Inside Bldg.

Fixed Camera ceiling mounted in the center of bldg. 1220 facing east

Field of view: Back door leading to flight line

Scope: New camera, mount, conduit, wiring to the closest node located in comm closet approximately 150ft away, new electrical components as necessary

ECP 1Pole mounted PTZ camera facing S/SW

Field of view: Outbound/Inbound ECP 1

Scope: Remove current camera and wiring, install appropriate exterior rated wiring using existing path to node 90ft away, replace or install new electrical components as necessary and new camera

ECP 18Pole mounted PTZ Camera on corner of

Rex Rd.

Field of view: Full Coverage of ECP 18

Scope: Remove current camera and wiring, install appropriate exterior rated wiring using existing path to node 280ft away, install new electrical components as necessary

ECP 17

PTZ Camera pole mounted on the North side of ECP 17 facing the south

Field of view: In/Outbound gate of ECP 17

Scope: Remove current camera/mount and wiring, install appropriate exterior rated wiring using existing path to node 200ft, replace or install new electrical components as necessary and new camera.

ECP 16

ECP 15

Inbound

PTZ Camera wall mounted on NW corner of Hangar 8

Field of view: ECP 15 In & ECP 16

Scope: New camera, mount, conduit, wiring to the closest node located in comm closet 200ft within Hangar 8, new electrical components as necessary

ECP 22

Inbound

PTZ Camera pole mounted on corner of ECP 22

Inbound

Field of view: Full Coverage of ECP 22

Inbound/ECP 23 (Turnstile)

Scope: New pole, camera, mount, conduit, wiring to the closest node 85ft, and new electrical

ECP 22 In

ECP 22 Out

Node Box 40

Current underground conduits at

ECP 22

ECP 24

Inbound PTZ Camera pole mounted on corner of ECP 24

Inbound

Field of view: Full Coverage of ECP 24 Inbound

Scope: New pole, camera, mount, conduit (may be available already), wiring to the closest node

200ft, and new electrical components as necessary

ECP 24

Outbound

Primary location (Green): PTZ Camera pole mounted on secure side of ECP 24 outbound

Secondary location (Orange): PTZ Camera pole mounted on fence line adjacent to ECP 24 outbound

Field of view: Facing vehicles exiting through the gate

Scope: New pole, camera, mount, conduit (may be available already), wiring to the closest node125ft/15ft away, and new electrical

ECP 24 In

Node Box 43

Current underground conduits at ECP 24

ECP 24 Out