Attachment 2 EDS Vent Drain.pdf
PDF 814 KB Posted
- Attached to
- Repairs on the Liquid Effluent Decontamination Systems (EDS) and Thermal Tissue Autoclaves (TTA)
- Solicitation number
- 12805B24Q0177
About this file
This document is a pipe connection detail drawing related to the repair of the Effluent Decontamination System (EDS) and Thermal Tissue Autoclaves (TTA) at the NBAF facility in Manhattan, KS.
The drawing depicts the proposed 4-inch drain pipe modification to the existing 6-inch vent pipe. The modification includes installing a flange fitting for future use and connecting the drain pipe to a condensate receiving tank. The drawing provides details on the pipe routing, valve configuration, and tank specifications.
This drawing is related to Solicitation Number 12805B24Q0177, which is a combined synopsis/solicitation for the repair of the EDS and TTA systems. The solicitation is an unrestricted commercial item procurement with a NAICS code of 811310 and a small business size standard of $12.5M. Quotes are due by May 6th at 10:00am Central Time and should be submitted via email to the Contracting Officer. The Government intends to award a firm-fixed price purchase order to the responsible offeror whose quote conforms to the specifications and is the most advantageous based on technical acceptance, past performance, and price.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIPE CONNECTION
DETAIL
PIPE CONNECTION
DETAIL
\\pri-engineering\Engineering\Proposal\DeCon\_P12XX\P1215\Submittal\P1215_NBAF_VENT_LINE_MODIFICATION.dwg
PRELIMINARY FOR APPROVAL FOR CONSTRUCTION AS BUILT
DATE CREATED: 2/9/2024
FOR-
DRAWN: AC CHK'D:
DWG. NO.
SHEET
PROJ. NO.
REV.
P1215
P1215 A
EDS VENT HEADER
PRI MODIFICATION PROPOSAL
NBAF
TOLERANCES:
FRACTION = +-1/32"
.XX = +-.01"
ANGULAR = +-1/2 DEG.
X
THIS PRINT AND ALL INFORMATION THEREON IS THE
PROPERTY OF PROGRESSIVE RECOVERY INCORPORATED
AND MUST BE KEPT CONFIDENTIAL AND NOT BE MADE
PUBLIC OR COPIED UNLESS SO AUTHORIZED BY THEM AND
IS SUBJECT TO RETURN UPON DEMAND.
W.O.
(QTY. REQ'D)
Printed by: AC ; on 2/13/2024; about 8:59 AM
4" DRAIN PIPE
A INITIAL RELEASE AC 2/9/2024
REV REVISION DWN CHK'D DATE
FLOW
TANK 1 TANK 2 TANK 7
TANK 8
EXISTING 6" VENT PIPE
TO CONDENSATE
RECEIVING TANK
SEE SHEET 2
PROPOSED 4" PIPE
BY PRI
SLOPE DOWN
EXISTING COLUMN
USE FOR PIPE SUPPORT
EXISTING COLUMN
USE FOR PIPE SUPPORT
ELEVATION VIEW
6" EXISTING
VENT PIPE
4" DRAIN PIPE BY PRI
PORT FOR
CLEANOUT
FOR PROPOSAL
ONLY
6" EXISTING VENT PIPE
Justin.Schlegel Rectangle
Justin.Schlegel Rectangle
Justin.Schlegel Callout Install a flange flitting for future use
\\pri-engineering\Engineering\Proposal\DeCon\_P12XX\P1215\Submittal\P1215_NBAF_VENT_LINE_MODIFICATION.dwg
PRELIMINARY FOR APPROVAL FOR CONSTRUCTION AS BUILT
DATE CREATED: 2/9/2024
FOR-
DRAWN: AC CHK'D:
DWG. NO.
SHEET
PROJ. NO.
REV.
P1215
P1215 A
EDS VENT HEADER
PRI MODIFICATION PROPOSAL
NBAF
TOLERANCES:
FRACTION = +-1/32"
.XX = +-.01"
ANGULAR = +-1/2 DEG.
X
THIS PRINT AND ALL INFORMATION THEREON IS THE
PROPERTY OF PROGRESSIVE RECOVERY INCORPORATED
AND MUST BE KEPT CONFIDENTIAL AND NOT BE MADE
PUBLIC OR COPIED UNLESS SO AUTHORIZED BY THEM AND
IS SUBJECT TO RETURN UPON DEMAND.
W.O.
(QTY. REQ'D)
Printed by: AC ; on 2/13/2024; about 8:59 AM
CONDENSATE RECEIVING TANK
A INITIAL RELEASE AC 2/9/2024
REV REVISION DWN CHK'D DATE
CONDENSATE INLET
FROM VENT HEADER DRAIN PIPING
SIGHT
GLASS
8" CLEAN OUT PORT
90 GAL CAPACITY
NOTES:
1. ALL DIMENSIONS ARE APPROXIMATE
2 MANUAL VALVES
W/ SPRING RETURN HANDLE
TO CLOSED POSITION
TO SUMP PIT
SUMP PIT WALL
8'-1 11/16"
FOR PROPOSAL
ONLY
FIELD VERIFY ALL DIMENSIONS
Ø22" OD
2'-5 3/4"
MATERIAL OF CONSTRUCTION:
CARBON STEEL
Justin.Schlegel Rectangle
Justin.Schlegel Rectangle
File details come from the government source that posted it. Updated .