Attachment 2 - Ghana Warehouse Construction - Bid Chart.xlsx

XLSX spreadsheet 60 KB Posted

Attached to
Ghana Warehouse, Maintenance, and Motor Pool Facility Project
Solicitation number
19AQMM25R0042
Issued by

About this file

This is a bid pricing template spreadsheet for the Ghana Warehouse Construction project, divided into four main sections with associated CLINs: COE Warehouse & Maintenance Facility (CLINs 0001-0002), 100-Vehicle Warehouse (CLINs 0003-0004), Surface and Road Areas (CLINs 0005-0006), and Perimeter Walls and Guard House (CLINs 0007-0008).

Each section contains identical line items for bidders to input costs across three categories: Material Cost, Equipment Cost, and Labor Cost. The line items include pre-construction activities, site surveys, earthworks, concrete work, masonry, carpentry, plumbing, electrical work, roofing, doors/windows, finishes, and various building systems. Each section also includes administrative costs, unforeseen costs, profit, and DBA Insurance calculations. The template is dated January 3, 2024, and is associated with Department of State solicitation 19AQMM25R0042, which has a proposal due date of March 21, 2025.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WBS BID CHART-GH Warehouse Bldg

BID CHART
GAF COE Warehouse & Maintenance Facility
Accra (Tema), Ghana
1/3/24

BASE BID

ITEMDESCRIPTIONMATERIAL COSTEQUIPMENT COSTLABOR COSTTOTAL COST
CLIN 0001 Pre-Construction Activities$ 0.00
Site Survey and Design Revisions$ 0.00
CLIN 0002 COE WAREHOUSE & MAINTENANCE FAC (GHANA)$ 0.00
Initial Site Survey (Soil, Perclation, Density Test)$ 0.00

Earthworks $ 0.00

Concrete & Concrete Accesssories $ 0.00

Masonry $ 0.00

Carpentry $ 0.00

Plumbing (latrine and septic system) $ 0.00

Structural Welding $ 0.00

Electrical Works $ 0.00

Miscelaneous Metal Fabrications $ 0.00

Fabricated Roof Panels Assemblies $ 0.00

Flashing and Sheet Metal $ 0.00

Aluminium Doors and Frames $ 0.00

Windows $ 0.00

Door Hardware $ 0.00

Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00

Interior Signage $ 0.00

Toilet Accessories $ 0.00

Fire Extinguishers $ 0.00

Basic Mechanical Materials and Methods $ 0.00

Basic Electrical Materials and Methods $ 0.00

Lighting $ 0.00

Water Distribution $ 0.00

Sanitary Sewer $ 0.00

Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00

Furnishings $ 0.00

Labor $ 0.00

DTOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID)$ 0.00
DAdministration$ 0.00
DUnforenseens$ 0.00
DProfit$ 0.00
DDBA Insurance$ 0.00
TTOTAL COSTS (BASE BID) $$ 0.00

100-vehicle Warehouse

BID CHART
GAF COE Warehouse & Maintenance Facility
Accra (Tema), Ghana
1/3/24

BASE BID

ITEMDESCRIPTIONMATERIAL COSTEQUIPMENT COSTLABOR COSTTOTAL COST
CLIN 0003 Pre-Construction Activities$ 0.00
Site Survey and Design Revisions$ 0.00
CLIN 0004 100-VEHICLE SHED (GHANA)$ 0.00
Initial Site Survey (Soil, Perclation, Density Test)$ 0.00

Earthworks $ 0.00

Concrete & Concrete Accesssories $ 0.00

Masonry $ 0.00

Carpentry $ 0.00

Plumbing (latrine and septic system) $ 0.00

Structural Welding $ 0.00

Electrical Works $ 0.00

Miscelaneous Metal Fabrications $ 0.00

Fabricated Roof Panels Assemblies $ 0.00

Flashing and Sheet Metal $ 0.00

Aluminium Doors and Frames $ 0.00

Windows $ 0.00

Door Hardware $ 0.00

Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00

Interior Signage $ 0.00

Toilet Accessories $ 0.00

Fire Extinguishers $ 0.00

Basic Mechanical Materials and Methods $ 0.00

Basic Electrical Materials and Methods $ 0.00

Lighting $ 0.00

Water Distribution $ 0.00

Sanitary Sewer $ 0.00

Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00

Furnishings $ 0.00

Labor $ 0.00

DTOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID)$ 0.00
DAdministration$ 0.00
DUnforenseens$ 0.00
DProfit$ 0.00
DDBA Insurance$ 0.00
TTOTAL COSTS (BASE BID) $$ 0.00

Surface and Road Areas

BID CHART
GAF COE Warehouse & Maintenance Facility
Accra (Tema), Ghana
1/3/24

BASE BID

ITEMDESCRIPTIONMATERIAL COSTEQUIPMENT COSTLABOR COSTTOTAL COST
CLIN 0005 Pre-Construction Activities$ 0.00
Site Survey and Design Revisions$ 0.00
CLIN 0006 SURFACE AND ROAD AREAS (GHANA)$ 0.00
Initial Site Survey (Soil, Perclation, Density Test)$ 0.00

Earthworks $ 0.00

Concrete & Concrete Accesssories $ 0.00

Masonry $ 0.00

Carpentry $ 0.00

Plumbing (latrine and septic system) $ 0.00

Structural Welding $ 0.00

Electrical Works $ 0.00

Miscelaneous Metal Fabrications $ 0.00

Fabricated Roof Panels Assemblies $ 0.00

Flashing and Sheet Metal $ 0.00

Aluminium Doors and Frames $ 0.00

Windows $ 0.00

Door Hardware $ 0.00

Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00

Interior Signage $ 0.00

Toilet Accessories $ 0.00

Fire Extinguishers $ 0.00

Basic Mechanical Materials and Methods $ 0.00

Basic Electrical Materials and Methods $ 0.00

Lighting $ 0.00

Water Distribution $ 0.00

Sanitary Sewer $ 0.00

Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00

Furnishings $ 0.00

Labor $ 0.00

DTOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID)$ 0.00
DAdministration$ 0.00
DUnforenseens$ 0.00
DProfit$ 0.00
DDBA Insurance$ 0.00
TTOTAL COSTS (BASE BID) $$ 0.00

Perimeter Walls and Guard House

BID CHART
GAF COE Warehouse & Maintenance Facility
Accra (Tema), Ghana
1/3/24

BASE BID

ITEMDESCRIPTIONMATERIAL COSTEQUIPMENT COSTLABOR COSTTOTAL COST
CLIN 0007 Pre-Construction Activities$ 0.00
Site Survey and Design Revisions$ 0.00
CLIN 0008 PERIMETER WALL AND GUARD HOUSE (GHANA)$ 0.00
Initial Site Survey (Soil, Perclation, Density Test)$ 0.00

Earthworks $ 0.00

Concrete & Concrete Accesssories $ 0.00

Masonry $ 0.00

Carpentry $ 0.00

Plumbing (latrine and septic system) $ 0.00

Structural Welding $ 0.00

Electrical Works $ 0.00

Miscelaneous Metal Fabrications $ 0.00

Fabricated Roof Panels Assemblies $ 0.00

Flashing and Sheet Metal $ 0.00

Aluminium Doors and Frames $ 0.00

Windows $ 0.00

Door Hardware $ 0.00

Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00

Interior Signage $ 0.00

Toilet Accessories $ 0.00

Fire Extinguishers $ 0.00

Basic Mechanical Materials and Methods $ 0.00

Basic Electrical Materials and Methods $ 0.00

Lighting $ 0.00

Water Distribution $ 0.00

Sanitary Sewer $ 0.00

Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00

Furnishings $ 0.00

Labor $ 0.00

DTOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID)$ 0.00
DAdministration$ 0.00
DUnforenseens$ 0.00
DProfit$ 0.00
DDBA Insurance$ 0.00
TTOTAL COSTS (BASE BID) $$ 0.00

image1.emf

File details come from the government source that posted it. Updated .