Attachment 2-Price Schedule-19Feb-KIMBALL UPDD.xls
XLS spreadsheet 58 KB Posted
- Attached to
- Dry-dock (DD): USCGC KIMBALL FY25 Repair
- Solicitation number
- 70Z08525QLREP0001
About this file
This is a pricing schedule template for the USCGC KIMBALL (WMSL-418) unplanned drydock repair work scheduled for FQ2 FY2025. The schedule outlines 13 line items, including 10 definite items (D-01 through D-10) covering fire prevention, drydocking, temporary services, bow thruster unit renewal, sea trials support, cathodic protection renewal, Talon Grid inspection/testing, flight deck tenting, deck covering renewal, and underwater body inspection/touch-up.
The schedule also includes three option items: O-11 for composite labor rate based on an estimated 1,069 hours, O-12 for markup on subcontractors and materials based on an estimated $500,000, and O-13 for 5 laydays. The work is to be performed at the vendor's facility between May 13, 2025, and June 12, 2025, under Department of Homeland Security US Coast Guard contract 70Z08525QLREP0001. The template requires vendors to input unit prices for each line item to calculate extended prices and total costs for both definite and optional items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 003 - CGC KIMBALL DD FY25.doc | DOC document | |
| Amendment 002 - CGC KIMBALL DD FY25.doc | DOC document | |
| Amendment 001 - CGC KIMBALL DD FY25.doc | DOC document | |
| Attachment 3-Clarification Request-KIMBALL DD.docx | DOCX document | |
| Attachment 5-Past Performance Information Form.doc | DOC document | |
| Attachment 4-GFP Report-KIMBALL DD.docx | DOCX document | |
| Solicitation-KIMBALL UPDD-19Feb2025.docx | DOCX document | |
| Attachment 1-Specification-14Feb-KIMBALL UPDD.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC KIMBALL (WMSL-418) UNPLANNED DRYDOCK FQ2 FY2025 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-01 | Fire Prevention, Provide | JOB | 1 | ||
| D-02 | Drydocking (UPDD), Accomplish | JOB | 1 | ||
| D-03 | Temporary Services, Drydock Provide | JOB | 1 | ||
| D-04 | Bow Thruster Unit, Renew | JOB | 1 | ||
| D-05 | Sea Trials Performance, Support, Provide | JOB | 1 | ||
| D-06 | Cathodic Protection (zincs), renew | JOB | 1 | ||
| D-07 | Talon Grid (Type 18-08), Inspect and Test | JOB | 1 | ||
| D-08 | Tenting (Flight Deck), Provide | JOB | 1 | ||
| D-09 | Deck Covering (Slip-Resistant) Flight Deck Renew | JOB | 1 | ||
| D-10 | U/W Body, Inspect and Touch Up | JOB | 1 | ||
| O-11 | Composite Labor Rate - based on *1069 hours. (*1069 hours is only an estimate provided for proposal pricing purposes.) | Hour | 1069 | ||
| O-12 | Markup for Subcontractors and Materials-based on $500,000.00. $500,000.00 is only an estimate provided for proposal pricing purposes. | 500,000.00 | Percent | ||
| O-13 | Laydays | Day | 5 | ||
| Total Price of Definite (D) Items | |||||
| Total Price of Option (O) Items | |||||
| Grand Total Price of Definite and Optional Items |
&C(5/3/2023) Draft-00 - Page &P of &N
File details come from the government source that posted it. Updated .