This solicitation is for renovation work at Eglin Air Force Base in Florida. The project includes selective demolition of existing interior construction and finishes as well as modifications to supply rooms and tool rooms. The scope also involves modifying an existing SAPF to meet new standards and converting a second SAPF into a SCIF for intelligence functions. Additional work includes maintenance on a 270 VDC power system. The NAICS code is 236220 for commercial and institutional building construction, with a size standard of $39.5 million. The estimated value is between $1-5 million. This opportunity is a 100% small business set-aside utilizing best value source selection. The performance period is anticipated to be 300 days after notice to proceed. Proposals are due no later than June 4, 2021 via the DoD SAFE system. Site visits must be scheduled by May 10. Funding is not presently available and no award will be made until funds are obligated, while the government reserves the right to cancel the solicitation.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
HAUL ROAD GATE
CONSTRUCTION ACCESS
WEST GATE BASE EXIT
EGLIN BLVD.
H
AU
L R
D
GENERAL NOTES
1. HAUL ROAD GATE CONSTRUCTION ACCESS -- PRIMARY
CONSTRUCTION ENTRANCE GATE SHALL BE OPEN MON-SAT EXCLUDING
HOLIDAYS. NO SUNDAY DELIVERIES ARE ALLOWED. ALL DELIVERY
TRUCKS MUST HAVE A BILL OF LADING IDENTIFYING THE CONTRACTOR,
CONTRACT NUMBER, AND LIST OF MATERIALS. ANY SPECIAL DELIVERIES
SHALL BE SUBMITTED IN WRITING TO THE CONTRACTING OFFICER 5 DAYS
IN ADVANCE, AND SECURITY FORCES SHALL BE NOTIFIED 72 HOURS IN
ADVANCE. NOT ALL REQUESTS MAY BE GRANTED.
2. CONTRACTORS AND SUPPLIERS WITH CONTRACTOR EQUIPMENT
SHALL ENTER BASE THROUGH THE HAUL ROAD GATE.
3. ALL CONTRACTOR DELIVERIES MUST BE INSPECTED AT THE HAUL
ROAD GATE PRIOR TO ARRIVAL AT THE PROJECT SITE.
4. ALL CONSTRUCTION TRAFFIC SHALL EXIT THROUGH THE HAUL ROAD
GATE OR WEST GATE. AR94997
DERETSI
G
E R
A R C H
IT
EC
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
RLT
1/26/2021
REVISION DATE DESCRIPTION BY APPR'D
BASE CIVIL ENGINEER
EGLIN AIR FORCE BASE, FLORIDA
DATE
SIGNATURE
APPROVED
CENM
DRAWN BY
PROJ. ENGR.
CONTENTS
APPROVED
TITLE
DATE
SCALE
SHEET OF
SPEC. NO.
INDEX NO.
PROJ. NO. DRAWING NO. FILE NO.
96/CEG/CEN
APPROVED
DEPUTY BASE CIVIL ENGINEER
APPROVED
PROGRAM MANAGER
APPROVED
FIRE PREVENTION
APPROVED
SAFETY REPRESENTATIVE
APPROVED
DIR. BASE. MED. SERVICE
APPROVED
USING AGENCY
APPROVED
COMMUNICATIONS
APPROVED
OPERATIONS ENGINEERING
APPROVED
ENVIRONMENTAL
APPROVED
SECURITY FORCES
APPROVED
ASUS
APPROVED
CHELCO
20AH FTFA20CB73 1
RENOVATE SQUADRON
OPERATIONS AREA JSF
HANGAR B1412
1/26/2021
G-001
TITLE SHEET
GJD
LCS
RENOVATE SQUADRON OPERATIONS AREA JSF HANGAR B1412
EGLIN AFB, FLORIDA
98o o43
BAY
p65
FAIRHOPE
MOBILE
o31 p
MINETTE
o 98o
9010p
45o
FOLEY
o 98o o331
ANDALUSIA
o84 o31
CRESTVIEW
oo85
VALPARISO
90o
MILTON
p10 EGLIN AIR FORCE BASE
ALABAMA
FLORIDA
o29 p10
DE FUNIAK
SPRINGS
FORT
WALTON
BEACH
98o
ATMORE
o31 o90 p5
BREWTON
FLOMATON
PENSACOLA
BASE MAP
NORTH
PROJECT LOCATION
PROJECT LOCATION
AR94997
DERETSI
G
E R
A R C H
IT
EC
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
RLT
1/26/2021
REVISION DATE DESCRIPTION BY APPR'D
BASE CIVIL ENGINEER
EGLIN AIR FORCE BASE, FLORIDA
DATE
SIGNATURE
APPROVED
CENM
DRAWN BY
PROJ. ENGR.
CONTENTS
APPROVED
TITLE
DATE
SCALE
SHEET OF
SPEC. NO.
INDEX NO.
PROJ. NO. DRAWING NO. FILE NO.
96/CEG/CEN
APPROVED
DEPUTY BASE CIVIL ENGINEER
APPROVED
PROGRAM MANAGER
APPROVED
FIRE PREVENTION
APPROVED
SAFETY REPRESENTATIVE
APPROVED
DIR. BASE. MED. SERVICE
APPROVED
USING AGENCY
APPROVED
COMMUNICATIONS
APPROVED
OPERATIONS ENGINEERING
APPROVED
ENVIRONMENTAL
APPROVED
SECURITY FORCES
APPROVED
ASUS
APPROVED
CHELCO
20AH FTFA20CB73 2
RENOVATE SQUADRON
OPERATIONS AREA JSF
HANGAR B1412
1/26/2021
G-002
INDEX OF DRAWINGS
KRW
LCS
INDEX OF DRAWINGS
SHEET
NUMBER SHEET NAME
FIRE PROTECTION
FA001 FIRE ALARM COVER SHEET
FA101 FIRE ALARM DEMOLITION PLAN NE
FA102 FIRE ALARM DEMOLITION PLAN SW
FA103 FIRE ALARM DEMOLITION PLAN SE
FA111 FIRE ALARM NEW WORK PLAN NE
FA112 FIRE ALARM NEW WORK PLAN SW
FA113 FIRE ALARM NEW WORK PLAN SE
MECHANICAL
M-001 HVAC LEGEND & GENERAL NOTES
M-100 HVAC OVERALL
M-101 HVAC DEMO AREA F
M-102 HVAC DEMO INTEL VAULT
M-201 HVAC NEW WORK SUPPORT ROOM
M-202 HVAC NEW WORK 60 FS VAULT
M-203 HVAC NEW WORK INTEL VAULT
M-601 HVAC SCHEDULES-1
ELECTRICAL
E-001 ELECTRICAL LEGEND AND GENERAL NOTES
E-002 NEW WORK RISER AND PANEL SCHEDULES
E-100 ELECTRICAL DEMOLITION PLAN NE
E-101 ELECTRICAL DEMOLITION PLAN SW
E-102 ELECTRCIAL DEMOLITION PLAN SE
E-103 LIGHTING DEMOLITION PLAN NE
E-104 LIGHTING DEMOLITION PLAN SW
E-105 LIGHTING DEMOLITION PLAN SE
E-200 NEW WORK ELECTRICAL POWER PLAN NE
E-201 NEW WORK ELECTRICAL POWER PLAN SW
E-202 NEW WORK ELECTRICAL POWER PLAN SE
E-203 NEW WORK LIGHTING PLAN NE
E-204 NEW WORK LIGHTING PLAN SW
E-205 NEW WORK LIGHTING PLAN SE
TELECOMMUNICATIONS
T-001 TELECOM LEGEND
T-002 TELECOM NOTES
T-101 TELECOM EXISTING PARTIAL PLAN SW
T-102 TELECOM EXISTING PARTIAL PLAN SE
T-103 TELECOM EXISTING PARTIAL PLAN NE
T-111 TELECOM PARTIAL FLOOR PLAN SW
T-112 TELECOM PARTIAL FLOOR PLAN SE
T-113 TELECOM PARTIAL FLOOR PLAN NE
T-201 TELECOM EXISTING OUTLET DETAILS
T-202 TELECOM EXISTING OUTLET DETAILS
T-203 TELECOM FACEPLATE DETAILS
T-204 TELECOM FACEPLATE DETAILS
T-205 TELECOM DETAILS
T-301 TELECOM SINGLE LINE DIAGRAMS
T-302 TELECOM SINGLE LINE DIAGRAMS
T-401 TELECOM ENLARGED PLANS
T-501 RACK ELEVATIONS
T-502 RACK ELEVATIONS
INDEX OF DRAWINGS
SHEET
NUMBER SHEET NAME
GENERAL
G-001 TITLE SHEET
G-002 INDEX OF DRAWINGS
G-003 LIFE SAFETY PLAN
STRUCTURAL
S-001 GENERAL NOTES & WIND LOAD DIAGRAMS
S-101 PARTIAL FLOOR PLAN
S-102 PARTIAL ROOF FRAMING PLAN
S-201 WALL OPENING ELEVATIONS
S-301 SECTIONS & DETAILS
S-302 SECTIONS & DETAILS
ARCHITECTURAL
A-001 LEGEND, NOTES, AND ABBREVIATIONS
A-100 EXISTING FLOOR PLAN - OVERALL
A-101 PARTIAL EXISTING FLOOR PLAN
A-102 PARTIAL EXISTING FLOOR PLAN
A-103 PARTIAL EXISTING FLOOR PLAN
A-110 DEMOLITION FLOOR PLAN - OVERALL
A-111 PARTIAL DEMOLITION FLOOR PLAN
A-112 PARTIAL DEMOLITION FLOOR PLAN
A-113 PARTIAL DEMOLITION FLOOR PLAN
A-120 FLOOR PLAN - OVERALL/PHASING PLAN
A-121 PARTIAL FLOOR PLAN
A-122 PARTIAL FLOOR PLAN
A-123 PARTIAL FLOOR PLAN
A-150 REFLECTED CEILING PLAN - OVERALL
A-151 PARTIAL REFLECTED CEILING PLAN
A-152 PARTIAL REFLECTED CEILING PLAN
A-153 PARTIAL REFLECTED CEILING PLAN
A-301 BUILDING SECTIONS
A-310 WALL SECTIONS, ELEVATIONS & DETAILS
A-401 ENLARGED PLANS & CASEWORK
A-601 OPENING SCHEDULE AND DETAILS
A-602 DOOR AND WINDOW DETAILS
INTERIOR
I-101 FINISH PLAN - OVERALL
I-102 PARTIAL FINISH PLAN
I-103 PARTIAL FINISH PLAN
I-104 PARTIAL FINISH PLAN
I-105 FURNITURE PLAN - OVERALL
I-106 PARTIAL FURNITURE PLAN
I-107 PARTIAL FURNITURE PLAN
I-108 PARTIAL FURNITURE PLAN
I-109 SIGNAGE PLAN - OVERALL
I-110 PARTIAL SIGNAGE PLAN
I-111 PARTIAL SIGNAGE PLAN
I-112 PARTIAL SIGNAGE PLAN
I-601 FINISH SCHEDULE, NOTES, AND DETAILS
I-602 FURNITURE SCHEDULE
I-603 SIGNAGE SCHEDULE AND DETAILS
444 441 439 438 436 435
466474
124 123 122 121
175162
148149151
132 127 125 427425
421 422 423 424
133 131 129 128 126
426 428 429 431 433
477478181179
161 461
442443
412411403
453 456
468472174
171169
145144141139138137136135134
118 117
143142
413103
111 101 401
195 197 198 199 203 205
501 499
485486
187188
192 488
191 487
482185
190 480
496202
OCCUPANT LOAD INCREASE (BUSINESS) DOES NOT
REQUIRE ADDITIONAL EXITS OR EXIT DOORS OR
REQUIRE DOOR SWINGS TO CHANGE
NO REDUCTION IN NUMBER OF EXITS
OCCUPANT LOAD INCREASE (42) DOES
NOT REQUIRE ADDITIONAL EXITS OR
REQUIRE DOOR SWINGS TO CHANGE
AR94997
DERETSI
G
E R
A R C H
IT
EC
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
RLT
1/26/2021
REVISION DATE DESCRIPTION BY APPR'D
BASE CIVIL ENGINEER
EGLIN AIR FORCE BASE, FLORIDA
DATE
SIGNATURE
APPROVED
CENM
DRAWN BY
PROJ. ENGR.
CONTENTS
APPROVED
TITLE
DATE
SCALE
SHEET OF
SPEC. NO.
INDEX NO.
PROJ. NO. DRAWING NO. FILE NO.
96/CEG/CEN
APPROVED
DEPUTY BASE CIVIL ENGINEER
APPROVED
PROGRAM MANAGER
APPROVED
FIRE PREVENTION
APPROVED
SAFETY REPRESENTATIVE
APPROVED
DIR. BASE. MED. SERVICE
APPROVED
USING AGENCY
APPROVED
COMMUNICATIONS
APPROVED
OPERATIONS ENGINEERING
APPROVED
ENVIRONMENTAL
APPROVED
SECURITY FORCES
APPROVED
ASUS
APPROVED
CHELCO
20AH FTFA20CB73 3
RENOVATE SQUADRON
OPERATIONS AREA JSF
HANGAR B1412
1/26/2021
G-003
LIFE SAFETY PLAN
KRW
LCS
1" = 20'-0"G-003
1 LIFE SAFETY PLAN
PLAN
NORTH
1.00 GENERAL NOTES
1.01 THESE DRAWINGS ADDRESS ONLY THE STRUCTURAL DESIGN OF THE STRUCTURE. THE DIMENSIONAL
LAYOUT OF THE STRUCTURE HAS BEEN DICTATED TO JOE DEREUIL ASSOCIATES IN ORDER TO
PRODUCE STRUCTURAL DESIGN DOCUMENTS. NO REPRESENTATION IS MADE REGARDING CODE
CONFORMANCE OF NON-STRUCTURAL ASPECTS OF THE STRUCTURE.
1.02 THESE STRUCTURAL NOTES SHALL BE APPLIED WITH THE TECHNICAL SPECIFICATIONS IN THE SPECIFICATIONS MANUAL. ANY CONFLICTING REQUIREMENTS SHALL BE BROUGHT TO THE ATTENTION
OF THE CONTRACTING OFFICER FOR RESOLUTION BEFORE PROCEEDING WITH FABRICATION OR
CONSTRUCTION.
1.03 DRAWINGS SHOW TYPICAL AND CERTAIN SPECIFIC CONDITIONS ONLY. FOR DETAILS NOT
SPECIFICALLY SHOWN, PROVIDE DETAILS SIMILAR TO THOSE SHOWN.
1.04 VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS BEFORE STARTING WORK. NOTIFY
CONTRACTING OFFICER OF ANY DISCREPANCY.
1.05 THE DESIGN, ADEQUACY, AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC., ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. TAKE NECESSARY PRECAUTIONS TO PROTECT THE EXISTING STRUCTURE AND ITS FOUNDATION AND TO LIMIT, TO THE EXTENT POSSIBLE, THE EFFECTS OF CONSTRUCTION THAT THE NEW STRUCTURE HAS ON THE EXISTING STRUCTURE.
1.06 COORDINATE STRUCTURAL CONTRACT DOCUMENTS WITH ARCHITECTURAL, MECHANICAL,
ELECTRICAL, PLUMBING AND CIVIL. NOTIFY CONTRACTING OFFICER OF ANY CONFLICT AND/OR OMISSION. CONTRACTOR SHALL MAKE NO DEVIATION FROM DESIGN DRAWINGS WITHOUT WRITTEN
APPROVAL OF THE CONTRACTING OFFICER. FOR ADDITIONAL OPENINGS NOT SHOWN ON THE
STRUCTURAL DRAWINGS, SEE ARCHITECTURAL, MECHANICAL, AND PLUMBING DRAWINGS.
1.07 DESIGN CRITERIA:
THE STRUCTURE HAS BEEN DESIGNED UTILIZING THE FOLLOWING REFERENCES:
A. UFC 1-200-01, GENERAL BUILDING REQUIREMENTS
B. UFC 3-301-01, STRUCTURAL ENGINEERING
C. UFC 4-010-01, DOD MINIMUM ANTITERRORISM STANDARD FOR BUILDINGS
D. INTERNATIONAL BUILDING CODE, 2018
E. ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
F. ACI 318-14, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
G. AISC STEEL CONSTRUCTION MANUAL 15TH EDITION
1.08 DESIGN LOADS
A. WIND LOADS - STRUCTURE HAS BEEN DESIGNED TO CONFORM TO THE WIND PROVISIONS OF
ASCE 7-16. SEE WIND PRESSURE DIAGRAM & CHART FOR THE FOLLOWING:
1. BASIC WIND SPEED (3-SEC GUST)
2. BUILDING RISK CATEGORY
3. WIND EXPOSURE CATEGORY
4. INTERNAL PRESSURE COEFFICIENT
5. COMPONENT & CLADDING WIND PRESSURES
1.09 SHOP DRAWING SUBMITTALS:
A. THE REVIEW OF SUBMITTALS AND/OR SHOP DRAWINGS DONE BY THE CONTRACTING OFFICER
DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO REVIEW AND CHECK SHOP
DRAWINGS BEFORE SUBMITTAL TO THE CONTRACTING OFFICER. THE REVIEW BY THE
CONTRACTING OFFICER IS FOR GENERAL CONFORMANCE ONLY. IF SHOP DRAWINGS HAVE NOT
BEEN REVIEWED AND APPROVED BEFORE SUBMITTAL TO THE CONTRACTING OFFICER, THEY
SHALL BE RETURNED WITHOUT APPROVAL.
B. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY AND ALL ERRORS AND OMISSIONS
ASSOCIATED WITH THE PREPARATION OF ALL SHOP DRAWINGS AS THEY PERTAIN TO MEMBER
SIZES, DETAILS, AND DIMENSIONS SPECIFIED IN THE CONSTRUCTION DOCUMENTS.
C. CONTRACTOR IS SOLEY RESPONSBILE FOR MEANS, METHODS, TECHNIQUES, SEQUENCES, AND
PROCEDURES OF CONSTRUCTION.
D. ALL MODIFICATIONS MADE FOR SUBMITTALS THAT ARE RE-SUBMITTED SHALL CLEARLY NOTE
ALL CHANGES.
E. REPRODUCING THE CONTRACT DOCUMENTS FOR USE AS SHOP DRAWINGS IS NOT ALLOWED,
AND SHOP DRAWINGS WILL BE RETURNED WITHOUT APPROVAL.
F. GENERAL SHOP DRAWING REQUIREMENTS:
1. SUBMIT SHOP DRAWINGS AND ANY OTHER SPECIAL INFORMATION NECCESSARY FOR
PROPER FABRICATION, ERECTION, AND PLACEMENT OF STRUCTURAL FABRICATIONS.
INCLUDE PLANS, ELEVATIONS, AND SECTIONS. CLEARLY SHOW ANCHORAGES,
CONNECTIONS, AND ACCESSORY ITEMS. THE DETAILER MUST INTERPRET THE
CONTRACT DOCUMENTS AND CLEARLY CONVEY THIS INTERPRETATION TO THE FIELD IN
THE FORM OF PLACING OR ERECTION DRAWINGS.
2. CONCRETE REINFORCING DETAILER - PROVIDE PLACING DRAWINGS FOR FABRICATION
AND PLACING OF REINFORCING STEEL. THESE DRAWINGS SHALL INCLUDE, BUT ARE NOT
LIMITED TO, THE FOLLOWING: BAR LISTS, SCHEDULES, BENDING DETAILS, PLACING
DETAILS, PLACING PLANS, AND PLACING ELEVATIONS. CLEARLY SHOW FOUNDATION
REINFORCING. INDICATE BAR LENGTHS, LOCATION AND SPLICES OF CONTINUOUS BARS,
AND BAR SUPPORTS. CLEARLY SHOW LOCATIONS OF ALL DOWELS ON PLAN.
2.00 REINFORCED CONCRETE
2.01 ALL CONCRETE WORK SHALL CONFORM TO ACI 301-16, SPECIFICATIONS FOR STRUCTURAL CONCRETE. DESIGN IS BASED ON ACI 318-14, BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE. DETAIL CONCRETE REINFORCEMENT AND ACCESSORIES IN ACCORDANCE WITH ACI
315R-18, GUIDE TO PRESENTING REINFORCING STEEL DESIGN DETAILS. DETAIL ALL CONCRETE WALLS AND BEAMS ON THE SHOP DRAWINGS IN ELEVATION UNLESS SPECIFICALLY APPROVED OTHERWISE.
SUBMIT SHOP DRAWINGS FOR APPROVAL, SHOWING ALL FABRICATION DIMENSIONS AND LOCATIONS FOR PLACING REINFORCING STEEL AND ACCESSORIES. DO NOT BEGIN FABRICATION UNTIL SHOP
DRAWINGS ARE COMPLETED AND REVIEWED.
2.02 UNLESS NOTED OTHERWISE, ALL CONCRETE SHALL BE NORMAL WEIGHT AND HAVE THE FOLLOWING MINIMUM 28 DAY COMPRESSIVE STRENGTHS (Fc’), WATER TO CEMENTITIOUS CONTENT (W/CM) AND
AIR CONTENT ACCORDING TO EXPOSURE CLASS (EC):
Fc’ MAX. W/CM AIR CONTENT
A. SLAB-ON-GRADE – INTERIOR
(EC-F0, S0, W0, C0) 3500 PSI 0.50 N/A
CONCRETE MAY CONTAIN A PROPERLY DESIGNED SUPERPLASTICIZER FOR WORKABILITY.
2.03 REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60 UNLESS NOTED OTHERWISE.
2.04 THE PROPOSED MATERIALS AND MIX DESIGN SHALL BE FULLY DOCUMENTED AND REVIEWED BY THE OWNER'S TESTING LABORATORY. RESPONSIBILITY FOR OBTAINING THE REQUIRED DESIGN STRENGTH
IS THE CONTRACTOR'S.
2.05 USE OF CALCIUM CHLORIDE, CHLORIDE IONS, OR OTHER SALTS IN CONCRETE IS NOT PERMITTED.
2.06 HORIZONTAL CONSTRUCTION JOINTS ARE PERMITTED ONLY WHERE INDICATED. THE CONTRACTING
OFFICER SHALL APPROVE THE LOCATION OF VERTICAL CONSTRUCTION JOINTS. CONSTRUCTION
JOINTS SHALL BE THOROUGHLY ROUGHENED BY MECHANICAL MEANS, AND CLEANED. CONTRACTOR
SHALL SUBMIT DRAWINGS SHOWING INTENDED POURING SEQUENCE AND LOCATION OF
CONSTRUCTION JOINT TO THE ENGINEER FOR REVIEW. PROPOSED METHODS MUST BE ACCEPTABLE
TO THE ARCHITECT BEFORE USE.
2.07 CHAMFER OR ROUND ALL EXPOSED CORNERS A MINIMUM OF 3/4".
2.08 TIE ALL REINFORCING STEEL AND EMBEDMENTS SECURELY IN PLACE PRIOR TO PLACING CONCRETE.
PROVIDE SUFFICIENT SUPPORTS TO MAINTAIN THE POSITION OF REINFORCEMENT WITHIN SPECIFIED TOLERANCE DURING ALL CONSTRUCTION ACTIVITIES. "STICKING” DOWELS INTO WET CONCRETE IS
NOT PERMITTED.
2.09 PROVIDE CONTINUOUS REINFORCEMENT WHEREVER POSSIBLE; SPLICE ONLY AS SHOWN OR
APPROVED; STAGGER SPLICE WHERE POSSIBLE; USE FULL TENSION SPLICE (CLASS "B") UNLESS
NOTED OTHERWISE. DOWELS SHALL MATCH THE SIZE AND SPACING OF THE SPECIFIED
REINFORCEMENT AND SHALL BE LAPPED WITH FULL TENSION SPLICES (CLASS "B") UNLESS NOTED
OTHERWISE. TERMINATE BARS WITH STANDARD HOOKS.
2.10 REINFORCING STEEL SHALL HAVE THE FOLLOWING CONCRETE COVER UNLESS NOTED OTHERWISE
(PER ACI 318-14 TABLE 20.6.1.3.1):
A. CONCRETE AGAINST EARTH (NOT FORMED): 3"
B. FORMED CONCRETE EXPOSED TO THE EARTH OR WEATHER:
1. #6 THROUGH #18 BARS: 2"
2. #5 BARS AND SMALLER: 1-1/2"
C. CONCRETE NOT EXPOSED TO EARTH OR WEATHER:
1. SLABS AND WALLS: 3/4"
2. BEAMS (STIRRUPS) AND COLUMNS (TIES): 1-1/2"
2.11 DO NOT PLACE DUCTS EXCEEDING ONE-THIRD THE SLAB OR WALL THICKNESS WITHIN THE SLAB OR
WALL UNLESS SPECIFICALLY SHOWN AND DETAILED ON STRUCTURAL DRAWINGS.
2.12 DO NOT WELD OR TACK WELD REINFORCING STEEL UNLESS APPROVED OR DIRECTED BY THE
CONTRACTING OFFICER.
2.13 THE LICENSED DESIGN PROFESSIONAL, A PERSON UNDER THE SUPERVISION OF A LICENSED DESIGN
PROFESSIONAL, OR A QUALIFIED INSPECTOR SHALL VERIFY COMPLIANCE WITH CONSTRUCTION
DOCUMENTS. (ACI 318-14 PAR. 26.13.1.3)
2.14 ALL REINFORCING STEEL PLACEMENTS SHALL BE REVIEWED BY THE CONTRACTING OFFICER, OR BY A
REPRESENTATIVE RESPONSIBLE TO HIM. (RE: ACI 318 PAR. 26.13.1)
3.00 STRUCTURAL STEEL
3.01 STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED ACCORDING TO AISC 360-10
SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS.
3.02 SUBMIT SHOP DRAWINGS PREPARED IN ACCORDANCE WITH AISC MANUAL "DETAILING FOR STEEL
CONSTRUCTION", LATEST EDITION. DO NOT BEGIN FABRICATION UNTIL SHOP DRAWINGS ARE
COMPLETED AND REVIEWED.
3.03 STRUCTURAL STEEL SHAPES, PLATES, ANGLES, AND CHANNELS SHALL CONFORM TO ASTM A36
UNLESS NOTED OTHERWISE.
3.04 USE PRE-QUALIFIED WELDED JOINTS AS PER AISC, AND AWS D1.1 "STRUCTURAL WELDING CODE." USE
ONLY CERTIFIED WELDERS; ALL ELECTRODES SHALL CONFORM TO AWS A5 GRADE E70XX. BARE
ELECTRODE AND GRANULAR FLUX SHALL CONFORM TO AWS A5, F70 AWS FLUX CLASSIFICATION.
MINIMUM WELD SIZE TO BE 3/16" FILLET WELD, U.N.O.
3.05 PAINT STRUCTURAL STEEL IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. DO NOT PAINT
STEEL SURFACES TO BE ENCASED IN CONCRETE OR RECEIVE SPRAYED ON FIREPROOFING,
CONNECTIONS DESIGNATED AS SLIP CRITICAL, OR TO BE WELDED.
3.06 PRIMER: SSPC-PAINT 25, TYPE I, ZINC OXIDE, ALKYD, LINSEED OIL PRIMER.
3.07 STRUCTURAL STEEL LINTELS, DOOR JAMBS AND CANOPIES SHALL BE HOT-DIP GALVANIZED.
4.00 MASONRY
4.01 CONCRETE MASONRY DESIGN, CONSTRUCTION AND TESTING SHALL CONFORM TO TMS 402/602-16, BUILDING CODE REQUIREMENTS AND SPECIFICATION FOR MASONRY STRUCTURES.
4.02 PROVIDE LIGHTWEIGHT, HOLLOW, LOAD-BEARING CONCRETE MASONRY UNITS (CMU) CONFORMING
TO ASTM C90, UNLESS NOTED OTHERWISE.
4.03 PROVIDE MASONRY CONSTRUCTION WITH MINIMUM COMPRESSIVE STRENGTH, f'm = 2,000 PSI.
4.04 PROVIDE TYPE "M" OR “S” MORTAR IN ACCORDANCE WITH ASTM C270 BY PROPORTION
REQUIREMENTS, UNLESS NOTED OTHERWISE.
4.05 VERTICAL CELLS SHALL BE REINFORCED AS SHOWN ON PROJECT DETAILS.
4.06 PROVIDE GROUT FOR REINFORCED MASONRY IN ACCORDANCE WITH ASTM C476. GROUT SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 3,000 PSI UNLESS NOTED OTHERWISE. GROUT SHALL BE FLUID CONSISTENCY. FLUID CONSISTENCY SHALL MEAN THAT CONSISTENCY IS AS FLUID AS POSSIBLE FOR POURING WITHOUT SEGREGATION OF THE CONSTITUENT PARTS. FILL ALL CELLS BELOW GRADE WITH GROUT. ALL GROUT SHALL BE CONSOLIDATED AT THE TIME OF POURING BY VIBRATING AND THEN RECONSOLIDATED BY AGAIN PUDDLING LATER, BEFORE PLASTICITY IS LOST.
WHEN GROUTING IS STOPPED FOR ONE HOUR OR LONGER, CONSTRUCTION JOINTS SHALL BE
FORMED BY STOPPING THE POUR OF THE GROUT 1-1/2 INCHES BELOW THE TOP OF THE UPPERMOST
UNIT.
4.07 ALL MASONRY UNITS SHALL BE FREE OF EXCESSIVE DUST AND DIRT AT THE TIME THEY ARE LAYED BY
THE MASON.
4.08 ALL REINFORCED HOLLOW UNIT MASONRY SHALL BE BUILT TO PRESERVE THE UNOBSTRUCTED VERTICAL CONTINUITY OF THE CELLS TO BE FILLED. WALLS AND CROSS WEBS IN ALL REINFORCED MASONRY WALLS SHALL BE FULLY BEDDED IN MORTAR. ALL HEAD (OR END) JOINTS SHALL BE SOLIDLY FILLED WITH MORTAR FOR A DISTANCE IN FROM EACH FACE OF THE UNIT NOT LESS THAN THE THICKNESS OF THE LONGITUDINAL FACE SHELLS, BOND SHALL BE PROVIDED BY LAPPING UNITS IN
SUCCESSIVE VERTICAL COURSES.
5.00 POST-INSTALLED ANCHORS
5.01 EXCEPT WHERE INDICATED ON THE DRAWINGS, POST-INSTALLED ANCHORS SHALL CONSIST OF THE FOLLOWING ANCHOR TYPES AS PROVIDED BY HILTI, INC. CONTACT HILTI AT (800) 879-8000 FOR
PRODUCT RELATED QUESTIONS. EQUIVALENT ANCHORAGE SYSTEMS MAY BE SUBMITTED
FOR APPROVAL.
a) ANCHORAGE TO SOLID GROUTED MASONRY
i) ADHESIVE ANCHORS USE:
(1) HILTI HIT-HY 270 MASONRY ADHESIVE ANCHORING SYSTEM (ICC PENDING).
(2) STEEL ANCHOR ELEMENT SHALL BE STAINLESS STEEL CONTINUOUSLY THREADED
ROD OR CONTINUOUSLY DEFORMED STEEL REBAR
ii) MECHANICAL ANCHORS USE:
(1) HILTI KWIK HUS-EZ SCREW ANCHOR PER ICC ESR-3056
(2) HILTI KWIK BOLT-3 EXPANSION ANCHORS PER ICC ESR-1385
5.02 ANCHOR CAPACITY USED IN DESIGN SHALL BE BASED ON THE TECHNICAL DATA PUBLISHED BY HILTI OR SUCH OTHER METHOD AS APPROVED BY THE CONTRACTING OFFICER. SUBSTITUTION REQUESTS FOR ALTERNATE PRODUCTS MUST BE APPROVED IN WRITING BY THE CONTRACTING OFFICER PRIOR
TO USE.
5.03 INSTALL ANCHORS PER THE MANUFACTURER INSTRUCTIONS, AS INCLUDED IN THE ANCHOR
PACKAGING AND IN STRICT ACCORDANCE WITH THE CURRENT ICC ESR.
5.04 EXISTING REINFORCING BARS IN THE CONCRETE STRUCTURE MAY CONFLICT WITH SPECIFIC ANCHOR
LOCATIONS. UNLESS NOTED ON THE DRAWINGS THAT THE BARS CAN BE CUT, THE CONTRACTOR
SHALL REVIEW THE EXISTING STRUCTURAL DRAWINGS AND SHALL UNDERTAKE TO LOCATE THE
POSITION OF THE REINFORCING BARS AT THE LOCATIONS OF THE CONCRETE ANCHORS, BY HILTI
FERROSCAN, GPR, X-RAY, CHIPPING OR OTHER MEANS.
5.05 ADHESIVE ANCHORS SHALL BE INSTALLED IN CONCRETE HAVING A MINIMUM AGE OF 21 DAYS AT THE
TIME OF ANCHOR INSTALLATION IN ACCORDANCE WITH ACI 318-11 D.2.2.
5.06 PROVIDE SPECIAL INSPECTION FOR ALL MECHANICAL AND ADHESIVE ANCHORS PER THE APPLICABLE
BUILDLING CODE AND PER THE CURRENT ICC-ES REPORT FOR THE ANCHOR.
REPRESENTATIVE DIAGRAM
WIND LOAD DETERMINATION ASSUMPTIONS - INTERNATIONAL BUILDING CODE 2018
ROOF SLOPE
154 C 29.5 1.5 ON 12 III ENCLOSED
WIND VELOCITY
(MPH)
EXPOSURE
CATEGORY
MEAN ROOF
HEIGHT (FT.)
RISK
CATEGORY
ENCLOSURE
CATEGORY
ULTIMATE DESIGN WIND PRESSURES FOR COMPONENTS AND CLADDING (PSF)
ROOF
ZONE 1
ROOF
ZONE 2
ROOF
ZONE 3
WALL
ZONE 4
WALL
ZONE 5
24.2 -64.7 -74.8 54.6 -59.1 -72.7
50 20.7 -64.7 -71.2 48.9 -53.5 -61.5
19.2 -64.7 -69.7 46.5 -51.1 -56.7
-100.0
-78.8
-69.7
NOTES:
1. FOR EFFECTIVE AREAS BETWEEN THOSE GIVEN ABOVE THE LOAD MAY BE INTERPOLATED,
OTHERWISE USE THE LOAD ASSOCIATED WITH THE LOWER EFFECTIVE AREA.
2. THE EDGE STRIP, a = 14.2 FT.
3. PRESSURES SHALL BE APPLIED IN ACCORDANCE WITH THE FIGURE SHOWN ON THIS SHEET.
4. PRESSURES GIVEN ARE ULTIMATE LOADS TO BE USED WITH STRENGTH DESIGN. FOR SERVICE
LOADS TO BE USED WITH ALLOWABLE STRESS DESIGN, MULTIPLY THE PRESSURES BY 0.60. SEE
TABLES 2.3 AND 2.4 IN ASCE 7-16 FOR MORE INFORMATION ON LOAD COMBINATIONS.
< 10
> 100
EFF.
AREA
(SQ. FT.)
54.6
48.9
46.5
24.2
20.7
19.2
24.2
20.7
19.2
O-HNGO-HNG
-140.4
-105.1
-89.9
-89.9
-86.4
-84.9
ROOF ZONE 2 O-HNG PRESSURES
SHALL BE UTILIZED FOR THE CANOPY
D
EU
SOJ
R
EG ISTERE
REENIGNED
EPH ER
IL
SIUOL
ADIOLF R
STATE OF
No. 54319
ET
ACFIT
C
RE
I
REVISIONREVISIONREVISIONREVISION DATEDATEDATEDATE DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION BYBYBYBY APPR'DAPPR'DAPPR'DAPPR'D
BASE CIVIL ENGINEERBASE CIVIL ENGINEERBASE CIVIL ENGINEERBASE CIVIL ENGINEER
EGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDA
DATEDATEDATEDATE
SIGNATURESIGNATURESIGNATURESIGNATURE
APPROVEDAPPROVEDAPPROVEDAPPROVED
CENMCENMCENMCENM
DRAWN BYDRAWN BYDRAWN BYDRAWN BY
PROJ. ENGR.PROJ. ENGR.PROJ. ENGR.PROJ. ENGR.
CONTENTSCONTENTSCONTENTSCONTENTS
APPROVEDAPPROVEDAPPROVEDAPPROVED
TITLETITLETITLETITLE
DATEDATEDATEDATE
SCALESCALESCALESCALE
SHEETSHEETSHEETSHEET OFOFOFOF
SPEC. NO.SPEC. NO.SPEC. NO.SPEC. NO.
INDEX NO.INDEX NO.INDEX NO.INDEX NO.
PROJ. NO.PROJ. NO.PROJ. NO.PROJ. NO. DRAWING NO.DRAWING NO.DRAWING NO.DRAWING NO. FILE NO.FILE NO.FILE NO.FILE NO.
96/CEG/CEN96/CEG/CEN96/CEG/CEN96/CEG/CEN
APPROVEDAPPROVEDAPPROVEDAPPROVED
DEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEER
APPROVEDAPPROVEDAPPROVEDAPPROVED
PROGRAM MANAGERPROGRAM MANAGERPROGRAM MANAGERPROGRAM MANAGER
APPROVEDAPPROVEDAPPROVEDAPPROVED
FIRE PREVENTIONFIRE PREVENTIONFIRE PREVENTIONFIRE PREVENTION
APPROVEDAPPROVEDAPPROVEDAPPROVED
SAFETY REPRESENTATIVESAFETY REPRESENTATIVESAFETY REPRESENTATIVESAFETY REPRESENTATIVE
APPROVEDAPPROVEDAPPROVEDAPPROVED
DIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICE
APPROVEDAPPROVEDAPPROVEDAPPROVED
USING AGENCYUSING AGENCYUSING AGENCYUSING AGENCY
APPROVEDAPPROVEDAPPROVEDAPPROVED
COMMUNICATIONSCOMMUNICATIONSCOMMUNICATIONSCOMMUNICATIONS
APPROVEDAPPROVEDAPPROVEDAPPROVED
OPERATIONS ENGINEERINGOPERATIONS ENGINEERINGOPERATIONS ENGINEERINGOPERATIONS ENGINEERING
APPROVEDAPPROVEDAPPROVEDAPPROVED
ENVIRONMENTALENVIRONMENTALENVIRONMENTALENVIRONMENTAL
91919191
APPROVEDAPPROVEDAPPROVEDAPPROVED
SECURITY FORCESSECURITY FORCESSECURITY FORCESSECURITY FORCES
APPROVEDAPPROVEDAPPROVEDAPPROVED
ASUSASUSASUSASUS
APPROVEDAPPROVEDAPPROVEDAPPROVED
CHELCOCHELCOCHELCOCHELCO
FTFA20CB73FTFA20CB73FTFA20CB73FTFA20CB73
RENOVATE SQUADRONRENOVATE SQUADRONRENOVATE SQUADRONRENOVATE SQUADRON
OPERATIONS AREA JSFOPERATIONS AREA JSFOPERATIONS AREA JSFOPERATIONS AREA JSF
HANGAR B1412HANGAR B1412HANGAR B1412HANGAR B1412
1/26/20211/26/20211/26/20211/26/2021
SSSS----001001001001
GENERAL NOTES & WIND LOAD DIAGRAMSGENERAL NOTES & WIND LOAD DIAGRAMSGENERAL NOTES & WIND LOAD DIAGRAMSGENERAL NOTES & WIND LOAD DIAGRAMS
KLMKLMKLMKLM
BJBBJBBJBBJB
1/26/211/26/211/26/211/26/21
420AH 93934
A
13.2 14 14.2 15 16 17 18 19 19.8 20 21
A.5 A.6
A.9
B
S-2013
S-201
S-201
S-201
6' - 4"
EDGE/NEW DOOR FRAME
6' - 4"
FIELD VERIFY
+/- 13' - 4"
EDGE/NEW DOOR FRAME
12' - 8"
FIELD VERIFY
+/- 12' - 0"
498499501502 496 495
S-301
NEW STEEL-FRAMED CANOPY ABOVE
SEE DETAILS, SHEET S-302
S-302
S-201
(2) SLAB MOUNTED PAINTED
STEEL BOLLARD WITH CONCRETE
FILL; REFER TO ARCH. FOR LAYOUT.
EDGE/NEW &
EXIST. DOOR FRAMES
REFER TO DETAILS REQUIRED FOR
SLOT DIMENSIONS AT FULL GROUT
FILLED CMU.
A
13.2 14 14.2 15 16 17 18 19 19.8 20 21
A.5 A.6
A.9
B
S-2013
S-201
S-201
S-201
EDGE/NEW &
EXIST. DOOR FRAMES
13' - 4"
EDGE/NEW DOOR OPENING
13' - 4"
12' - 0"
498499501502 496 495
EXISTING CANOPY ABOVE
TO BE DEMOLISHED
S-201
SEE ARCH. FOR DEMOLITION
OF VAULT
FULL GROUT-FILLED CMU
EXISTING BRACING IN WALL
TO REMAIN; DOOR LOCATION DESIGNED
TO MISS EXISTING BRACING.
D
EU
SOJ
R
EG ISTERE
REENIGNED
EPH ER
IL
SIUOL
ADIOLF R
STATE OF
No. 54319
ET
ACFIT
C
RE
I
REVISIONREVISIONREVISIONREVISION DATEDATEDATEDATE DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION BYBYBYBY APPR'DAPPR'DAPPR'DAPPR'D
BASE CIVIL ENGINEERBASE CIVIL ENGINEERBASE CIVIL ENGINEERBASE CIVIL ENGINEER
EGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDA
DATEDATEDATEDATE
SIGNATURESIGNATURESIGNATURESIGNATURE
APPROVEDAPPROVEDAPPROVEDAPPROVED
CENMCENMCENMCENM
DRAWN BYDRAWN BYDRAWN BYDRAWN BY
PROJ. ENGR.PROJ. ENGR.PROJ. ENGR.PROJ. ENGR.
CONTENTSCONTENTSCONTENTSCONTENTS
APPROVEDAPPROVEDAPPROVEDAPPROVED
TITLETITLETITLETITLE
DATEDATEDATEDATE
SCALESCALESCALESCALE
SHEETSHEETSHEETSHEET OFOFOFOF
SPEC. NO.SPEC. NO.SPEC. NO.SPEC. NO.
INDEX NO.INDEX NO.INDEX NO.INDEX NO.
PROJ. NO.PROJ. NO.PROJ. NO.PROJ. NO. DRAWING NO.DRAWING NO.DRAWING NO.DRAWING NO. FILE NO.FILE NO.FILE NO.FILE NO.
96/CEG/CEN96/CEG/CEN96/CEG/CEN96/CEG/CEN
APPROVEDAPPROVEDAPPROVEDAPPROVED
DEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEER
APPROVEDAPPROVEDAPPROVEDAPPROVED
PROGRAM MANAGERPROGRAM MANAGERPROGRAM MANAGERPROGRAM MANAGER
APPROVEDAPPROVEDAPPROVEDAPPROVED
FIRE PREVENTIONFIRE PREVENTIONFIRE PREVENTIONFIRE PREVENTION
APPROVEDAPPROVEDAPPROVEDAPPROVED
SAFETY REPRESENTATIVESAFETY REPRESENTATIVESAFETY REPRESENTATIVESAFETY REPRESENTATIVE
APPROVEDAPPROVEDAPPROVEDAPPROVED
DIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICE
APPROVEDAPPROVEDAPPROVEDAPPROVED
USING AGENCYUSING AGENCYUSING AGENCYUSING AGENCY
APPROVEDAPPROVEDAPPROVEDAPPROVED
COMMUNICATIONSCOMMUNICATIONSCOMMUNICATIONSCOMMUNICATIONS
APPROVEDAPPROVEDAPPROVEDAPPROVED
OPERATIONS ENGINEERINGOPERATIONS ENGINEERINGOPERATIONS ENGINEERINGOPERATIONS ENGINEERING
APPROVEDAPPROVEDAPPROVEDAPPROVED
ENVIRONMENTALENVIRONMENTALENVIRONMENTALENVIRONMENTAL
91919191
APPROVEDAPPROVEDAPPROVEDAPPROVED
SECURITY FORCESSECURITY FORCESSECURITY FORCESSECURITY FORCES
APPROVEDAPPROVEDAPPROVEDAPPROVED
ASUSASUSASUSASUS
APPROVEDAPPROVEDAPPROVEDAPPROVED
CHELCOCHELCOCHELCOCHELCO
FTFA20CB73FTFA20CB73FTFA20CB73FTFA20CB73
RENOVATE SQUADRONRENOVATE SQUADRONRENOVATE SQUADRONRENOVATE SQUADRON
OPERATIONS AREA JSFOPERATIONS AREA JSFOPERATIONS AREA JSFOPERATIONS AREA JSF
HANGAR B1412HANGAR B1412HANGAR B1412HANGAR B1412
1/26/20211/26/20211/26/20211/26/2021
SSSS----101101101101
PARTIAL FLOOR PLANPARTIAL FLOOR PLANPARTIAL FLOOR PLANPARTIAL FLOOR PLAN
KLMKLMKLMKLM
BJBBJBBJBBJB
1/26/211/26/211/26/211/26/21
1/8" = 1'-0"S-101
2 PARTIAL FLOOR PLAN - NEW WORK
KEY PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
1/8" = 1'-0"S-101
1 PARTIAL FLOOR PLAN - DEMO
520AH
PLAN
NORTH
PLAN
93935
17 18 19 19.8 20
J
H
G
F
E.5
18.4
W
X
W
X
O P
E R
A B
LE
P
A R
T
IT
IO
N
S U
P P
O R
T B
E A
M
O P
E R
A B
LE
P
A R
T
IT
IO
N
S U
P P
O R
T B
E A
M
S-302
S-302
432431428427
F
IE
LD
V
E R
IF
Y
S-302
Sim
S-302
Sim
BRACING ANGLE AND
JOIST REINF.; SEE DETAIL
BRACING ANGLE AND
JOIST REINF.; SEE DETAIL
D
EU
SOJ
R
EG ISTERE
REENIGNED
EPH ER
IL
SIUOL
ADIOLF R
STATE OF
No. 54319
ET
ACFIT
C
RE
I
REVISIONREVISIONREVISIONREVISION DATEDATEDATEDATE DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION BYBYBYBY APPR'DAPPR'DAPPR'DAPPR'D
BASE CIVIL ENGINEERBASE CIVIL ENGINEERBASE CIVIL ENGINEERBASE CIVIL ENGINEER
EGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDA
DATEDATEDATEDATE
SIGNATURESIGNATURESIGNATURESIGNATURE
APPROVEDAPPROVEDAPPROVEDAPPROVED
CENMCENMCENMCENM
DRAWN BYDRAWN BYDRAWN BYDRAWN BY
PROJ. ENGR.PROJ. ENGR.PROJ. ENGR.PROJ. ENGR.
CONTENTSCONTENTSCONTENTSCONTENTS
APPROVEDAPPROVEDAPPROVEDAPPROVED
TITLETITLETITLETITLE
DATEDATEDATEDATE
SCALESCALESCALESCALE
SHEETSHEETSHEETSHEET OFOFOFOF
SPEC. NO.SPEC. NO.SPEC. NO.SPEC. NO.
INDEX NO.INDEX NO.INDEX NO.INDEX NO.
PROJ. NO.PROJ. NO.PROJ. NO.PROJ. NO. DRAWING NO.DRAWING NO.DRAWING NO.DRAWING NO. FILE NO.FILE NO.FILE NO.FILE NO.
96/CEG/CEN96/CEG/CEN96/CEG/CEN96/CEG/CEN
APPROVEDAPPROVEDAPPROVEDAPPROVED
DEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEER
APPROVEDAPPROVEDAPPROVEDAPPROVED
PROGRAM MANAGERPROGRAM MANAGERPROGRAM MANAGERPROGRAM MANAGER
APPROVEDAPPROVEDAPPROVEDAPPROVED
FIRE PREVENTIONFIRE PREVENTIONFIRE PREVENTIONFIRE PREVENTION
APPROVEDAPPROVEDAPPROVEDAPPROVED
SAFETY REPRESENTATIVESAFETY REPRESENTATIVESAFETY REPRESENTATIVESAFETY REPRESENTATIVE
APPROVEDAPPROVEDAPPROVEDAPPROVED
DIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICE
APPROVEDAPPROVEDAPPROVEDAPPROVED
USING AGENCYUSING AGENCYUSING AGENCYUSING AGENCY
APPROVEDAPPROVEDAPPROVEDAPPROVED
COMMUNICATIONSCOMMUNICATIONSCOMMUNICATIONSCOMMUNICATIONS
APPROVEDAPPROVEDAPPROVEDAPPROVED
OPERATIONS ENGINEERINGOPERATIONS ENGINEERINGOPERATIONS ENGINEERINGOPERATIONS ENGINEERING
APPROVEDAPPROVEDAPPROVEDAPPROVED
ENVIRONMENTALENVIRONMENTALENVIRONMENTALENVIRONMENTAL
91919191
APPROVEDAPPROVEDAPPROVEDAPPROVED
SECURITY FORCESSECURITY FORCESSECURITY FORCESSECURITY FORCES
APPROVEDAPPROVEDAPPROVEDAPPROVED
ASUSASUSASUSASUS
APPROVEDAPPROVEDAPPROVEDAPPROVED
CHELCOCHELCOCHELCOCHELCO
FTFA20CB73FTFA20CB73FTFA20CB73FTFA20CB73
RENOVATE SQUADRONRENOVATE SQUADRONRENOVATE SQUADRONRENOVATE SQUADRON
OPERATIONS AREA JSFOPERATIONS AREA JSFOPERATIONS AREA JSFOPERATIONS AREA JSF
HANGAR B1412HANGAR B1412HANGAR B1412HANGAR B1412
1/26/20211/26/20211/26/20211/26/2021
SSSS----102102102102
PARTIAL ROOF FRAMING PLANPARTIAL ROOF FRAMING PLANPARTIAL ROOF FRAMING PLANPARTIAL ROOF FRAMING PLAN
KLMKLMKLMKLM
BJBBJBBJBBJB
1/26/211/26/211/26/211/26/21 1/8" = 1'-0"S-102
PARTIAL FLOOR PLAN - NEW WORK OPERABLE
PARTITION
KEY PLAN
620AH
PLAN
NORTH
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
93936
SLAB ON GRADE
0"
NEW
OPENING
8" 6'-4" VERIFY W/ ARCH. 8"
7' - 8"
7'
V E
R
IF
Y W
/ A R
C H
EXISTING 8" CMU
WALL W/ VENEER
AT EXTERIOR FACE,
REMOVE AND REPLACE BRICK
VENEER AS REQUIRED TO INSTALL
NEW BRICK LINTEL AND FLASHING
AT EXTERIOR FACE, PROVIDE
BENT PLATE WITH BOLTS TO
HEADER; REFER TO 7/S-201
REFER TO SHEET S-301 FOR
SEQUENCING OF OPENING
MODIFICATION DETAILS
EXISTING WALL IS FULLY GROUT-
FILLED AT THIS LOCATION
S-201
Sim
CUT OPENINGS TO GROUT
FILL BLOCK AFTER REINF. HAS BEEN
INSTALLED AND INSPECTED.
CMU SUPPORT
BEAM BEYOND;
FIELD LOCATE
#6x3'-6" DOWELS;
DRILL AND EPOXY 8"
INTO EXISTING GROUT
FILLED BOND BEAM
#6x3'-6" DOWELS;
DRILL AND EPOXY 8"
INTO EXISTING
CONCRETE STEMWALL
#6 VERT. REINF. BAR CUT
INTO EXISTING CMU WALL
AND GROUT FILLED
EXTEND
REINFORCING TO
CENTERLINE OF
INTERIOR STEEL
BEAM WALL SUPPORT
AT APPROX. 12'-8"
EXISTING CONCRETE
STEMWALL
S-301
Sim
INFILL CMU;
REFER TO 1/S-301
SLAB ON GRADE
0"
NEW
OPENING
EXISTING
OPENING
EXISTING VENEER AND
EXTERIOR SYSTEM TO BE
REMOVED AND REPLACED
AS REQUIRED TO INSTALL
REQUIRED REINFORCING.
2' - 0" 12' - 0" VERIFY W/ ARCH.
+/- 16' - 0" O/O VENEER DEMO REQ'D
E X
IS
T
IN
G
O P
E N
IN
G
(F
IE
LD
V
E R
IF
Y
V E
R
IF
Y W
/ A R
C H
EXTENT OF FINISHED OPENING
(FIELD VERIFY)
EXIST. OPENING
3' - 4"
REMOVE AND REPLACE BRICK
VENEER AS REQUIRED TO INSTALL
NEW BRICK LINTEL,FLASHING AND REINF.
AT EXTERIOR FACE, PROVIDE
BENT PLATE WITH BOLTS TO
HEADER; REFER TO 7/S-201
BEAM BEYOND @12'-0" AFF
S-301
2' - 0"
S-201
EXISTING WALL
BEYOND
EXISTING COLUMN
BEYOND
SLAB ON GRADE
0"
7'
V E
R
IF
Y W
/ A R
C H
EXENT OF FINISHED OPENING
NEW
OPENING
EXISTING 8" CMU
WALL W/ VENEER
REFER TO SHEET S-301 FOR
SEQUENCING OF OPENING
MODIFICATION DETAILS
CUT OPENINGS TO GROUT
FILL BLOCK AFTER REINF. HAS BEEN
INSTALLED AND INSPECTED.
EXISTING CONCRETE
BOND BEAM
#6x3'-6" DOWELS;
DRILL AND EPOXY 8"
INTO EXISTING BEAM
#6x3'-6" DOWELS;
DRILL AND EPOXY 8"
INTO EXISTING
CONCRETE STEMWALL
#6 VERT. REINF. BAR CUT
INTO EXISTING CMU WALL
AND GROUT FILLED
EXISTING CONCRETE
STEMWALL
7' - 8" O/O DEMO
8" 6' - 4" CLR. OPENING 8"
EXISTING CONCRETE
STEMWALL TO REMAIN;
GRIND SMOOTH TO MATCH
ADJACENT FLOORS.
11'-4"
FIELD VERIFY (F.V.)
INFILL CMU;
REFER TO 1/S-301
SLAB ON GRADE
0"
EXIST.
OPENING
8"6' - 4" VERIFY W/ ARCH.
7' - 0" O/O DEMO
7'
V E
R
IF
Y W
/ A R
C H
EXTENT OF FINISHED OPENING
EXIST. JAMB REINF.
EXISTING GROUT-FILLED & REINF.
CELL. IF CELLS ARE NOT GROUT-FILLED
AND/OR REINFORCED, CONTRACTOR
SHALL PROVIDE DETAILS SIMILAR TO
UNFILLED JAMB DETAILS, INCLUDING
GROUT FILLING & REINFORCING
AS SHOWN IN THESE DRAWINGS
NEW
OPENING
EXISTING 8" CMU
WALL W/ VENEER
REFER TO SHEET S-301 FOR
SEQUENCING OF OPENING
MODIFICATION DETAILS
CUT OPENINGS TO GROUT
FILL BLOCK AFTER REINF. HAS BEEN
INSTALLED AND INSPECTED.
EXISTING CONCRETE
BOND BEAM FOR EXISTING
STEEL BEAM SUPPORT
#6x3'-6" DOWELS;
DRILL AND EPOXY 8"
INTO EXISTING BOND BEAM
#6x3'-6" DOWELS;
DRILL AND EPOXY 8"
INTO EXISTING
CONCRETE STEMWALL
#6 VERT. REINF. BAR CUT
INTO EXISTING CMU WALL
AND GROUT FILLED
FIELD VERIFY (F.V.)
+/- 9'-4"
B/EXISTING BOND BEAM
W-SHAPE WALL SUPPORT
BEAM BEYOND
INFILL CMU;
REFER TO 1/S-301
EXISTING CONCRETE
STEMWALL TO REMAIN;
GRIND SMOOTH TO MATCH
ADJACENT FLOORS.
EXISTING CONCRETE
STEMWALL
SLAB ON GRADE
0"
S-301
NEW
OPENING
CONC. JAMB W/GALV. CHANNEL;
REFER TO DETAIL
CUT OPENINGS TO GROUT
FILL BLOCK AFTER REINF. HAS BEEN
INSTALLED AND INSPECTED.
CONT. GROUT FILLED BOND
BEAM AND STEEL BEAM
BEYOND.
CONCRETE SLAB INFILL;
REFER TO DETAIL
2' - 0"
#7x4'-0" DOWELS;
DRILL AND EPOXY 8"
INTO EXISTING GROUT
FILLED BOND BEAM
#7x4'-0" DOWELS;
DRILL AND EPOXY 8"
INTO EXISTING GROUT
CONC. STEMWALL
#7 VERT. REINF. BAR CUT
INTO EXISTING CMU WALL
AND GROUT FILLED
#7x4'-0" DOWELS TOP
AND BOTTOM; DRILL AND EPOXY
8" INTO EXISTING NEWLY GROUT
FILLED AND REINFORCED HEADER BEAM
AND SLAB BELOW.
S-201
S-201
S-201
REFER TO SHEET S-301 FOR
SEQUENCING OF OPENING
MODIFICATION DETAILS
EXISTING CONCRETE
STEMWALL
1/
2"
3"
1/
2"
HOT DIP GALV. C8x11.5 W/
(2) 1/2"x6" HEADED SHEAR STUDS
MECHANICALLY WELDED AT
1'-4" O.C. MAX SPACING
#7 VERTICAL IN CENTER OF
CONC. FILL.
#3x1'-0" SINGLE
LEG TIE EPOXIED INTO
CMU WALL 6" LOCATED
AT 1'-4" O.C. VERTICALLY
CUT-IN VERTICAL REINF
AND GROUT FILL, SEE ELEVATION
1/
2"
F.V.
7 1/2"
HOLD
1/2"
8"
2"
CONT. HOT DIP GALV. 5/16" BENT P
x LENGTH OF OPENING +
4" BEARING EACH SIDE AT 6'-4" OPENINGS
8" BEARING EACH SIDE AT 12'-0" OPENINGS
L
5/8"Ø STAINLESS STEEL
THREADED RODS EPOXIED 5 3/4" INTO
GROUT-FILL HEADER @2'-0" O.C. PROVIDE S.S.
NUT AND WASHER
CONTRACTOR SHALL PROVIDE
SMOOTH FACE AT HEAD.
EXISTING CMU WALL
SUPPORT BEAM TO REMAIN
EXISTING VERTICAL REINFORCING TO
REMAIN WHERE FOUND; CHIP CAREFULLY
AROUND REINFORCING BARS IN GROUTED CELLS
1/
2"
1/
2"
GROUT FILL
REMOVE AND REPLACE VENEER AS REQUIRED TO
INSTALL FLASHING AND LINTEL; REFER TO ARCH.
FOR ADDITIONAL DETAILS.
D
EU
SOJ
R
EG ISTERE
REENIGNED
EPH ER
IL
SIUOL
ADIOLF R
STATE OF
No. 54319
ET
ACFIT
C
RE
I
REVISIONREVISIONREVISIONREVISION DATEDATEDATEDATE DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION BYBYBYBY APPR'DAPPR'DAPPR'DAPPR'D
BASE CIVIL ENGINEERBASE CIVIL ENGINEERBASE CIVIL ENGINEERBASE CIVIL ENGINEER
EGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDA
DATEDATEDATEDATE
SIGNATURESIGNATURESIGNATURESIGNATURE
APPROVEDAPPROVEDAPPROVEDAPPROVED
CENMCENMCENMCENM
DRAWN BYDRAWN BYDRAWN BYDRAWN BY
PROJ. ENGR.PROJ. ENGR.PROJ. ENGR.PROJ. ENGR.
CONTENTSCONTENTSCONTENTSCONTENTS
APPROVEDAPPROVEDAPPROVEDAPPROVED
TITLETITLETITLETITLE
DATEDATEDATEDATE
SCALESCALESCALESCALE
SHEETSHEETSHEETSHEET OFOFOFOF
SPEC. NO.SPEC. NO.SPEC. NO.SPEC. NO.
INDEX NO.INDEX NO.INDEX NO.INDEX NO.
PROJ. NO.PROJ. NO.PROJ. NO.PROJ. NO. DRAWING NO.DRAWING NO.DRAWING NO.DRAWING NO. FILE NO.FILE NO.FILE NO.FILE NO.
96/CEG/CEN96/CEG/CEN96/CEG/CEN96/CEG/CEN
APPROVEDAPPROVEDAPPROVEDAPPROVED
DEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEER
APPROVEDAPPROVEDAPPROVEDAPPROVED
PROGRAM MANAGERPROGRAM MANAGERPROGRAM MANAGERPROGRAM MANAGER
APPROVEDAPPROVEDAPPROVEDAPPROVED
FIRE PREVENTIONFIRE PREVENTIONFIRE PREVENTIONFIRE PREVENTION
APPROVEDAPPROVEDAPPROVEDAPPROVED
SAFETY REPRESENTATIVESAFETY REPRESENTATIVESAFETY REPRESENTATIVESAFETY REPRESENTATIVE
APPROVEDAPPROVEDAPPROVEDAPPROVED
DIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICE
APPROVEDAPPROVEDAPPROVEDAPPROVED
USING AGENCYUSING AGENCYUSING AGENCYUSING AGENCY
APPROVEDAPPROVEDAPPROVEDAPPROVED
COMMUNICATIONSCOMMUNICATIONSCOMMUNICATIONSCOMMUNICATIONS
APPROVEDAPPROVEDAPPROVEDAPPROVED
OPERATIONS ENGINEERINGOPERATIONS ENGINEERINGOPERATIONS ENGINEERINGOPERATIONS ENGINEERING
APPROVEDAPPROVEDAPPROVEDAPPROVED
ENVIRONMENTALENVIRONMENTALENVIRONMENTALENVIRONMENTAL
91919191
APPROVEDAPPROVEDAPPROVEDAPPROVED
SECURITY FORCESSECURITY FORCESSECURITY FORCESSECURITY FORCES
APPROVEDAPPROVEDAPPROVEDAPPROVED
ASUSASUSASUSASUS
APPROVEDAPPROVEDAPPROVEDAPPROVED
CHELCOCHELCOCHELCOCHELCO
FTFA20CB73FTFA20CB73FTFA20CB73FTFA20CB73
RENOVATE SQUADRONRENOVATE SQUADRONRENOVATE SQUADRONRENOVATE SQUADRON
OPERATIONS AREA JSFOPERATIONS AREA JSFOPERATIONS AREA JSFOPERATIONS AREA JSF
HANGAR B1412HANGAR B1412HANGAR B1412HANGAR B1412
1/26/20211/26/20211/26/20211/26/2021
SSSS----201201201201
WALL OPENING ELEVATIONSWALL OPENING ELEVATIONSWALL OPENING ELEVATIONSWALL OPENING ELEVATIONS
KLMKLMKLMKLM
BJBBJBBJBBJB
1/26/211/26/211/26/211/26/21
1/2" = 1'-0"S-201
1 WALL OPENING 1 (REINF. DIAGRAM) 1/2" = 1'-0"S-201
2 WALL OPENING 2 (NORTH ELEVATION)
1/2" = 1'-0"S-201
3 WALL OPENING 3 (EAST ELEVATION)
1/2" = 1'-0"S-201
4 WALL OPENING 4 (NORTH ELEVATION)
720AH
1/2" = 1'-0"S-201
5 WALL OPENING 2 (REINFORCING DIAGRAM)
1" = 1'-0"S-201
6 CHANNEL/CONC. JAMB DETAIL
1" = 1'-0"S-201
7 TYPICAL OPENING HEAD DETAIL
INSTALL NEW CMU REINFORCING IN WALLS FROM THE INTERIOR FACE AT THIS LOCATION
INSTALL NEW CMU REINFORCING IN WALLS FROM THE EXTERIOR FACE AT THIS LOCATION
COORDINATE WITH THE CONTRACTING OFFICER WHICH FACE TO CUT IN REINF.
AT THIS LOCATION.
INSTALL NEW CMU REINFORCING IN WALLS FROM THE INTERIOR FACE AT THIS LOCATION
0 1' 2' 4'
SCALE 1/2":1'-0"
6"
0 6" 1' 2'
SCALE 1":1'-0"
3"
93937
(1) #5 T&B
LINTEL REINF.
STEP 1
INSTALL OPENING REINFORCING
REFER TO S-201 FOR SIZES AND LOCATIONS
WALL OPENING; TYP.
EXTEND 24" BEYOND
A
A
SECTION A-A
0'-0"
FINISH FLOOR
0'-0"
FINISH FLOOR
EXISTING 8x8x16 OR 8x12x16 CMU TO
REMAIN; SAWCUT HORIZONTAL
SLOTS IN (2) CMU COURSES, INSERT
#5 REBAR INTO CUT COURSES,
INSERT PAPER GROUT PLUGS AND
GROUT SOLID COURSES. EXTEND
REBAR AND GROUT 24" EACH SIDE
OF NEW OPENING.
EXISTING CMU
SECTION B-B
0'-0"
FINISH FLOOR
AFTER GROUT CURES,
SAWCUT AND REMOVE
CMU BELOW LINTEL &
BETWEEN JAMBS.
EXISTING CMU
CUT SLOT IN CMU TO INSERT "N" JAMB
REINF. IN CENTER OF CELL AND GROUT
SOLID TYP. EACH SIDE OF OPENING
B
B
STEP 3
INSTALL JAMB BLOCKS AND REINFORCING;
REFER TO S-201 FOR SIZES AND LOCATIONS
DRILL & EPOXY; REFER
TO S-201
0'-0"
FINISH FLOOR
0'-0"
FINISH FLOOR
CC
SAWCUT
OPENING
SECTION C-C
TYP., U.N.O.
DRILL & EPOXY;
REFER TO S-201
ADD'L JAMB REINF.
CENTERED IN GROUT
FILLED CELLS.
STEP 2
DEMO WALL OPENING
LEAVE 4" SLOT
TO POUR
FINAL OPENING
DIMENSION "W" SEE ARCH.
F
IN
A L
O P
E N
IN
G
D
IM
E N
S
IO
N S
E E
A R
C H
FINAL OPENING
DIMENSION +16"**
F
IN
A L
O P
E N
IN
G
D
IM
E N
S
IO
N S
E E
A R
C H
FINAL OPENING
DIMENSION
F
IN
A L
O P
E N
IN
G
D
IM
E N
S
IO
N S
E E
A R
C H
8" ** 8" **
GROUT
PLUG
GROUT
PLUG
TOP OF NEW
OPENING
8"
EXISTING CMU
TOP OF NEW
OPENING
SILL REINF. DETAILS; REFER
TO S-201
VERTICAL REBAR
@ JAMB (CENTERED
IN WALL AT JAMB
BEYOND)
OPENING
WIDTH "W"
NUMBER OF
BARS "N"
WIDTH OF
JAMB "J"
0' TO 6'-4" 1#6 8"
12'-0"
"J" "J"
REFER TO DETAIL BELOW FOR
CLEAR DIMENSION REQUIREMENTS
IF EXISTING CELLS ARE FOUND
TO BE GROUT FILLED.
EXISTING STEEL GIRT
DETERMINE LOCATION IN FIELD
DRILL & EPOXY DOWEL INTO
EXISTING BOND BEAM. IF NO
BOND BEAM IS ENCOUNTERED,
EXTEND TO 14'-0" A.F.F. MINIMUM
IF GROUT-FILLED
CELLS ARE ENCOUNTERED
4" MIN.
6"
MINIMUM SLOT DIMENSIONS IF
CELLS ARE FOUND TO
BE GROUT-FILLED
PROVIDE MANUFACTURED
BULLNOSE CORNERS
1/
2"
1/ 2"
1#7 8"
8"
PROVIDE CLEAN AND SMOOTH
HEAD CONDITION.
WHERE GROUT FILLED AND
REINF. CELLS ARE
ENCOUNTERED DURING
CUTTING OF SLOTS, CAREFULLY
CHIP AROUND EXISTING
REINFORCING TO PROVIDE
SLOTS, DO NOT CUT REINF.
** REFER 4/S-201 WHERE EXISTING JAMB
REINFORCING IS TO REMAIN. DO NOT
OVERCUT EXISTING JAMB SIDE OF
OPENING AT THIS LOCATION.
#3x1'-0" SINGLE
LEG TIE EPOXIED INTO
CMU WALL 6" LOCATED
AT 1'-4" O.C. VERTICALLY
CENTER VERTICAL IN GROUTED
CELLS; TYPICAL
REFER TO S-201 WHERE
STEMWALL DEMO IS REQ'D
REFER TO S-201 FOR ADD'L DETAILS
EXISTING EXTERIOR
CONCRETE SLAB
NEW ROLL-UP DOOR
(SEE ARCH.)
EXISTING CONCRETE
STEMWALL
F .V
5"
F.V.
1' - 4 1/2"
NEW CONCRETE THRESHOLD
@ NEW DOOR; SLOPE SILL TO MATCH
EXISTING ELEVATIONS
CLR.
2"
C
LR
2"
CLEAN SURFACE & APPLY BOND BREAKER
DRILL & EPOXY
#4 CONT.
DEMO EXIST. CONC.
DO NOT CUT REINF.
EXIST. REINF. TO REMAIN
8 1/2"
#3 @12"
CLR.
2 1/2"
6"
12"
0" N
T S
1/2" MINIMUM (MATCH EXISTING) JOINT FILLER
WITH CAULK JOINT.
3/4"x10" SMOOTH DOWELS @1'-0" O.C.;
DRILL INTO EXISTING SLAB AND GREASE.
LOCATE IN CENTER OF SLAB.
SLOPE
D
EU
SOJ
R
EG ISTERE
REENIGNED
EPH ER
IL
SIUOL
ADIOLF R
STATE OF
No. 54319
ET
ACFIT
C
RE
I
REVISIONREVISIONREVISIONREVISION DATEDATEDATEDATE DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION BYBYBYBY APPR'DAPPR'DAPPR'DAPPR'D
BASE CIVIL ENGINEERBASE CIVIL ENGINEERBASE CIVIL ENGINEERBASE CIVIL ENGINEER
EGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDA
DATEDATEDATEDATE
SIGNATURESIGNATURESIGNATURESIGNATURE
APPROVEDAPPROVEDAPPROVEDAPPROVED
CENMCENMCENMCENM
DRAWN BYDRAWN BYDRAWN BYDRAWN BY
PROJ. ENGR.PROJ. ENGR.PROJ. ENGR.PROJ. ENGR.
CONTENTSCONTENTSCONTENTSCONTENTS
APPROVEDAPPROVEDAPPROVEDAPPROVED
TITLETITLETITLETITLE
DATEDATEDATEDATE
SCALESCALESCALESCALE
SHEETSHEETSHEETSHEET OFOFOFOF
SPEC. NO.SPEC. NO.SPEC. NO.SPEC. NO.
INDEX NO.INDEX NO.INDEX NO.INDEX NO.
PROJ. NO.PROJ. NO.PROJ. NO.PROJ. NO. DRAWING NO.DRAWING NO.DRAWING NO.DRAWING NO. FILE NO.FILE NO.FILE NO.FILE NO.
96/CEG/CEN96/CEG/CEN96/CEG/CEN96/CEG/CEN
APPROVEDAPPROVEDAPPROVEDAPPROVED
DEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEER
APPROVEDAPPROVEDAPPROVEDAPPROVED
PROGRAM MANAGERPROGRAM MANAGERPROGRAM MANAGERPROGRAM MANAGER
APPROVEDAPPROVEDAPPROVEDAPPROVED
FIRE PREVENTIONFIRE PREVENTIONFIRE PREVENTIONFIRE PREVENTION
APPROVEDAPPROVEDAPPROVEDAPPROVED
SAFETY REPRESENTATIVESAFETY REPRESENTATIVESAFETY REPRESENTATIVESAFETY REPRESENTATIVE
APPROVEDAPPROVEDAPPROVEDAPPROVED
DIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICE
APPROVEDAPPROVEDAPPROVEDAPPROVED
USING AGENCYUSING AGENCYUSING AGENCYUSING AGENCY
APPROVEDAPPROVEDAPPROVEDAPPROVED
COMMUNICATIONSCOMMUNICATIONSCOMMUNICATIONSCOMMUNICATIONS
APPROVEDAPPROVEDAPPROVEDAPPROVED
OPERATIONS ENGINEERINGOPERATIONS ENGINEERINGOPERATIONS ENGINEERINGOPERATIONS ENGINEERING
APPROVEDAPPROVEDAPPROVEDAPPROVED
ENVIRONMENTALENVIRONMENTALENVIRONMENTALENVIRONMENTAL
91919191
APPROVEDAPPROVEDAPPROVEDAPPROVED
SECURITY FORCESSECURITY FORCESSECURITY FORCESSECURITY FORCES
APPROVEDAPPROVEDAPPROVEDAPPROVED
ASUSASUSASUSASUS
APPROVEDAPPROVEDAPPROVEDAPPROVED
CHELCOCHELCOCHELCOCHELCO
FTFA20CB73FTFA20CB73FTFA20CB73FTFA20CB73
RENOVATE SQUADRONRENOVATE SQUADRONRENOVATE SQUADRONRENOVATE SQUADRON
OPERATIONS AREA JSFOPERATIONS AREA JSFOPERATIONS AREA JSFOPERATIONS AREA JSF
HANGAR B1412HANGAR B1412HANGAR B1412HANGAR B1412
1/26/20211/26/20211/26/20211/26/2021
SSSS----301301301301
SECTIONS & DETAILSSECTIONS & DETAILSSECTIONS & DETAILSSECTIONS & DETAILS
KLMKLMKLMKLM
BJBBJBBJBBJB
1/26/211/26/211/26/211/26/21
3/4" = 1'-0"S-301
1 NEW OPENING IN CMU WALL
1" = 1'-0"S-301
2 SECTION @ OVERHEAD DOOR THRESHOLD
20AH
0 6" 1' 2'
SCALE 3/4":1'-0"
4'
0 6" 1' 2'
SCALE 1":1'-0"
3"
93938
H S
S x4 x1
/4
H A
N G
E R
H S
S 4x4x1/4" B R
A C
E
W-SHAPE PARTITION
BEAM; SEE PLAN
EX-W16X50
30.00°
S-302
11'-2" A.F.F.
3/8" GUSSET P (TYP.)L
3/8" GUSSET PL
3/16 4
TYP. (4)
SIDES
FABRICATOR COORDINATE
HOLES AS REQUIRED BY DOOR MFR.
FINAL SHOP DRAWINGS; TYPICAL
3/16
3/16
TYP.
TYP.
2" MIN.
G F
S-302
H
SS
x4 x1 /4
" B R
A C
E
L5x5x5/16" BRACING ANGLE
TO ADJACENT JOISTS
WITH 3/8"x6x6 GUSSET FOR
BRACE CONNECTION
L2x2x3/16" BRACING ANGLE
AND DIAGONAL STRUT TO
JOIST PANEL POINT.
CONTRACTOR COORDINATE FINAL HOLE LAYOUTS WITH OPERABLE WALL MFR.
W10X33
H S
S 4X
4X 1/
4 H S
S 4X
4X 1/
EXISTING 14 K
BAR JOISTS TO REMAIN
EXISTING ROOF
DECK; TO REMAIN
EX-W16X50
EX-W16X50
3/8" GUSSET P (TYP.)L
3/8" GUSSET PL
3/16 4
TYP.
3/8" GUSSET P (TYP.)L
30.00°
3/16
1/8 2
1/8 2
TYP.
3/16 4
3/16 4
TYP.
3/16 4
3/16 4
TYP.
A
1' - 6" * 1' - 6" **
* EXISTING DOOR OPENING TO
EDGE/EXISTING CANOPY. FIELD VERIFY.
** EXISTING DOOR OPENING TO
NEW END/CANOPY.
HSS16x4x5/16
C8x11.5
H S
S x2 x3
/1
EXISTING DOOR OPENING
S-302 S-201
DEMO EXISTING CANOPY FRAMING & DIAGONAL SUPPORTS
9' - 4" FIELD VERIFY
H S
S x2 x3
/1
L3 x3 x3 /1
L3 x3 x3 /1
L3x3x3/16
1 1/2" PIPE BRACE
TYP. (2) PLACES
P1/2" P1/2"L
L
ALL STEEL FRAMING & FASTENERS
SHALL BE HOT-DIPPED GALVANIZED, U.N.O.
CAP END & GRING
SMOOTH W/ 1/4"
PLATE (TYP.)
1.5 20 GA. VULCRAFT
METAL DECK OR EQUIV.
FASTEN TO SUPPORTS:
(2) #12 SCREWS @6" O.C.
FASTEN SIDELAPS:
#10 SCREWS @12" O.C.
HSS16x5
L3x3
HSS12x2 C8
P1/2"x3"L
3"
3/4"Ø THRU BOLT
3/16 3
3/16 3
1 1/2"Ø STANDARD PIPE
BRACE (SEE PLAN)
3/4"Ø THRU BOLT 5"
3"
TYP.
BRICK VENEER (E)
REMOVE & REPLACE BRICK VENEER
ONLY AS REQUIRED TO MAKE
CONNECTION (COORD. W/ ARCH.)
P1/2"x3"L
3/16
TYP.
HSS4x4x1/4
EXISTING REINFORCED BOND BEAM (FIELD
VERIFY LOCATION - NOTIFY STRUCTURAL
EOR IF NONE EXISTS)
P1/2"x6"x1'-0"L
1'
2" 2"
(2)3/4"Ø STAINLESS STEEL THREADED RODS
EPOXIED INTO GROUT-FILL CMU &
EMBED. 5 5/8" MINIMUM
CUT IN 2'-0"x2'-0" MIN. W/ 4" MIN.
GROUT EA. SIDE OF ANCHORS
3" 3"
4" 4"
6"
5'
/2
1'
1/
2"
1/ 2"
8"
4" 4"
1 1/2" 1 1/2"
P1/2"x8"x1'-2"L
(4)3/4"Ø STAINLESS STEEL
THREADED ROD EPOXIED
INTO GROUT FILLED CMU
EMBED MIN. 5 5/8"
3/16
S-302
4' - 8 3/8"
L4x3 1/2x3/8 W/
(2) 3/4"Ø BOLTS
SHOP WELD TO HSS
3 1/2"
METAL
DECK
3/16
TYP.
GRIND
SMOOTH 3/16
3 SIDES
3/16 2@12
TYP
3/16 3
3/16 3
HSS12x2
3" 4"
SLOTTED END
3/4"Ø THRU BOLT
P1/2"L
5"
HSS16x4
D
EU
SOJ
R
EG ISTERE
REENIGNED
EPH ER
IL
SIUOL
ADIOLF R
STATE OF
No. 54319
ET
ACFIT
C
RE
I
REVISIONREVISIONREVISIONREVISION DATEDATEDATEDATE DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION BYBYBYBY APPR'DAPPR'DAPPR'DAPPR'D
BASE CIVIL ENGINEERBASE CIVIL ENGINEERBASE CIVIL ENGINEERBASE CIVIL ENGINEER
EGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDAEGLIN AIR FORCE BASE, FLORIDA
DATEDATEDATEDATE
SIGNATURESIGNATURESIGNATURESIGNATURE
APPROVEDAPPROVEDAPPROVEDAPPROVED
CENMCENMCENMCENM
DRAWN BYDRAWN BYDRAWN BYDRAWN BY
PROJ. ENGR.PROJ. ENGR.PROJ. ENGR.PROJ. ENGR.
CONTENTSCONTENTSCONTENTSCONTENTS
APPROVEDAPPROVEDAPPROVEDAPPROVED
TITLETITLETITLETITLE
DATEDATEDATEDATE
SCALESCALESCALESCALE
SHEETSHEETSHEETSHEET OFOFOFOF
SPEC. NO.SPEC. NO.SPEC. NO.SPEC. NO.
INDEX NO.INDEX NO.INDEX NO.INDEX NO.
PROJ. NO.PROJ. NO.PROJ. NO.PROJ. NO. DRAWING NO.DRAWING NO.DRAWING NO.DRAWING NO. FILE NO.FILE NO.FILE NO.FILE NO.
96/CEG/CEN96/CEG/CEN96/CEG/CEN96/CEG/CEN
APPROVEDAPPROVEDAPPROVEDAPPROVED
DEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEERDEPUTY BASE CIVIL ENGINEER
APPROVEDAPPROVEDAPPROVEDAPPROVED
PROGRAM MANAGERPROGRAM MANAGERPROGRAM MANAGERPROGRAM MANAGER
APPROVEDAPPROVEDAPPROVEDAPPROVED
FIRE PREVENTIONFIRE PREVENTIONFIRE PREVENTIONFIRE PREVENTION
APPROVEDAPPROVEDAPPROVEDAPPROVED
SAFETY REPRESENTATIVESAFETY REPRESENTATIVESAFETY REPRESENTATIVESAFETY REPRESENTATIVE
APPROVEDAPPROVEDAPPROVEDAPPROVED
DIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICEDIR. BASE. MED. SERVICE
APPROVEDAPPROVEDAPPROVEDAPPROVED
USING AGENCYUSING AGENCYUSING AGENCYUSING AGENCY
APPROVEDAPPROVEDAPPROVEDAPPROVED
COMMUNICATIONSCOMMUNICATIONSCOMMUNICATIONSCOMMUNICATIONS
APPROVEDAPPROVEDAPPROVEDAPPROVED
OPERATIONS ENGINEERINGOPERATIONS ENGINEERINGOPERATIONS ENGINEERINGOPERATIONS ENGINEERING
APPROVEDAPPROVEDAPPROVEDAPPROVED
ENVIRONMENTALENVIRONMENTALENVIRONMENTALENVIRONMENTAL
91919191
APPROVEDAPPROVEDAPPROVEDAPPROVED
SECURITY FORCESSECURITY FORCESSECURITY FORCESSECURITY FORCES
APPROVEDAPPROVEDAPPROVEDAPPROVED
ASUSASUSASUSASUS
APPROVEDAPPROVEDAPPROVEDAPPROVED
CHELCOCHELCOCHELCOCHELCO
FTFA20CB73FTFA20CB73FTFA20CB73FTFA20CB73
RENOVATE SQUADRONRENOVATE SQUADRONRENOVATE SQUADRONRENOVATE SQUADRON
OPERATIONS AREA JSFOPERATIONS AREA JSFOPERATIONS AREA JSFOPERATIONS AREA JSF
HANGAR B1412HANGAR B1412HANGAR B1412HANGAR B1412
1/26/20211/26/20211/26/20211/26/2021
SSSS----302302302302
SECTIONS & DETAILSSECTIONS & DETAILSSECTIONS & DETAILSSECTIONS & DETAILS
KLMKLMKLMKLM
BJBBJBBJBBJB
1/26/211/26/211/26/211/26/21
3/4" = 1'-0"S-302
1 SECTION THROUGH SUPPORT BEAM3/4" = 1'-0"S-302
2 PARTITION BEAM ELEVATION DETAIL
3/8" = 1'-0"S-302
3 DOOR CANOPY PLAN
3/4" = 1'-0"S-302
4 SECTION THRU CANOPY
20AH
1 1/2" = 1'-0"S-302
5 CANOPY CONNECTION DETAIL
0 6" 1' 2'
SCALE 3/4":1'-0"
4'
0 3" 6" 1'
SCALE 1-1/2":1'-0"
2'
0 1' 2' 4'
SCALE 3/8":1'-0"
8'
93939
ABBREVIATIONS
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PVC POLYVINYL CHOLORIDE
R RADIUS, RANGE, RISER
RCP REFLECTED CEILING PLAN
RD REINFORCING STEEL BARS REBAR
REF REFERENCE, REFRIGERATOR
REG REGISTER
REINF REINFORCE
RET RETURN
REV REVISION
RH RIGHT HAND
RM ROOM
ROW RIGHT OF WAY
SC SOLID CORE
SCHED SCHEDULE
SD STORM DRAIN
SECT SECTION
SF SQUARE FOOT(FEET)
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
SS SERVICE SINK
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPEND
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TE TOP ELEVATION
TEL TELEPHONE
TOC TOP OF CONCRETE
TOS TOP OF SLAB, TOP OF STEEL
TV TELEVISION
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VTR VENT THROUGH ROOF
W WASHER, WEST, WIDE
W/ WITH
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WH WATER HEATER
WP WATERPROOFING
WSCT WAINSCOT
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT, ADJOINING, ADJUSTABLE
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
BD BOARD
BLDG BUILDING
BOT BOTTOM
BRG BEARING
BRG PL BEARING PLATE
BUR BUILT-UP ROOFING
CF/CI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CF/GI CONTRACTOR FURNISHED/
GOVERNMENT INSTALLED
CID COMPREHENSIVE INTERIOR
DESIGN PACKAGE
CIP CAST-IN-PLACE, CAST IRON PIPE
CJ CONSTRUCTION JOINT/CONTROL
JOINT
CL CENTER LINE, CLASS, CLOSE
CLG CEILING
CLR CLEAR, COLOR, COOLER
CMU CONCRETE MASONRY UNIT
CPT CARPET
COL COLUMN
CONC CONCRETE
CONT CONTINUE, CONTINUOUS
CONTR CONTRACT, CONTRACTOR
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
COTR CONTRACTING OFFICER
TECHNICAL REPRESENTATIVE
CU FT CUBIC FEET
CU YD CUBIC YARD
D DRYER
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWS EYE WASH STATION
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF EL FINISH FLOOR ELEVATION
FIN GR FINISH GRADE
FLR FLOOR
FP FIREPROOF
FT FEET, FOOT
FTG FOOTING
GA GAGE
GALV GALVANIZED IRON
GB GRAB BAR
GC GENERAL CONTRACTOR
GF/GI GOVERNMENT FURNISHED/
GOVERNMENT INSTALLED
GF/CI GOVERNMENT FURNISHED/
CONTRACTOR INSTALLED
GL GLASS
GLZ GLAZING
GMS GALVANIZED METAL STUD
GYP BD GYPSUM BOARD
HB HOSE BIBB
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATING/AIR COND
IBC INTERNATIONAL BUILDING CODE
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
LAM LAMINATE
LAV LAVATORY
LH LEFT HAND
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MS MOP SINK
MT MOUNT
MTD MOUNTED
MTG MEETING
MTL METAL
MW MICROWAVE
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .