Pre-construction Risk Assessment PCRA
Orlando VA Medical Center (OVAMC)
1 of 14 Last Revision: 22 Jun 2021
Project Title: Project Number:
Competent Person (CP): Date:
In-House or contracted Out:
CP Qualifications:
Scope of Project:
Low Risk Medium Risk High Risk Highest Risk
▪ Offices or
Conference/
Education
Rooms in
Non-Clinical areas
**For offices in clinical areas, (e.g.
conference room on 3W ICU) follow the risk level for that specific area
▪ Cardiology
▪ Echocardiography
▪ Endoscopy
▪ Nuclear Medicine
▪ Physical Therapy
▪ Radiology/MRI
▪ Respiratory Therapy
▪ DOM
▪ Rehab
▪ PV, Etc
▪ Outpatient Clinic
Exam Areas
▪ Medical Units
▪ Emergency Room
▪ Interventional
Radiology
▪ Laboratories
(specimen)
▪ Dialysis
▪ Minor Surgery
▪ Pharmacy
▪ Post Anesthesia Care
Unit
▪ Surgical Units
▪ CLC
▪ Cardiac Cath Lab
▪ Central Sterile Supply
▪ Intensive Care Units (ICU)
▪ Oncology
▪ Operating rooms
▪ Sterile Processing (SPS)
▪ Pharmacy Compounding areas
DE-ESCALATION CHECKLIST – (IF APPLICABLE)
FINAL INSPECTION (END OF PROJECT):
Infection Control has inspected and approved barrier removal:
Date: ________________ IC staff initials _________________
PATIENT RISK GROUP
Please check all applicable boxes.
___ 1. Dust-producing construction activities are complete.
___ 2. Construction debris/ waste has been removed.
___ 3. Area has been cleaned of all dust AND inspected by Infection Control or Safety.
___ 4. Infection Control or Safety staff approval for removal of negative air or other de-escalation: Date: _________________ Initials: ______________
___ 5. New PCRA classification
2 of 14 Last Revision: 22 Jun 2021
CONSTRUCTION RISK REDUCTION PLAN
Location of Construction: Project Start Date:
Contractor Performing Work: Estimated Duration:
CONSTRUCTION ACTIVITY IC RISK GROUP
Type A: Inspection, non-invasive, minor Low Risk
Type B: Small scale, short duration, moderate levels. Medium Risk
Type C: Moderate to high level of dust. High Risk
Type D: Major demolition and construction projects. Highest Risk
**NOTE: If mold is discovered, stop work and notify COTR
Immediately!
See Appendix A for additional requirements.
RISK ASSESSMENT MATRIX: IC GUIDELINES FOR CONSTRUCTION
TYPE A
Inspection and Non-Invasive Activities.
Includes, but is not limited to:
▪ removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
▪ painting (but not sanding)
▪ wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
TYPE B
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
▪ installation of telephone and computer cabling
▪ access to chase spaces
▪ cutting of walls or ceiling where dust migration can be controlled.
TYPE C
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
▪ sanding of walls for painting or wall covering
▪ removal of floor coverings, ceiling tiles and casework
▪ new wall construction
▪ minor duct work or electrical work above ceilings
▪ major cabling activities
▪ any activity that cannot be completed within a single work shift.
TYPE D
Major demolition and construction projects
Includes, but is not limited to:
▪ activities which require consecutive work shifts
▪ requires heavy demolition or removal of a complete cabling system
▪ new construction.
3 of 14 Last Revision: 22 Jun 2021
Description of Required Infection Control Precautions by Class
Patient Risk Group TYPE A TYPE B TYPE C TYPE D
LOW Risk Group I II II
MEDIUM Risk Group I II III IV
HIGH Risk Group I II IV
HIGHEST Risk Group II IV
During Construction Project Upon Completion of Project
C L
A S
S I
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection
C L
A S
S I
I
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area
6. Remove or isolate HVAC system in areas where work is being performed.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Remove isolation of HVAC system in areas where work is being performed.
C L
A S
S I
II
1. Remove or Isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing
HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and
Infection Control Department and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant.
5. Remove isolation of HVAC system in areas where work is being performed.
C L
A S
S I
V
1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing
HEPA equipped air filtration units.
4. Seal holes, pipes, conduits, and punctures appropriately.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a
HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and thoroughly cleaned by the owner’s Environmental Services
Department.
1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
III
III III
III
4 of 14 Last Revision: 22 Jun 2021
INITIAL STEPS:
1. Identify the source of moisture (see the table below for clean/contaminated categories)
2. Halt further intrusion by repairing the water leak
3. Use moisture detection equipment to evaluate the extent of moisture intrusion (e.g. moisture meter, infrared camera, borescope).
4. Determine how long materials have been wet.
a. If less than 72 hours and Category 1 flood water, attempts to dry materials are acceptable using HEPA wet vacs, air movers, dehumidifiers.
b. If more than 72 hours, wet/ absorbent items must be removed and discarded. The presence of mold should be assumed.
c. If time frame is unknown, treat as wet for more than 72 hours
Category of Flood Water
Caused by
Category 1- Clean water
1. Clean water from a sink overflow,
2. broken water or steam line,
3. rainwater infiltration (roof leak)
4. Condensation
Category 2 – Gray Water
1. treated cooling water,
2. some surface water,
3. fire suppression systems,
4. Discharged water from sinks, washers, etc
Category 3 – Black Water
1. water from sewers,
2. storm drain back ups
3. some surface water
(highly contaminated water)
GUIDELINES TO ADDRESS WATER INTRUSION
5 of 14 Last Revision: 22 Jun 2021
Description of Required Response Procedures for Water Intrusion
Water Intrusion Work Practice Level W-1
1. Non-Porous Surfaces and Hard Surfaces and
Floors:
• remove water as indicated above and mop with floor cleaner.
2. Overhead fixtures and equipment with trapped water:
• open to air, wipe down and dehumidify.
3. Porous Surfaces:
Carpet / Textiles / Fibrous
Coverings
• If wet greater than 72 hours or time frame is unknown, discard and replace porous materials.
• If wet less than 72 hours, determine salvageable status and follow procedure below
• Extract water if possible, disengage carpet and remove pad;
• secure carpet to original tack strips and/or elevate without pad and apply drying procedures (i.e. fans/dehumidification);
• check floor and carpet moisture content and re- install carpet when dried; and,
• complete final carpet or upholstery cleaning to limit microbial growth and development of odors.
4. Wallboard / Hard- line
Ceilings: IMPORTANT ensure all electrical and supply conveyance systems are de-energized
• If wet greater than 72 hours or time frame is unknown, remove all sheetrock to 6 inches beyond the high-water mark and apply drying procedures to area
• In the absence of insulation, and if wet less than 72 hours, may be dried in place.
Open areas (ports) per stud spacing to ventilate
• apply drying procedures; and,
• check for moisture content post drying
• patch/paint over wall ports when appropriately dried
5. Pipe Insulation (overhead):
• open the area to ventilate space;
• remove pipe insulation;
• apply drying procedures to space;
• replace pipe insulation with new material; and, Response Procedures For Water Type Matrix
Patient
Risk
Group (IC)
Category I
(Clean water)
Category II
(Gray water)
Category III
(Black water)
Low Risk W-1 W-2 W-3
Medium Risk W-1 W-2 W-3
High Risk W-1 W-3 W-3
Highest Risk W-1 W-3 W-3
6 of 14 Last Revision: 22 Jun 2021
• replace coverings.
6. Drop Ceilings: • replace wet ceiling tiles.
7. Paper / Files: To be determined based on scenario i.e. amount of water, importance of files.
Water Intrusion Work Practices Level W-2 All persons working in and around Category II (Gray) water during the initial stages of response and prior to completion of cleaning and restoration should be equipped with PPE including but not limited to the following:
• industrial- grade rubber gloves;
• full eye/splash protection (goggles);
• protective suit;
• rubber boots; and,
• hard hat if overhead hazards exist.
Non-Porous Surfaces, Hard Surfaces and Floors:
• remove water as indicated above;
• remove and dispose if penetration is observed (buckling, warping, or bubbling),;
• clean and disinfect sub- floor with EPA-approved disinfectant; and,
• flush clean cracks if floor is intact, (pressure wash) with EPA-approved disinfectant and recover with HEPA filtered extraction unit (use caution and adequate controls to minimize the distribution of bio aerosols and fluid contaminants).
Overhead Fixtures (trapped water):
• open to air and wipe down with EPA-approved disinfectant and dehumidify.
Porous Surfaces:
IMPORTANT ensure all electrical and supply conveyance systems are de- energized
Carpet / Textiles / Fibrous
Coverings:
• If wet greater than 72 hours or time frame is unknown, discard and replace porous materials.
• If wet less than 72 hours, determine salvageable status and follow procedure below
• Extract water if possible,
• disengage carpet and remove pad;
• secure carpet to original tack strips and/or elevate without pad and apply drying procedures (i.e. fans/dehumidification);
• check floor and carpet moisture content and re- install carpet when dried;
and,
• complete final carpet or upholstery cleaning to limit microbial growth and development of odors.
Wallboard/Hard- Ceilings: • If wet greater than 72 hours or time frame is unknown, remove all sheetrock to 6 inches beyond the high water mark and apply drying procedures to area
• In the absence of insulation, and if wet less than 72 hours, may be dried in place. Open areas (ports) per stud spacing to ventilate
• apply drying procedures; and,
• check for moisture content post drying
• patch/paint over wall ports when appropriately dried
7 of 14 Last Revision: 22 Jun 2021
Suspended Ceilings • remove and replace all wet ceiling tiles; and,
• wipe supports with EPA-approved disinfectant.
Pipe Insulation • assess condition (integrity and ACM);
• open to ventilate space;
• remove contaminated pipe insulation;
• wipe structure with EPA-approved disinfectant;
• apply drying procedures;
• replace pipe insulation with new material; and,
• replace coverings.
Paper / Files • Dispose of all highly absorbent saturated materials.
Water Intrusion Work Practices Level W-3
Non-Porous Surfaces and
Hard Surfaces and Floors:
• remove water as indicated above;
• remove and dispose if penetration is observed (buckling, warping, or bubbling);
• clean and disinfect subfloor with EPA-approved disinfectant; and,
• flush clean cracks if floor is intact, (pressure wash) with EPA-approved disinfectant and recover with HEPA filtered extraction unit (use caution and adequate controls to minimize the distribution of bio aerosols and fluid contaminants).
Overhead Fixtures (trapped water):
• open to air and wipe down with EPA-approved disinfectant/ dehumidify.
Porous Surfaces:
IMPORTANT ensure all electrical and supply conveyance systems are de-energized
• carpet / textiles / fibrous coverings;
• clear the area to expose wet surfaces (treat moved items and prevent cross contamination);
• disengage and remove carpet and pad and dispose; and,
• clean and disinfect floor and replace with in kind floor covering.
Wallboard / Hard Ceilings: • remove and dispose all material (including insulation) to nearest seam past affected area;
• remove all sheetrock to at least 6 inches beyond the high water mark
• apply EPA-approved disinfectant to exposed surfaces (studs and plates);
• apply drying procedures; recheck for moisture
• install new drywall.
8 of 14 Last Revision: 22 Jun 2021
Pipe Insulation • assess condition (integrity and ACM);
• open to ventilate space;
• remove pipe insulation;
• disinfect pipe by wiping down with EPA-approved disinfectant;
• apply drying procedures; recheck for moisture
• replace pipe insulation with new material; and,
• replace coverings.
Suspended Ceilings • remove and replace all wet ceiling tiles; and,
• disinfect supports by wiping with EPA-disinfectants.
Paper / Files • dispose of all highly absorbent saturated materials.
9 of 14 Last Revision: 22 Jun 2021
OVAMC ILSM Requirement Assessment Worksheet
• These criteria will be used to evaluate smoke compartments in which a Life Safety Code deficiency has been identified, or in which construction, renovation or alteration activities are planned. Any “Yes” answers below may require ILSM to address occupant safety.
• Document any methods you plan on using, and what measures were taken under comments.
Submitter: ________________ Date Submitted: _____________
Project: _________________
Building: ________________ Floor: ______________ Expected Duration: __________
Criteria YES NO
The issue/work alters or significantly compromises exit access, exiting, or exit discharge building elements
The issue/work compromises building compartmentation including fire or smoke walls, floor/ceiling assemblies, corridor walls, use area doors, or other defend in place elements
The issue/work impairs the building Fire Protection Systems (alarm, sprinklers, suppression) for more than 4 hours in a 24-hour period.
The activity includes Hot Work
The activity includes large quantities of combustible materials, flammable materials, or generation of large amounts of dust and debris.
Access to the area by emergency forces will be impaired
Will non/limited combustible partitions be required?
[ ] ILSM is required* [ ] ILSM are not required*
* A yes answer to any of the above criteria may require that an ILSM be initiated. Use the following check sheet to denote the interim life safety measures appropriate for the issue/work which compromises life safety. Periodic inspections of other aspects of an ILSM shall be completed during the pendency of the ILSM. All forms will be maintained by the COR with copies in the project file.
If an ILSM is not required, provide the completed assessment only to the safety manager for review.
Maintain a copy in the project file.
Work:
Comments:
Reviewed by:___________________________________________ Safety Manager Date:___________
Approved by:___________________________________________ Chief Facilities Management Date:________
10 of 14 Last Revision: 22 Jun 2021
Interim Life Safety Measures Check Sheet to be implemented
Project Name: _________________________
Log Number: _________________________
Place a check mark in each applicable ILSM activity as determined by an assessment of the risks identified in the Assessment Work Sheet.
#1 INSPECTIONS / SURVEILLANCE
Increased surveillance of buildings, grounds, and equipment: shift / daily / other:
Means of exiting construction areas inspected daily
Implementation of Fire Watch
Not applicable
#2 ACCESSIBILITY
Maintenance of escape/egress routes from construction areas
Maintenance of access to emergency services for emergency equipment, fire alarm pull stations, Fire
Department connections (internal & external)
Alternate EXIT signs posted YES NO NA
Not applicable
#3 EQUIPMENT – LIFE SAFETY
Temporary fire alarm, detection, suppression system in place
Monthly testing and inspection of temporary systems
Provide additional firefighting equipment in project area
Provide additional firefighting equipment in adjacent areas
Not applicable
#4 COMMUNICATIONS
Notification to Municipal Fire Department (or applicable emergency forces group)
Not applicable
#5 CONSTRUCTION MATERIALS / PRACTICES
Partitions smoke tight and constructed of noncombustible or limited combustible materials
Prohibition of smoking throughout building and in and near construction areas
Implement appropriate storage practices
Implement appropriate housekeeping practices
Implement appropriate debris removal practices
Not applicable
2 fire drills per shift per quarter throughout Hospital (one additional drill beyond requirement of
EC.5.30).
2 fire drills per shift per quarter in areas adjacent to project (one additional drill beyond requirement of EC.5.30)
More than 2 fire drills per shift per quarter throughout Hospital. If yes, how many_________
More than 2 fire drills per shift per quarter in areas adjacent to project. If yes, how many_______
Not applicable
#6 # 6 FIRE DRILLS
11 of 14 Last Revision: 22 Jun 2021
Additional training for staff in immediate area
Additional training for staff throughout hospital
Additional training for incident response team
Training to promote awareness of fire-safety building deficiencies, construction hazards, ILSM
Training on changes in physical environment (egress routes)
Training on firefighting equipment
Training on compensating for impaired structural or compartmentalization features of fire safety
Not applicable
Other measures: ____________________________________________
Comments: _________________________________________________
Prepared by: ______________________
Reviewed by:___________________________________________ Safety Manager Date:___________
Approved by:___________________________________________ Chief, Facilities Management Date:________
#7 #7 TRAINING
12 of 14 Last Revision: 22 Jun 2021
ADDITIONAL CONSTRUCTION SAFETY QUESTIONS
Will project place contracted workers at risk for transmission of Mycobacterium tuberculosis? _______ If yes, refer to MCP
00Q-09 for guidance.
Has the Job Site been evaluated for ACM (asbestos) or other environmental hazards? _____ If yes provide comments.
Will Project create potential air quality issues other than identified in ICRA? _____ Is any work or equipment near air intakes?
______ Are Volatile Organic Compounds VOC being used? ______ If yes, please explain and note plans to minimize:
Will project create potential noise issues? ___ If yes, please explain and note plans to minimize:
Will project create potential vibration issues? ___ If yes, please explain and note plans to minimize:
Is contractor required to provide 14 days-notice for utility shutdowns? ____ Will contractor/COR follow Utility Shutdown SOP when utilities are shut down? ____ Will contractor be given emergency notification telephone numbers for unplanned utility failures? ____
Will project create a potential for leaks? ___ If yes, please include in contract for contractor to dike any floor penetration in construction area.
Any additional potential issues that affect EOC( Environment of Care).
Will contractors be instructed to wear badges at all times while on site? ___ Will badges identify name, employer name, project name and location and expiration date? ___ Will police be notified if project takes place on off-hours? ____
Will contract require general and sub-contractor’s construction workers all complete the OSHA 10-hour construction worker course or the 30-hour construction course with OSHA certified training? ______
Has/will the construction safety committee reviewed drawings and specs and signed off on each design submission? ______
Will Contracting Officer be requested to evaluate and consider past safety records of prospective contractors in the awarding of contracts? _______
Will contractor submittals include the names, qualifications and training dates for contractor CP designated to administer the site specific safety program, as well as the CP for other activities as required by OSHA regulation (such as scaffolds, cranes, excavation, etc.) ____ Will COR provide copy of the site specific safety program to the Construction Safety Committee? ___
Is any portion of the project related to a special field that the CP does not have the required background for (for example, scaffolding, cranes, or excavation)? _______ Will another VA Employee be CP for those special fields? ______
13 of 14 Last Revision: 22 Jun 2021
APPENDIX A
MOLD REMEDIATION
MOLD REMEDIATION AMOUNT IDENTIFIED REQUIREMENTS
Source Containment Total area of mold less than 3 sq ft
1. Contact COR
2. Apply self-adhering plastic to entire moldy surface or SECURELY tape 6-mil poly over the ENTIRE moldy surface
3. Remove material and wrap or bag and securely. Enclose ALL moldy contents or materials in 6 mil poly or comparable packaging,
4. Avoid crushing materials or other actions that would generate dust and disperse fungal spores and fragments into the air.
5. Identify and remove any source of water intrusion
6. Remediators must wear appropriate PPE
Local Containment Area of mold greater than 3 sq ft but less than 100 sq ft
1. Contact COR immediately
2. Treat as ICRA Type C (or type D if work meets criteria for Type D) work and follow requirements based Patient Risk Group. (Refer to ICRA Matrix at the bottom of page 2)
3. Construction should stop until barriers have been erected and negative air established.
4.Identify and remove any source of water intrusion
5. Remediators must wear appropriate PPE
Full Containment Area of mold greater than 100sq feet
Contact COR, Safety and Infection Control for guidance.
14 of 14 Last Revision: 22 Jun 2021
I have read and understand the requirements of this Pre-Construction Risk Assessment and will comply with its requirements.
SIGNATURES:
Project COR
Infection Control
Chief of Police & Law Enforcement
GEMS Coordinator
Chief Engineer
Date:
Union Safety Officer
Safety Manager
Chair – Construction Safety Committee
Contractor
Other as Applicable
Date:
| Project Title: |
| Project Number: |
| Competent Person CP: |
| Date: |
| InHouse or contracted Out: |
| CP Qualifications: |
| Scope of Project: |
| escalation Date: |
| Initials: |
| Date_2: |
| IC staff initials: |
| Location of Construction: |
| Project Start Date: |
| Contractor Performing Work: |
| Estimated Duration: |
| Submitter: |
| Building: |
| Date_3: |
| Chief Facilities Management Date: |
| Project Name: |
| Increased surveillance of buildings grounds and equipment shift daily other: Off |
| Means of exiting construction areas inspected daily: Off |
| Implementation of Fire Watch: Off |
| Not applicable: Off |
| Maintenance of escapeegress routes from construction areas: Off |
| Maintenance of access to emergency services for emergency equipment fire alarm pull stations Fire: Off |
| Alternate EXIT signs posted: Off |
| NO: Off |
| NA: Off |
| undefined_3: Off |
| Not applicable_2: Off |
| Temporary fire alarm detection suppression system in place: Off |
| Monthly testing and inspection of temporary systems: Off |
| Provide additional firefighting equipment in project area: Off |
| Provide additional firefighting equipment in adjacent areas: Off |
| Not applicable_3: Off |
| Notification to Municipal Fire Department or applicable emergency forces group: Off |
| Not applicable_4: Off |
| Partitions smoke tight and constructed of noncombustible or limited combustible materials: Off |
| Prohibition of smoking throughout building and in and near construction areas: Off |
| Implement appropriate storage practices: Off |
| Implement appropriate housekeeping practices: Off |
| Implement appropriate debris removal practices: Off |
| Not applicable_5: Off |
| 2 fire drills per shift per quarter throughout Hospital one additional drill beyond requirement of: Off |
| 2 fire drills per shift per quarter in areas adjacent to project one additional drill beyond requirement: Off |
| More than 2 fire drills per shift per quarter throughout Hospital If yes how many: |
| of EC530: Off |
| undefined_4: Off |
| Not applicable_6: Off |
| More than 2 fire drills per shift per quarter in areas adjacent to project If yes how many: |
| Additional training for staff in immediate area: Off |
| Additional training for staff throughout hospital: Off |
| Additional training for incident response team: Off |
| Training to promote awareness of firesafety building deficiencies construction hazards ILSM: Off |
| Training on changes in physical environment egress routes: Off |
| Training on firefighting equipment: Off |
| Training on compensating for impaired structural or compartmentalization features of fire safety: Off |
| Not applicable_7: Off |
| Other measures: |
| Comments: |
| Prepared by: |
| Date_4: |
| Chief Facilities Management Date_2: |
| undefined_5: |
| undefined_6: |
| Has the Job Site been evaluated for ACM asbestos or other environmental hazards If yes provide comments: |
| undefined_7: |
| Will Project create potential air quality issues other than identified in ICRA Is any work or equipment near air intakes Are Volatile Organic Compounds VOC being used If yes please explain and note plans to minimize: |
| undefined_8: |
| undefined_9: |
| Will project create potential noise issues If yes please explain and note plans to minimize: |
| Will project create potential vibration issues If yes please explain and note plans to minimize: |
| Is contractor required to provide 14 daysnotice for utility shutdowns: |
| Will contractorCOR follow Utility Shutdown SOP when utilities are shut down: |
| Will contractor be given emergency notification telephone numbers for unplanned utility failures: |
| undefined_11: |
| undefined_12: |
| undefined_13: |
| undefined_14: |
| excavation etc: |
| scaffolding cranes or excavation: |
| Will another VA Employee be CP for those special fields: |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Text15: |
| Text16: |
| Text17: |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Text34: |
| Text37: |
| Text41: |
| Text42: |
| Text43: |
| Text44: |
| Text56: |
| Text57: |
| Text58: |
| Text59: |
| Text60: |
| Text61: |
| Text62: |
| CheckBoxA: Off |
| CheckBoxB: Off |
| CheckBoxC: Off |
| CheckBoxD: Off |
| CheckBoxLow: Off |
| CheckBoxMedium: Off |
| CheckBoxHigh: Off |
| CheckBoxHighest: Off |
| ClassI_af_image: |
| ClassII_af_image: |
| ClassIII_af_image: |
| ClassIV_af_image: |
| Text40: |
| issuess: |
| worktext: |
| commenttext: |
| Any additional potential issues that affect EOC Environment of Care: |
| LEAKS: |
| Activity/Risk Matrix Script Documentation (Click here and see the script in the "Actions" tab): |
| Text55: |
| Text554: |
| Text5544: |
File details come from the government source that posted it. Updated .