Attachment 2 - ELINs Hampton Roads Utilities Distribution Systems IDIQ Contract.xlsx

XLSX spreadsheet 250 KB Posted

Attached to
N4008525B2505 Regional Indefinite Delivery Indefinite Quantity (IDIQ) Construction Maintenance Contract for Utilities Distribution Systems for Hampton Roads Region, Virginia
Solicitation number
N4008525B2505
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

CONTRACT SUMMARY

BASE YEAR
OPTION 1
OPTION 2
OPTION 3
OPTION 4

TOTAL CONTRACT

Base Year

Solicitation No. TBD
INDEFINITE QUANTITY CONSTRUCTION CONTRACT FOR:
CONSTRUCTION MAINTENANCE AND REPAIR OF UTILITY DISTRIBUTION SYSTEMS
(Repair and Replacement of Steam Distribution, Sewer, Storm Drain, Oily Water Waste Oil (OWWO),
Rehabilitation of Lines, Fresh Water, Salt Water, Compressed Air, Natural Gas, and LPG (Propane) Distribution Systems)

Work shall include sustainability efforts to minimize environmental impacts. The Contractor shall provide all labor, materials, equipment, tools, facilities, transportation, incidental engineering, supervision, safety, safety measures including gas free certification for all confined spaces, surveys, scoping, layout work, testing, and management necessary to fulfill the requirements of this contract and each task order issued by the Contracting Officer in a timely manner with safety as a high priority and quality work as a final product to provide the services outlined below and described in this Performance Work Statement (PWS).

This is an Indefinite Quantity contract to provide maintenance, inspection, cleaning, painting, repair, testing, and replacement of various utility systems located outside of facilities and buildings, inside of facilities and buildings where connected to the building systems, under facilities and buildings, underground, above ground, above piers, on piers, under piers, inside double deck piers, in trenches, in manholes and pits, in valve pits, in wet wells, and in pump station facilities and in accordance with the bid schedule or as negotiated non-prepriced work, and including but not limited to: steam and condensate distribution including pre-engineered, pre-manufactured and pre-insulated conduit systems and pre-insulated conduit systems, sanitary sewage collection systems, sanitary sewage distribution systems, storm water drainage systems, rehabilitation of lines, water tanks, fire protection water systems, hydrants, water distribution systems, oily water - waste oil (OWWO) collection and distribution systems, compressed air distribution systems, natural gas distribution systems, and propane distribution systems, road and sidewalk repairs, valves, control valves, relief valves, strainers, piping accessories, pumps, pump stations, motors, manholes, wet wells, controls, and structural and pipe supports, including all related appurtenances and incidental work. Work shall include all necessary permits. Electrical specifications also apply to all Electrical work performed.

REFER TO THE LINE ITEM DESCRIPTION TAB FOR ADDITIONAL DESCRIPTIVE
INFORMATION ABOUT THE ELINS BELOW
EXHIBIT A, EXHIBIT LINE ITEMS
SCHEDULE OF PRICES FOR SUPPLIES/SERVICES
ELINDescriptionEst. QtyUnitUnit PriceTotal Price

INDEFINITE QUANTITY (IQ) WORK ITEMS - BASE YEAR - CLIN 0001

A01ABOVE GROUND STEAM DISTRIBUTION
Work includes utility tunnels, manholes, on piers, below piers, in double decker piers. Confine space inspection includes gas free, time limits in confined space, confined space procedures, cool air, protective suits respirators, work shields, safety procedures , proper hydration, etc.
A01.01EXPANSION JOINTS (For above ground steam and Condensate lines)
Gun Pak type expansion joints are externally pressurized stainless steel bellows type, ASME Code stamped -Exterior Aboveground Steam Distribution. Work includes inspection and replacement.
A01.01.01Replace 2” single bellows expansion joint with welded ends and anchor base.6EA$ - 0$ - 0
A01.01.02Replace 2” double bellows expansion joint with welded ends and anchor base.6EA$ - 0$ - 0
A01.01.03Replace 3” single bellows expansion joint with welded ends and anchor base.5EA$ - 0$ - 0
A01.01.04Replace 3” double bellows expansion joint with welded ends and anchor base.5EA$ - 0$ - 0
A01.01.05Replace 4” single bellows expansion joint with welded ends and anchor base.8EA$ - 0$ - 0
A01.01.06Replace 4” double bellows expansion joint with welded ends and anchor base.9EA$ - 0$ - 0
A01.01.07Replace 5” or 6” single bellows expansion joint with welded ends and anchor base.9EA$ - 0$ - 0
A01.01.08Replace 5” or 6” double bellows expansion joint with welded ends and anchor base.9EA$ - 0$ - 0
A01.01.09Replace 8” single bellows expansion joint with welded ends and anchor base.5EA$ - 0$ - 0
A01.01.10Replace 8” double bellows expansion joint with welded ends and anchor base.7EA$ - 0$ - 0
A01.01.11Replace 10” single bellows expansion joint with welded ends and anchor base.6EA$ - 0$ - 0
A01.01.12Replace 10” double bellows expansion joint with welded ends and anchor base.6EA$ - 0$ - 0
A01.01.13Replace 12" single bellows expansion joint with welded ends and anchor base6EA$ - 0$ - 0
A01.01.14Replace 14" single bellows expansion joint with welded ends and anchor base6EA$ - 0$ - 0
A01.02VALVES (For Steam and Condensate Service)
Work includes inspection, replacement, and adjustment.
A01.02.01Replace 2” thru 3” 150# flanged or welded steel gate, globe or check valves.70EA$ - 0$ - 0
A01.02.02Replace 4” 150# steel flanged gate, check, or globe valves.35EA$ - 0$ - 0
A01.02.03Replace 5” thru 6” 150# flanged steel gate, globe or check valves.30EA$ - 0$ - 0
A01.02.04Replace 8” 150# flanged steel gate, check, or globe valves.13EA$ - 0$ - 0
A01.02.05Replace 10” thru 12” 150# flanged steel gate, globe or check valves.11EA$ - 0$ - 0
A01.02.06Replace 14” 150# flanged gate, globe or check valves.2EA$ - 0$ - 0
A01.02.07Replace 16” 150# flanged steel gate, globe or check valves2EA$ - 0$ - 0
A01.02.08Replace steam pressure regulating valve, 2” - 4” 150# or 300# class, 150# to 15#.8EA$ - 0$ - 0
A01.02.09Replace steel safety relief valve, Type III, Class 10, Style D or E with 150# class flanges flanged end connections 4” x 6” - Orifice size 6.379 sq. in2EA$ - 0$ - 0
A01.02.10Replace steel safety relief valve, Type III, Class 10, Style D or E with 150# class flanges flanged end connections 6” x 8” - Orifice size 11.05 sq. in2EA$ - 0$ - 0
A01.02.11Replace 1/4 thru 3/4” 125# or 200# bronze/steel threaded gate, check, globe valves40EA$ - 0$ - 0
A01.02.12Replace 1” thru 1 -1/2” 125# or 200# bronze/steel threaded gate, check, globe valves52EA$ - 0$ - 0
A01.02.13Replace 2” thru 3” 200# bronze threaded gate, check or globe valves8EA$ - 0$ - 0
A01.03FLANGES
These are flat face flanges for steam and condensate service.
A01.03.01Replace 1-13/4” 150# screwed or slip on flange with 1’ of pipe36EA$ - 0$ - 0
A01.03.02Replace 2” thru 3” 150# screwed or slip on flange with 1’ of pipe28EA$ - 0$ - 0
A01.03.03Replace 2” thru 3” 300# slip on flange with 1’ of pipe4EA$ - 0$ - 0
A01.03.04Replace 4” thru 6” 150# screwed or weld or slip on flange with 1’ of pipe39EA$ - 0$ - 0
A01.03.05Replace 4” thru 6” 300# screwed or weld flange with 1’ of pipe18EA$ - 0$ - 0
A01.03.06Replace 8” 150# screwed or weld flange with 1’ of pipe12EA$ - 0$ - 0
A01.03.07Replace 8” 300# screwed or weld flange with 1’ of pipe4EA$ - 0$ - 0
A01.03.08Replace 10” 150# weld flange with 1’ of pipe6EA$ - 0$ - 0
A01.03.09Replace 10” 300# weld flange with 1’ of pipe4EA$ - 0$ - 0
A01.03.10Replace 12” 150-300# weld flange with 1’ of pipe4EA$ - 0$ - 0
A01.04GASKETS
Flat face gaskets for steam and condensate service.
A01.04.01Replace 2” thru 3” flange, flexitallic or bonnet gaskets55EA$ - 0$ - 0
A01.04.02Replace 4” thru 8” flange, flexitallic or bonnet gaskets43EA$ - 0$ - 0
A01.04.03Replace 10” thru 12” flange, flexitallic or bonnet gaskets20EA$ - 0$ - 0
A01.04.04Replace 14” thru 16” flange, flexitallic or bonnet gaskets12EA$ - 0$ - 0
A01.05WELDS
Welding Pressure Piping, Certified ASME welder, Cost includes shutting down steam system, preparation, preparing pipe, inspection, set up, certified procedure, remove defect, welding, inspect, inspect weld by certified inspector - certified inspection procedure (ultrasonic method), pass or fail - if failed do over - put stamp on weld, test system, start-up, and clean-up.
A01.05.01Repair welds including window welds on 1-1/2” thru 6” pipe, Weld length: full pipe circumference40EA$ - 0$ - 0
A01.05.02Repair welds including window welds on 8” thru 12” pipe, Weld length: full pipe circumference60EA$ - 0$ - 0
A01.05.03Repair welds including window welds on 14” thru 16” pipe, Weld length: full pipe circumference3EA$ - 0$ - 0
A01.06STEAM & CONDENSATE PIPE, ABOVE GROUND
Steam and Condensate Service Piping - Work includes remove existing pipe and provide new pipe. Welded pressure pipe, welds inspected by certified inspector - ultrasonic method
A01.06.01Replace 1/4” thru 1-1/2” welded or threaded pipe600FT$ - 0$ - 0
A01.06.02Replace 2” thru 2-1/2” welded or threaded pipe600FT$ - 0$ - 0
A01.06.03Replace 3” thru 5” welded or threaded pipe600FT$ - 0$ - 0
A01.06.04Replace 6” thru 8” welded or threaded pipe600FT$ - 0$ - 0
A01.06.05Replace 10” thru 12” welded or threaded pipe350FT$ - 0$ - 0
A01.06.06Replace 14” thru 16” welded pipe40FT$ - 0$ - 0
A01.07STEAM AND CONDENSATE PIPE, ABOVE GROUND, PRE-ENGINEERED, PRE-FABRICATED, PRE-INSULATED ABOVE GROUND
Steam and Condensate Service Piping - Work includes remove existing pipe and provide new complete system - metal jacketed (spiral wound, lock seamed type, internal seam, and air and water tight), pre-engineered, factory fabricated, and factory pre-insulated by piping system manufacturer pipe. Welded pressure pipe, welds inspected by certified inspector - ultrasonic method
A01.07.01Replace 1/4” thru 1-1/2” welded or threaded pipe600FT$ - 0$ - 0
A01.07.02Replace 2” thru 2-1/2” welded or threaded pipe600FT$ - 0$ - 0
A01.07.03Replace 3” thru 5” welded pipe600FT$ - 0$ - 0
A01.07.04Replace 6” thru 8” welded pipe600FT$ - 0$ - 0
A01.07.05Replace 10” thru 12” welded pipe350FT$ - 0$ - 0
A01.07.06Replace 14” thru 16” welded pipe40FT$ - 0$ - 0
A01.08FITTINGS FOR STEAM AND CONDENSATE PIPE, ABOVE GROUND, PRE-FABRICATED, PRE-INSULATED
Fittings for Steam and Condensate Service Piping - Work includes remove existing fittings and provide new fittings on pipe. Fittings are for above ground. pre-fabricated, pre-insulated systems and for pre-fabricated, pre-insulated, and pre-engineered systems. Pipe is metal jacketed (spiral wound, lock seamed type, internal seam, and air and water tight). Welded pressure pipe, welds inspected by certified inspector - ultrasonic method For Steam and Condensate Service.
A01.08.01Replace 1/4” thru 3/4” welded fitting (tee, ell, reducer, etc.)30EA$ - 0$ - 0
A01.08.02Replace 1” thru 1-1/2” welded fitting (tee, ell, reducer, etc.)30EA$ - 0$ - 0
A01.08.03Replace 2” thru 3” welded fitting (tee, ell, reducer, etc.)30EA$ - 0$ - 0
A01.08.04Replace 4” thru 6” welded fitting (tee, ell, reducer, etc.)30EA$ - 0$ - 0
A01.08.05Replace 8” thru 10” welded fitting (tee, ell, reducer, etc.)20EA$ - 0$ - 0
A01.08.06Replace 12” welded fitting (tee, ell, reducer, etc.)12EA$ - 0$ - 0
A01.08.07Replace 14” welded fitting (tee, ell, reducer, etc.)8EA$ - 0$ - 0
A01.08.08Replace 16” welded fitting (tee, ell, reducer, etc.)8EA$ - 0$ - 0
A01.08.09Replace 1/4” thru 3/4” NPT fitting (elbow, tee, reducer, etc.)25EA$ - 0$ - 0
A01.08.10Replace 1” thru 1-1/2” NPT fitting (elbow, tee, reducer, etc.)25EA$ - 0$ - 0
A01.08.11Replace 2” thru 3” NPT fitting (elbow, tee, reducer, etc.)20EA$ - 0$ - 0
A01.09PIPE HANGERS
A01.09.01Replace 1/4” thru 4” pipe hangers on all distribution systems120EA$ - 0$ - 0
A01.09.02Replace 5” thru 12” pipe hangers on all distribution systems200EA$ - 0$ - 0
A01.09.03Replace 14” thru 16” pipe hangers on all distribution systems8EA$ - 0$ - 0
A01.10INSULATION
A01.10.01Replace insulation on 3/4” thru 4” 45 or 90 elbow, tee or flange130EA$ - 0$ - 0
A01.10.02Replace insulation on 5” thru 8” 45 or 90 elbow, tee or flange50EA$ - 0$ - 0
A01.10.03Replace insulation on 10” thru 12” 45 or 90 elbow, tee or flange22EA$ - 0$ - 0
A01.10.04Replace insulation on 14” thru 16” 45 or 90 elbow, tee or flange10EA$ - 0$ - 0
A01.10.05Replace insulation on 3/4 thru 4” valves50EA$ - 0$ - 0
A01.10.06Replace insulation on 5” thru 8” valves25EA$ - 0$ - 0
A01.10.07Replace insulation on 10” thru 12” valves20EA$ - 0$ - 0
A01.10.08Replace insulation on 14” thru 16" valves7EA$ - 0$ - 0
A01.10.09Replace insulation on 3/4” thru 3" pipe550LF$ - 0$ - 0
A01.10.10Replace insulation on 3-1/2” thru 5” pipe900LF$ - 0$ - 0
A01.10.11Replace insulation on 6” thru 8” pipe1,000LF$ - 0$ - 0
A01.10.12Replace insulation on 10” thru 12” pipe500LF$ - 0$ - 0
A01.10.13Replace insulation on 14" thru 16" pipe80LF$ - 0$ - 0
A01.11PIPE JACKET
For Steam and Condensate Service - Remove, and Replace existing pipe jacket with new Anodized Aluminum Jacket, color as approved by Contracting Officer
A01.11.01Replace jacket on 3/4” thru 4” 45 or 90 elbow, tee or flange130EA$ - 0$ - 0
A01.11.02Replace jacket on 5” thru 8” 45 or 90 elbow, tee or flange50EA$ - 0$ - 0
A01.11.03Replace jacket on 10” thru 12” 45 or 90 elbow, tee or flange22EA$ - 0$ - 0
A01.11.04Replace jacket on 14” thru 16” 45 or 90 elbow, tee or flange10EA$ - 0$ - 0
A01.11.05Replace jacket on 3/4 thru 4” valves50EA$ - 0$ - 0
A01.11.06Replace jacket on 5” thru 8” valves25EA$ - 0$ - 0
A01.11.07Replace jacket on 10” thru 12” valves20EA$ - 0$ - 0
A01.11.08Replace jacket on 14” thru 16" valves7EA$ - 0$ - 0
A01.11.09Replace jacket on 3/4” thru 3" pipe550LF$ - 0$ - 0
A01.11.10Replace jacket on 3-1/2” thru 5” pipe900LF$ - 0$ - 0
A01.11.11Replace jacket on 6” thru 8” pipe1,300LF$ - 0$ - 0
A01.11.12Replace jacket on 10” thru 12” pipe500LF$ - 0$ - 0
A01.11.13Replace jacket on 14" thru 16" pipe80LF$ - 0$ - 0
A01.12FITTINGS
For Steam and Condensate Service - Work includes remove existing fittings and provide new fittings on pipe.
A01.12.01Replace 1/4” thru 3/4” welded fitting (tee, ell, etc.)200EA$ - 0$ - 0
A01.12.02Replace 1” thru 1-1/2” welded fitting (tee, ell, etc.)110EA$ - 0$ - 0
A01.12.03Replace 2” thru 3” welded fitting (tee, ell, etc.)100EA$ - 0$ - 0
A01.12.04Replace 4” thru 6” welded fitting (tee, ell, etc.)80EA$ - 0$ - 0
A01.12.05Replace 8” thru 10” welded fitting (tee, ell, etc.)30EA$ - 0$ - 0
A01.12.06Replace 12” welded fitting (tee, ell, etc.)8EA$ - 0$ - 0
A01.12.07Replace 14” welded fitting (tee, ell, etc.)4EA$ - 0$ - 0
A01.12.08Replace 16” welded fitting (tee, ell, etc.)4EA$ - 0$ - 0
A01.12.09Replace 1/4” thru 3/4” NPT fitting50EA$ - 0$ - 0
A01.12.10Replace 1” thru 1-1/2” NPT fitting55EA$ - 0$ - 0
A01.12.11Replace 2” thru 3” NPT fitting20EA$ - 0$ - 0
A01.13UNIONS
For Steam and Condensate Service - Work includes removal of existing unions and provide new unions.
A01.13.01Replace 1/4" thru 3/4" NPT unions80EA$ - 0$ - 0
A01.13.02Replace 1" thru 1-1/2" NPT unions55EA$ - 0$ - 0
A01.13.03Replace 2" thru 3" NPT unions20EA$ - 0$ - 0
A01.14STEAM TRAPS
For Steam and Condensate Service - work for replacement includes removal of existing trap and provide new steam traps.
A01.14.01Repair of 1/2" thru 1” steam trap assembly (threaded)100EA$ - 0$ - 0
A01.14.02Replace 1/2" thru 1" steam trap assembly (threaded) to include isolation valve, strainer, blowdown valve off of the strainer, trap, 20 feet of piping, and up to 3 fittings150EA$ - 0$ - 0
A01.14.03Repair of 1/2" thru 1” steam trap assembly (socket weld connections)100EA$ - 0$ - 0
A01.14.04Replace 1/2" thru 1" steam trap assembly (socket weld connections) to include isolation valve, strainer, blowdown valve off of the strainer, trap, 20 feet of piping, and up to 3 fittings150EA$ - 0$ - 0
A01.14.05Provide new 4' DIAM x 8' DEEP Drywell for steam traps25EA$ - 0$ - 0
A01.15STRAINERS
For Steam and Condensate Service - Work includes removal of existing steam strainer and provide new steam strainer
A01.15.01Replace NPT steam Strainer 1/2” thru 1”45EA$ - 0$ - 0
A01.15.02Replace NPT steam Strainer 1-1/4” thru 1-1/216EA$ - 0$ - 0
A01.15.03Replace NPT steam Strainer 2” thru 3”12EA$ - 0$ - 0
A01.15.04Replace NPT steam Strainer 1/2” thru 1”, class 150# or 300#45EA$ - 0$ - 0
A01.15.05Replace NPT steam Strainer 1-1/4” thru 1-1/2, class 150# or 300#16EA$ - 0$ - 0
A01.15.06Replace NPT steam Strainer class 150# or 300# Size 2”6EA$ - 0$ - 0
A01.15.07Replace NPT steam Strainer class 150# or 300# Size 2-1/2” thru 3”4EA$ - 0$ - 0
A01.15.08Replace NPT steam Strainer class 150# or 300# Size 4”4EA$ - 0$ - 0
A01.15.09Replace NPT steam Strainer class 150# or 300# Size 5” thru 6”4EA$ - 0$ - 0
A01.15.10Replace NPT steam Strainer class 150# or 300# Size 8”2EA$ - 0$ - 0
A01.15.11Replace NPT steam Strainer class 150# or 300# Size 10”2EA$ - 0$ - 0
A01.16SUMP PUMPS
For Steam and Condensate Service - Replacement work includes removal of existing steam operated sump pump and provide new steam operated sump pump.
A01.16.01Repair of steam operated sump pump assembly and clean-out pit.30EA$ - 0$ - 0
A01.16.02Replace steam sump pump22EA$ - 0$ - 0
A01.17GAGES
For Steam and Condensate Service -Work includes removal of existing and provide new. Factory Calibrated
A01.17.01Replace gages, includes replacing valves, fittings and nipples40EA$ - 0$ - 0
A01.17.02Replace gages only25EA$ - 0$ - 0
A01.18SUPPORTS
For Steam and Condensate Service - Work includes removal of existing and provide new
A01.18.01Replace 2" thru 4" pipe alignment guide supports100EA$ - 0$ - 0
A01.18.02Replace 5" thru 12" pipe alignment guide supports100EA$ - 0$ - 0
A01.18.03Replace 2" thru 4" pipe stanchion saddle supports23EA$ - 0$ - 0
A01.18.04Replace 5" thru 8" pipe stanchion saddle supports23EA$ - 0$ - 0
A01.18.05Replace 10" thru 12" pipe stanchion saddle supports28EA$ - 0$ - 0
A01.18.06Replace angle iron used in construction of pipe supports, up thru 4” x 4” x 1/2”500LF$ - 0$ - 0
A01.18.07Replace channel iron used in construction of pipe supports Up thru 4”250LF$ - 0$ - 0
A01.18.08Replace channel iron used in construction of pipe supports 5” thru 8”300LF$ - 0$ - 0
A01.18.09Replace channel iron used in construction of pipe supports 10”thru 12”135LF$ - 0$ - 0
A01.18.10Replace channel iron used in construction of pipe supports up to 15"20EA$ - 0$ - 0
A01.18.11Replace base plates used in construction of pipe supports over 12” x 12” x 1/2” thick up through 12” x 12” 1” thick175EA$ - 0$ - 0
A01.18.12Replace expansion shields or drop-in type anchor bolts Up thru 5/8” diameter2,200EA$ - 0$ - 0
A01.18.13Replace expansion shields or drop-in type anchor bolts 3/4” thru 1” diameter1,160EA$ - 0$ - 0
A01.18.14Replace missing hanger bolts105EA$ - 0$ - 0
A01.19RIGGING
A01.19.01Rigging/jacking 2-1/2" thru 6" steam mains back into place each 10’ length1,032EA$ - 0$ - 0
A01.19.02Rigging/jacking 8" thru 12" steam mains back into place each 10’ length1,032EA$ - 0$ - 0
A01.19.03Rigging/jacking 14" thru 16" steam mains back into place each 10’ length10EA$ - 0$ - 0
A01.20ANCHORS (Replacement of capsule type ANCHORS on all utility distribution systems)
Capsule type anchoring system is a heavy duty anchoring system that uses a high strength 2-part epoxy adhesive to retain a threaded rod and other materials in concrete or other masonry material. The system consists of a glass capsule containing the proper amount of resin, hardener and aggregate for the anchor, a stud rod with washer, nut, and drive unit to allow the stud to be inserted into a standard hammer drill.
A01.20.015/8" diameter160EA$ - 0$ - 0
A01.20.023/4" diameter500EA$ - 0$ - 0
A01.21SAFETY RELIEF VALVES
For Steam and Condensate Service - Work includes inspection, removal, and replacement of Safety Relief Valves. ASME code stamped.
A01.21.01Replacement of Safety Relief Valves 1/2” thru 1”20EA$ - 0$ - 0
A01.21.02Replacement of Safety Relief 1-1/4” thru 1-1/2”10EA$ - 0$ - 0
A01.21.03Replacement of Safety Relief Valves 2” thru 2-1/2”7EA$ - 0$ - 0
A01.21.04Replacement of Safety Relief Valves 3”5EA$ - 0$ - 0
A01.22STEAM PRESSURE REGULATING VALVES
For Steam and Condensate Service - Work includes inspection, removal, and provide new pressure reducing valves.
A01.22.01Replacement of threaded steam pressure regulators 1/2” thru 1”20EA$ - 0$ - 0
A01.22.02Replacement of threaded steam pressure regulators 1-1/4” thru 1-1/2”10EA$ - 0$ - 0
A01.22.03Replacement of threaded steam pressure regulators 2” thru 2-1/2”7EA$ - 0$ - 0
A01.22.04In-Service testing of Pressure Reducing Valves for proper operation16EA$ - 0$ - 0
A01.22.05Replacement of threaded steam pilot valves on main pressure regulators 1/4” thru 1/2” (3-150 psig)12EA$ - 0$ - 0
A01.22.06Replacement of threaded steam pilot valves on main pressure regulators 1/4” thru 1/2” (1-25 psig)9EA$ - 0$ - 0
A01.22.07Repair steam pressure regulators threaded or flange 1/2” thru 1-1/2”10EA$ - 0$ - 0
A01.22.08Repair steam pressure regulators threaded or flange 2” thru 2-1/2"”13EA$ - 0$ - 0
A01.22.09Repair 3" steam pressure regulator flanged class 150# to 300#5EA$ - 0$ - 0
A01.22.10Repair 4" steam pressure regulator flanged class 150# to 300#5EA$ - 0$ - 0
A01.22.11Adjust steam pressure regulator / pilot valve32EA$ - 0$ - 0
A01.23STEAM FLOW METERS
For Steam and Condensate Service - Exterior Aboveground Steam Distribution. Provide certificated calibration from a NIST certified calibration facility. Provide a temporary flanged pipe spool piece with insulation in place of meter to allow continuation of steam flow. Remove & Re-install meter. Replace meter when non functioning.
A01.23.01Calibrate and certify the calibration of a steam flow meter.1EA$ - 0$ - 0
A01.23.02Replacement of steam flow meter1EA$ - 0$ - 0
A02UNDERGROUND STEAM DISTRIBUTION
Underground steam distribution is for pre-engineered, factory manufactured, pre-insulated, drainable, dryable, and testable steam pipe and conduit systems. Work includes utility tunnels, manholes, and vaults. Confine space inspection includes gas free, time limits in confine space, confined space procedures, cool air, protective suits respirators, work shields, safety procedures , proper hydration, etc. Underground line is steam pipe with steel conduit and HDPE jacket. Condensate is not returned in same conduit. On some locations condensate is returned by separate conduit system.
A02.01UTILITY SYSTEMS SURVEY AND ASSESSMENT
A02.01.01Underground survey for individual systems, 500 feet each10EA$ - 0$ - 0
A02.01.02Compressed air test conduit systems for leakage, 500 feet each10EA$ - 0$ - 0
A02.02CONDUIT/PIPE REMOVAL OF EXISTING UNDERGROUND STEAM DISTRIBUTION
Composite Rate for various sizes. This ELIN covers pipe removal and pipe disposal. (extra fill may be ordered on other line items if needed). Underground line is steam pipe with steel conduit and HDPE jacket. Condensate is not returned. Prices do not include shoring, dewatering, excavation to the bottom of each pipe (steam conduit and insulation), backfill with excavated materials, grade, seeding, and cleanup - these items are covered by separate ELIN.
A02.02.011-1/2" Steam in 8-5/8" conduit250LF$ - 0$ - 0
A02.02.022" Steam in 8-5/8" conduit250LF$ - 0$ - 0
A02.02.033" Steam in 10-3/4"" conduit250LF$ - 0$ - 0
A02.02.044" Steam in 12-3/4" conduit250LF$ - 0$ - 0
A02.02.056" Steam in 14" conduit250LF$ - 0$ - 0
A02.02.068" Steam 18" conduit250LF$ - 0$ - 0
A02.02.0710" Steam in 20" conduit250LF$ - 0$ - 0
A02.02.0812" Steam in 22" conduit250LF$ - 0$ - 0
A02.02.0914" Steam in 24" conduit250LF$ - 0$ - 0
A02.02.1016" Steam 26" conduit250LF$ - 0$ - 0
A02.02.11Cap existing pipe and Conduit, where steam line is removed and not replaced. 1-1/2" to 3" steam pipe25EA$ - 0$ - 0
A02.02.12Cap existing pipe and Conduit, where steam line is removed and not replaced. 4" to 10" steam pipe10EA$ - 0$ - 0
A02.02.13Cap existing pipe and Conduit, where steam line is removed and not replaced. 12" to 16" steam pipe5EA$ - 0$ - 0
A02.03NEW CONDUIT / PIPE REPLACEMENT FOR REPAIR OF UNDERGROUND STEAM DISTRIBUTION
Composite Rate for various sizes. Old already removed, trench is open, ready for repair of existing system. Prices include new bedding, connection to existing system, repair distribution system, Replace old with new pre-engineered factory manufactured system, drainable dryable, testable steam and conduit system. Costs includes connection to manhole and existing piping. Work includes inspection and testing of piping and conduit system. Work includes start-up of existing & new system. Underground line is steam pipe with steel conduit and HDPE jacket. Condensate is not returned in same conduit. Welded pressure pipe system. On some locations condensate is returned in separate conduit system. Excavation already performed. Costs for excavation, backfill, dewatering, shoring, sheeting, fill, grad, and seed is covered by separate ELIN item.
A02.03.011-1/2" Steam in 8-5/8" conduit250LF$ - 0$ - 0
A02.03.022" Steam in 8-5/8" conduit250LF$ - 0$ - 0
A02.03.033" Steam in 10-3/4"" conduit250LF$ - 0$ - 0
A02.03.044" Steam in 12-3/4" conduit250LF$ - 0$ - 0
A02.03.056" Steam in 14" conduit250LF$ - 0$ - 0
A02.03.068" Steam 18" conduit250LF$ - 0$ - 0
A02.03.0710" Steam in 20" conduit250LF$ - 0$ - 0
A02.03.0812" Steam in 22" conduit250LF$ - 0$ - 0
A02.03.0914" Steam in 24" conduit100LF$ - 0$ - 0
A02.03.1016" Steam 26" conduit100LF$ - 0$ - 0
A02.04FITTINGS FOR NEW CONDUIT/PIPE REPLACEMENT FOR REPAIR OF UNDERGROUND STEAM DISTRIBUTION
New fittings for underground pre-engineered factory manufactured system, drainable dryable, testable steam and conduit system. Composite Rate for various sizes. Old already removed, trench is open, ready for repair of existing system, excavation already performed under another ELIN . Prices include new bedding, connection to existing system, repair distribution system, Replace old with new pre-engineered factory manufactured system, drainable dryable, testable steam and conduit system. Costs includes connection to manhole and existing piping. Work includes inspection and testing of piping and conduit system. Work includes start-up of existing & new system. Costs for backfill, dewatering, shoring, excavation, fill, grad, and seed is covered by separate ELIN. Underground line is steam pipe with steel conduit and HDPE jacket. Condensate is not returned in same conduit. On some locations condensate is returned in separate conduit system.
A02.04.01Replace 4” welded fitting (tee, ell, reducer, etc.) in 12-5/8" conduit10EA$ - 0$ - 0
A02.04.02Replace 6” welded fitting (tee, ell, reducer, etc.) in 14" conduit10EA$ - 0$ - 0
A02.04.03Replace 8” welded fitting (tee, ell, reducer, etc.) in 18" conduit10EA$ - 0$ - 0
A02.04.04Replace 10” welded fitting (tee, ell, reducer, etc.) in 20" conduit8EA$ - 0$ - 0
A02.04.05Replace 12" welded fitting (elbow, tee, reducer, etc.) in 22" conduit8EA$ - 0$ - 0
A02.04.06Replace 14” welded fitting (elbow, tee, reducer, etc.) in 24 " conduit8EA$ - 0$ - 0
A02.04.07Replace 16" welded fitting (elbow, tee, reducer, etc.) in 26" conduit8EA$ - 0$ - 0
A02.05EXPANSION ELBOW FOR NEW CONDUIT/PIPE REPLACEMENT FOR REPAIR OF UNDERGROUND STEAM DISTRIBUTION
New Pressure balanced Expansion Elbow Joint (PBEEJ) for underground pre-engineered factory manufactured system, drainable dryable, testable steam and conduit system. Composite Rate for various sizes. Old already removed, trench is open, ready for repair of existing system, excavation already performed under another ELIN . Prices include new bedding, connection to existing system, repair distribution system, Replace old with new pre-engineered factory manufactured system, drainable dryable, testable steam and conduit system. Costs includes connection to manhole and existing piping. Work includes inspection and testing of piping and conduit system. Work includes start-up of existing & new system. Underground line is steam pipe with steel conduit and HDPE jacket. Condensate is not returned in same conduit. On some locations condensate is returned in separate conduit system.
A02.05.01Replace 4” welded fitting PBEEJ in 12-5/8" conduit4EA$ - 0$ - 0
A02.05.02Replace 6” welded fitting PBEEJ in 14" conduit4EA$ - 0$ - 0
A02.05.03Replace 8” welded fitting PBEEJ in 18" conduit4EA$ - 0$ - 0
A02.05.04Replace 10” welded fitting PBEEJ in a 20" conduit4EA$ - 0$ - 0
A02.05.05Replace 12" welded fitting PBEEJ in 22" conduit4EA$ - 0$ - 0
A02.05.06Replace 14” welded fitting PBEEJ in 24 " conduit4EA$ - 0$ - 0
A02.05.07Replace 16" welded fitting PBEEJ in 26" conduit4EA$ - 0$ - 0
A02.06DRIP TEE, MODIFIED DRIP TEE, & RISER FOR NEW CONDUIT/PIPE REPLACEMENT FOR REPAIR OF UNDERGROUND STEAM DISTRIBUTION
New Drip Tee, Modified Drip Tee, and Riser for underground pre-engineered factory manufactured system, drainable dryable, testable steam and conduit system. Composite Rate for various sizes. Old already removed, trench is open, ready for repair of existing system, excavation already performed under another ELIN. Prices include new bedding, connection to existing system, repair distribution system, Replace old with new pre-engineered factory manufactured system, drainable dryable, testable steam and conduit system. Costs includes connection to manhole and existing piping. Work includes inspection and testing of piping and conduit system. Work includes start-up of existing & new system. Underground line is steam pipe with steel conduit and HDPE jacket. Condensate is not returned in same conduit. On some locations condensate is returned in separate conduit system.
A02.06.011-1/2” welded fitting Drip Tee, Modified Drip Tee in 8-5/8" conduit with 3/4" riser30EA$ - 0$ - 0
A02.06.022” welded fitting Drip Tee, Modified Drip Tee in 8-5/8" conduit with 3/4" riser30EA$ - 0$ - 0
A02.06.033” welded fitting Drip Tee, Modified Drip Tee in 10-5/8" conduit with 3/4" riser30EA$ - 0$ - 0
A02.06.044” welded fitting Drip Tee, Modified Drip Tee in 12-5/8" conduit with 3/4" riser30EA$ - 0$ - 0
A02.06.056” welded fitting Drip Tee, Modified Drip Tee in 14" conduit with 3/4" riser30EA$ - 0$ - 0
A02.06.06Replace 8” welded fitting Drip Tee, Modified Drip Tee in 18" conduit with 1" riser30EA$ - 0$ - 0
A02.06.07Replace 10” welded fitting Drip Tee, Modified Drip Tee in a 20" conduit with 1" riser30EA$ - 0$ - 0
A02.06.0812" welded fitting Drip Tee, Modified Drip Tee in 22" conduit with 1" riser30EA$ - 0$ - 0
A02.06.0914” welded fitting Drip Tee, Modified Drip Tee in 24 " conduit with 1" riser30EA$ - 0$ - 0
A02.06.1016" welded fitting Drip Tee, Modified Drip Tee in 26" conduit with 1" riser30EA$ - 0$ - 0
A02.07UNDERGROUND PIPE ANCHOR FOR NEW CONDUIT/PIPE REPLACEMENT FOR REPAIR OF UNDERGROUND STEAM DISTRIBUTION
New Underground Pipe Anchor for underground pre-engineered factory manufactured system, drainable dryable, testable steam and conduit system. Composite Rate for various sizes. Old already removed, trench is open, ready for repair of existing system, excavation already performed under another ELIN. Prices include new bedding, connection to existing system, repair distribution system, Replace old with new pre-engineered factory manufactured system, drainable dryable, testable steam and conduit system. Costs includes connection to manhole and existing piping. Work includes inspection and testing of piping and conduit system. Work includes start-up of existing & new system. Underground line is steam pipe with steel conduit and HDPE jacket. Condensate is not returned in same conduit. On some locations condensate is returned in separate conduit system.
A02.07.01Pipe Anchor for 4” Pipe in 12-5/8" conduit4EA$ - 0$ - 0
New Underground Pipe Anchor for underground pre-engineered factory manufactured system, drainable dryable, testable steam and conduit system. Composite Rate for various sizes. Old already removed, trench is open, ready for repair of existing system, excavation already performed under another ELIN. Shoring, backfill and dewatering being performed by separate ELIN item, see A06. Prices include new bedding, connection to existing system, repair distribution system, Replace old with new pre-engineered factory manufactured system, drainable dryable, testable steam and conduit system. Costs includes connection to manhole and existing piping. Work includes inspection and testing of piping and conduit system. Work includes start-up of existing & new system. Costs for backfill, dewatering, shoring, excavation, fill, grad, and seed is covered by separate ELIN item. Underground line is steam pipe with steel conduit and HDPE jacket. Condensate is not returned in same conduit. Welded pressure pipe system, Spec 33 63 13 and 40 17 26.00 20. On some locations condensate is returned in separate conduit system.
A02.08.02Pipe Anchor for 6” Pipe in 14" conduit4EA$ - 0$ - 0
A02.08.03Pipe Anchor for 8” Pipe in 18" conduit4EA$ - 0$ - 0
A02.08.04Pipe Anchor for 10” Pipe in a 20" conduit4EA$ - 0$ - 0
A02.08.05Pipe Anchor for 12" Pipe in 22" conduit3EA$ - 0$ - 0
A02.08.06Pipe Anchor for 14” Pipe in 24 " conduit3EA$ - 0$ - 0
A02.08.07Pipe Anchor for 16" pipe in 26" conduit3EA$ - 0$ - 0

A03 SANITARY SEWER, FRESH WATER, SALT WATER, AND STORM DRAIN DISTRIBUTION

A03.01PROVIDE FLOWABLE FILL FOR PIPES TO BE ABANDONED IN PLACE
A03.01.01Install flowable fill in Utility pipes to be abandoned in place100CY$ - 0$ - 0
A03.02PIPE REMOVAL FOR SEWER, WATER AND STORM DRAIN DISTRIBUTION
Composite Rate for various sizes and materials. Composite Prices do cover pipe removal and pipe disposal. (Extra fill may be ordered on line items excavation.)
A03.02.01Composite rate for sewer pipe removal of 1/2" through 6" -IRON3,000LF$ - 0$ - 0
A03.02.02Composite rate for pipe removal of 8" through 16" -IRON3,000LF$ - 0$ - 0
A03.02.03Composite rate for pipe removal of 18" through 24" -IRON3,000LF$ - 0$ - 0
A03.02.04Composite rate for pipe removal of 12" through 16" -REINFORCED CONCRETE1,000LF$ - 0$ - 0
A03.02.05Composite rate for pipe removal of 18" through 27" -REINFORCED CONCRETE1,000LF$ - 0$ - 0
A03.02.06Composite rate for pipe removal of 30" through 36" - REINFORCED CONCRETE1,000LF$ - 0$ - 0
A03.02.07Composite rate for pipe removal of 38" through 48" - REINFORCED CONCRETE250LF$ - 0$ - 0
A03.02.08Composite rate for pipe removal of 48" through 54" -REINFORCED CONCRETE250LF$ - 0$ - 0
A03.02.09Composite rate for pipe removal of 56" through 72" -REINFORCED CONCRETE250LF$ - 0$ - 0
A03.02.10Composite rate for pipe removal of 1" through 12" -POLYVINYL CHLORIDE (PVC)3,000LF$ - 0$ - 0
A03.02.11Composite rate for pipe removal of 14" through 16" -POLYVINYL CHLORIDE (PVC)1,500LF$ - 0$ - 0
A03.02.12Composite rate for pipe removal of 18" through 30" -POLYVINYL CHLORIDE (PVC)500LF$ - 0$ - 0
A03.02.13Composite rate for pipe removal of 12" through 16" -CORRUGATED METAL PIPE250LF$ - 0$ - 0
A03.02.14Composite rate for pipe removal of 18" through 27" -CORRUGATED METAL PIPE250LF$ - 0$ - 0
A03.02.15Composite rate for pipe removal of 30" through 36" - CORRUGATED METAL PIPE250LF$ - 0$ - 0
A03.02.16Composite rate for pipe removal of 38" through 48" - CORRUGATED METAL PIPE250LF$ - 0$ - 0
A03.02.17Composite rate for pipe removal of 48" through 54" -CORRUGATED METAL PIPE250LF$ - 0$ - 0
A03.02.18Composite rate for pipe removal of 56" through 72" -CORRUGATED METAL PIPE250LF$ - 0$ - 0
A03.03HYDRANT REMOVAL
Composite Rate for removal of fire hydrant from water line. Prices include service line removal including valve, pipe disposal and cleanup. (extra fill may be ordered on other line items if needed) Dispose of hydrant if not ordered to be reinstalled on other line items.
A03.03.01Fire Hydrant Removal30EA$ - 0$ - 0
A03.04WATER LINE VALVE REMOVAL
Composite Rate for removal of valves from water line, all valve sizes, includes valve box disposal. Dispose of if not ordered to be reinstalled on other line item. (extra fill may be ordered on other line items if needed)
A03.04.01Water Line Valve Removal30EA$ - 0$ - 0
A03.05WATER METER REMOVAL
Composite Rate for removal of meters from water line, all valve sizes, includes meters box disposal. Dispose of if not ordered to be reinstalled on other line items. (extra fill may be ordered on other line items if needed)
A03.05.01Water Meter Removal30EA$ - 0$ - 0
A03.06CONCRETE & PRECAST MANHOLE OR WET WELL REMOVAL
Composite Rate for removal of Manhole or Wet Well from water line, all Manhole or Wet Well sizes. Dispose of if not ordered to be reinstalled on other line items. (extra fill may be ordered on other line items if needed)
A03.06.014' Diameter or Square Manhole or Wet Well removal, Per Vertical LF100VLF$ - 0$ - 0
A03.06.026' Diameter or Square Manhole or Wet Well removal, Per Vertical LF100VLF$ - 0$ - 0
A03.06.038' Diameter or Square Manhole or Wet Well removal, Per Vertical LF100VLF$ - 0$ - 0
A03.06.0410' Diameter or Square Manhole or Wet Well removal, Per Vertical LF100VLF$ - 0$ - 0
A03.07MASONRY MANHOLE OR WET WELL REMOVAL
Composite Rate for removal of Manhole or Wet Well from water line, all Manhole or Wet Well sizes. Dispose of if not ordered to be reinstalled on other line items. (extra fill may be ordered on other line items if needed)
A03.07.014' Diameter or Square Manhole or Wet Well removal, Per Vertical LF100VLF$ - 0$ - 0
A03.07.026' Diameter or Square Manhole or Wet Well removal, Per Vertical LF5VLF$ - 0$ - 0
A03.07.038' Diameter or Square Manhole or Wet Well removal, Per Vertical LF5VLF$ - 0$ - 0
A03.07.0410' Diameter or Square Manhole or Wet Well removal, Per Vertical LF5VLF$ - 0$ - 0
A03.08FLOW BYPASSING OF MANHOLES
Composite Rate for bypassing sewer flow around manhole - diameter or square. Bypassing flow occurs during sewer cleaning, manhole cleaning, manhole rehabilitation, sewer lift station work, sewer line rehabilitation, sewer inspection, manhole inspection, and manhole removal. Prices include flow blockage, bypass discharge lines, temporary controls of pumps and standby equipment, standby power, operating equipment during bypass, fuel for operation, coning and barricading, dewatering, temporary pump station, temporary plugs, reports, temporary connections to lines for bypass, clean-up of any sewage, and noise control. (Excavation, shoring, backfill for temporary lines and connections, clean-up, disposal, grade, and cleanup may be ordered on other line items if needed.) Cleaning of manhole covered by separate ELINS. Manholes cover both round and square sizes.
A03.08.01Diameter or Square Manhole - Flow Bypassing Diesel per day90DA$ - 0$ - 0
A03.08.02Diameter or Square Manhole - Flow Bypassing Diesel per week120WK$ - 0$ - 0
A03.08.03Diameter or Square Manhole - Flow Bypassing Diesel per month18MO$ - 0$ - 0
A03.08.04Diameter or Square Manhole - Flow Bypassing Electric per day90DA$ - 0$ - 0
A03.08.05Diameter or Square Manhole - Flow Bypassing Electric per week120WK$ - 0$ - 0
A03.08.06Diameter or Square Manhole - Flow Bypassing Electric per month18MO$ - 0$ - 0
A03.09FLOW BYPASSING OF WET WELLS AT PUMP STATIONS
Control Sewer Flow, Composite Rate for bypassing flow around wet wells - diameter or square. Bypassing flow occurs during wet well and pump station cleaning, pumps repair, wet well rehabilitation, pump station repair and overhaul work, water and sewer line rehabilitation, water line inspection, wet well inspection, and wet well removal. Prices include flow blockage, bypass discharge lines, temporary controls of pumps and standby equipment, standby power, operating equipment during bypass, fuel for operation, coning and barricading, dewatering, temporary pump station, temporary plugs, reports, temporary connections to lines for bypass, clean-up of any sewage, and noise control. (Excavation, shoring, backfill for temporary lines and connections, clean-up, disposal, grade, and cleanup may be ordered on other line items if needed.) Cleaning of manhole covered by separate ELINS. Wet wells cover both round and square sizes.
A03.09.01Diameter or Square Wet well - Flow Bypassing Diesel per day90DA$ - 0$ - 0
A03.09.02Diameter or Square Wet Well - Flow Bypassing Diesel per week120WK$ - 0$ - 0
A03.09.03Diameter or Square Wet Well - Flow Bypassing Diesel per month18MO$ - 0$ - 0
A03.09.04Diameter or Square Wet well - Flow Bypassing Electric per day90DA$ - 0$ - 0
A03.09.05Diameter or Square Wet Well - Flow Bypassing Electric per week120WK$ - 0$ - 0
A03.09.06Diameter or Square Wet Well - Flow Bypassing Electric per month18MO$ - 0$ - 0
A03.10MANHOLE AND/OR WET WELL FLOW MONITORING (Payment will be made at the lowest applicable rate based on actual Months of Monitoring for Each unit.)
Flow Monitoring Manhole, Wet Well, water, sanitary sewer, storm water, oily water waste oil, Record, report, measure flow rates; includes installation, set-up, removal, calibration, collection of data, data analyses, relocation of flow meters, flow meters equipment, pressure transducer, ultrasonic doppler sensors, NEMA 4X enclosures, battery operated, secure data storage, monitor multiple flow streams at once, high speed communication, handle all influent and infiltration flows, Measure on 5 minutes increments, SCADA capable, Manholes and wet wells cover both round and square sizes. Cost should include relocating to another manhole and /or wet well.
A03.10.01Diameter or Square - Flow Monitoring, Each manholes and or wet wells / Month4EA$ - 0$ - 0
A03.10.02Diameter or Square - Flow Monitoring, Each manholes and or wet wells / 2 to 6 Months2EA$ - 0$ - 0
A03.10.03Diameter or Square - Flow Monitoring, Each manholes and or wet wells / 7 to 12 Months2EA$ - 0$ - 0
A03.11RAIN GAUGE PROVIDE AND MONITOR WITH REPORT, TIPPING BUCKET TYPE EACH (Payment will be made at the lowest applicable rate based on actual Months of Monitoring for Each unit.)
A03.11.01Rain Gauge and Monitoring Each manholes and or wet wells / Month6MO$ - 0$ - 0
A03.11.02Rain Gauge and Monitoring Each manholes and or wet wells / 2 to 4 Months12MO$ - 0$ - 0
A03.11.03Rain Gauge and Monitoring Each manholes and or wet wells / 5 to 7 Months24MO$ - 0$ - 0
A03.12CLEANING OF SEWER AND STORM DRAIN LINES
Cleaning Storm and Sanitary Sewers, Composite Rate for high velocity high pressure water or fluid - remove sediment, rocks, debris, roots, grease, accumulations, and obstructions - cleaning sanitary and storm drain and sewer lines. Include site and sewer inspection prior to and after cleaning. Television inspection will be performed after cleaning. (During cleaning perform manhole bypass of sewer flow around line being cleaned - Separate ELIN.)
A03.12.014" to 14" Dia.60000LF$ - 0$ - 0
A03.12.0215" to 30" Dia.10000LF$ - 0$ - 0
A03.13CLEANING OF SEWER AND STORM DRAIN LINES (to clear blockage)
Composite Rate for high velocity high pressure water or fluid - remove sediment, rocks, debris, roots, grease, accumulations, and obstructions - cleaning sanitary and storm drain sewer lines. Intent is to remove blockage and restore pipe to service. No television inspection required.
A03.13.01Clear Blockage2500LF$ - 0$ - 0
A03.14CLEANING OF MANHOLES, VAULTS, AND WET WELLS
Cleaning Storm and Sanitary Sewers, Composite Rate for high velocity high pressure water or fluid - remove sediment, rocks, debris, roots, grease, accumulations, and obstructions - cleaning of manholes, wet wells, and vaults. Include site and sewer inspection prior to and after cleaning. Television inspection will be performed after cleaning. Clean manhole and wet wells to sewer line invert. (During manhole and wet well cleaning perform manhole and wet well bypass of sewage flow - separate ELIN.)
A03.14.01Manhole, Valve Pits, & Wet Well surface Cleaning10000SF$ - 0$ - 0
A03.15CLEANING OF OILY WATER WASTE OIL PIPING
Cleaning Storm and Sanitary Sewers, Composite Rate for high velocity high pressure water or fluid - remove sediment, rocks, debris, roots, grease, accumulations, and obstructions - cleaning oily water waste oil lines. Include site and sewer inspection prior to and after cleaning. Television inspection will be performed after cleaning. (During cleaning perform manhole bypass of sewer flow around line being cleaned - Separate ELIN.) Work includes testing, removal, and disposal of non-hazardous oil contaminated water, oily solids, and oily sludge.
A03.15.014" to 14" Dia.1000LF$ - 0$ - 0
A03.16INSPECT / CLEAN OIL/WATER SEPARATOR
A03.16.01Inspect Oil/Water Separator System4EA$ - 0$ - 0
A03.16.02Clean Oil/Water Separator System4EA$ - 0$ - 0
A04CONTAMINATED SOIL, MATERIAL, WATER, OILY SOLIDS, WASTE, ETC. - TESTING, HAULING AND DISPOSAL
For testing, removal, pump, disposal, excavation hauling of contaminated soil and water from work areas. Not associated with cleaning of piping, sewer lines, and manholes.
A04.01TESTING CONTAMINATED SOIL, MATERIAL, WATER, OILY SOLIDS, WASTE, ETC.
A04.01.01Perform TCLP test method 601040EA$ - 0$ - 0
A04.01.02Perform TPH test method 8010 Diesel40EA$ - 0$ - 0
A04.01.03Perform TPH test method 8015 Modified Gas40EA$ - 0$ - 0
A04.01.04Perform Flammability test method SW 7.140EA$ - 0$ - 0
A04.02OIL CONTAMINATED WATER
A04.02.01Remove, Hall and dispose of non-hazardous oil contaminated water (3000 gallons minimum)50000GL$ - 0$ - 0
A04.03NON-HAZARDOUS OILY SOLIDS, SLUDGE
A04.03.01Remove, Hall and Dispose of Oily Solids5000GL$ - 0$ - 0
A04.03.02Pump, Haul and Dispose of oily solids200GL$ - 0$ - 0
A04.03.03Pump, Haul and Dispose of oily sludge1000GL$ - 0$ - 0
A04.04POTABLE WATER SYSTEM WASTE
A04.04.01Remove, Hall and Dispose of non-hazardous contaminated water (3000 gallons minimum) from potable water storage tank10000GL$ - 0$ - 0
A04.04.02Pump, Haul and Dispose of non-hazardous sediments from potable water Storage Tank148CY$ - 0$ - 0
A04.04.03Pump, Haul and Dispose of non-hazardous sludge from potable water storage tank15CY$ - 0$ - 0
A04.05SOIL
A04.05.01Excavate and Dispose of non-hazardous contaminated soil (22 CY minimum)80CY$ - 0$ - 0
A04.06HAZARDOUS CONTAMINATED MATERIALS
A04.06.01Excavate and Dispose of characteristic hazardous contaminated waste (20 CY minimum)20CY$ - 0$ - 0
A04.06.02Pump, haul and Dispose of hazardous oil contaminated water5000GL$ - 0$ - 0
A05TV INSPECTIONS OF SEWER AND STORM DRAINS
TV inspection must be by NASSCO certified inspector. Inspections shall include reports, logs, DVDs, footage counters, and all applicable documentation.
A05.01.014" to 14" Dia.50000LF$ - 0$ - 0
A05.01.0215" to 30" Dia.7000LF$ - 0$ - 0
A06EXCAVATION AND FILL FOR ANY UTILITY PIPE
This covers work for excavation and fill for any type of a single utility pipe regardless of width and covers the composite price for sheeting / shoring, benching, dewatering with well points, excavation, backfilling, and seeding. Depth as measured to the invert of the pipe plus allowance for bed depth. Utility pipe costs is not included and is covered by separate ELIN. Separate ELIN for pipe preparation, new bedding, and installation.
A06.01.010' To 4' depth for 1/2" to 16" Pipe6000LF$ - 0$ - 0
A06.01.024' To 7' depth for 1/2" to 16" Pipe6000LF$ - 0$ - 0
A06.01.037' To 10' depth for 1/2" to 16" Pipe1500LF$ - 0$ - 0
A06.01.040' To 4' depth for 18" to 36" Pipe2000LF$ - 0$ - 0
A06.01.054' To 7' Deep for 18" to 36" Pipe2000LF$ - 0$ - 0
A06.01.067' To 10' Deep for 18" to 36" Pipe1000LF$ - 0$ - 0
A06.01.070' To 4' Deep for 38" to 54" Pipe50LF$ - 0$ - 0
A06.01.084' To 7' Deep for 38" to 54" Pipe50LF$ - 0$ - 0
A06.01.097' To 10' deep for 38" to 54" Pipe50LF$ - 0$ - 0
A06.01.100' To 4' Deep for 56" to 72" Pipe20LF$ - 0$ - 0
A06.01.114' To 7' Deep for 56" to 72" Pipe20LF$ - 0$ - 0
A06.01.127' To 10' Deep for 56" to 72" Pipe10LF$ - 0$ - 0
A06.01.13Provide extra backfill where excavated material will not fill area, includes grading and seeding.500CY$ - 0$ - 0
A06.01.14Additional Width required for multiple pipes7500LF$ - 0$ - 0
A07NEW PIPE FOR SANITARY SEWER
This covers work for, Sanitary Sewer and OWWO, Gravity and Pressure Pipe. Includes pipe material, installation, clean-up, new pipe, bedding.
A07.01DUCTILE IRON
A07.01.01Ductile Iron 6" Pipe400LF$ - 0$ - 0
A07.01.02Ductile Iron 8" Pipe800LF$ - 0$ - 0
A07.01.03Ductile Iron 10" Pipe200LF$ - 0$ - 0
A07.01.04Ductile Iron 12" Pipe200LF$ - 0$ - 0
A07.01.05Ductile Iron 14" Pipe200LF$ - 0$ - 0
A07.01.06Ductile Iron 16" Pipe400LF$ - 0$ - 0
A07.01.07Ductile Iron 18" Pipe100LF$ - 0$ - 0
A07.01.08Ductile Iron 20" Pipe100LF$ - 0$ - 0
A07.01.09Ductile Iron 24" Pipe100LF$ - 0$ - 0
A07.02CERAMIC EPOXY COATED & LINED INSTEAD OF CEMENT LINED
A07.02.01Ductile Iron, 6" Pipe ceramic epoxy coated & lined400LF$ - 0$ - 0
A07.02.02Ductile Iron 8" Pipe ceramic epoxy coated & lined800LF$ - 0$ - 0
A07.02.03Ductile Iron 10" Pipe ceramic epoxy coated & lined200LF$ - 0$ - 0
A07.02.04Ductile Iron 12" Pipe ceramic epoxy coated & lined200LF$ - 0$ - 0
A07.02.05Ductile Iron 14" Pipe ceramic epoxy coated & lined200LF$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .