This is a transformer oil sample outage phasing plan detailing 59 scheduled power outages for oil sampling at Peterson Space Force Base. The document lists specific tasks involving transformer and switch maintenance, including the outage source, number of transformers affected, transformer IDs, impacted facilities, facilities with generators, and required outage duration.

The plan includes special coordination requirements and scheduling constraints: medical facilities require coordination with Medical Facility Manager, child development centers must be scheduled on weekends, FAA Air Traffic Control Tower (Building 205) outages must occur before 5:00 AM, and AAFES/Commissary facilities prefer outages before 7:00 AM. Most outages are scheduled for 60 minutes, with some requiring 60-90 minutes or 120-240 minutes. Task 32, highlighted in red, must be performed on weekends and affects 24 buildings through Switch S13-090. The plan requires collaboration between 21 CES and Building 2 Electricians for building transformer switching operations, and coordination with Security Forces for traffic light and gate-related outages.

View the file

Other files

File Type Posted
Attachment 1 - SOW Oil Testing.docx DOCX document
Sources Sought Oil Sample Testing.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 3 60 MIN

2 2 60 MIN

3 1 60 MIN

4 1 60 MIN

5 3 60 MIN

6 4 60-90 MIN

7 2 60 MIN

8 6 60-90 MIN

9 2 60 MIN

10 4 60 MIN

11 2 60 MIN

12 2 60 MIN

13 1 60 MIN

14 3 60 MIN

15 3 60 MIN

16 2 60 MIN

17 1 60 MIN

18 1 60 MIN

19 2 60 MIN

20 1 60 MIN

21 1 60 MIN

22 1 60 MIN

23 1 60 MIN

24 1 60 MIN

25 1 60 MIN

TASK #

OUTAGE

SOURCE

# of XFMRs

LIST XFMRs

SWITCH, MULTI

SWITCH, S24-120

FACILITIES

w/GEN

TIME

SWITCH, S6-050

SWITCH, MULTI

XFMR

XFMR

N/A

N/A

XFMR

XFMR

XFMR

T2032, T2035, T2036

T2027, T2060

T-EWST

T2028

T2012, T2018, T2019

XFMR

XFMR

XFMR

XFMR

XFMR

XFMR

SWITCH, S24-150

SWITCH, S24-100

XFMR

SWITCH, S24-040

SWITCH MULTI

SWITCH, S24-020

SWITCH, S6-020

SWITCH S5-050

XFMR

SWITCH S24-160

2019 (Cmsry)

T2006, T-STWLTS, T2021,

T2017

N/A

T2015, T2004 EAST GATE

T200, T104, T102, T3745, T3747, T-P3

EAST GATE and PETE EAST CDC

102, 104, 200, POND 2, POND 3,

T203, T205 205 (FAA)

T845, T890, T895A, T895B 845, 890

T207, T208 N/A

203, 203

845, 890, 895

207, 208

N/A

216, 218, 888

361, 365, 368, 391

NONE

T210, T214 210

T893 N/A

T119, T121, T350B N/A

210, 214

119, 121, 350

T2C SEE NOTE

2 OLD SIDE

2 OLD SIDE

T2E SEE NOTE

T2F SEE NOTE

T2A SEE NOTE

2 NEW SIDE

2 NEW SIDE

2 OLD SIDE

P.S.F.B. XFMR OIL SAMPLE OUTAGE PHASING

LIST IMPACTED

FACILITIES

2032, 2034, 2035, 2036

2027, 2060

FAA PETE EAST ANTENNA

2012, 2018, 2019

2017, 2021

T2B SEE NOTE

T-SPKLR N/A

T-IR1, T-IR2 N/A

T30 (NEW SOCNORTH) 30 (SOCNorth)

NONE

NONE

T216, T218, T888 218

T361, T365 361

T-LT3

26 1 60 MIN

27 1 60 MIN

28 2 60 MIN

29 1 60 MIN

30 1 60 MIN

31 3 60 MIN

32 10 120-240

MIN

33 1 60 MIN

34 1 60 MIN

35 1 60 MIN

36 1 60 MIN

37 3 60 MIN

38 1 60 MIN

39 5 60-90 MIN

40 3 60 MIN

41 2 60 MIN

42 4 60-90

43 2 60 MIN

44 7 120 MIN

45 3 60 MIN

46 5 60-90 MIN

P.S.F.B. XFMR OIL SAMPLE OUTAGE PHASING

TASK #

OUTAGE

SOURCE

# of XFMRs

LIST XFMRs

XFMR T1284 1284 N/A

SWITCH, S3-070 T1860, T1868, T1398 NORTH GATE, 1868, 1860 NORTH GATE

SWITCH, S13-090

T682, T681, T678, T672, T1320, T1322, T1327, T690, T1324, T1334

24 BLDGS MULTI

SWITCH, S3-010 T1840 1840 1840

SWITCH, S3-070 T1350

TIME

XFMR T1255 1255 N/A

XFMR T1229 1229 AND LRS FUEL PUMP 1229

XFMR T1285 1285 N/A

1350 N/A

XFMR T3 3 3

SWITCH, S3-020 T1844A, T1844B 1844 1844

XFMR

SWITCH, MULTI T1270, T1166, T1143 1143, 1270 N/A

SWITCH, S13-090 T1262 1262, 1256, 1280 N/A

FACILITIES

w/GEN

T2D 2 OLD SIDE SEE NOTE

LIST IMPACTED

FACILITIES

SWITCH, S13-175 T140A, T140B, T625, T630 140, 625, 626, 630 N/A

SWITCH, S13-190 T640, T605, T538A, T538B 538, 605, 640 N/A

SWITCH, MULTI T650, T654, T656, T620, T590

590, 656, 654, 652, 650, 617, 685, 660, 662, 664, 666 N/A

SWITCH, S13-180 T668, T150, T161 150, 162, POL YARD 668

SWITCH, MULTI T475, T122, T123 122, 123, LYON'S PARK 122, 123

SWITCH, S13-010

T-WWST, T1876, T3755,

T1485, T1345

1876, 3755, ENT, STAR BANK,

PAINE/STEWART TRAFFIC

LIGHTS

N/A

SWITCH, S13-200 T133, T130 133, 130 N/A

SWITCH, S13-210

T502A, T502B, T503, T504, T506, T425, T418 502, 503, 504, 506, 425, 418 N/A

47 3 60 MIN

48 2 60 MIN

49 3 60 MIN

50 2 60 MIN

51 5 60-90 MIN

52 2 60 MIN

53 6 60-90 MIN

54 2 60 MIN

55 3 60 MIN

56 1 60 MIN

57 4 60-90 MIN

58 5 120 MIN

59 2 60 MIN

COMMENTS: All bldg 2 XFMRs can be switched via internal switchgears and tie breakers, switching ops will need to be a collaboration with 21 CES and Bldg 2 Electricians. All medical facilities will need to be coordinated with Med Fac Manager, they have unique scheduling requirements. Row highlighted red must be done on a weekend!. All items with red words will require special coordination as the users are difficult to get approvals. All XFMRs affecting traffic lights and gates need special coordination with SFS personnel. Child Development Center Facilities (CDC) must be done on a weekend. Bldg 205 is the FAA Air Traffic Control Tower, this needs to be done prior to 05:00 in the morning, they will not sign off on an outage after 5 in the morning unless it is an emergency. AAFES and Commissary facilities will be difficult to coordinate, but usually anything prior to 07:00 can be supported.

P.S.F.B. XFMR OIL SAMPLE OUTAGE PHASING

TASK #

OUTAGE

SOURCE

# of XFMRs

LIST XFMRs

SWITCH, S13-002 T-MISSILE, T1376, T1365 1365, 1376 1376

LIST IMPACTED

FACILITIES

FACILITIES

w/GEN

TIME

SWITCH, S11-030 T-LT2, T1525

1525, PETERSON/STEWART

TRAFFIC

N/A

SWITCH, S11-040 T982, T981, T979, T910, T863 982, 981, 980, 979, 999, 863, 910 N/A

SWITCH, MULTI T1410, T1440, T1555 1555, 1440, 1410 N/A

SWITCH, MULTI T1360, T1465 1360, 1361, 1465, 1466 N/A

SWITCH, S11-110 T725, T1102, T1160 1102, 725, 1160 1160

SWITCH, S22-020 T1042A, T1042B, T1038 1038, 1042 1038

SWITCH, S11-050 T959A, T959B 959 959 (med owned)

SWITCH, S11-100

T570N, T570S, T560, T406, T404, T3765 560, 404, 406, Lyons Park N/A

SWITCH, MULTI

T1026, T1030, 1054A, T1054B, T-COMVAULT

1054, 1030, 1026, 1685, 1058(COM

VAULT

SWITCH, S22-070 T875, T850 875, 873, 871, 869, 897, 865, 850 875

XFMR T1040 1040 1040

SWITCH, MULTI T1091, T1093, T1096, T1013

1091, 1092, 1093, 1094, 1095, 1096, N/A

File details come from the government source that posted it. Updated .