Attachment 2 - Ghana Warehouse Construction - Bid Chart.xlsx
XLSX spreadsheet 60 KB Posted
- Solicitation number
- 19AQMM25R0042
About this file
This is a bid pricing template spreadsheet for the Ghana Warehouse Construction project, divided into four main sections with associated CLINs: COE Warehouse & Maintenance Facility (CLINs 0001-0002), 100-Vehicle Warehouse (CLINs 0003-0004), Surface and Road Areas (CLINs 0005-0006), and Perimeter Walls and Guard House (CLINs 0007-0008).
Each section contains identical line items for bidders to input costs across three categories: Material Cost, Equipment Cost, and Labor Cost. The line items include pre-construction activities, site surveys, earthworks, concrete work, masonry, carpentry, plumbing, electrical work, roofing, doors/windows, finishes, and various building systems. Each section also includes administrative costs, unforeseen costs, profit, and DBA Insurance calculations. The template is dated January 3, 2024, and is associated with Department of State solicitation 19AQMM25R0042, which has a proposal due date of March 21, 2025.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WBS BID CHART-GH Warehouse Bldg
| BID CHART | |
| GAF COE Warehouse & Maintenance Facility | |
| Accra (Tema), Ghana | |
| 1/3/24 |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0001 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions | $ 0.00 |
| CLIN 0002 COE WAREHOUSE & MAINTENANCE FAC (GHANA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) | $ 0.00 |
Earthworks $ 0.00
Concrete & Concrete Accesssories $ 0.00
Masonry $ 0.00
Carpentry $ 0.00
Plumbing (latrine and septic system) $ 0.00
Structural Welding $ 0.00
Electrical Works $ 0.00
Miscelaneous Metal Fabrications $ 0.00
Fabricated Roof Panels Assemblies $ 0.00
Flashing and Sheet Metal $ 0.00
Aluminium Doors and Frames $ 0.00
Windows $ 0.00
Door Hardware $ 0.00
Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00
Interior Signage $ 0.00
Toilet Accessories $ 0.00
Fire Extinguishers $ 0.00
Basic Mechanical Materials and Methods $ 0.00
Basic Electrical Materials and Methods $ 0.00
Lighting $ 0.00
Water Distribution $ 0.00
Sanitary Sewer $ 0.00
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00
Furnishings $ 0.00
Labor $ 0.00
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
100-vehicle Warehouse
| BID CHART | |
| GAF COE Warehouse & Maintenance Facility | |
| Accra (Tema), Ghana | |
| 1/3/24 |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0003 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions | $ 0.00 |
| CLIN 0004 100-VEHICLE SHED (GHANA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) | $ 0.00 |
Earthworks $ 0.00
Concrete & Concrete Accesssories $ 0.00
Masonry $ 0.00
Carpentry $ 0.00
Plumbing (latrine and septic system) $ 0.00
Structural Welding $ 0.00
Electrical Works $ 0.00
Miscelaneous Metal Fabrications $ 0.00
Fabricated Roof Panels Assemblies $ 0.00
Flashing and Sheet Metal $ 0.00
Aluminium Doors and Frames $ 0.00
Windows $ 0.00
Door Hardware $ 0.00
Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00
Interior Signage $ 0.00
Toilet Accessories $ 0.00
Fire Extinguishers $ 0.00
Basic Mechanical Materials and Methods $ 0.00
Basic Electrical Materials and Methods $ 0.00
Lighting $ 0.00
Water Distribution $ 0.00
Sanitary Sewer $ 0.00
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00
Furnishings $ 0.00
Labor $ 0.00
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
Surface and Road Areas
| BID CHART | |
| GAF COE Warehouse & Maintenance Facility | |
| Accra (Tema), Ghana | |
| 1/3/24 |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0005 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions | $ 0.00 |
| CLIN 0006 SURFACE AND ROAD AREAS (GHANA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) | $ 0.00 |
Earthworks $ 0.00
Concrete & Concrete Accesssories $ 0.00
Masonry $ 0.00
Carpentry $ 0.00
Plumbing (latrine and septic system) $ 0.00
Structural Welding $ 0.00
Electrical Works $ 0.00
Miscelaneous Metal Fabrications $ 0.00
Fabricated Roof Panels Assemblies $ 0.00
Flashing and Sheet Metal $ 0.00
Aluminium Doors and Frames $ 0.00
Windows $ 0.00
Door Hardware $ 0.00
Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00
Interior Signage $ 0.00
Toilet Accessories $ 0.00
Fire Extinguishers $ 0.00
Basic Mechanical Materials and Methods $ 0.00
Basic Electrical Materials and Methods $ 0.00
Lighting $ 0.00
Water Distribution $ 0.00
Sanitary Sewer $ 0.00
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00
Furnishings $ 0.00
Labor $ 0.00
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
Perimeter Walls and Guard House
| BID CHART | |
| GAF COE Warehouse & Maintenance Facility | |
| Accra (Tema), Ghana | |
| 1/3/24 |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0007 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions | $ 0.00 |
| CLIN 0008 PERIMETER WALL AND GUARD HOUSE (GHANA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) | $ 0.00 |
Earthworks $ 0.00
Concrete & Concrete Accesssories $ 0.00
Masonry $ 0.00
Carpentry $ 0.00
Plumbing (latrine and septic system) $ 0.00
Structural Welding $ 0.00
Electrical Works $ 0.00
Miscelaneous Metal Fabrications $ 0.00
Fabricated Roof Panels Assemblies $ 0.00
Flashing and Sheet Metal $ 0.00
Aluminium Doors and Frames $ 0.00
Windows $ 0.00
Door Hardware $ 0.00
Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00
Interior Signage $ 0.00
Toilet Accessories $ 0.00
Fire Extinguishers $ 0.00
Basic Mechanical Materials and Methods $ 0.00
Basic Electrical Materials and Methods $ 0.00
Lighting $ 0.00
Water Distribution $ 0.00
Sanitary Sewer $ 0.00
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00
Furnishings $ 0.00
Labor $ 0.00
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
image1.emf
File details come from the government source that posted it. Updated .