Attachment 2 - Price List.pdf
PDF 203 KB Posted
- Attached to
- DPW - Air Emission Source Testing
- Solicitation number
- FA527026Q0015
About this file
This is a pricing template for federal contract FA527026Q0015 requiring semi-annual pricing submissions across a five-year period consisting of a base year and four option years. The price list applies to emissions monitoring and control services at multiple installations categorized by equipment type: Boiler systems at three Torii Stations (235 #1, 235 #2, and 275) and Diesel Engine Fuel Pumps at three tank farms (Kuwae Tank Farm 2, Chimuwan Tank Farm 1, and Chimuwan Tank Farm 2). Pricing must be provided for three emission parameters: PM (particulate matter), NOx (nitrogen oxides), and SOx (sulfur oxides).
The template structure requires contractors to populate pricing data for each of the five contract periods on a semi-annual basis, with a final row designated for total five-year pricing. The document provides the framework for cost submission but does not contain actual pricing figures, building numbers, or specific service descriptions. Contractors are expected to complete all price fields for boiler installations and diesel engine fuel pump installations across the identified facilities to enable government evaluation of total contract cost over the full performance period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2
FA527026Q0015
Attachment 2 Price List
Base Year (Semi Annually)
Option Year 1(Semi Annually)
Installation Building Emission Parameter
PM NOx SOx
Boiler Torii Station 235 #1
Torii Station 235 #2
Torii Station 275
Diesel Engine Fuel Pumps
Kuwae Tank Farm 2 815
Chimuwan Tank Farm 1 111
Chimuwan Tank Farm 2 201
Installation Building Emission Parameter
PM NOx SOx
Boiler Torii Station 235 #1
Torii Station 235 #2
Torii Station 275
Diesel Engine Fuel Pumps
Kuwae Tank Farm 2 815
Chimuwan Tank Farm 1 111
Chimuwan Tank Farm 2 201
Option Year 2 (Semi Annually)
Option Year 3 (Semi Annually)
Installation Building Emission Parameter
PM NOx SOx
Boiler Torii Station 235 #1
Torii Station 235 #2
Torii Station 275
Diesel Engine Fuel Pumps
Kuwae Tank Farm 2 815
Chimuwan Tank Farm 1 111
Chimuwan Tank Farm 2 201
Installation Building Emission Parameter
PM NOx SOx
Boiler Torii Station 235 #1
Torii Station 235 #2
Torii Station 275
Diesel Engine Fuel Pumps
Kuwae Tank Farm 2 815
Chimuwan Tank Farm 1 111
Option Year 4 (Semi Annually)
Installation Building Emission Parameter
PM NOx SOx
Boiler Torii Station 235 #1
Torii Station 235 #2
Torii Station 275
Diesel Engine Fuel Pumps
Kuwae Tank Farm 2 815
Chimuwan Tank Farm 1 111
Total 5 years
| Installation: |
| Torii Station: |
| PM235 1: |
| NOx235 1: |
| SOx235 1: |
| Torii Station_2: |
| PM235 2: |
| NOx235 2: |
| SOx235 2: |
| Torii Station_3: |
| PM275: |
| NOx275: |
| SOx275: |
| PM815: |
| NOx815: |
| PM111: |
| NOx111: |
| PM201: |
| NOx201: |
| Installation_2: |
| Boiler_2: |
| Torii Station_4: |
| PM235 1_2: |
| NOx235 1_2: |
| SOx235 1_2: |
| Torii Station_5: |
| PM235 2_2: |
| NOx235 2_2: |
| SOx235 2_2: |
| Torii Station_6: |
| PM275_2: |
| NOx275_2: |
| SOx275_2: |
| PM815_2: |
| NOx815_2: |
| SOx815_2: |
| PM111_2: |
| NOx111_2: |
| SOx111_2: |
| PM201_2: |
| NOx201_2: |
| SOx201_2: |
| Installation_3: |
| Boiler_3: |
| Torii Station_7: |
| PM235 1_3: |
| NOx235 1_3: |
| SOx235 1_3: |
| Torii Station_8: |
| PM235 2_3: |
| NOx235 2_3: |
| SOx235 2_3: |
| Torii Station_9: |
| PM275_3: |
| NOx275_3: |
| SOx275_3: |
| PM815_3: |
| NOx815_3: |
| SOx815_3: |
| PM111_3: |
| NOx111_3: |
| SOx111_3: |
| PM201_3: |
| NOx201_3: |
| SOx201_3: |
| Installation_4: |
| Boiler_4: |
| Torii Station_10: |
| PM235 1_4: |
| NOx235 1_4: |
| SOx235 1_4: |
| Torii Station_11: |
| PM235 2_4: |
| NOx235 2_4: |
| SOx235 2_4: |
| Torii Station_12: |
| PM275_4: |
| NOx275_4: |
| SOx275_4: |
| PM815_4: |
| NOx815_4: |
| SOx815_4: |
| PM111_4: |
| NOx111_4: |
| SOx111_4: |
| PM201_4: |
| NOx201_4: |
| SOx201_4: |
| Installation_5: |
| Boiler_5: |
| Torii Station_13: |
| PM235 1_5: |
| NOx235 1_5: |
| SOx235 1_5: |
| Torii Station_14: |
| PM235 2_5: |
| NOx235 2_5: |
| SOx235 2_5: |
| Torii Station_15: |
| PM275_5: |
| NOx275_5: |
| SOx275_5: |
| PM815_5: |
| NOx815_5: |
| SOx815_5: |
| PM111_5: |
| NOx111_5: |
| SOx111_5: |
| PM201_5: |
| NOx201_5: |
| SOx201_5: |
| Total 5 years: |
File details come from the government source that posted it. Updated .