Attachment 2 - Engine Startup Procedures.pdf
PDF 261 KB Posted
- Attached to
- REQUEST FOR INFORMATION
- Solicitation number
- N3220524R4087
About this file
This is a detailed diesel engine maintenance start-up readiness assessment checklist used by Military Sealift Command (MSC) for their vessel operations. The checklist outlines specific procedures to be completed at 72 hours, 48 hours, and 24 hours prior to engine startup, as well as pre-start requirements.
The checklist covers comprehensive safety and operational verification steps including: verification of fire/smoke detection systems, lockout/tag out clearance, exhaust system integrity, tank closures, firefighting systems readiness, damage control equipment availability, ventilation checks, and fluid level inspections. Key technical checks include engine oil levels, cooling water systems, fuel oil transfers, purifier operations, emergency systems testing, and final safety verifications. The document requires sign-off from both the Chief Engineer and Port Engineer before engine startup can commence, with specific requirements for notifying the Master and documenting any incidents. The checklist is part of MSC's Safety Management Procedures Manual (Rev 0.2, dated July/March 2022) and applies to both regular maintenance start-ups and dormant start-up situations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIESEL ENGINE MAINTENANCE START-UP READINESS
ASSESSMENT
USNS/USS ________________________ Hull No: _______
Diesel Engine Examined for Start-up: ____________________________________
Port / Shipyard: __________________________ Date: ________
Military Sealift Command, Government Operations Safety Management Procedures Manual
Rev 0.2 23 Jul 2022
1st Asst Engineer End of evolution plus 30 days without incident (1 year if incident occurs) Eng Files
Checklist 10.10-002-01-ALL Diesel Engine Maintenance Start-up Readiness Assessment Page 1 of 2
72 Hours (notional) Prior to Dock Trial (Machinery Space Turnover) Verification received from Contractor / Tech Rep that all work is complete and Engine is ready and safe to start. (Only required if OEM maintenance and repair was accomplished. Otherwise skip this check.)
Verify machinery space fire and smoke detection systems are operational.
Verify all Lockout / Tag out locks / tags are cleared IAW SMS 2.1-004-ALL “Lockout /
Tag out.”
Verify that diesel exhaust systems are intact and no fire hazards exist in the uptake spaces.
Verify all tanks in the machinery spaces are closed.
Verify all machinery space doors are operating correctly including any installed door closers.
Verify fixed, semi-portable and portable firefighting systems are certified and operational.
Verify Damage Control Locker and equipment are available.
Verify that all machinery space reach rods and remote pull stations are functional and operable where fitted.
Verify all hoses, staging, covers, rigging, etc., temporarily installed in support of ship maintenance and repair, are removed from the machinery spaces.
Verify that machinery space supply and exhaust ventilation and fire dampers are functioning properly.
Verify that all installed engine hoses have been checked for wear and compliance with
SAMM PM/PMIA requirements.
48 Hours (notional) Prior to Startup
Check engine oil level in sump.
Check governor oil level.
Check cooling water level.
Check central fresh water treatment and level.
Check oil levels in reduction gear, lineshaft bearings and thrust bearing sumps as applicable.
Verify fuel oil lines on engine are secure.
Transfer fuel oil from storage tanks to settler.
Take a watercut on the fuel oil service tanks/day tanks.
Verify all engine filters cleaned or renewed.
24 Hours (notional) Prior to Startup
Remove stack covers.
Walk around the engine and check for leaks on and under the engine.
Verify 115V / 24VDC control voltage available.
Perform lamp test locally and at EOS console.
Diesel Engine Maintenance Start-up and Dormant Start-up Readiness Assessment
(One Checklist per Diesel Engine)
Military Sealift Command, Government Operations Safety Management Procedures Manual
Rev 0.2 31 Mar 2022
Chief Engineer End of evolution plus 30 days without incident (1 year if incident occurs) Eng Files
Checklist 10.10-002-01-ALL Diesel Engine Maintenance Start-up and Dormant Start-up Readiness Assessment
Run the lube oil and fuel oil purifiers on sumps and service tanks.
Run auxiliary systems; check pressures and temperatures.
Verify auto start of standby pumps.
Verify machinery space bilges are clean with no accumulations of liquids or debris.
Conduct onboard LO testing IAW MSC QMS N0712-005.00-AQ LO Sampling and
Analysis, Section 3.3.3 for idle machinery.
Pre-Start
Check oil level in sumps.
Check head tank levels.
Disengage barring gear.
Review USCG Periodic Safety Test Plan (PSTP) and verify that all engine related safety and alarm features are functioning properly.
Verify that salt water cooling / fresh water cooling systems and heat exchangers are on-line and operational.
Verify that lube oil service pumps / lube oil service system are functional.
Verify that lube oil purifiers are operating properly.
Verify that fuel oil service pumps / fuel oil service system are functional.
Verify that fuel oil purifiers are operating properly.
Verify that compressed air / start air systems are functional.
Obtain wheel clearance from the bridge Verify that the shaft(s) are clear of any obstructions Stop all fuel transfers.
Test sliding watertight doors.
Verify EDG is available and ready; test run off line.
Check local emergency stop.
Check remote emergency stop.
Open all Engine cocks and roll the engine.
Chief Engineer to notify Master and Port Engineer that start-up readiness assessment has been completed for all prime movers, and associated support systems and that machinery is ready / not-ready for start-up.
Master to provide concurrence for start-up or not and conveys same to Type Desk and PM for information.
Chief Engineer Port Engineer