Attachment 2 -Installation Plan.docx

DOCX document 20 KB Posted

Attached to
6515--Ceiling Lift for Orlando
Solicitation number
36C24822Q0836
Issued by

View the file

Other files

File Type Posted
VOLUME 4B_Interior Elevations Updated 02.19.13.pdf PDF
VOLUME 4C_Millwork Updated 04.29.13.pdf PDF
VOLUME 4D_Interiors Updated 07.08.13.pdf PDF
36C24822Q0836 0004.pdf PDF
Simlearn pgs 301-381.pdf PDF
CLC Volume 1 Pages 151-225.pdf PDF
CLC Volume 1 Pages 1-75.pdf PDF
CLC Volume 1 Pages 226-300.pdf PDF
CLC Volume 1 Pages 301-318.pdf PDF
Simlearn pgs 76-150.pdf PDF
Simlearn pgs 151-225.pdf PDF
CLC Volume 1 Pages 76-150.pdf PDF
Simlearn pgs 1-75.pdf PDF
Simlearn pgs 226-300.pdf PDF
CLC Volume 2 Pages 51-100.pdf PDF
CLC Volume 2 Pages 101-150.pdf PDF
CLC Volume 2 Pages 151-200.pdf PDF
CLC Volume 2 Pages 251-300.pdf PDF
CLC Volume 2 Pages 201-250.pdf PDF
CLC Volume 2 Pages 1-50.pdf PDF
150427 SimLEARN Current Drawings.zip ZIP file
150427 SimLEARN Current Drawings.pdf PDF
PCRA-ILSM-Form (rev. 6-22-21).pdf PDF
VOLUME 4A_RCPs Updated 07.02.14.pdf PDF
Volume 2 updated through CPR CLC-036.pdf PDF
Volume 1 updated through CPR CLC-036.pdf PDF
VOLUME 2A_Structure Updated 02.14.13 (1).pdf PDF
VOLUME 2B_Arch Area Plans Updated 07.08.13.pdf PDF
36C24822Q0836 0003.docx DOCX document
36C24822Q0836 0002.docx DOCX document
36C24822Q0836 0001.docx DOCX document
36C24822Q0836.docx DOCX document
36C24822Q0836.docx DOCX document
Attachment 1 Hospital Lift Configuration Lift.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4: Installation Plan for Orlando VAHCS – Lake Nona The contractor shall provide a master schedule prior to the start of the work. The schedule shall include one or more discrete tasks for each lift. It is understood that the contractor’s ability to manage/stick to the schedule is constrained by the availability of patient rooms. The primary intent of the schedule is to track the progress of the overall effort.

The contractor’s master schedule shall include phasing and indicating time per unit. Minimum interference with patient care must be considered so the contractor must be in close communication with the COR to install on days when patient population is down. The least amount of disruption to patient’s comfort and care is expected. Vendor will coordinate with the COR and area manager to gain access to rooms and not impede patient care.

Phasing of Lift Installation:

1) Installation of the Ceiling Lifts are to begin in the MedSIM located on the 4th Floor Clinic at the Orlando VAHCS – Lake Nona. A one-week notice must be given prior to removal of the current ceiling lift systems located in the area. Four (4) lifts are needed for this area.

· Area Managers POC – Michelle Petrovic and Genevieve Lubin (407) 631-0141

2) The Community Living Center (CLC) is the next area to receive ceiling lifts. A one-week notice must be given prior to removal of the current ceiling lifts systems locating in the area. The CLC can provide one room per village per day to allow the contractor to complete their work. A total of 4 rooms will be available per day. A one-week notice must be given prior to removal of the current ceiling lift systems located in the area. One hundred and twenty-five (125) lifts are needed for this area.

· Area Manger POC – Anitra Eiland (407) 631-6913

3) The Medical-Surgical (Med-Surg) area would be the next to have the ceiling lifts installed after the CLC. This area is also known as 3 East, 4 West, and 4 East. A one-week notice must be given prior to removal of the current ceiling lift systems located in the area. Seventy-two (72) lifts are needed for this area.

· Area Manager POC – Maxine Rehder (407) 631-4774

4) The Intensive Care Unit (ICU) would be the next area to have the ceiling lifts installed after Med-Surg. This area is also known as 3 West. A one-week notice must be given prior to removal of the current ceiling lift systems located in the area. Twenty-four (24) lifts are needed for this area.

· Area Manager POC – Natalee Jowallah (407) 631-3561

5) The Radiology Department would be the next area to have the ceiling lifts installed after the ICU. A one-week notice must be given prior to removal of the current ceiling lift systems located in the area. Twenty-five (25) lifts are needed for this area.

· Area Manager POC – Jose Rosario (407) 631-1902

6) The Emergency Department (ED) would be the next area to have the ceiling lifts installed after the Radiology Department. A one-week notice must be given prior to removal of the current ceiling lift systems located in the area. Twenty-three (23) lifts are needed for this area.

· Area Manager POC – Frederick Boisvert (407) 631-1710

7) The Sleep Lab would be the next area to have the ceiling lifts installed after the ED. A one-week notice must be given prior to removal of the current ceiling lift systems located in the area. Six (6) lifts are needed for this area.

· Area Manager POC – Glen Brown (407) 631-2758

8) The various clinics on the first, second, third, and fourth floors, would be the next area to have the ceiling lifts installed after the Sleep Lab. A one-week notice must be given prior to removal of the current ceiling lift systems located in the area. Forty-nine (49) lifts are needed for this area.

· Area Manager POC – Zaneta Robinson (407) 376-6941

9) The morgue will be the next area to have the ceiling lifts installed after the clinics. A one-week notice must be given prior to removal of the current ceiling lift systems located in the area. Two (2) lifts are needed for this area.

· Area Manager POC – Candace McNulty (407) 631-1972

10) The Post-Anesthesia Care Unit (PACU) will be the next area to have the ceiling lifts installed after the morgue. A one-week notice must be given prior to removal of the current ceiling lift systems located in the area. Thirteen (13) lifts are needed for this area.

· Area Manager POC – Maureen Barth (407) 631-3710

11) The Pre-Op and Recovery will be the next area to have the ceiling lifts installed after the morgue. A one-week notice must be given prior to removal of the current ceiling lift systems located in the area. Forty-two (42) lifts are needed for this area.

· Area Manager POC – Maureen Barth (407) 631-3710

12) The SimLearn will be the next area to have the ceiling lifts installed after Pre-Op and Recovery. A one-week notice must be given prior to removal of the current ceiling lift systems located in the area. Five (5) lifts are needed for this area.

· Area Manager POC – Rhonda Sargent (407) 631-9501