Attachment 2 - Ghana Warehouse Construction - Bid Chart.xlsx
XLSX spreadsheet 127 KB Posted
- Solicitation number
- 19AQMM24R0160
About this file
This document appears to be an Attachment 2 - Bid Chart for the Ghana Warehouse, Maintenance, and Motor Pool Facility Project, which is a federal contract opportunity with Solicitation Number 19AQMM24R0160. The Bid Chart provides a detailed breakdown of the various construction items and estimated costs for the project, including the COE Warehouse & Maintenance Facility, 50-vehicle Warehouse Sheds, Motor Pool & Container Sheds, and Perimeter Wall. The project is being managed by the Department of State Office of Acquisition Management. The solicitation schedule includes a pre-proposal conference, site visit, and proposal due date. Contractors will be required to provide pricing for the various construction elements, as well as administration, unforeseens, profit, and insurance costs.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WBS BID CHART-SEN BLDG & WRHS
| IGCE |
| GAF COE Warehouse & Maintenance Facility |
| Accra (Tema), Ghana |
| 1/3/24 |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0001 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions | $ 0.00 |
| CLIN 0002 COE WAREHOUSE & MAINTENANCE FAC (GHANA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) | $ 0.00 |
Earthworks $ 0.00
Concrete & Concrete Accesssories $ 0.00
Masonry $ 0.00
Carpentry $ 0.00
Plumbing (latrine and septic system) $ 0.00
Structural Welding $ 0.00
Electrical Works $ 0.00
Miscelaneous Metal Fabrications $ 0.00
Fabricated Roof Panels Assemblies $ 0.00
Flashing and Sheet Metal $ 0.00
Aluminium Doors and Frames $ 0.00
Windows $ 0.00
Door Hardware $ 0.00
Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00
Interior Signage $ 0.00
Toilet Accessories $ 0.00
Fire Extinguishers $ 0.00
Basic Mechanical Materials and Methods $ 0.00
Basic Electrical Materials and Methods $ 0.00
Lighting $ 0.00
Water Distribution $ 0.00
Sanitary Sewer $ 0.00
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00
Furnishings $ 0.00
Labor $ 0.00
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
50-vehicle Warehouse Sheds
| IGCE |
| GAF COE Warehouse & Maintenance Facility |
| Accra (Tema), Ghana |
| 1/3/24 |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0001 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions | $ 0.00 |
| CLIN 0003 VEHICLE WAREHOUSE SHEDS (GHANA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) | $ 0.00 |
Earthworks $ 0.00
Concrete & Concrete Accesssories $ 0.00
Masonry $ 0.00
Carpentry $ 0.00
Plumbing (latrine and septic system) $ 0.00
Structural Welding $ 0.00
Electrical Works $ 0.00
Miscelaneous Metal Fabrications $ 0.00
Fabricated Roof Panels Assemblies $ 0.00
Flashing and Sheet Metal $ 0.00
Aluminium Doors and Frames $ 0.00
Windows $ 0.00
Door Hardware $ 0.00
Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00
Interior Signage $ 0.00
Toilet Accessories $ 0.00
Fire Extinguishers $ 0.00
Basic Mechanical Materials and Methods $ 0.00
Basic Electrical Materials and Methods $ 0.00
Lighting $ 0.00
Water Distribution $ 0.00
Sanitary Sewer $ 0.00
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00
Furnishings $ 0.00
Labor $ 0.00
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
Motor Pool & Container Sheds
| IGCE |
| GAF COE Warehouse & Maintenance Facility |
| Accra (Tema), Ghana |
| 1/3/24 |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0001 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions | $ 0.00 |
| CLIN 0004 MOTOR POOL AND CONTAINER SHEDS (GHANA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) | $ 0.00 |
Earthworks $ 0.00
Concrete & Concrete Accesssories $ 0.00
Masonry $ 0.00
Carpentry $ 0.00
Plumbing (latrine and septic system) $ 0.00
Structural Welding $ 0.00
Electrical Works $ 0.00
Miscelaneous Metal Fabrications $ 0.00
Fabricated Roof Panels Assemblies $ 0.00
Flashing and Sheet Metal $ 0.00
Aluminium Doors and Frames $ 0.00
Windows $ 0.00
Door Hardware $ 0.00
Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00
Interior Signage $ 0.00
Toilet Accessories $ 0.00
Fire Extinguishers $ 0.00
Basic Mechanical Materials and Methods $ 0.00
Basic Electrical Materials and Methods $ 0.00
Lighting $ 0.00
Water Distribution $ 0.00
Sanitary Sewer $ 0.00
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00
Furnishings $ 0.00
Labor $ 0.00
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
Perimeter Walls and Guard Shack
| IGCE |
| GAF COE Warehouse & Maintenance Facility |
| Accra (Tema), Ghana |
| 1/3/24 |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0001 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions | $ 0.00 |
| CLIN 0005 PERIMETER WALL (GHANA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) | $ 0.00 |
Earthworks $ 0.00
Concrete & Concrete Accesssories $ 0.00
Masonry $ 0.00
Carpentry $ 0.00
Plumbing (latrine and septic system) $ 0.00
Structural Welding $ 0.00
Electrical Works $ 0.00
Miscelaneous Metal Fabrications $ 0.00
Fabricated Roof Panels Assemblies $ 0.00
Flashing and Sheet Metal $ 0.00
Aluminium Doors and Frames $ 0.00
Windows $ 0.00
Door Hardware $ 0.00
Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00
Interior Signage $ 0.00
Toilet Accessories $ 0.00
Fire Extinguishers $ 0.00
Basic Mechanical Materials and Methods $ 0.00
Basic Electrical Materials and Methods $ 0.00
Lighting $ 0.00
Water Distribution $ 0.00
Sanitary Sewer $ 0.00
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00
Furnishings $ 0.00
Labor $ 0.00
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |