Attachment 2 - Plans.pdf

PDF 1 MB Posted

Attached to
Trapper Creek Dorm Asbestos and Mold Remediation and Reconstruction
Solicitation number
12441926Q0021
Issued by

About this file

This document is a facility planning and renovation guide for the Trapper Creek Civilian Conservation Center (CCC) located in Darby, Montana. The document provides vicinity maps, existing site plans, building floor plans, and photographic documentation of three men's dormitory buildings (Buildings 10, 11, and 12) and one women's dormitory building (Building 13) that require renovation work.

The renovation scope includes removal of old carpet and asbestos floor tiles with installation of new carpet tiles in designated mechanical and storage spaces across all four buildings. Building 11 requires mold remediation, new gypsum board installation, and carpet replacement in areas affected by water leaks and subsequent mold growth in the crawlspace. The document includes detailed floor plans identifying specific rooms and areas requiring work, site plans showing the location of all facilities within the 74-building CCC campus, and photographic evidence of existing conditions in mechanical rooms, storage areas, and affected spaces. The facility houses student dormitories with typical bedroom units, shared toilet and shower facilities, lounges, kitchenettes, laundries, and support spaces. All four buildings identified for renovation are student housing facilities within the larger Trapper Creek CCC campus.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DARBY, MONTANA

TRAPPER CREEK

CCC

TRAPPER CREEK

CIVILIAN CONSERVATION CENTER

20 MI10 0

Space that will have old carpet and Asbestos Tiles removed and new carpet tiles installed.

AaronSanford Cross-Out

MEN'S DORMITORY

BUILDING 10

TRAPPER CREEK CCC

DARBY.MONTANA

AaronSanford Text Box

TYPICAL MECHANICAL AND STORAGE ROOMS BUILDING 10 (DORM 1)

have old carpet and Asbestos Tiles removed and new carpet tiles installed.

Area to have mold remdiation, new gypsum board and carpting (this is likely mold in teh crawlspace as well)

BUILDING 11

TRAPPER CREEK CCC

DARBY.MONTANA

AaronSanford

TYPICAL MECHANICAL AND STORAGE ROOMS BUILDING 11 (DORM 2)

BUILDING 11

TRAPPER CREEK CCC

DARBY.MONTANA

AaronSanford

BUILDING 11 (DORM 2): AREA WHERE WATER LEAK AND SUBSEQUENT MOLD OCCURRED

have old carpet and Asbestos Tiles removed and new carpet tiles installed.

BUILDING 12

TRAPPER CREEK CCC

DARBY.MONTANA

AaronSanford

TYPICAL MECHANICAL AND STORAGE ROOMS BUILDING 12 (DORM 3)

have old carpet and Asbestos Tiles removed and new carpet tiles installed.

WOMEN'S DORMITORY

BUILDING 13

TRAPPER CREEK CCC

DARBY.MONTANA

AaronSanford

TYPICAL MECHANICAL AND STORAGE ROOMS BUILDING 13 (DORM 4)

File details come from the government source that posted it. Updated .