Attachment 2 - List of Fire Protection Systems (AUG 2026).xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- CNF INTEGRATED FIRE PROTECTION SYSTEMS
- Solicitation number
- 1240BF26Q0056
- Issued by
-
Department of Agriculture Forest Service
About this file
This file is an attachment listing all active fire protection systems covered under the CNF Integrated Fire Protection Systems contract, organized across five tabs detailing specific equipment and service requirements at multiple Chugach National Forest facilities in Southcentral Alaska.
The contract encompasses fire protection system maintenance and services across three geographic locations: Cordova (accessible only by airplane/ferry), Girdwood, and Seward (accessible by road). Tab 1 lists six fire alarm systems requiring annual inspection, testing, certification, and maintenance, including EST Model LSS1 and Kidde KDR-100 panels at ranger district administrative offices, visitor centers, and work centers. Tab 2 specifies six fire suppression systems requiring annual service, consisting of five Pyro-Chem Model MCH3 dry chemical fire suppression units with 360 fusible link fire dampers (with annual replacement of fusible links and CO2 cartridges, and hydrostatic testing per NFPA 10) and one 2-story wet fire sprinkler system serving eight apartments. Tab 3 identifies one backflow preventer (Ames Company Colt 400Z RPZA 2-1/2") requiring annual inspection, testing, certification, and maintenance. Tab 4 lists 115 fire extinguishers distributed across all facilities—predominantly rechargeable multi-purpose ABC dry chemical units ranging from 2.5 to 20 pounds—requiring annual inspection, testing, certification, and maintenance; the Government acknowledges incomplete maintenance records and authorizes the contractor to determine which units require internal maintenance, hydrostatic testing, replacement, and disposal, subject to CO authorization once funding is certified. Tab 5 identifies five fire alarm systems requiring monthly remote monitoring services, with three designated as optional items contingent on funding availability. All services must comply with NFPA and OSHA requirements, and the contractor must coordinate all work with the Contracting Officer's Representative at least 10 business days in advance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TAB 1 - FAS
CNF Integrated Fire Protection Systems - Fire Alarm Systems (AUG 2026)
The following list includes the sites/locations of all active fire alarm systems covered under this contract.
| Item # | City | Facility | Facility Address | Equipment Category | Equipment Make and Model | Quantity | Required Level of Service | Frequency of Services | Remarks |
| 1 | Cordova | Cordova Ranger District (CRD) Administrative Office | 612 2nd Street, Cordova, AK 99574 | Alarm Panel | EST Model LSS1 | 1 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | |
| 2 | Cordova | Cordova Ranger District (CRD) Bunkhouse | 913 LeFevre Street, Cordova, AK 99574 | Alarm Panel | Kidde KDR-100 | 1 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | |
| 3 | Girdwood | Glacier Ranger District (GRD) Administrative Office | 145 Forest Station Road, Girdwood, AK 99587 | Alarm Panel | Walter Kidde Gemini | 1 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | |
| 4 | Girdwood | Begich Boggs Visitor Center (BBVC) | 800 Portage Lake Loop, Girdwood, AK 99587 | Alarm Panel | General Electric EST | 1 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | |
| 5 | Seward | Seward Ranger District (SRD) Administrative Office | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Alarm Panel | Fire Control Instruments 7100 Series (Includes 36 Initiating Devices) | 1 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | The initiating devices are not specific to the system, but they need to be tested to make sure each one initiates the alarm. |
| 6 | Seward | Kenai Lake Work Center (KLWC) Flex Housing | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Alarms/Autodialer | Autodialer Only (No Fire Alarm Control Panel) AD-2000 (Includes 17 Notification Appliances) | 1 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | The system must be serviced as a whole with visual inspections of all notification appliances. |
TOTAL 6
NOTE: Systems listed may be upgraded during the performance of this contract.
TAB 2 - FSS
CNF Integrated Fire Protection Systems - Fire Suppression Systems (AUG 2026)
The following list includes the sites/locations of all active fire suppression systems covered under this contract.
| Item # | City | Facility | Facility Address | Equipment Category | Equipment Make and Model | Equipment Description | Quantity | Required Level of Service | Frequency of Services | Remarks |
| 1 | Cordova | Cordova Ranger District (CRD) Hazardous Material Storage Buildings | 913 LeFevre Street, Cordova, AK 99574 | Fire Suppression | Pyro-Chem Model MCH3 Control Head for Dry Chem Bottle | 360° Fusible Link Fire Dampers + 35 lbs ABC Dry Chemical Bottle with CO2 Cartridge | 2 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Two 360° fusible link fire dampers and one 35 lbs dry chemical bottle with CO2 cartridge. The fusible links and CO2 cartridge are required to be replaced annually. Hydrostatic testing of dry chemical bottles is required, following NFPA 10 requirements. |
| 2 | Girdwood | Portage Work Center Hazardous Material Storage Building | 2190 Portage Glacier Road, Girdwood, AK 99587 | Fire Suppression | Pyro-Chem Model MCH3 Control Head for Dry Chem Bottle | 360° Fusible Link Fire Dampers + 35 lbs ABC Dry Chemical Bottle with CO2 Cartridge | 1 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Two 360° fusible link fire dampers and one 35 lbs dry chemical bottle with CO2 cartridge. The fusible links and CO2 cartridge are required to be replaced annually. Hydrostatic testing of dry chemical bottles is required, following NFPA 10 requirements. |
| 3 | Seward | Kenai Lake Work Center (KLWC) Hazardous Material Storage Buildings | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Fire Suppression | Pyro-Chem Model MCH3 Control Head for Dry Chem Bottle | 360° Fusible Link Fire Dampers + 35 lbs ABC Dry Chemical Bottle with CO2 Cartridge | 2 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Two 360° fusible link fire dampers and one 35 lbs dry chemical bottle with CO2 cartridge. The fusible links and CO2 cartridge are required to be replaced annually. Hydrostatic testing of dry chemical bottles is required, following NFPA 10 requirements. |
| 4 | Seward | Kenai Lake Work Center (KLWC) Flex Housing | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Fire Sprinkler System | 2-Story Wet System | Wet System for 8 Apartments and Auto-Dialer (2-Story Building) | 1 | Inspection, Testing, Certification, and Maintenance | ANNUALLY |
TOTAL 6
NOTE: Systems listed may be upgraded during the performance of this contract.
TAB 3 - BFP
CNF Integrated Fire Protection Systems - Backflow Preventers (AUG 2026)
The following list includes the sites/locations of all active backflow preventers covered under this contract.
| Item # | City | Facility | Facility Address | Equipment Category | Equipment Make | Equipment Model | Equipment Type | Equipment Size | Equipment Serial Number | Equipment Location | Equipment Connection | Quantity | Required Level of Service | Frequency of Services |
| 1 | Seward | Kenai Lake Work Center (KLWC) Flex Housing | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Backflow Preventer | Ames Company | Colt 400Z | RPZA | 2-1/2" | HL 0502 | Boiler/Utility Room | Sprinklers | 1 | Inspection, Testing, Certification, and Maintenance | ANNUALLY |
TOTAL 1
NOTE: The backflow preventers listed may be upgraded during the performance of this contract.
TAB 4 - FE
CNF Integrated Fire Protection Systems - List of Fire Extinguishers (AUG 2026)
The following list includes the sites/locations of all fire extinguishers covered under this contract.
| Item # | City | Facility | Address | Rechargeable? | Equipment Type/Size | Quantity | Date of Last Internal Maintenance | Date of Last Hydrostatic Testing | Required Level of Service | Frequency of Services | Remarks |
| 1 | Cordova | Cordova Ranger District (CRD) Administrative Office | 612 2nd Street, Cordova, AK 99574 | Rechargeable | Multi-Purpose ABC Dry Chemical (~10 lbs) | 5 | Apr-25 | Apr-25 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located near building exists. |
| 2 | Cordova | Cordova Ranger District (CRD) Administrative Office | 612 2nd Street, Cordova, AK 99574 | Rechargeable | Halon (~2.5 lbs) | 1 | Apr-25 | Apr-25 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located near building exists. |
| 3 | Cordova | Cordova Ranger District (CRD) Work Center | 913 LeFevre Street, Cordova, AK 99574 | Rechargeable | Multi-Purpose ABC Dry Chemical (~10 lbs) | 16 | Apr-25 | Apr-25 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located near building exists. |
| 4 | Cordova | Cordova Ranger District (CRD) Work Center | 913 LeFevre Street, Cordova, AK 99574 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 1 | Apr-25 | Apr-25 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located near building exists. |
| 5 | Cordova | Cordova Ranger District (CRD) Work Center | 913 LeFevre Street, Cordova, AK 99574 | Rechargeable | Multi-Purpose ABC Dry Chemical (~2.5 lbs) | 10 | Apr-25 | Apr-25 | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located near building exists. |
| 6 | Girdwood | Glacier Ranger District (GRD) Administrative Office | 145 Forest Station Road, Girdwood, AK 99587 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 5 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located in the office area near the exits. |
| 7 | Girdwood | Glacier Ranger District (GRD) Bunkhouse | 145 Forest Station Road, Girdwood, AK 99587 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 4 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located in the bunkhouse. |
| 8 | Girdwood | Glacier Ranger District (GRD) Warehouse | 145 Forest Station Road, Girdwood, AK 99587 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 5 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located in the warehouse. |
| 9 | Girdwood | Glacier Ranger District (GRD) Landscaping Shed | 145 Forest Station Road, Girdwood, AK 99587 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 1 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located in the shed. |
| 10 | Girdwood | Glacier Ranger District (GRD) Vehicles and Equipment | 145 Forest Station Road, Girdwood, AK 99587 | Rechargeable | Multi-Purpose ABC Dry Chemical (~2.5 lbs) | 5 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | One (1) fire extinguisher is located at WCF #1613 next to the external fuel tank, one (1) is located in WCF #1298 (UTV), one (1) is located in WCF #1230 (Loader), and two (2) are extras. |
| 11 | Girdwood | Glacier Ranger District (GRD) Vehicles and Equipment | 145 Forest Station Road, Girdwood, AK 99587 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 2 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | These 2 fire extinguishers are extras. |
| 12 | Girdwood | Glacier Ranger District (GRD) Portage Work Center Warehouse | 2190 Portage Glacier Road, Girdwood, AK 99587 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 3 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located in the main building. |
| 13 | Girdwood | Glacier Ranger District (GRD) Portage Work Center Bunkhouse (Storage Building) | 2190 Portage Glacier Road, Girdwood, AK 99587 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 1 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguisher is located near the storage building exit. |
| 14 | Girdwood | Glacier Ranger District (GRD) Portage Work Center Wellhouse | 2190 Portage Glacier Road, Girdwood, AK 99587 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 1 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguisher is located in the wellhouse. |
| 15 | Girdwood | Glacier Ranger District (GRD) BBVC Portage Barracks | 430 Portage Lake Loop, Girdwood, AK 99587 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 2 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located in the barracks. |
| 16 | Girdwood | Glacier Ranger District (GRD) BBVC Lagoon Lift Station Building | 430 Portage Lake Loop, Girdwood, AK 99587 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 1 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguisher is located in the building. |
| 17 | Girdwood | Begich Boggs Visitor Center (BBVC) | 800 Portage Lake Loop, Girdwood, AK 99587 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 14 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located in the visitor center. |
| 18 | Seward | Kenai Lake Work Center (KLWC) Main Office | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 3 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Two (2) fire extinguishers are located in the office area, and one (1) is located in the boiler room. |
| 19 | Seward | Kenai Lake Work Center (KLWC) Modular Office | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~10 lbs) | 2 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located in the office space. |
| 20 | Seward | Kenai Lake Work Center (KLWC) Warehouse | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~10 lbs) | 3 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located in the warehouse. |
| 21 | Seward | Kenai Lake Work Center (KLWC) Equipment Bay | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~10 lbs) | 4 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located in the equipment bay. |
| 22 | Seward | Kenai Lake Work Center (KLWC) Equipment Bay | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~20 lbs) | 1 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguisher is located in the equipment bay. |
| 23 | Seward | Kenai Lake Work Center (KLWC) Front Office | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 1 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguisher is located in the front office building. |
| 24 | Seward | Kenai Lake Work Center (KLWC) Front Office | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~10 lbs) | 1 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguisher is located in the front office building. |
| 25 | Seward | Kenai Lake Work Center (KLWC) Carpenter Shop | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 1 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguisher is located in the carpenter shop. |
| 26 | Seward | Kenai Lake Work Center (KLWC) Carpenter Shop | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~10 lbs) | 1 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguisher is located in the carpenter shop. |
| 27 | Seward | Kenai Lake Work Center (KLWC) South Dorm | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~10 lbs) | 4 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Two (2) fire extinguishers are located upstairs, and two (2) are located in the basement. |
| 28 | Seward | Kenai Lake Work Center (KLWC) North Dorm | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~10 lbs) | 3 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Two (2) fire extinguishers are located upstairs, and one (1) is located in the basement. |
| 29 | Seward | Kenai Lake Work Center (KLWC) Flex Housing | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 9 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguishers are located throughout the flex housing building. |
| 30 | Seward | Kenai Lake Work Center (KLWC) Lake House | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~5 lbs) | 1 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguisher is located in the lake house. |
| 31 | Seward | Kenai Lake Work Center (KLWC) Broadview | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~10 lbs) | 2 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Due to the remoteness of this facility, these units will be the only ones collected by FS employees and transported to the KLWC to be serviced by the contractor. |
| 32 | Seward | Kenai Lake Work Center (KLWC) Gas House | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~20 lbs) | 1 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguisher is located in the gas house next to the fueling station. |
| 33 | Seward | Kenai Lake Work Center (KLWC) Big Top | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Rechargeable | Multi-Purpose ABC Dry Chemical (~10 lbs) | 1 | Unknown | Unknown | Inspection, Testing, Certification, and Maintenance | ANNUALLY | Fire extinguisher is located near the exits of the temporary storage (big top) building. |
TOTAL 115
| NOTES: |
| (1) At this time, the Government does not possess a complete inventory of fire extinguishers requiring replacement, nor records indicating the dates of the last internal maintenance or hydrostatic testing. |
| (2) The contractor shall be responsible for inspecting all fire extinguishers; determining which ones will require internal maintenance and/or hydrostatic testing; identifying expiration dates and the operational status of each extinguisher; and replacing and disposing of units as necessary. |
| (3) The contractor shall notify the CO and COR of any fire extinguishers requiring replacement, internal maintenance, or hydrostatic testing before performing any work. The CO will authorize the work once funding is available and certified by the Budget Office. |
| (4) The contractor will be responsible for visiting each location and inspecting each unit in its installed location. The contractor shall be responsible for coordinating all services with the COR at least 10 business days in advance. |
TAB 5 - FAS RM
CNF Integrated Fire Protection Systems - Fire Alarm Systems Remote Monitoring Services (AUG 2026)
The following list includes the sites/locations of all active fire alarm systems covered under this contract.
| Item # | City | Facility | Facility Address | Equipment Category | Equipment Make and Model | Quantity | Required Level of Service | Frequency of Services | Remarks |
| 1 | Girdwood | Begich Boggs Visitor Center (BBVC) | 800 Portage Lake Loop, Girdwood, AK 99587 | Alarm Panel | General Electric EST | 1 | Remote Monitoring | MONTHLY | |
| 2 | Seward | Kenai Lake Work Center (KLWC) Flex Housing | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Sprinkler System with Autodialer | Autodialer Only (No Fire Alarm Control Panel) AD-2000 | 1 | Remote Monitoring | MONTHLY | |
| 3 | Cordova | Cordova Ranger District (CRD) Administrative Office | 612 2nd Street, Cordova, AK 99574 | Alarm Panel | EST Model LSS1 | 1 | Remote Monitoring | MONTHLY | OPTIONAL ITEM: This system will not require remote monitoring services at time of contract award. The services start date are to be determined and if funds are available. |
| 4 | Girdwood | Glacier Ranger District (GRD) Administrative Office | 145 Forest Station Road, Girdwood, AK 99587 | Alarm Panel | Walter Kidde Gemini | 1 | Remote Monitoring | MONTHLY | OPTIONAL ITEM: This system will not require remote monitoring services at time of contract award. The services start date are to be determined and if funds are available. |
| 5 | Seward | Seward Ranger District (SRD) Administrative Office | 33599 Ranger Station Spur (Mile Marker 23.5 Seward Hwy), Seward, AK 99664 | Alarm Panel | Fire Control Instruments 7100 Series | 1 | Remote Monitoring | MONTHLY | OPTIONAL ITEM: This system will not require remote monitoring services at time of contract award. The services start date are to be determined and if funds are available. |
TOTAL 5
NOTE: Systems listed may be upgraded during the performance of this contract.
File details come from the government source that posted it. Updated .