Attachment 2 - JLSS 18-0007 Repair Siding Drawing 418.pdf
PDF 3 MB Posted
- Attached to
- Construction - Repair Siding B418 Federal contract opportunity
- Solicitation number
- FA671222B0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4 - Bid Schedule1.pdf | ||
| Attachment 6 - FA671222B0001-Bid Instructions.pdf | ||
| Amendment 01 SF30.pdf | ||
| Attachment 7 - QAs_B418 Siding_Answered.pdf | ||
| Site visit attendees for B418 Repair Siding.pdf | ||
| RFI-Communication Form_fillable.pdf | ||
| Attachment 3 - DB Wage Determination PA20220001.pdf | ||
| Attachment 1 - JLSS 18-0007 Specifications.pdf | ||
| Solicitation - FA671222B0001.pdf | ||
| Attachment 4 - Bid Schedule.pdf | ||
| Attachment 5 - Contractor-Visitor Access Memo.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
REPAIR SIDING
BUILDING 418
US AIR FORCE RESERVE
911TH AIRLIFT WING
Pittsburgh International Airport, ARS
Moon Township, PA 15108-5000
Project No: JLSS 18-0007
ISSUED FOR CONSTRUCTION
MAY 13, 2021
AREA OF WORK
B418
C
D
E
A
B
C
D
E
1 2 3 4 5
1 2 3 4 5
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CHIEF ENG. FLIGHT BASE CIVIL ENG. DRAWING NO. PLATE
PROJECT NO: DATE: SCALE:
SHEET
REPAIR SIDING
BUILDING 418
OF
U.S. AIR FORCE
911TH AIRLIFT WING
PITTSBURGH INTERNATION AIRPORT, ARS
MOON TOWNSHIP, PA 15108-5000
2AS INDICATED 1
LEB
BDK
B
G-1
NORTH
DAB
JLSS 18-0007
GTP 210-171
13-MAY-2021
REV.
NO. DATE DESCRIPTION BY
ANTI-TERRORISM & SECURITY
SAFETY
FIRE
ENVIRONMENTAL ENG.
BIO ENVIRONMENTAL
COMMUNICATIONS
USING AGENCY
CHIEF CE OPERATIONS
REVIEW COORDINATION
SIGNATURE AND DATE
GENERAL NOTES
1. EACH CONTRACTOR SHALL COORDINATE HIS OPERATIONS WITH OTHER CONTRACTORS AND APPROPRIATE UTILITY
COMPANIES THROUGH THE CONTRACTING OFFICER.
2. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING UTILITIES AND TO MAINTAIN
UNINTERRUPTED SERVICE. ANY DAMAGE INCURRED SHALL BE REPAIRED IMMEDIATELY TO THE SATISFACTION OF
THE CONTRACTING OFFICER AT THE CONTRACTOR'S EXPENSE. NOTIFY THE CONTRACTING OFFICER A MINIMUM OF
15 DAYS IN ADVANCE OF ANY UTILITY OUTAGES.
3. THE CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES THROUGH THE USE OF A QUALIFIED
UNDERGROUND UTILITY LOCATION SERVICE PRIOR TO ANY EXCAVATION. NOTIFY THE CONTRACTING OFFICER 72
HOURS PRIOR TO COMMENCING ANY DEMOLITION, EXCAVATION OR CONSTRUCTION.
4. MAINTAIN CLEAR, COMPLETE AND SAFE ACCESS FOR GOVERNMENT PERSONNEL AND CIVILIANS TO ALL BUILDINGS
WITHIN OR ADJACENT TO THE PROJECT LIMITS.
5. THE CONTRACTOR SHALL CAREFULLY PRESERVE BENCH MARKS, PROPERTY CORNERS, REFERENCE POINTS, STAKES AND OTHER SURVEY REFERENCE MONUMENTS OR MARKERS. IN CASES OF WILLFUL OR CARELESS
DESTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORATIONS AT NO COST TO THE OWNER.
RESETTING OF MARKERS SHALL BE PERFORMED BY A PENNSYLVANIA PROFESSIONAL SURVEYOR AS APPROVED BY
THE CONTRACTING OFFICER.
6. NON-RUBBER TIRED VEHICLES SHALL NOT BE MOVED ON OR ACROSS PUBLIC STREETS OR HIGHWAYS WITHOUT
THE WRITTEN PERMISSION OF THE CONTRACTING OFFICER.
7. THE CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN EXISTED
BEFORE CONSTRUCTION. DRAINAGE DITCHES OR WATER COURSES THAT ARE DISTURBED BY CONSTRUCTION
SHALL BE RESTORED TO THE GRADES AND CROSS-SECTIONS THAT EXISTED BEFORE CONSTRUCTION.
8. ALL SIGNS, LANDSCAPING, STRUCTURES OR OTHER APPURTENANCES DISTURBED OR DAMAGED DURING
CONSTRUCTION SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER. THE
COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
9. BACKFILL UNDER OR WITHIN A 1:1 INFLUENCE LINE OF EXISTING STRUCTURES OR INFRASTRUCTURE (PAVEMENT, CURBS, SIDEWALKS, ETC.), SHALL BE COMPACTED BACKFILL ACCORDING TO THE SPECIFICATIONS. COMPACTED FILL
FOR TRENCHES UNDER DRIVEWAYS SHALL EXTEND FIVE FEET BEYOND DRIVEWAY LIMITS IN EACH DIRECTION.
10. ALL TRENCHES WITHIN THE CONSTRUCTION AREA SHALL BE BACKFILLED ACCORDING TO THE APPROVED
CONSTRUCTION DRAWINGS OR SECURELY PLATED DURING NONWORKING HOURS. TRENCHES NOT PLATED OR
BACKFILLED SHALL BE PROTECTED AN ACCORDANCE WITH PENNDOT PUBLICATION 213 INCLUDING TEMPORARY
BARRICADES OR BARRIER DURING NONWORKING HOURS. CLEAN-UP SHALL FOLLOW CLOSELY BEHIND THE
TRENCHING OPERATION. REBAR WITH ORANGE PLASTIC FENCE OR PLASTIC BARRIER TAPE ARE NOT ACCEPTABLE.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDITION OF TRENCHES AND OVERLYING PAVEMENT WITHIN
THE CONSTRUCTION AREA AND UTILITY EASEMENTS FOR A PERIOD OF ONE YEAR FROM THE FINAL ACCEPTANCE OF
THE WORK, AND SHALL MAKE ANY NECESSARY REPAIRS AT NO COST TO THE OWNER.
12. PAVEMENTS SHALL BE CUT, SAW-CUT IN NEAT, STRAIGHT LINES THE FULL DEPTH OF THE EXISTING PAVEMENT, OR
AS REQUIRED BY THE CONTRACTING OFFICER. PAVEMENT REPAIR AND RESURFACING SHALL BE CONDUCTED PER
THE DETAILS SHOWN ON THE CONTRACT DRAWINGS.
13. STORAGE OF NEW MATERIALS, INCLUDING PIPE AND EQUIPMENT SHALL BE WITHIN THE SPECIFIED CONTRACTOR
STAGING AREA. ADDITIONAL STAGING AREA SHALL BE COORDINATED WITH THE CONTRACTING OFFICER.
14. TRACKING OR SPILLING MUD, DIRT OR DEBRIS ON OWNER'S PAVEMENT, SIDEWALK OR PATH IS PROHIBITED. ANY
SUCH OCCURRENCE SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR AT NO COST TO THE OWNER. IF
THE CONTRACTOR FAILS TO REMOVE SAID MUD, DIRT, DEBRIS OR SPILLAGE, THE OWNER RESERVES THE RIGHT TO
ORDER ALL WORK TO BE STOPPED UNTIL SAID MATERIAL IS REMOVED.
15. ALL EXCAVATED MATERIAL WITH THE EXCEPTION OF DELETERIOUS MATERIAL SHALL STAY ON SITE TO BE USED AS
BACKFILL MATERIAL. ALL EXCESS MATERIAL NOT USED AS BACKFILL MATERIAL SHALL BE HAULED OFF SITE TO AN
APPROVED LOCATION.
16. CONTRACTOR SHALL BE REQUIRED TO PROVIDE PUMPING EQUIPMENT NECESSARY TO ADEQUATELY DEWATER
WORKING AREA AND COMPLETE WORK ON TIME.
17. CONTRACTOR SHALL DEFINE THE LIMITS OF ANY WEAK SOILS ENCOUNTERED BY PROOF ROLLING WHERE SOFT
SUBGRADE IS ENCOUNTERED IN CUTS. DUE TO NO FAULT OF THE CONTRACTOR AND SATISFACTORY COMPACTION
CANNOT BE OBTAINED, THE UNSTABLE MATERIAL SHALL BE REMOVED AND REPLACED WITH MATERIAL APPROVED
BY THE ENGINEER. THE STABLE MATERIAL SHALL BE PLACED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
18. CONTRACTOR TO PROVIDE THE CONTRACTING OFFICER WITH A LIST OF MILLING AND/OR PAVING LOCATIONS ONE
WEEK PRIOR TO MILLING AND/OR PAVING OPERATIONS FOR THE CO'S USE IN CONTACTING THE BUILDING
MANAGERS, OCCUPANTS OF CONSTRUCTION IN THE AREA AND POSSIBLE FUMES FROM THE OPERATIONS GETTING
INTO THE HVAC SYSTEM.
19. NO CONTRACTOR WORK ALLOWED ON UTA WEEKENDS.
20. PROTECT ALL CURB BOXES, MANHOLES, WATER VALVES, AND OTHER EXISTING FACILITIES FROM BEING PAVED OVER
AND CLEAN OFF COMPLETELY AS NECESSARY.
21. FOR PAVING OPERATIONS REMOVE, STORE, AND REINSTALL PLANTERS AND BARRIERS WITHIN WORK AREAS.
COORDINATE WITH THE CONTRACTING OFFICER FOR THE TIME AND LOCATIONS OF TEMPORARY
REMOVAL/PLACEMENT.
22. CONTRACTOR TO COORDINATE WITH CONTRACTING OFFICER AND PROVIDE TEMPORARY ACCESS TO BUILDING
ENTRANCES APPROVED BY CONTRACTING OFFICER.
23. CONTRACTING OFFICER MUST WITNESS GEOGRID AND GLASSGRID, TACK COAT, AND REMOVAL OF UNSUITABLE
MATERIAL OPERATIONS.
24. CONTRACTING OFFICER MUST BE PRESENT TO VERIFY SUBGRADE, SUBBASE, SUBGRADE PROOFROLLING, AND
PAVEMENT.
25. ANY TEMPORARY FENCING USED MUST INCLUDE A TOP RAIL AND FENCE POST CAPABLE OF RESISTING A 35LB LOAD
APPLIED IN ANY DIRECTION AND SHALL NOT DEFLECT MORE THAN 10 INCHES.
27. ALL PAVEMENT OVERLAY AND RECONSTRUCTION SHALL BE GRADED TO DRAIN.
26. ANY EXISTING UNDERDRAIN UNEARTHED DURING RECONSTRUCION MUST BE REPLACED OR MAINTAINED TO
FUNCTION.
FIRST FLOOR
0"
SECOND FLOOR
10' - 0"
ROOF - ELEV
TOWER
34' - 6"
ROOF - HANGAR
BAY
30' - 0"
ROOF - WINGS
20' - 0"
ROOF - T.O.
HANGAR BAY
43' - 6"
FIRST FLOOR
0"
SECOND FLOOR
10' - 0"
ROOF - ELEV
TOWER
34' - 6"
ROOF - HANGAR
BAY
30' - 0"
ROOF - WINGS
20' - 0"
ROOF - T.O.
HANGAR BAY
43' - 6"
BUILDING 418 - EAST ELEVATION
SCALE: 1/8"= 1'-0"
BUILDING 418 - EAST ELEVATION
SCALE: 1/8"= 1'-0"
RED-SHADED AREA INDICATES
EXTENT OF WORK: DEMO EXISTING
PANELS AND FLASHING, INSTALL NEW
SEE ENLARGED DEMOLITION AND
NEW CONSTRUCTION DETAILS
ON THIS PAGE.
RED-SHADED AREA INDICATES
EXTENT OF WORK: DEMO EXISTING
PANELS AND FLASHING, INSTALL NEW
WALL CONTINUES ON BEHIND
WALL IN FOREGROUND
WALL CONTINUES ON BEHIND
WALL IN FOREGROUND
EXISTING MT'L ROOF
NEOPRENE CLOSURE
EXISTING
MT'L CLOSURE
EXISTING ANGLES
FOR ADJUSTMENT
& ALIGNMENT
EXISTING
MT'L CLOSURE
EXISTING MT'L FLASHING
EXISTING COLS., BEAMS,
GIRTS, ETC.
REMOVE EXISTING WALL PANEL
ASSEMBLY, INCLUDING ORIGINAL
PANELS, DOUBLE ANGLES, AND
OUTER PANELS, AS WELL AS
ASSOCIATED FLASHINGS, DOWN TO
EXISTING GIRTS
EXISTING MT'L CLOSURE
EXISTING MT'L CLOSURE
DEMOLITION DETAIL NEW CONSTRUCTION DETAIL
EXISTING MT'L ROOF
NEOPRENE CLOSURE
EXISTING COLS., BEAMS,
GIRTS, ETC.
NEW HEAD FLASHING,
TYPICAL
NEW 3" INSULATED METAL WALL
PANELS. CENTRIA FORMAWALL
DIMENSION SERIES OR EQUAL
NEW BASE FLASHING,
TYPICAL
SCALE: 1"= 1'-0" SCALE: 1"= 1'-0"
NOTE:
PROVIDE NEW METAL PANELS TO MATCH EXISTING.
PANELS SHALL BE INSTALLED TO EXISTING SEAMS.
COORDINATE NEW PANEL INSTALLATION WITH
EXISTING CONDITIONS. MATCH EXISTING COLOR
FROM MANUFACTURERS STANDARD COLORS.
C
D
E
A
B
C
D
E
1 2 3 4 5
1 2 3 4 5
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CHIEF ENG. FLIGHT BASE CIVIL ENG. DRAWING NO. PLATE
PROJECT NO: DATE: SCALE:
SHEET
REPAIR SIDING
BUILDING 418
OF
U.S. AIR FORCE
911TH AIRLIFT WING
PITTSBURGH INTERNATION AIRPORT, ARS
MOON TOWNSHIP, PA 15108-5000
2AS INDICATED 2
LEB
BDK
B
A-1
NORTH
DAB
JLSS 18-0007
GTP 210-171
13-MAY-2021
REV.
NO. DATE DESCRIPTION BY
FOR OFFICIAL USE ONLY
ANTI-TERRORISM & SECURITY
SAFETY
FIRE
ENVIRONMENTAL ENG.
BIO ENVIRONMENTAL
COMMUNICATIONS
USING AGENCY
CHIEF CE OPERATIONS
REVIEW COORDINATION
SIGNATURE AND DATE
1 9-14-2021 REVISION #1 - CHANGE CLOUD TO NIC BDK
| 2 - JLSS 18-0007 Repair Siding Building Drawing 418 |
| JLSS 18-0007_Sheet 01 of 02_G-1 Cover Sheet |
| Sheets and Views |
| Sheet 01 of 02 G-1 |
| JLSS 18-0007_Revision 1_Sheet 02 of 02_A-1 Elevation and Details |
| Sheets and Views |
| Sheet 02 of 02 A-1 |
File details come from the government source that posted it. Updated .