This file contains technical drawings and specifications for a vault toilet replacement project at Pompeys Pillar National Monument in Yellowstone County, Montana. The drawings detail the demolition of existing vault toilets and sidewalk, and installation of a new double vault toilet facility.
The drawings include a state reference map, vicinity map, work location map, demolition plan, site plan, vault toilet details, and concrete/grading details. Key specifications include: removal of existing vault toilets and 160 square feet of sidewalk, installation of ADA-compliant concrete sidewalk, excavation of approximately 26' x 22' area with 5' depth for the new vault, installation of crushed aggregate base course, and topsoil/seeding work. The new double vault toilet structure will be constructed with cedar shake roof texture, galvanized doors, and wall vents. The contractor must coordinate with Montana 811 for utility locates, compact subgrade to 95% maximum dry density, and minimize disturbance to existing vegetation. The drawings provide detailed elevations, dimensions, and construction specifications for the toilet facility and associated site work.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
U.S. DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AUTOCAD
AutoCAD SHX Text
RECOMMENDED BY:
AutoCAD SHX Text
DESIGN OFFICE:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
MONTANA/DAKOTAS STATE OFFICE
AutoCAD SHX Text U.
AutoCAD SHX Text S.
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text M
AutoCAD SHX Text a
AutoCAD SHX Text r
AutoCAD SHX Text c
AutoCAD SHX Text h
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
POMPEYS PILLAR VAULT TOILET REPLACEMENT
AutoCAD SHX Text
YELLOWSTONE COUNTY
AutoCAD SHX Text
BILLINGS FIELD OFFICE
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
BILLINGS FIELD OFFICE
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
MARK
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M:\SUPPORT_SERVICES\ENGINEERING\BIFO\RECREATION SITES\POMPEY'S\2024 POMPEYS PILLAR VAULT TOILET REPLACEMENT\CONTRACT DOCUMENTS\CADD DRAWINGS\SHEETS\PPNM VAULT TOILET - 1 - COVER SHEET.DWG
AutoCAD SHX Text
PPNM VAULT TOILET - 1 - COVER SHEET.DWG
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
POMPEYS PILLAR VAULT TOILET REPLACEMENT
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text
DATE:
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
%%UDRAWING INDEX
AutoCAD SHX Text
%%USTATE REFERENCE MAP
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
JUSTIN MILLAR
AutoCAD SHX Text
TANNER CAHILL
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
VICINITY MAP: SHEET 2
AutoCAD SHX Text
PROJECT MAPS
AutoCAD SHX Text
AutoCAD SHX Text
DEMOLITION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
AutoCAD SHX Text
CONCRETE/GRADING DETAILS
AutoCAD SHX Text
VAULT TOILET DETAILS
AutoCAD SHX Text
NOT TO SCALE
WORK LOCATION
DATE:
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
U.S. DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGN OFFICE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AutoCAD SHX Text
BILLINGS FIELD OFFICE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
PPNM VAULT TOILET - 2 - PROJECT MAPS.DWG
AutoCAD SHX Text
MONTANA/DAKOTAS STATE OFFICE
AutoCAD SHX Text
JSM
AutoCAD SHX Text
JSM
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text
MARK
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
PROJECT MAPS
AutoCAD SHX Text
POMPEYS PILLAR VAULT TOILET REPLACEMENT
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text
TJC
AutoCAD SHX Text
TJC
AutoCAD SHX Text M:\SUPPORT_SERVICES\ENGINEERING\BIFO\RECREATION SITES\POMPEY'S\2024 POMPEYS PILLAR VAULT TOILET REPLACEMENT\CONTRACT DOCUMENTS\CADD DRAWINGS\SHEETS\PPNM VAULT TOILET - 2 - PROJECT MAPS.DWG
AutoCAD SHX Text
%%UVICINITY MAP
AutoCAD SHX Text
%%UWORK LOCATION MAP
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
AUTOCAD
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
PROJECT WORK LOCATION
AutoCAD SHX Text
AutoCAD SHX Text
INTERPRETIVE CENTER
AutoCAD SHX Text
YELLOWSTONE RIVER
AutoCAD SHX Text
U.S. HIGHWAY 312HIGHWAY 312
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text I-94
AutoCAD SHX Text
EXIT 23
AutoCAD SHX Text
POMPEYS PILLAR MAIN PUBLIC ENTRANCE
AutoCAD SHX Text
POMPEYS PILLAR CONSTRUCTION ENTRANCE
AutoCAD SHX Text
POMPEYS PILLAR
AutoCAD SHX Text
OLD INTERPRETIVE CENTER
POMPEYS PILLAR CONSTRUCTION ACCESS ROUTE
GENERAL NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR ALL PUBLIC AND PRIVATE UTILITY LOCATES. COORDINATE WITH MONTANA 811 AND ANY OTHER NECESSARY ENTITIES.
2. CONTRACTOR TO REMOVE EXISTING VAULT TOILETS AND RESPONSIBLE FOR PROPER DISPOSAL IN AN APPROVED LANDFILL.
3. CONTRACTOR TO SAW CUT ALONG THE LINE BETWEEN THE SIDEWALK TO BE DEMOLISHED AND THE POMPEYS PILLAR WALKING PATH.
4. CONTRACTOR TO REMOVE EXISTING SIDEWALK TO VAULT TOILETS AND RESPONSIBLE FOR DISPOSAL IN AN APPROVED LANDFILL.
5. CONTRACTOR TO PERFORM CLEARING AND GRUBBING AS NEEDED TO REMOVE EXISTING BRUSH AND TREES.
6. CONTRACTOR TO RE-USE SUITABLE CUT MATERIAL FROM EXCAVATION AS FILL MATERIAL TO MEET GRADE. GOVERNMENT TO APPROVE OF ALL FILL MATERIALS
PRIOR TO PLACEMENT.
7. CONTRACTOR TO SUPPLY 3 INCH MINUS PIT RUN MATERIAL AS NEEDED TO MEET THE DRAWINGS AND SPECIFICATIONS.
8. ALL RE-USED AND NEW FILL MATERIAL SHALL BE FREE OF TOPSOIL AND ORGANIC MATERIAL.
9. SUBGRADE AND ALL FILL MATERIAL SHALL BE COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY PER ASTM D-698.
10. CONTRACTOR TO SUPPLY TOPSOIL FILL MATERIAL AND GRASS SEED AS NEEDED TO MEET THE DRAWINGS AND SPECIFICATIONS.
11. DISTURBANCE OF EXISTING VEGETATION SHALL BE MINIMIZED TO THE GREATEST EXTENT POSSIBLE. ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL
BE REPAIRED.
12. CONTRACTOR SHALL PROVIDE ALL SIGNAGE TO CLOSE THE CONSTRUCTION AREA.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
U.S. DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AUTOCAD NAME:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGN OFFICE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BILLINGS FIELD OFFICE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
PPNM VAULT TOILET - 3 - DEMOLITION PLAN.DWG
AutoCAD SHX Text
MONTNA/DAKOTAS STATE OFFICE
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DEMOLITION PLAN
AutoCAD SHX Text
POMPEYS PILLAR VAULT TOILET REPLACEMENT
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text M:\SUPPORT_SERVICES\ENGINEERING\BIFO\RECREATION SITES\POMPEY'S\2024 POMPEYS PILLAR VAULT TOILET REPLACEMENT\CONTRACT DOCUMENTS\CADD DRAWINGS\SHEETS\PPNM VAULT TOILET - 3 - DEMOLITION PLAN.DWG
AutoCAD SHX Text
JSM
AutoCAD SHX Text
JSM
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text
TJC
AutoCAD SHX Text
TJC
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
MARK
AutoCAD SHX Text APPROXIMATE LOCATION OF EXISTING UNDERGROUND WATER LINE - DEPTH UNKNOWN, CONTRACTOR TO VERIFY
AutoCAD SHX Text
EXISTING VEGETATED AREA
AutoCAD SHX Text
EXISTING VEGETATED AREA
AutoCAD SHX Text
EXISTING VAULT TOILETS TO BE REMOVED AND BACKFILLED. SEE NOTES.
AutoCAD SHX Text
EXISTING SIDEWALK TO BE REMOVED
AutoCAD SHX Text
EXISTING CONCRETE SIDEWALK TO BE REMOVED
AutoCAD SHX Text
EXISTING VAULT TOILETS TO BE REMOVED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 5'
AutoCAD SHX Text 10'
AutoCAD SHX Text
SAW CUT LINE
AutoCAD SHX Text APPROXIMATE LOCATION OF EXISTING UNDERGROUND POWER LINE - DEPTH UNKNOWN, CONTRACTOR TO VERIFY
AutoCAD SHX Text
%%UDEMOLITION PLAN
CLEARING AND GRUBBING AS NEEDED
1. CONTRACTOR IS RESPONSIBLE FOR ALL PUBLIC AND PRIVATE UTILITY LOCATES. COORDINATE WITH
MONTANA 811 AND ANY OTHER NECESSARY ENTITIES.
2. CONTRACTOR TO PERFORM CLEARING AND GRUBBING AS NEEDED TO REMOVE BRUSH AND TREES.
3. CONTRACTOR TO SUPPLY CONCRETE VAULT TOILET PER DRAWINGS AND SPECIFICATIONS.
4. CONTRACTOR TO EXCAVATE FOR VAULT TOILET PLACEMENT PER THE DRAWINGS AND
SPECIFICATIONS.
5. CONTRACTOR TO BED THE VAULT TOILET WITH 8 INCHES OF 0.75"-MINUS CRUSHED AGGREGATE
BASE COURSE (CABC).
6. CONTRACTOR TO INSTALL ADA COMPLIANT CONCRETE SIDEWALK AND LANDINGS PER THE
DRAWINGS AND SPECIFICATIONS.
7. CONTRACTOR TO BED THE CONCRETE SIDEWALK AND LANDINGS WITH 6 INCHES ON 0.75" MINUS
CABC.
8. CONTRACTOR TO FIELD VERIFY ELEVATIONS OF THE NEW SIDEWALK TIE-IN LOCATION AND ENSURE
THAT THE FLOOR OF THE CONCRETE VAULT TOILET IS PLACED AT AN ELEVATION 0.1' HIGHER THAN
THE 1% ANNUAL CHANCE FLOOD ELEVATION.
9. GOVERNMENT SHALL PROVIDE A CONTROL POINT WITH A KNOWN ELEVATION FOR CONTRACTOR
TO BASE ELEVATIONS ON.
10. CONTRACTOR TO RE-USE SUITABLE CUT MATERIAL FROM EXCAVATION AS FILL MATERIAL TO MEET
GRADE. GOVERNMENT TO APPROVE OF ALL FILL MATERIALS PRIOR TO PLACEMENT.
11. CONTRACTOR TO SUPPLY 3 INCH MINUS PIT RUN MATERIAL AS NEEDED TO MEET THE DRAWINGS
AND SPECIFICATIONS.
12. ALL RE-USED AND NEW FILL MATERIAL SHALL BE FREE OF TOPSOIL AND ORGANIC MATERIAL.
13. SUBGRADE, CABC, AND ALL FILL MATERIAL SHALL BE COMPACTED TO 95% OF THE MAXIMUM DRY
DENSITY PER ASTM D-698.
14. CONTRACTOR TO SUPPLY TOPSOIL FILL MATERIAL AS NEEDED TO MEET THE DRAWINGS AND
SPECIFICATIONS.
15. DISTURBANCE OF EXISTING VEGETATION SHALL BE MINIMIZED TO THE GREATEST EXTENT
POSSIBLE. ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE REPAIRED.
16. CONTRACTOR SHALL PROVIDE ALL SIGNAGE TO CLOSE THE CONSTRUCTION AREA.
17. CONTRACTOR TO SEED THE TOPSOIL PER THE SPECIFICATIONS WITH SUN AND SHADE TOLERANT
GRASS SEED.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
U.S. DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AUTOCAD NAME:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGN OFFICE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BILLINGS FIELD OFFICE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
PPNM VAULT TOILET - 4 - SITE PLAN.DWG
AutoCAD SHX Text
MONTANA/DAKOTAS STATE OFFICE
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
POMPEYS PILLAR VAULT TOILET REPLACEMENT
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text M:\SUPPORT_SERVICES\ENGINEERING\BIFO\RECREATION SITES\POMPEY'S\2024 POMPEYS PILLAR VAULT TOILET REPLACEMENT\CONTRACT DOCUMENTS\CADD DRAWINGS\SHEETS\PPNM VAULT TOILET - 4 - SITE PLAN.DWG
AutoCAD SHX Text
JSM
AutoCAD SHX Text
JSM
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text
TJC
AutoCAD SHX Text
TJC
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
NEW CONCRETE SIDEWALK
AutoCAD SHX Text
NEW DOUBLE VAULT TOILET
AutoCAD SHX Text APPROXIMATE LOCATION OF EXISTING UNDERGROUND POWER LINE - DEPTH UNKNOWN, CONTRACTOR TO VERIFY
AutoCAD SHX Text
NEW DOUBLE VAULT TOILET PER DETAIL. SEE SHEET 5
AutoCAD SHX Text
MARK
AutoCAD SHX Text APPROXIMATE LOCATION OF EXISTING UNDERGROUND WATER LINE - DEPTH UNKNOWN, CONTRACTOR TO VERIFY
AutoCAD SHX Text
NEW TOPSOIL MATERIAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 5'
AutoCAD SHX Text 10'
AutoCAD SHX Text
8.33% MAX.
AutoCAD SHX Text
PRECAST CONCRETE VAULT TOILET WITH CHASE
AutoCAD SHX Text
GRADE TO MATCH TOP OF SIDEWALKS
AutoCAD SHX Text 4:1
AutoCAD SHX Text 4:1
AutoCAD SHX Text 4:1
AutoCAD SHX Text 4:1
AutoCAD SHX Text
TIE INTO EXISTING SIDEWALK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R=25'
AutoCAD SHX Text R=35'
AutoCAD SHX Text
AutoCAD SHX Text
NEW ADA COMPLIANT CONCRETE SIDEWALK PER DETAIL. SEE SHEET 6.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TIE INTO EXISTING SIDEWALK
AutoCAD SHX Text
NEW ADA COMPLIANT CONCRETE SIDEWALK PER DETAIL. SEE SHEET 6.
AutoCAD SHX Text 1.5%
AutoCAD SHX Text 1.5%
AutoCAD SHX Text
8.33% MAX.
AutoCAD SHX Text 1.5%
AutoCAD SHX Text 4:1
AutoCAD SHX Text R=25'
AutoCAD SHX Text R=35'
AutoCAD SHX Text
%%USITE PLAN
NEW FILL AT 4:1 SLOPE PER DETAIL. SEE SHEET 6.
1. CONTRACTOR SUPPLIED CONCRETE DOUBLE VAULT TOILET
WITH CHASE. VAULT TOILET TO BE DELIVERED TO THE
SITE AND PLACED BY THE CONTRACTOR. CONCRETE VAULT
TO BE SET ON BASE PREPARED BY CONTRACTOR.
2. CONTRACTOR TO PERFORM EXCAVATION TO THE LINES,
GRADES, AND ELEVATIONS INDICATED IN THE DRAWINGS.
3. CONTRACTOR TO PROVIDE PROPER DEPTH WITH
ALLOWANCE MADE FOR CRUSHED AGGREGATE BASE
COURSE (CABC) BEDDING. VAULT EXCAVATION
APPROXIMATELY 26' X 22' WITH A 5' DEPTH.
4. CONTRACTOR TO COMPACT SUBGRADE TO 95% OF THE
MAXIMUM DRY DENSITY.
5. CONTRACTOR TO BED VAULT WITH CABC, PLACE TIMBERS
TO GRADE AND SCREED LEVEL. COMPACT TO 95% OF
MAXIMUM DRY DENSITY.
6. CONTRACTOR TO BACKFILL TO 6" BELOW FINISH GRADE
TO 95% OF MAXIMUM DRY DENSITY IN 6" LIFTS USING
GOVERNMENT APPROVED EMBANKMENT MATERIAL. CAP
BACKFILL WITH 6 INCHES OF TOPSOIL.
AutoCAD SHX Text
CEDAR SHAKE ROOF TEXTURE CHARCOAL GREY COLOR
AutoCAD SHX Text
HORIZONTAL LAP TEXTURE SAND BEIGE COLOR
AutoCAD SHX Text 4"x12"x16' DF TIMBER PLANKS FURNISHED BY CONTRACTOR
AutoCAD SHX Text
8" CABC COMPACTED IN PLACE 95% OF MAX. DRY DENSITY
AutoCAD SHX Text SPRING HINGE 4 "x4 " 12"x4 " 12" (TYP 3 PLCS)
AutoCAD SHX Text
MS-2 WALL VENT (TYP. 2 PLC'S IN REAR) (VENTS TO FACE SOUTHWEST DIRECTION)
AutoCAD SHX Text
PLACE TOP OF VAULT EVEN WITH SUBGRADE
AutoCAD SHX Text
BLEND AB EVEN WITH TOP OF CONCRETE PAD
AutoCAD SHX Text
2868 GALVANIZED DOOR ASSEMBLY
AutoCAD SHX Text
3068 GALVANIZED DOOR ASSEMBLY
AutoCAD SHX Text
BUILDING TO VAULT CONNCTION: BUTYL TAPE ADHESIVE SEALANT.
AutoCAD SHX Text
PLACE TOP OF VAULT EVEN WITH SUBGRADE,
AutoCAD SHX Text
BLEND AB EVEN WITH TOP OF CONCRETE PAD
AutoCAD SHX Text
FINISH GRADE ELEV. 2883.20'
AutoCAD SHX Text
FINISH GRADE ELEV. 2883.20'
AutoCAD SHX Text
1% CHANCE ANNUAL FLOOD ELEV. 2883.10'
AutoCAD SHX Text
EXISTING GRADE ELEV. 2882.00'
AutoCAD SHX Text
1% CHANCE ANNUAL FLOOD ELEV. 2883.10'
AutoCAD SHX Text
EXISTING GRADE ELEV. 2882.00'
AutoCAD SHX Text
6" TOPSOIL
AutoCAD SHX Text
BACKFILL 4:1 SLOPE
AutoCAD SHX Text
3" MINUS FILL
AutoCAD SHX Text
MS-13 WINDOWS
AutoCAD SHX Text
SPRING HINGE 4 " X4 " 12" X4 " 12" (TYP. 6 PLCS)6 PLCS)
AutoCAD SHX Text
SIGN (SI-2) (ACCESSIBLE AND UNISEX SYMBOLS) (TYP. 2 PLCS.)
AutoCAD SHX Text
ANCHOR NAIL "X " 14"X " 34" PREDRILL " 14" (TYP. 12 PLCS)
AutoCAD SHX Text
TWO PIECE VENT PIPE 15'-0" OVERALL HEIGHT (TYP. 2 PLCS)2 PLCS)
AutoCAD SHX Text 14'-4"
AutoCAD SHX Text 16'-10"
AutoCAD SHX Text 15'-2 "12"
AutoCAD SHX Text 4'-4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 5"
AutoCAD SHX Text 5"
AutoCAD SHX Text 13'-6"
AutoCAD SHX Text 12'
AutoCAD SHX Text 11'-11"
AutoCAD SHX Text 11'-11"
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
U.S. DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AUTOCAD
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGN OFFICE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BILLINGS FIELD OFFICE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
PPNM VAULT TOILET - 5 - VAULT TOILET DETAILS.DWG
AutoCAD SHX Text
MONTANA/DAKOTAS STATE OFFICE
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text
MARK
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
VAULT TOILET DETAILS
AutoCAD SHX Text
POMPEYS PILLAR VAULT TOILET REPLACEMENT
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text M:\SUPPORT_SERVICES\ENGINEERING\BIFO\RECREATION SITES\POMPEY'S\2024 POMPEYS PILLAR VAULT TOILET REPLACEMENT\CONTRACT DOCUMENTS\CADD DRAWINGS\SHEETS\PPNM VAULT TOILET - 5 - VAULT TOILET DETAILS.DWG
AutoCAD SHX Text
JSM
AutoCAD SHX Text
JSM
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text
TJC
AutoCAD SHX Text
TJC
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
%%UVAULT TOILET DETAILS
1. CONTRACTOR IS RESPONSIBLE FOR ALL PUBLIC AND PRIVATE UTILITY LOCATES. COORDINATE WITH
MONTANA 811 AND ANY OTHER NECESSARY ENTITIES.
2. CONTRACTOR TO INSTALL ADA COMPLIANT CONCRETE SIDEWALK AND LANDINGS PER THE
DRAWINGS AND SPECIFICATIONS.
3. CONTRACTOR TO BED THE CONCRETE SIDEWALK AND LANDINGS WITH 6 INCHES ON 0.75" MINUS
CABC.
4. CONTRACTOR TO RE-USE SUITABLE CUT MATERIAL FROM EXCAVATION AS FILL MATERIAL TO MEET
GRADE. GOVERNMENT TO APPROVE OF ALL FILL MATERIALS PRIOR TO PLACEMENT.
5. CONTRACTOR TO SUPPLY 3 INCH MINUS PIT RUN MATERIAL AS NEEDED TO MEET THE DRAWINGS
AND SPECIFICATIONS.
6. ALL RE-USED AND NEW FILL MATERIAL SHALL BE FREE OF TOPSOIL AND ORGANIC MATERIAL.
7. SUBGRADE, CABC, AND ALL FILL MATERIAL SHALL BE COMPACTED TO 95% OF THE MAXIMUM DRY
DENSITY PER ASTM D-698.
8. CONTRACTOR TO SUPPLY TOPSOIL FILL MATERIAL AS NEEDED TO MEET THE DRAWINGS AND
SPECIFICATIONS.
9. DISTURBANCE OF EXISTING VEGETATION SHALL BE MINIMIZED TO THE GREATEST EXTENT
POSSIBLE. ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE REPAIRED.
10. CONTRACTOR SHALL PROVIDE ALL SIGNAGE TO CLOSE THE CONSTRUCTION AREA.
11. CONTRACTOR TO SEED THE TOPSOIL PER THE SPECIFICATIONS WITH SUN AND SHADE TOLERANT
GRASS SEED.
AutoCAD SHX Text
4" CONCRETE 4000 PSI DAVIS COLORS, SANDSTONE #5237
AutoCAD SHX Text
#4 REBAR 18" O.C. CONTINUOUS THROUGHOUT
AutoCAD SHX Text
BACKFILL 4:1
AutoCAD SHX Text
1.5% MAX CROSS SLOPE
AutoCAD SHX Text NOTE: 1. CONSTRUCT " WIDE X 1" DEEP CONTRACTION JOINTS SPACED 5' APART. CONSTRUCT " WIDE X 1" DEEP CONTRACTION JOINTS SPACED 5' APART. 18" WIDE X 1" DEEP CONTRACTION JOINTS SPACED 5' APART. 2. INSTALL EXPANSION JOINT BETWEEN CONCRETE SIDEWALK AND VAULT TOILET. INSTALL EXPANSION JOINT BETWEEN CONCRETE SIDEWALK AND VAULT TOILET. 3. CONCRETE SHALL HAVE COLOR ADDITIVE. DAVIS COLORS, SANDSTONE #5237.CONCRETE SHALL HAVE COLOR ADDITIVE. DAVIS COLORS, SANDSTONE #5237.
AutoCAD SHX Text
6" TOPSOIL
AutoCAD SHX Text
VAULT TOILET FINISHED FLOOR
AutoCAD SHX Text
VAULT TOILET WALL
AutoCAD SHX Text
BACKFILL 4:1
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
U.S. DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AUTOCAD
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGN OFFICE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BILLINGS FIELD OFFICE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
PPNM VAULT TOILET - 6 - CONCRETE_GRADING DETAILS.DWG
AutoCAD SHX Text
MONTANA/DAKOTAS STATE OFFICE
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text
MARK
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
CONCRETE/GRADING DETAILS
AutoCAD SHX Text
POMPEYS PILLAR VAULT TOILET REPLACEMENT
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text M:\SUPPORT_SERVICES\ENGINEERING\BIFO\RECREATION SITES\POMPEY'S\2024 POMPEYS PILLAR VAULT TOILET REPLACEMENT\CONTRACT DOCUMENTS\CADD DRAWINGS\SHEETS\PPNM VAULT TOILET - 6 - CONCRETE_GRADING DETAILS.DWG
AutoCAD SHX Text
JSM
AutoCAD SHX Text
JSM
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text 1/19/24
AutoCAD SHX Text
TJC
AutoCAD SHX Text
TJC
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
%%UGRADING DETAIL
AutoCAD SHX Text
%%UCONCRETE SIDEWALK DETAIL
AutoCAD SHX Text
NOT TO SCALE
| PPNM Vault Toilet - 1 - Cover Sheet |
| Sheets and Views |
| Layout1 |
| PPNM Vault Toilet - 2 - Project Maps |
| Sheets and Views |
| MAP |
| PPNM Vault Toilet - 3 - Demolition Plan |
| Sheets and Views |
| Layout1 |
| PPNM Vault Toilet - 4 - Site Plan |
| Sheets and Views |
| Layout1 |
| PPNM Vault Toilet - 5 - Vault Toilet Details |
| Sheets and Views |
| Layout1 |
| PPNM Vault Toilet - 6 - Concrete_Grading Details |
| Sheets and Views |
| Layout1 |
| PPNM Vault Toilet - 4 - Site Plan.pdf |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .