive rate calculation methodology that includes base hourly rates, fringe, overhead, G&A, and profit components.

The template requires offerors to detail labor positions with full-time equivalent (FTE) rates, where 1 FTE equals 1,912 hours, and all positions are expected to be on-site at Jefferson Labs. The document indicates provisions for subcontractors to be paid at the same hourly rate as the prime contractor, and includes a column for Service Contract Labor Standards (SCLS) exemption status. While the actual rates are currently populated with placeholder $0.00 values, the structure allows for a detailed, transparent pricing breakdown across base and option years, enabling a comprehensive cost evaluation for the laboratory services contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Loaded Labor Rates

75F40125R126822 Attachment 2 Pricing Worksheet 1 of 1
Transition In PeriodBase YearOption Year 1Option Year 2Option Year 3Option Year 4
Brief Description, Duties, Qualifications, Educational Levels, Degrees, Experience, Licenses, Certificates, etc.*SCLS exempt or Non-ExemptFTEBase Hourly RateHourly Rate with Fringe (___%) + Overhead (____%)+ G&A (___%)+ Profit (____%) = Final Loaded Rate# of HoursTotal LaborFTEBase Hourly RateHourly Rate with Fringe (___%) + Overhead (____%)+ G&A (___%)+ Profit (____%) = Final Loaded Rate# of HoursTotal LaborFTEOption Period 1 Base Hourly RateHourly Rate with Fringe (___%) + Overhead (____%)+ G&A (___%)+ Profit (____%) = Final Loaded Rate# of HoursTotal LaborFTEOption Period 2 Base Hourly RateHourly Rate with Fringe (___%) + Overhead (____%)+ G&A (___%)+ Profit (____%) = Final Loaded Rate# of HoursTotal LaborFTEOption Period 3 Base Hourly RateHourly Rate with Fringe (___%) + Overhead (____%)+ G&A (___%)+ Profit (____%) = Final Loaded Rate# of HoursTotal LaborFTEOption Period 4 Base Hourly RateHourly Rate with Fringe (___%) + Overhead (____%)+ G&A (___%)+ Profit (____%) = Final Loaded Rate# of HoursTotal LaborFTE
Position 1$0.00$0.00$0.00$0.00$0.00$0.00
Position 2$0.00$0.00$0.00$0.00$0.00$0.00
Position 3$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Total Direct Labor
Total Estimated Amount$0.00$0.00$0.00$0.00$0.00$0.00
Total Amount: transition in, Base plus 4 Option Years$0.00
All Positions are onsite at Jefferson Labs
FTE is equivalent to 1,912 hours
Rows may be added if additional positions are needed
* Indicate "A" for applicable personnel or "E" for those exempt from SCLS
Subcontractors will be paid at the same hourly rate as the prime

File details come from the government source that posted it. Updated .