Attachment 2 - Phased Outage Plan.pdf
PDF 208 KB Posted
- Attached to
- Oil Sample Testing (Transformers)
- Solicitation number
- Not on record
About this file
This is a transformer oil sample outage phasing plan detailing 59 scheduled power outages for oil sampling at Peterson Space Force Base. The document lists specific tasks involving transformer and switch maintenance, including the outage source, number of transformers affected, transformer IDs, impacted facilities, facilities with generators, and required outage duration.
The plan includes special coordination requirements and scheduling constraints: medical facilities require coordination with Medical Facility Manager, child development centers must be scheduled on weekends, FAA Air Traffic Control Tower (Building 205) outages must occur before 5:00 AM, and AAFES/Commissary facilities prefer outages before 7:00 AM. Most outages are scheduled for 60 minutes, with some requiring 60-90 minutes or 120-240 minutes. Task 32, highlighted in red, must be performed on weekends and affects 24 buildings through Switch S13-090. The plan requires collaboration between 21 CES and Building 2 Electricians for building transformer switching operations, and coordination with Security Forces for traffic light and gate-related outages.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - SOW Oil Testing.docx | DOCX document | |
| Sources Sought Oil Sample Testing.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 3 60 MIN
2 2 60 MIN
3 1 60 MIN
4 1 60 MIN
5 3 60 MIN
6 4 60-90 MIN
7 2 60 MIN
8 6 60-90 MIN
9 2 60 MIN
10 4 60 MIN
11 2 60 MIN
12 2 60 MIN
13 1 60 MIN
14 3 60 MIN
15 3 60 MIN
16 2 60 MIN
17 1 60 MIN
18 1 60 MIN
19 2 60 MIN
20 1 60 MIN
21 1 60 MIN
22 1 60 MIN
23 1 60 MIN
24 1 60 MIN
25 1 60 MIN
TASK #
OUTAGE
SOURCE
# of XFMRs
LIST XFMRs
SWITCH, MULTI
SWITCH, S24-120
FACILITIES
w/GEN
TIME
SWITCH, S6-050
SWITCH, MULTI
XFMR
XFMR
N/A
N/A
XFMR
XFMR
XFMR
T2032, T2035, T2036
T2027, T2060
T-EWST
T2028
T2012, T2018, T2019
XFMR
XFMR
XFMR
XFMR
XFMR
XFMR
SWITCH, S24-150
SWITCH, S24-100
XFMR
SWITCH, S24-040
SWITCH MULTI
SWITCH, S24-020
SWITCH, S6-020
SWITCH S5-050
XFMR
SWITCH S24-160
2019 (Cmsry)
T2006, T-STWLTS, T2021,
T2017
N/A
T2015, T2004 EAST GATE
T200, T104, T102, T3745, T3747, T-P3
EAST GATE and PETE EAST CDC
102, 104, 200, POND 2, POND 3,
T203, T205 205 (FAA)
T845, T890, T895A, T895B 845, 890
T207, T208 N/A
203, 203
845, 890, 895
207, 208
N/A
216, 218, 888
361, 365, 368, 391
NONE
T210, T214 210
T893 N/A
T119, T121, T350B N/A
210, 214
119, 121, 350
T2C SEE NOTE
2 OLD SIDE
2 OLD SIDE
T2E SEE NOTE
T2F SEE NOTE
T2A SEE NOTE
2 NEW SIDE
2 NEW SIDE
2 OLD SIDE
P.S.F.B. XFMR OIL SAMPLE OUTAGE PHASING
LIST IMPACTED
FACILITIES
2032, 2034, 2035, 2036
2027, 2060
FAA PETE EAST ANTENNA
2012, 2018, 2019
2017, 2021
T2B SEE NOTE
T-SPKLR N/A
T-IR1, T-IR2 N/A
T30 (NEW SOCNORTH) 30 (SOCNorth)
NONE
NONE
T216, T218, T888 218
T361, T365 361
T-LT3
26 1 60 MIN
27 1 60 MIN
28 2 60 MIN
29 1 60 MIN
30 1 60 MIN
31 3 60 MIN
32 10 120-240
MIN
33 1 60 MIN
34 1 60 MIN
35 1 60 MIN
36 1 60 MIN
37 3 60 MIN
38 1 60 MIN
39 5 60-90 MIN
40 3 60 MIN
41 2 60 MIN
42 4 60-90
43 2 60 MIN
44 7 120 MIN
45 3 60 MIN
46 5 60-90 MIN
P.S.F.B. XFMR OIL SAMPLE OUTAGE PHASING
TASK #
OUTAGE
SOURCE
# of XFMRs
LIST XFMRs
XFMR T1284 1284 N/A
SWITCH, S3-070 T1860, T1868, T1398 NORTH GATE, 1868, 1860 NORTH GATE
SWITCH, S13-090
T682, T681, T678, T672, T1320, T1322, T1327, T690, T1324, T1334
24 BLDGS MULTI
SWITCH, S3-010 T1840 1840 1840
SWITCH, S3-070 T1350
TIME
XFMR T1255 1255 N/A
XFMR T1229 1229 AND LRS FUEL PUMP 1229
XFMR T1285 1285 N/A
1350 N/A
XFMR T3 3 3
SWITCH, S3-020 T1844A, T1844B 1844 1844
XFMR
SWITCH, MULTI T1270, T1166, T1143 1143, 1270 N/A
SWITCH, S13-090 T1262 1262, 1256, 1280 N/A
FACILITIES
w/GEN
T2D 2 OLD SIDE SEE NOTE
LIST IMPACTED
FACILITIES
SWITCH, S13-175 T140A, T140B, T625, T630 140, 625, 626, 630 N/A
SWITCH, S13-190 T640, T605, T538A, T538B 538, 605, 640 N/A
SWITCH, MULTI T650, T654, T656, T620, T590
590, 656, 654, 652, 650, 617, 685, 660, 662, 664, 666 N/A
SWITCH, S13-180 T668, T150, T161 150, 162, POL YARD 668
SWITCH, MULTI T475, T122, T123 122, 123, LYON'S PARK 122, 123
SWITCH, S13-010
T-WWST, T1876, T3755,
T1485, T1345
1876, 3755, ENT, STAR BANK,
PAINE/STEWART TRAFFIC
LIGHTS
N/A
SWITCH, S13-200 T133, T130 133, 130 N/A
SWITCH, S13-210
T502A, T502B, T503, T504, T506, T425, T418 502, 503, 504, 506, 425, 418 N/A
47 3 60 MIN
48 2 60 MIN
49 3 60 MIN
50 2 60 MIN
51 5 60-90 MIN
52 2 60 MIN
53 6 60-90 MIN
54 2 60 MIN
55 3 60 MIN
56 1 60 MIN
57 4 60-90 MIN
58 5 120 MIN
59 2 60 MIN
COMMENTS: All bldg 2 XFMRs can be switched via internal switchgears and tie breakers, switching ops will need to be a collaboration with 21 CES and Bldg 2 Electricians. All medical facilities will need to be coordinated with Med Fac Manager, they have unique scheduling requirements. Row highlighted red must be done on a weekend!. All items with red words will require special coordination as the users are difficult to get approvals. All XFMRs affecting traffic lights and gates need special coordination with SFS personnel. Child Development Center Facilities (CDC) must be done on a weekend. Bldg 205 is the FAA Air Traffic Control Tower, this needs to be done prior to 05:00 in the morning, they will not sign off on an outage after 5 in the morning unless it is an emergency. AAFES and Commissary facilities will be difficult to coordinate, but usually anything prior to 07:00 can be supported.
P.S.F.B. XFMR OIL SAMPLE OUTAGE PHASING
TASK #
OUTAGE
SOURCE
# of XFMRs
LIST XFMRs
SWITCH, S13-002 T-MISSILE, T1376, T1365 1365, 1376 1376
LIST IMPACTED
FACILITIES
FACILITIES
w/GEN
TIME
SWITCH, S11-030 T-LT2, T1525
1525, PETERSON/STEWART
TRAFFIC
N/A
SWITCH, S11-040 T982, T981, T979, T910, T863 982, 981, 980, 979, 999, 863, 910 N/A
SWITCH, MULTI T1410, T1440, T1555 1555, 1440, 1410 N/A
SWITCH, MULTI T1360, T1465 1360, 1361, 1465, 1466 N/A
SWITCH, S11-110 T725, T1102, T1160 1102, 725, 1160 1160
SWITCH, S22-020 T1042A, T1042B, T1038 1038, 1042 1038
SWITCH, S11-050 T959A, T959B 959 959 (med owned)
SWITCH, S11-100
T570N, T570S, T560, T406, T404, T3765 560, 404, 406, Lyons Park N/A
SWITCH, MULTI
T1026, T1030, 1054A, T1054B, T-COMVAULT
1054, 1030, 1026, 1685, 1058(COM
VAULT
SWITCH, S22-070 T875, T850 875, 873, 871, 869, 897, 865, 850 875
XFMR T1040 1040 1040
SWITCH, MULTI T1091, T1093, T1096, T1013
1091, 1092, 1093, 1094, 1095, 1096, N/A
File details come from the government source that posted it. Updated .