Attachment_2_Map_and_Specifications_BIHO_CRM_Utilites_Survey.pdf
PDF 5 MB Posted
- Attached to
- BIHO CRM UTILITIES SURVEY Federal contract opportunity
- Solicitation number
- 140P8326Q0013
About this file
This document is a set of design and engineering plans for the replacement of a pump station and drainfield at Big Hole National Battlefield in southwestern Montana, prepared by licensed professional engineer Matthew C. Schmitter. The project is identified as Project No. 149302 and is under the jurisdiction of the United States Department of the Interior, National Park Service.
The plans encompass comprehensive site development specifications including survey control and existing site conditions, demolition requirements for the existing pump station #1 and related infrastructure, and detailed construction documents for the replacement systems. Key design elements include a new 2,000-gallon fiberglass dosing tank with duplex effluent pump system, a 3-inch PVC sanitary sewer force main extending approximately 2,505 linear feet from the pump station to the drainfield, and a pressure-dosed drainfield system with five rows of chambers designed for peak flow conditions of 2,741 gallons per day. The drainfield incorporates sub-surface absorption trenches with graveled chambers and includes monitoring ports and flushing ports. Construction details specify materials and installation requirements for all components, including utility trench specifications, backfill requirements, valve boxes, and drainage control features. The plans establish control points, site elevations, and provide profiles and plans at multiple stations along the force main alignment to guide construction activities and ensure proper slope and drainage characteristics throughout the system.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8326Q0013_Amd_0001.pdf | ||
| Attachment_5_Q_A_140P8326Q0013_0001.pdf | ||
| Attachment_3_Relevant_Experience_and_Past_Performance_Form.docx | DOCX document | |
| Attachment_4_Wage_Determination.pdf | ||
| Attachment_1_Scope_of_Work_BIHO_CRM_Utiliteis_Survey.docx | DOCX document | |
| Sol_140P8326Q0013.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8/7/2020 file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG
Big Hole NB Survey Area CRM Survey Location Detail
Legend
Big Hole National Battlefield Visitor Center
Big Hole Survey Area
1000 ft
N
N
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
R
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
PROPANE
W
EW EW
UGT UGT
ES
UGP
WV
H
Y
D
X X X X
GP
GM
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
0+00
0+50
1+00
1+50
2+00
2+50
3+00
3+50
4+00
4+50
5+00
5+50
6+00
6+50
7+00
7+50
8+00
8+50
9+00
9+50
10+00
10+50
11+00
11+50
12+00
12+50
13+00
13+50
14+00
14+50
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
21+00 21+5022
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
0+
0+
1+
1+
2+
2+
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
2+50
3+
3+
4+
4+
5+
5+
6+
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
6+
6+
7+
7+
8+
8+
9+
9+
+0
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
14+50
+0
+5
+0
+5
+0
+0
+5
+0
+5
+0
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
19+00
+5
0 20 +0
0 20 +5
+0
+5
+0
+5
+0
+5
+0
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
+0
+5
+0
+5
+0
+5
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
K bi
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
08/10/2020
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
| Sheets and Views |
| COVER COVER SHEET |
| SURVEY AREA MAP |
| G01 SURVEY CONTROL & EXISTING SITE PLAN |
| G02 DEMOLITION PLAN |
| G03 GENERAL NOTES, LEGEND, & ABBREVIATIONS |
| C01 SITE PLAN & KEY MAP |
| C02 FORCE MAIN PLAN & PROFILE |
| C03 FORCE MAIN PLAN & PROFILE |
| C04 FORCE MAIN PLAN & PROFILE |
| C05 FORCE MAIN PLAN & PROFILE |
| C06 FORCE MAIN PLAN & PROFILE |
| C07 FORCE MAIN PLAN & PROFILE |
| C08 FORCE MAIN PLAN & PROFILE |
| C09 DETAILS |
| C10 DETAILS |
| C11 DETAILS |
File details come from the government source that posted it. Updated .