Attachment 2 - Ghana Warehouse Construction - Bid Chart 0002.xlsx
XLSX spreadsheet 60 KB Posted
- Solicitation number
- 19AQMM24R0160
About this file
This document appears to be an attachment containing a bid chart for the Ghana Warehouse, Maintenance, and Motor Pool Facility Project, which is a federal contract opportunity with Solicitation Number 19AQMM24R0160.
The bid chart provides line items and cost estimates for various elements of the construction project, including the COE Warehouse & Maintenance Facility, 100-Vehicle Shed, Surface and Road Areas, and Perimeter Wall and Guard House. The line items cover activities such as site survey, earthworks, concrete, masonry, carpentry, plumbing, electrical, and finishes, with separate costs listed for materials, equipment, and labor. The total costs for each line item and the overall total costs for the base bid are provided, though all the individual cost figures are listed as $0.00.
The related federal contract opportunity has an estimated proposal due date of August 16, 2024 at 12:00 PM EDT. It is being solicited by the Department of State Office of Acquisition Management, a civilian agency. The solicitation includes a pre-proposal conference and site visit on July 3, 2024, as well as a deadline for submitting questions on July 12, 2024.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WBS BID CHART-GH Warehouse Bldg
| BID CHART | |
| GAF COE Warehouse & Maintenance Facility | |
| Accra (Tema), Ghana | |
| 1/3/24 |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0001 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions | $ 0.00 |
| CLIN 0002 COE WAREHOUSE & MAINTENANCE FAC (GHANA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) | $ 0.00 |
Earthworks $ 0.00
Concrete & Concrete Accesssories $ 0.00
Masonry $ 0.00
Carpentry $ 0.00
Plumbing (latrine and septic system) $ 0.00
Structural Welding $ 0.00
Electrical Works $ 0.00
Miscelaneous Metal Fabrications $ 0.00
Fabricated Roof Panels Assemblies $ 0.00
Flashing and Sheet Metal $ 0.00
Aluminium Doors and Frames $ 0.00
Windows $ 0.00
Door Hardware $ 0.00
Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00
Interior Signage $ 0.00
Toilet Accessories $ 0.00
Fire Extinguishers $ 0.00
Basic Mechanical Materials and Methods $ 0.00
Basic Electrical Materials and Methods $ 0.00
Lighting $ 0.00
Water Distribution $ 0.00
Sanitary Sewer $ 0.00
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00
Furnishings $ 0.00
Labor $ 0.00
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
100-vehicle Warehouse
| BID CHART | |
| GAF COE Warehouse & Maintenance Facility | |
| Accra (Tema), Ghana | |
| 1/3/24 |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0003 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions | $ 0.00 |
| CLIN 0004 100-VEHICLE SHED (GHANA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) | $ 0.00 |
Earthworks $ 0.00
Concrete & Concrete Accesssories $ 0.00
Masonry $ 0.00
Carpentry $ 0.00
Plumbing (latrine and septic system) $ 0.00
Structural Welding $ 0.00
Electrical Works $ 0.00
Miscelaneous Metal Fabrications $ 0.00
Fabricated Roof Panels Assemblies $ 0.00
Flashing and Sheet Metal $ 0.00
Aluminium Doors and Frames $ 0.00
Windows $ 0.00
Door Hardware $ 0.00
Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00
Interior Signage $ 0.00
Toilet Accessories $ 0.00
Fire Extinguishers $ 0.00
Basic Mechanical Materials and Methods $ 0.00
Basic Electrical Materials and Methods $ 0.00
Lighting $ 0.00
Water Distribution $ 0.00
Sanitary Sewer $ 0.00
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00
Furnishings $ 0.00
Labor $ 0.00
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
Surface and Road Areas
| BID CHART | |
| GAF COE Warehouse & Maintenance Facility | |
| Accra (Tema), Ghana | |
| 1/3/24 |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0005 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions | $ 0.00 |
| CLIN 0006 SURFACE AND ROAD AREAS (GHANA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) | $ 0.00 |
Earthworks $ 0.00
Concrete & Concrete Accesssories $ 0.00
Masonry $ 0.00
Carpentry $ 0.00
Plumbing (latrine and septic system) $ 0.00
Structural Welding $ 0.00
Electrical Works $ 0.00
Miscelaneous Metal Fabrications $ 0.00
Fabricated Roof Panels Assemblies $ 0.00
Flashing and Sheet Metal $ 0.00
Aluminium Doors and Frames $ 0.00
Windows $ 0.00
Door Hardware $ 0.00
Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00
Interior Signage $ 0.00
Toilet Accessories $ 0.00
Fire Extinguishers $ 0.00
Basic Mechanical Materials and Methods $ 0.00
Basic Electrical Materials and Methods $ 0.00
Lighting $ 0.00
Water Distribution $ 0.00
Sanitary Sewer $ 0.00
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00
Furnishings $ 0.00
Labor $ 0.00
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
Perimeter Walls and Guard House
| BID CHART | |
| GAF COE Warehouse & Maintenance Facility | |
| Accra (Tema), Ghana | |
| 1/3/24 |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0007 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions | $ 0.00 |
| CLIN 0008 PERIMETER WALL AND GUARD HOUSE (GHANA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) | $ 0.00 |
Earthworks $ 0.00
Concrete & Concrete Accesssories $ 0.00
Masonry $ 0.00
Carpentry $ 0.00
Plumbing (latrine and septic system) $ 0.00
Structural Welding $ 0.00
Electrical Works $ 0.00
Miscelaneous Metal Fabrications $ 0.00
Fabricated Roof Panels Assemblies $ 0.00
Flashing and Sheet Metal $ 0.00
Aluminium Doors and Frames $ 0.00
Windows $ 0.00
Door Hardware $ 0.00
Exterior Finishes (glazing, stucco, plaster, painting) $ 0.00
Interior Signage $ 0.00
Toilet Accessories $ 0.00
Fire Extinguishers $ 0.00
Basic Mechanical Materials and Methods $ 0.00
Basic Electrical Materials and Methods $ 0.00
Lighting $ 0.00
Water Distribution $ 0.00
Sanitary Sewer $ 0.00
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.) $ 0.00
Furnishings $ 0.00
Labor $ 0.00
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
image1.emf
File details come from the government source that posted it. Updated .