Attachment_1_Scope_of_Work_BIHO_CRM_Utiliteis_Survey.docx
DOCX document 26 KB Posted
- Attached to
- BIHO CRM UTILITIES SURVEY Federal contract opportunity
- Solicitation number
- 140P8326Q0013
About this file
This is a Scope of Work document for a cultural resources survey contract at Big Hole National Battlefield (BIHO) under solicitation number 140P8326Q0013. The National Park Service seeks a contractor to conduct Class I and Class III cultural resources surveys across approximately 20 acres divided into two distinct areas to support Section 106 of the National Historic Preservation Act compliance for a proposed utility infrastructure project involving sewer system replacement, water line installation, and leach field establishment. All compliance work must be completed by June 30, 2026.
The contractor must complete a Class I desktop survey reviewing existing cultural resources documentation from the Montana State Historic Preservation Office and Nez Perce National Historical Park, followed by an intensive Class III pedestrian survey incorporating shovel tests and test pits up to 2 meters deep to identify subsurface cultural material. Deliverables include comprehensive documentation meeting Montana SHPO standards and Secretary of Interior Standards, consisting of photographs, illustrations, complete GIS datasets, data sheets, National Register evaluations, and a final report with two bound paper copies and digital PDF in ArcGIS Pro-compatible format. The project area is located 10 miles west of Wisdom, Montana at approximately 6,500 feet elevation with varied terrain including flat surfaces and sloped areas; the accessible work window is limited to early July through late August before snowstorms begin. The NPS will provide engineering specifications, site access, prior archaeological reports, and relevant maps to support the survey work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8326Q0013_Amd_0001.pdf | ||
| Attachment_5_Q_A_140P8326Q0013_0001.pdf | ||
| Attachment_2_Map_and_Specifications_BIHO_CRM_Utilites_Survey.pdf | ||
| Attachment_4_Wage_Determination.pdf | ||
| Attachment_3_Relevant_Experience_and_Past_Performance_Form.docx | DOCX document | |
| Sol_140P8326Q0013.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Attachment 1: Scope of Work | CRM Utilities Survey | |
| 140P8326Q0013 | Big Hole National Battlefield (BIHO) |
SCOPE OF WORK – Cultural Resources Survey – Waterline at Big Hole National Battlefield The National Park Service seeks to contract with a third party to conduct a Class I and Class III cultural resources survey at Big Hole National Battlefield for an area being considered for utility demolition, repair, and installation.
BACKGROUND
In the early 2020s, Big Hole National Battlefield (BIHO) proposed a project to replace the aging sewer system within the park that services the visitor center and the park housing. This includes the demolition and replacement of the existing sewer treatment system, water pumps, sewer lagoons, water lines, and waste lines within the park.
It is proposed that the existing sewer system be replaced with a lower-maintenance system that utilizes a septic system and drain field in lieu of the sewer treatment facility and lagoons. This will require that the existing system be demolished and replaced in stages. Priority for the upcoming years has been given to the replacement of water lines, sewer lines, and water pumps, and the establishment of a leech field near the park boundary.
Prior to any portion of this proposed project taking place, it is required that the area be surveyed for cultural resources and that all identified cultural resources be documented for consideration during the NEPA/NHPA compliance process. It is expected that all compliance work will be completed by June 30, 2026. As part of this compliance process, for Section 106 of the National Historic Preservation Act requirements, a cultural resources survey is required to be completed along the proposed water line route, the proposed sewer line route, the proposed leach field expansion area, the area of the sewage lagoons, and the water pump stations.
The area to be surveyed is approximately 20 acres divided into two distinct areas by a road leading to the park’s trail heads. The northern area is the alignment of the sewer line, the water pump, and the location of the sewage lagoons. The southern area is the proposed new leach field area, (see map attachment).
REQUIREMENTS
To complete the necessary cultural resources survey work, the contractor shall complete the following tasks:
1. Complete a site visit to the project area at Big Hole National Battlefield prior to field work commencing to discuss the project and expected outcomes with the archaeologist and facilities manager from Nez Perce National Historical Park.
2. Conduct a class I cultural resources survey to identify, locate, and review existing cultural resources documentation regarding BIHO that is retained by the Montana State Historic Preservation Office and at Nez Perce National Historical Park.
3. Conduct a class III cultural resources survey/investigation of the proposed project area at BIHO.
a. The class III investigation shall include an intensive pedestrian survey of the entire project area
b. The class III investigation shall incorporate an investigative strategy that includes shovel tests and test pits of a sufficient depth (up to 2 meters in depth to match proposed depth of water lines) and quantity to determine likely/potential presence of subsurface cultural material in areas where ground disturbance for new waterlines will occur as part of the proposed undertaking.
c. All class III survey work shall meet the Secretary of Interior Standards for cultural resources investigations and documentation.
d. All class III survey work shall also meet the methodology and reporting requirements as set forth by the Montana State Historic Preservation Officer.
4. Thoroughly document all results from Class I survey work
5. Thoroughly document all work undertaken and completed as part of Class III investigation work. Documentation of this work shall include:
a. Photographs that show the following:
i. Project area
ii. Work in progress
iii. Each completed shovel test and test pit with appropriate scales indicating size and depth of pit/test
iv. All cultural material identified including artifacts and diagnostic materials
v. Any identified archaeological sites
b. Illustrations of the following:
i. Any diagnostic cultural items such as projectile points
ii. Unique instances of stratigraphy within test pits
iii. Cultural features such as roasting pits, rock alignments, etc.
iv. Identified archaeological sites
c. A complete GIS dataset that includes the following:
i. Survey area
ii. Locations of shovel tests and test pits
iii. Location of any features and resources identified
iv. Boundaries of archaeological sites identified and significant features within identified archaeological sites
d. Thorough data Sheets and National Register of Historic Places evaluations for each of the following:
i. Isolated cultural features identified during the Class III survey
ii. Archaeological sites identified during the Class III survey
e. Report
i. A final report that details all work completed and provides a thorough explanation of methodologies utilized for completing that work and summarizes all cultural resources identified and recorded during the execution of the Class III survey
6. All documentation generated shall meet reporting requirements and form standards as required by the Montana State Historic Preservation Office (SHPO / Montana Historical Society). Montana SHPO forms and guidelines are located here: https://mhs.mt.gov/Shpo/Forms.
7. Provide the National Park Service with a digital pdf of all project documentation in a final report form, two bound paper copies of the final report, and digital copies of all geospatial information collected for the project in a data type compatible with the most current version of ArcGIS Pro.
ADDITIONAL INFORMATION
Big Hole National Battlefield is located in the Big Hole Valley 10 miles west of Wisdom, MT on US HWY 43 along the north fork of the Big Hole River. The terrain to be surveyed is varied and includes the flat surface adjacent to the road, the areas directly below the slope adjacent to the existing sewer lagoons, and the flat areas near the existing leach field.
The elevation of the area is approximately 6,500 feet above sea level. Summer temperatures in the project area are typically in the mid to high 70s at the warmest parts of the summer. The evenings cool off dramatically and can see up to a 40-degree temperature drop. Services available in the area are minimal. Most major services for equipment, personal needs, tools, and more can be found in the small towns along Highway 93 about 1 hour away between Conner, MT and Lolo, MT.
The ground surface in the survey area is mostly denuded of trees and forbs, however, there is a small strip of trees and forbs in less than 1 acre of the survey area down a slope leading to the existing sewer lagoons. The ground surface is a mix of rocky, clay soils. The ground remains snow free during the summer season, but the summer season is short approximately early July – late August. After August, snowstorms are possible.
The current, proposed engineering design shows new pipe being laid adjacent to the existing pipeline along the entrance road. The pipe depth will be approximately 6 ft below ground surface. The design sheets for the proposed sewer project are included with this scope of work (see attached engineering specs).
NPS FURNISHED ITEMS
1. A pdf copy of the waterline project engineering specs indicating the location for new water lines and new leach field
2. Access to Big Hole National Battlefield
3. Access to reports on prior archaeological work conducted at Big Hole National Battlefield
4. Access to archived materials contained at Nez Perce National Historical Park for potential review by the contractor
5. Maps indicating areas required to be surveyed