Attachment_2_-_Pompeys_Pillar_Vault_Toilet_Drawings.pdf

PDF 5 MB Posted

Attached to
Pompeys Pillar Vault Toilet
Solicitation number
140L3625Q0002
Issued by

About this file

This file contains technical drawings and specifications for a vault toilet replacement project at Pompeys Pillar National Monument in Yellowstone County, Montana. The drawings detail the demolition of existing vault toilets and sidewalk, and installation of a new double vault toilet facility.

The drawings include a state reference map, vicinity map, work location map, demolition plan, site plan, vault toilet details, and concrete/grading details. Key specifications include: removal of existing vault toilets and 160 square feet of sidewalk, installation of ADA-compliant concrete sidewalk, excavation of approximately 26' x 22' area with 5' depth for the new vault, installation of crushed aggregate base course, and topsoil/seeding work. The new double vault toilet structure will be constructed with cedar shake roof texture, galvanized doors, and wall vents. The contractor must coordinate with Montana 811 for utility locates, compact subgrade to 95% maximum dry density, and minimize disturbance to existing vegetation. The drawings provide detailed elevations, dimensions, and construction specifications for the toilet facility and associated site work.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

AUTOCAD

AutoCAD SHX Text

RECOMMENDED BY:

AutoCAD SHX Text

DESIGN OFFICE:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

MONTANA/DAKOTAS STATE OFFICE

AutoCAD SHX Text U.

AutoCAD SHX Text S.

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text M

AutoCAD SHX Text a

AutoCAD SHX Text r

AutoCAD SHX Text c

AutoCAD SHX Text h

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

POMPEYS PILLAR VAULT TOILET REPLACEMENT

AutoCAD SHX Text

YELLOWSTONE COUNTY

AutoCAD SHX Text

BILLINGS FIELD OFFICE

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

BILLINGS FIELD OFFICE

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

PROJECT NO:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text M:\SUPPORT_SERVICES\ENGINEERING\BIFO\RECREATION SITES\POMPEY'S\2024 POMPEYS PILLAR VAULT TOILET REPLACEMENT\CONTRACT DOCUMENTS\CADD DRAWINGS\SHEETS\PPNM VAULT TOILET - 1 - COVER SHEET.DWG

AutoCAD SHX Text

PPNM VAULT TOILET - 1 - COVER SHEET.DWG

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

POMPEYS PILLAR VAULT TOILET REPLACEMENT

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text

DATE:

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text

MONTANA

AutoCAD SHX Text

NAME:

AutoCAD SHX Text

%%UDRAWING INDEX

AutoCAD SHX Text

%%USTATE REFERENCE MAP

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

JUSTIN MILLAR

AutoCAD SHX Text

TANNER CAHILL

AutoCAD SHX Text

PROJECT LOCATION

AutoCAD SHX Text

VICINITY MAP: SHEET 2

AutoCAD SHX Text

PROJECT MAPS

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLAN

AutoCAD SHX Text

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

AutoCAD SHX Text

CONCRETE/GRADING DETAILS

AutoCAD SHX Text

VAULT TOILET DETAILS

AutoCAD SHX Text

NOT TO SCALE

WORK LOCATION

DATE:

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGN OFFICE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

AutoCAD SHX Text

BILLINGS FIELD OFFICE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

PPNM VAULT TOILET - 2 - PROJECT MAPS.DWG

AutoCAD SHX Text

MONTANA/DAKOTAS STATE OFFICE

AutoCAD SHX Text

JSM

AutoCAD SHX Text

JSM

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

PROJECT MAPS

AutoCAD SHX Text

POMPEYS PILLAR VAULT TOILET REPLACEMENT

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text

TJC

AutoCAD SHX Text

TJC

AutoCAD SHX Text M:\SUPPORT_SERVICES\ENGINEERING\BIFO\RECREATION SITES\POMPEY'S\2024 POMPEYS PILLAR VAULT TOILET REPLACEMENT\CONTRACT DOCUMENTS\CADD DRAWINGS\SHEETS\PPNM VAULT TOILET - 2 - PROJECT MAPS.DWG

AutoCAD SHX Text

%%UVICINITY MAP

AutoCAD SHX Text

%%UWORK LOCATION MAP

AutoCAD SHX Text

MONTANA

AutoCAD SHX Text

AUTOCAD

AutoCAD SHX Text

NAME:

AutoCAD SHX Text

PROJECT WORK LOCATION

AutoCAD SHX Text

AutoCAD SHX Text

INTERPRETIVE CENTER

AutoCAD SHX Text

YELLOWSTONE RIVER

AutoCAD SHX Text

U.S. HIGHWAY 312HIGHWAY 312

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text I-94

AutoCAD SHX Text

EXIT 23

AutoCAD SHX Text

POMPEYS PILLAR MAIN PUBLIC ENTRANCE

AutoCAD SHX Text

POMPEYS PILLAR CONSTRUCTION ENTRANCE

AutoCAD SHX Text

POMPEYS PILLAR

AutoCAD SHX Text

OLD INTERPRETIVE CENTER

POMPEYS PILLAR CONSTRUCTION ACCESS ROUTE

GENERAL NOTES:

1. CONTRACTOR IS RESPONSIBLE FOR ALL PUBLIC AND PRIVATE UTILITY LOCATES. COORDINATE WITH MONTANA 811 AND ANY OTHER NECESSARY ENTITIES.

2. CONTRACTOR TO REMOVE EXISTING VAULT TOILETS AND RESPONSIBLE FOR PROPER DISPOSAL IN AN APPROVED LANDFILL.

3. CONTRACTOR TO SAW CUT ALONG THE LINE BETWEEN THE SIDEWALK TO BE DEMOLISHED AND THE POMPEYS PILLAR WALKING PATH.

4. CONTRACTOR TO REMOVE EXISTING SIDEWALK TO VAULT TOILETS AND RESPONSIBLE FOR DISPOSAL IN AN APPROVED LANDFILL.

5. CONTRACTOR TO PERFORM CLEARING AND GRUBBING AS NEEDED TO REMOVE EXISTING BRUSH AND TREES.

6. CONTRACTOR TO RE-USE SUITABLE CUT MATERIAL FROM EXCAVATION AS FILL MATERIAL TO MEET GRADE. GOVERNMENT TO APPROVE OF ALL FILL MATERIALS

PRIOR TO PLACEMENT.

7. CONTRACTOR TO SUPPLY 3 INCH MINUS PIT RUN MATERIAL AS NEEDED TO MEET THE DRAWINGS AND SPECIFICATIONS.

8. ALL RE-USED AND NEW FILL MATERIAL SHALL BE FREE OF TOPSOIL AND ORGANIC MATERIAL.

9. SUBGRADE AND ALL FILL MATERIAL SHALL BE COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY PER ASTM D-698.

10. CONTRACTOR TO SUPPLY TOPSOIL FILL MATERIAL AND GRASS SEED AS NEEDED TO MEET THE DRAWINGS AND SPECIFICATIONS.

11. DISTURBANCE OF EXISTING VEGETATION SHALL BE MINIMIZED TO THE GREATEST EXTENT POSSIBLE. ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL

BE REPAIRED.

12. CONTRACTOR SHALL PROVIDE ALL SIGNAGE TO CLOSE THE CONSTRUCTION AREA.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

AUTOCAD NAME:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGN OFFICE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BILLINGS FIELD OFFICE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

PPNM VAULT TOILET - 3 - DEMOLITION PLAN.DWG

AutoCAD SHX Text

MONTNA/DAKOTAS STATE OFFICE

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DEMOLITION PLAN

AutoCAD SHX Text

POMPEYS PILLAR VAULT TOILET REPLACEMENT

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text M:\SUPPORT_SERVICES\ENGINEERING\BIFO\RECREATION SITES\POMPEY'S\2024 POMPEYS PILLAR VAULT TOILET REPLACEMENT\CONTRACT DOCUMENTS\CADD DRAWINGS\SHEETS\PPNM VAULT TOILET - 3 - DEMOLITION PLAN.DWG

AutoCAD SHX Text

JSM

AutoCAD SHX Text

JSM

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text

TJC

AutoCAD SHX Text

TJC

AutoCAD SHX Text

MONTANA

AutoCAD SHX Text

MARK

AutoCAD SHX Text APPROXIMATE LOCATION OF EXISTING UNDERGROUND WATER LINE - DEPTH UNKNOWN, CONTRACTOR TO VERIFY

AutoCAD SHX Text

EXISTING VEGETATED AREA

AutoCAD SHX Text

EXISTING VEGETATED AREA

AutoCAD SHX Text

EXISTING VAULT TOILETS TO BE REMOVED AND BACKFILLED. SEE NOTES.

AutoCAD SHX Text

EXISTING SIDEWALK TO BE REMOVED

AutoCAD SHX Text

EXISTING CONCRETE SIDEWALK TO BE REMOVED

AutoCAD SHX Text

EXISTING VAULT TOILETS TO BE REMOVED

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5'

AutoCAD SHX Text 10'

AutoCAD SHX Text

SAW CUT LINE

AutoCAD SHX Text APPROXIMATE LOCATION OF EXISTING UNDERGROUND POWER LINE - DEPTH UNKNOWN, CONTRACTOR TO VERIFY

AutoCAD SHX Text

%%UDEMOLITION PLAN

CLEARING AND GRUBBING AS NEEDED

1. CONTRACTOR IS RESPONSIBLE FOR ALL PUBLIC AND PRIVATE UTILITY LOCATES. COORDINATE WITH

MONTANA 811 AND ANY OTHER NECESSARY ENTITIES.

2. CONTRACTOR TO PERFORM CLEARING AND GRUBBING AS NEEDED TO REMOVE BRUSH AND TREES.

3. CONTRACTOR TO SUPPLY CONCRETE VAULT TOILET PER DRAWINGS AND SPECIFICATIONS.

4. CONTRACTOR TO EXCAVATE FOR VAULT TOILET PLACEMENT PER THE DRAWINGS AND

SPECIFICATIONS.

5. CONTRACTOR TO BED THE VAULT TOILET WITH 8 INCHES OF 0.75"-MINUS CRUSHED AGGREGATE

BASE COURSE (CABC).

6. CONTRACTOR TO INSTALL ADA COMPLIANT CONCRETE SIDEWALK AND LANDINGS PER THE

DRAWINGS AND SPECIFICATIONS.

7. CONTRACTOR TO BED THE CONCRETE SIDEWALK AND LANDINGS WITH 6 INCHES ON 0.75" MINUS

CABC.

8. CONTRACTOR TO FIELD VERIFY ELEVATIONS OF THE NEW SIDEWALK TIE-IN LOCATION AND ENSURE

THAT THE FLOOR OF THE CONCRETE VAULT TOILET IS PLACED AT AN ELEVATION 0.1' HIGHER THAN

THE 1% ANNUAL CHANCE FLOOD ELEVATION.

9. GOVERNMENT SHALL PROVIDE A CONTROL POINT WITH A KNOWN ELEVATION FOR CONTRACTOR

TO BASE ELEVATIONS ON.

10. CONTRACTOR TO RE-USE SUITABLE CUT MATERIAL FROM EXCAVATION AS FILL MATERIAL TO MEET

GRADE. GOVERNMENT TO APPROVE OF ALL FILL MATERIALS PRIOR TO PLACEMENT.

11. CONTRACTOR TO SUPPLY 3 INCH MINUS PIT RUN MATERIAL AS NEEDED TO MEET THE DRAWINGS

AND SPECIFICATIONS.

12. ALL RE-USED AND NEW FILL MATERIAL SHALL BE FREE OF TOPSOIL AND ORGANIC MATERIAL.

13. SUBGRADE, CABC, AND ALL FILL MATERIAL SHALL BE COMPACTED TO 95% OF THE MAXIMUM DRY

DENSITY PER ASTM D-698.

14. CONTRACTOR TO SUPPLY TOPSOIL FILL MATERIAL AS NEEDED TO MEET THE DRAWINGS AND

SPECIFICATIONS.

15. DISTURBANCE OF EXISTING VEGETATION SHALL BE MINIMIZED TO THE GREATEST EXTENT

POSSIBLE. ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE REPAIRED.

16. CONTRACTOR SHALL PROVIDE ALL SIGNAGE TO CLOSE THE CONSTRUCTION AREA.

17. CONTRACTOR TO SEED THE TOPSOIL PER THE SPECIFICATIONS WITH SUN AND SHADE TOLERANT

GRASS SEED.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

AUTOCAD NAME:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGN OFFICE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BILLINGS FIELD OFFICE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

PPNM VAULT TOILET - 4 - SITE PLAN.DWG

AutoCAD SHX Text

MONTANA/DAKOTAS STATE OFFICE

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

POMPEYS PILLAR VAULT TOILET REPLACEMENT

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text M:\SUPPORT_SERVICES\ENGINEERING\BIFO\RECREATION SITES\POMPEY'S\2024 POMPEYS PILLAR VAULT TOILET REPLACEMENT\CONTRACT DOCUMENTS\CADD DRAWINGS\SHEETS\PPNM VAULT TOILET - 4 - SITE PLAN.DWG

AutoCAD SHX Text

JSM

AutoCAD SHX Text

JSM

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text

TJC

AutoCAD SHX Text

TJC

AutoCAD SHX Text

MONTANA

AutoCAD SHX Text

NEW CONCRETE SIDEWALK

AutoCAD SHX Text

NEW DOUBLE VAULT TOILET

AutoCAD SHX Text APPROXIMATE LOCATION OF EXISTING UNDERGROUND POWER LINE - DEPTH UNKNOWN, CONTRACTOR TO VERIFY

AutoCAD SHX Text

NEW DOUBLE VAULT TOILET PER DETAIL. SEE SHEET 5

AutoCAD SHX Text

MARK

AutoCAD SHX Text APPROXIMATE LOCATION OF EXISTING UNDERGROUND WATER LINE - DEPTH UNKNOWN, CONTRACTOR TO VERIFY

AutoCAD SHX Text

NEW TOPSOIL MATERIAL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5'

AutoCAD SHX Text 10'

AutoCAD SHX Text

8.33% MAX.

AutoCAD SHX Text

PRECAST CONCRETE VAULT TOILET WITH CHASE

AutoCAD SHX Text

GRADE TO MATCH TOP OF SIDEWALKS

AutoCAD SHX Text 4:1

AutoCAD SHX Text 4:1

AutoCAD SHX Text 4:1

AutoCAD SHX Text 4:1

AutoCAD SHX Text

TIE INTO EXISTING SIDEWALK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R=25'

AutoCAD SHX Text R=35'

AutoCAD SHX Text

AutoCAD SHX Text

NEW ADA COMPLIANT CONCRETE SIDEWALK PER DETAIL. SEE SHEET 6.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TIE INTO EXISTING SIDEWALK

AutoCAD SHX Text

NEW ADA COMPLIANT CONCRETE SIDEWALK PER DETAIL. SEE SHEET 6.

AutoCAD SHX Text 1.5%

AutoCAD SHX Text 1.5%

AutoCAD SHX Text

8.33% MAX.

AutoCAD SHX Text 1.5%

AutoCAD SHX Text 4:1

AutoCAD SHX Text R=25'

AutoCAD SHX Text R=35'

AutoCAD SHX Text

%%USITE PLAN

NEW FILL AT 4:1 SLOPE PER DETAIL. SEE SHEET 6.

1. CONTRACTOR SUPPLIED CONCRETE DOUBLE VAULT TOILET

WITH CHASE. VAULT TOILET TO BE DELIVERED TO THE

SITE AND PLACED BY THE CONTRACTOR. CONCRETE VAULT

TO BE SET ON BASE PREPARED BY CONTRACTOR.

2. CONTRACTOR TO PERFORM EXCAVATION TO THE LINES,

GRADES, AND ELEVATIONS INDICATED IN THE DRAWINGS.

3. CONTRACTOR TO PROVIDE PROPER DEPTH WITH

ALLOWANCE MADE FOR CRUSHED AGGREGATE BASE

COURSE (CABC) BEDDING. VAULT EXCAVATION

APPROXIMATELY 26' X 22' WITH A 5' DEPTH.

4. CONTRACTOR TO COMPACT SUBGRADE TO 95% OF THE

MAXIMUM DRY DENSITY.

5. CONTRACTOR TO BED VAULT WITH CABC, PLACE TIMBERS

TO GRADE AND SCREED LEVEL. COMPACT TO 95% OF

MAXIMUM DRY DENSITY.

6. CONTRACTOR TO BACKFILL TO 6" BELOW FINISH GRADE

TO 95% OF MAXIMUM DRY DENSITY IN 6" LIFTS USING

GOVERNMENT APPROVED EMBANKMENT MATERIAL. CAP

BACKFILL WITH 6 INCHES OF TOPSOIL.

AutoCAD SHX Text

CEDAR SHAKE ROOF TEXTURE CHARCOAL GREY COLOR

AutoCAD SHX Text

HORIZONTAL LAP TEXTURE SAND BEIGE COLOR

AutoCAD SHX Text 4"x12"x16' DF TIMBER PLANKS FURNISHED BY CONTRACTOR

AutoCAD SHX Text

8" CABC COMPACTED IN PLACE 95% OF MAX. DRY DENSITY

AutoCAD SHX Text SPRING HINGE 4 "x4 " 12"x4 " 12" (TYP 3 PLCS)

AutoCAD SHX Text

MS-2 WALL VENT (TYP. 2 PLC'S IN REAR) (VENTS TO FACE SOUTHWEST DIRECTION)

AutoCAD SHX Text

PLACE TOP OF VAULT EVEN WITH SUBGRADE

AutoCAD SHX Text

BLEND AB EVEN WITH TOP OF CONCRETE PAD

AutoCAD SHX Text

2868 GALVANIZED DOOR ASSEMBLY

AutoCAD SHX Text

3068 GALVANIZED DOOR ASSEMBLY

AutoCAD SHX Text

BUILDING TO VAULT CONNCTION: BUTYL TAPE ADHESIVE SEALANT.

AutoCAD SHX Text

PLACE TOP OF VAULT EVEN WITH SUBGRADE,

AutoCAD SHX Text

BLEND AB EVEN WITH TOP OF CONCRETE PAD

AutoCAD SHX Text

FINISH GRADE ELEV. 2883.20'

AutoCAD SHX Text

FINISH GRADE ELEV. 2883.20'

AutoCAD SHX Text

1% CHANCE ANNUAL FLOOD ELEV. 2883.10'

AutoCAD SHX Text

EXISTING GRADE ELEV. 2882.00'

AutoCAD SHX Text

1% CHANCE ANNUAL FLOOD ELEV. 2883.10'

AutoCAD SHX Text

EXISTING GRADE ELEV. 2882.00'

AutoCAD SHX Text

6" TOPSOIL

AutoCAD SHX Text

BACKFILL 4:1 SLOPE

AutoCAD SHX Text

3" MINUS FILL

AutoCAD SHX Text

MS-13 WINDOWS

AutoCAD SHX Text

SPRING HINGE 4 " X4 " 12" X4 " 12" (TYP. 6 PLCS)6 PLCS)

AutoCAD SHX Text

SIGN (SI-2) (ACCESSIBLE AND UNISEX SYMBOLS) (TYP. 2 PLCS.)

AutoCAD SHX Text

ANCHOR NAIL "X " 14"X " 34" PREDRILL " 14" (TYP. 12 PLCS)

AutoCAD SHX Text

TWO PIECE VENT PIPE 15'-0" OVERALL HEIGHT (TYP. 2 PLCS)2 PLCS)

AutoCAD SHX Text 14'-4"

AutoCAD SHX Text 16'-10"

AutoCAD SHX Text 15'-2 "12"

AutoCAD SHX Text 4'-4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 5"

AutoCAD SHX Text 5"

AutoCAD SHX Text 13'-6"

AutoCAD SHX Text 12'

AutoCAD SHX Text 11'-11"

AutoCAD SHX Text 11'-11"

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

AUTOCAD

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGN OFFICE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BILLINGS FIELD OFFICE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

PPNM VAULT TOILET - 5 - VAULT TOILET DETAILS.DWG

AutoCAD SHX Text

MONTANA/DAKOTAS STATE OFFICE

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

VAULT TOILET DETAILS

AutoCAD SHX Text

POMPEYS PILLAR VAULT TOILET REPLACEMENT

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text M:\SUPPORT_SERVICES\ENGINEERING\BIFO\RECREATION SITES\POMPEY'S\2024 POMPEYS PILLAR VAULT TOILET REPLACEMENT\CONTRACT DOCUMENTS\CADD DRAWINGS\SHEETS\PPNM VAULT TOILET - 5 - VAULT TOILET DETAILS.DWG

AutoCAD SHX Text

JSM

AutoCAD SHX Text

JSM

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text

TJC

AutoCAD SHX Text

TJC

AutoCAD SHX Text

MONTANA

AutoCAD SHX Text

NAME:

AutoCAD SHX Text

%%UVAULT TOILET DETAILS

1. CONTRACTOR IS RESPONSIBLE FOR ALL PUBLIC AND PRIVATE UTILITY LOCATES. COORDINATE WITH

MONTANA 811 AND ANY OTHER NECESSARY ENTITIES.

2. CONTRACTOR TO INSTALL ADA COMPLIANT CONCRETE SIDEWALK AND LANDINGS PER THE

DRAWINGS AND SPECIFICATIONS.

3. CONTRACTOR TO BED THE CONCRETE SIDEWALK AND LANDINGS WITH 6 INCHES ON 0.75" MINUS

CABC.

4. CONTRACTOR TO RE-USE SUITABLE CUT MATERIAL FROM EXCAVATION AS FILL MATERIAL TO MEET

GRADE. GOVERNMENT TO APPROVE OF ALL FILL MATERIALS PRIOR TO PLACEMENT.

5. CONTRACTOR TO SUPPLY 3 INCH MINUS PIT RUN MATERIAL AS NEEDED TO MEET THE DRAWINGS

AND SPECIFICATIONS.

6. ALL RE-USED AND NEW FILL MATERIAL SHALL BE FREE OF TOPSOIL AND ORGANIC MATERIAL.

7. SUBGRADE, CABC, AND ALL FILL MATERIAL SHALL BE COMPACTED TO 95% OF THE MAXIMUM DRY

DENSITY PER ASTM D-698.

8. CONTRACTOR TO SUPPLY TOPSOIL FILL MATERIAL AS NEEDED TO MEET THE DRAWINGS AND

SPECIFICATIONS.

9. DISTURBANCE OF EXISTING VEGETATION SHALL BE MINIMIZED TO THE GREATEST EXTENT

POSSIBLE. ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE REPAIRED.

10. CONTRACTOR SHALL PROVIDE ALL SIGNAGE TO CLOSE THE CONSTRUCTION AREA.

11. CONTRACTOR TO SEED THE TOPSOIL PER THE SPECIFICATIONS WITH SUN AND SHADE TOLERANT

GRASS SEED.

AutoCAD SHX Text

4" CONCRETE 4000 PSI DAVIS COLORS, SANDSTONE #5237

AutoCAD SHX Text

#4 REBAR 18" O.C. CONTINUOUS THROUGHOUT

AutoCAD SHX Text

BACKFILL 4:1

AutoCAD SHX Text

1.5% MAX CROSS SLOPE

AutoCAD SHX Text NOTE: 1. CONSTRUCT " WIDE X 1" DEEP CONTRACTION JOINTS SPACED 5' APART. CONSTRUCT " WIDE X 1" DEEP CONTRACTION JOINTS SPACED 5' APART. 18" WIDE X 1" DEEP CONTRACTION JOINTS SPACED 5' APART. 2. INSTALL EXPANSION JOINT BETWEEN CONCRETE SIDEWALK AND VAULT TOILET. INSTALL EXPANSION JOINT BETWEEN CONCRETE SIDEWALK AND VAULT TOILET. 3. CONCRETE SHALL HAVE COLOR ADDITIVE. DAVIS COLORS, SANDSTONE #5237.CONCRETE SHALL HAVE COLOR ADDITIVE. DAVIS COLORS, SANDSTONE #5237.

AutoCAD SHX Text

6" TOPSOIL

AutoCAD SHX Text

VAULT TOILET FINISHED FLOOR

AutoCAD SHX Text

VAULT TOILET WALL

AutoCAD SHX Text

BACKFILL 4:1

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

AUTOCAD

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGN OFFICE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BILLINGS FIELD OFFICE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

PPNM VAULT TOILET - 6 - CONCRETE_GRADING DETAILS.DWG

AutoCAD SHX Text

MONTANA/DAKOTAS STATE OFFICE

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

CONCRETE/GRADING DETAILS

AutoCAD SHX Text

POMPEYS PILLAR VAULT TOILET REPLACEMENT

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text M:\SUPPORT_SERVICES\ENGINEERING\BIFO\RECREATION SITES\POMPEY'S\2024 POMPEYS PILLAR VAULT TOILET REPLACEMENT\CONTRACT DOCUMENTS\CADD DRAWINGS\SHEETS\PPNM VAULT TOILET - 6 - CONCRETE_GRADING DETAILS.DWG

AutoCAD SHX Text

JSM

AutoCAD SHX Text

JSM

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text 1/19/24

AutoCAD SHX Text

TJC

AutoCAD SHX Text

TJC

AutoCAD SHX Text

MONTANA

AutoCAD SHX Text

NAME:

AutoCAD SHX Text

%%UGRADING DETAIL

AutoCAD SHX Text

%%UCONCRETE SIDEWALK DETAIL

AutoCAD SHX Text

NOT TO SCALE

PPNM Vault Toilet - 1 - Cover Sheet
Sheets and Views
Layout1
PPNM Vault Toilet - 2 - Project Maps
Sheets and Views
MAP
PPNM Vault Toilet - 3 - Demolition Plan
Sheets and Views
Layout1
PPNM Vault Toilet - 4 - Site Plan
Sheets and Views
Layout1
PPNM Vault Toilet - 5 - Vault Toilet Details
Sheets and Views
Layout1
PPNM Vault Toilet - 6 - Concrete_Grading Details
Sheets and Views
Layout1
PPNM Vault Toilet - 4 - Site Plan.pdf
Sheets and Views
Layout1

File details come from the government source that posted it. Updated .