Attachment 2 DUVRI Laboratory Sampling and Analysis.pdf

PDF 540 KB Posted

Attached to
Laboratory Sampling and Analysis of Potable Water, Wastewater and Unknown Waste and Material
Solicitation number
W912PF24Q0133
Issued by

About this file

This document is a combined synopsis/solicitation for a federal government contract opportunity to perform laboratory sampling and analysis of potable water, wastewater, and unknown waste and materials at USAG Italy DMC: Camp Darby, Depot and Ammunition Area (ASA). The performance period is a base year from 26 September 2024 to 25 September 2025, with up to four 1-year option periods. The services will take place at Camp Darby, Tirrenia (Pisa), Italy. Offers will be evaluated on Certifications and Price factors. Vendors must provide a DURC certificate, Chamber of Commerce certificate, and self-certification for anti-mafia communication. A pre-quote conference will be held on 9 August 2024. The Point of Contact is Ketti Andrei and Sonia Zanobini from the 414th CSB RCO Vicenza.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMITTENZA / COMMITTEE

COMANDO USA SETAF

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

STRUTTURA ORGANIZZATIVA NELLA QUALE SARA’ SVOLTA L’ATTIVITA’ / ORGANIZATIONAL STRUCTURE WHERE ACTIVITY WILL TAKE PLACE

DATORE DI LAVORO / EMPLOYER

LPW-E

VIA AURELIA SS1

ZONA DEPOSITO

56018 TIRRENIA PISA

COMANDANTE / COMMANDER: COL, Matt Gomlak DMC MANAGER: Timothy Andersen

RSPP Ufficio SPP / Safety Officer

Ing. Chiara Chelossi UFFICIO /

OFFICE

PUBLIC WORKS OFFICE (PWO)

Medico Competente / Occupational Health Doctor _Dr. Raffele Peluso_ Manager del PWO /

DWO Manager

JAMIE SCAGGS

RLS / Workers’ Safety Representative

Manrico Bendinelli Massimo Ferrari Riccardo Kolman

Responsabile di area / Area Supervisor

Committente / Commissioning Employer

Comando USA

SETAF

Addetti al pronto soccorso / First Aid qualified Employees

__DES-FireSection__

Addetti all’antincendio / Building Fire Wardens

DUVRI

DOCUMENTO DI VALUTAZIONE DEI RISCHI DI INTERFERENZA

ART. 26 COMMA 3, D.LGS. 81/08

SINGLE DOCUMENT FOR THE ASSESSMENT OF INTERFERENTIAL RISKS

Article 26, paragraph 3, Legislative Decree 81/08

DESCRIZIONE ATTIVITÀ / DESCRIPTION OF ACTIVITY

Laboratory Sampling and Analysis, Potable Water, Waste Water and Unknown Waste and Materials (Si prevedono: n 12 giornate di lavoro e n.2 tecnici)

(Estimated completion: 12 working days and Nr.2 technicians)

DITTA APPALTATRICE / CONTRACTOR

INDIRIZZO / ADDRESS

DATORE DI LAVORO / EMPLOYER: ___________________

Responsabile di cantiere / Contractor’s on-site Representative

Medico competente / OH Doctor

RSPP / Safety Officer _______________ Addetti al pronto soccorso (cantiere) / First Aid qualified Employees (Contractor)

Addetti all’antincendio (cantiere) / Fire Wardens (Contractor)

RLS / Employees’ Safety representative

PWO MANAGER

VERIFICATO/REVIEWED

Safety Office

VERIFICATO/REVIEWED

Jamie L. Scaggs DMC Acting DPW Manager

Date:

Signature________________________

Ing. Chiara Chelossi Date:

Signature________________

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08 Oggetto del contratto Laboratory Sampling and Analysis of Potable water, waste

Water and Unknown Waste Materials Edifici interessati USAG ITALY DMC VARIOUS BUILDINGS AND PLANTS Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto Appaltatore

Anagrafica dell'Appaltatore

Ragione sociale

Legale rappresentante

Sede legale

Sede operativa

Telefono/Fax e-Mail

Codice fiscale

Partita iva

Iscrizione alla C.C.I.A.A

Posizione assicurativa INAIL

Posizione INPS

C.C.N.L. applicato

Responsabile del Servizio di Prevenzione e Protezione (RSPP) Rappresentante dei Lavoratori per la Sicurezza (RLS)

Medico Competente

Responsabile Prevenzione Incendi

Responsabile Pronto Soccorso

Referente della ditta appaltatrice per il coordinamento e la sicurezza

Periodo di lavoro PERIODO: Lunedi – Venerdi ORARIO: dalle 8.00 alle 17.00

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08 Oggetto del contratto Laboratory Sampling and Analysis of Potable water, waste

Water and Unknown Waste Materials Edifici interessati USAG ITALY DMC VARIOUS BUILDINGS AND PLANTS Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto Appaltatore

RISCHI AMBIENTALI PRESENTI ALL’INTERNO DEGLI EDIFICI OGGETTO DELL’INTERVENTO / POTENTIAL RISKS PRESENT INSIDE THE

BUILDINGS OBJECT OF THIS WORK CONTRACT

Edifici Bldgs

N. Addetti –Descrizione Generale / No. Employees On site/description

Attrezzature – Macchinari / Machinery - equipment

Rischi presenti / Risks

USAG ITALY DMC

BUILDINGS

Affollamento Tot.: 0-20 addetti/edificio

No. Employees 0 - 20 units per bldg

Macchinari ed attrezzature:

apparecchi di sollevamento, attrezzature varie / Machines and equipment: various type of elevator, various tools.

Rischio di caduta nella fossa riparazione mezzi.

Utilizzo di utensili rumorosi e prova di motori rumorosi.

Presenza in stoccaggio di lubrificanti facilmente combustibili.

Presenza di lavorazioni che comportano la proiezione di schegge.

Movimentazione eseguita con carrelli elevatori.

Spostamento di veicoli e mezzi tattici.

Movimentazione di carichi con carroponte.

Movimentazione di oggetti pesanti.

Rischio dovuto ad elementi elettrici in tensione.

Rischio Generico.

Risk of falling into inspection pit.

Noisy equipment and engine test (ground hop).

Bulk Flammable / Combustible lubricants present.

Risk of flying particles by using machines / tools.

MHE movement on site.

Tactical vehicle traffic.

Overhead crane movement.

Manual handling of heavy loads.

Risk of electrical equipments under voltage.

Generic Risk.

ALTRI RISCHI PRESENTI nell’Aree/ OTHER GENERAL HAZARDS PRESENT IN THE AREAS

1. Traffico veicolare; automezzi privati, muletti, (talvolta questi ultimi sprovvisti di segnalatori acustici e/o ottici), bus navetta, veicoli militari, cisterne rifornimento serbatoi di olio combustibile o GPL esterni agli edifici, veicoli per la raccolta dei rifiuti. / Vehicular Traffic: POVs, forklifts, (sometimes with no regular yellow/orange blinking light and backward maneuvering beeper), shuttle bus, military vehicles, refueling tanks for combustible oil or LPG, trash collection dumpers.

Rischi: collisione – schiacciamento – interferenza con operazioni di rifornimento/raccolta rifiuti. / Risks: collision – crushing – interference with refueling/trash collection operations.

2. Presenza di veicoli per emergenze dei Vigili del Fuoco in prossimita’ del Stazione dei Pompieri, edificio 5013/918. / Presence of Fire Department emergency response vehicles near Bldg.

5013/918, Fire Department.

Rischi: investimento - interferenza con operazioni di intervento/salvataggio. / Risks: crash - interference with response/rescue operations.

3. Traffico pedonale (la zona e’ per lo piu’ sprovvista di marciapiedi). / pedestrian traffic (almost no side walks in the area).

Rischi: investimento. / Risks: hitting a pedestrian.

DARBY MILITARY COMMUNITY

Water and Unknown Waste Materials Edifici interessati USAG ITALY DMC VARIOUS BUILDINGS AND PLANTS Datore di lavoro richiedente COMANDO USA SETAF

4. Segnaletica si sicurezza non sempre conforme alle vigenti norme di sicurezza e non sempre bilingue. / Road signs / marking not always IAW traffic code and not always bilingual.

Rischi: fraintendimento dei segnali. / Risks: misinterpretation of road signs / marking.

5. Presenza di personale di lingua non Italiana. / Presence of non-Italian speaking personnel.

Rischi: fraintendimento nelle comunicazioni verbali. / Risks: verbal communication misinterpretation.

6. Possibile interazione con personale della sicurezza militare all’interno dell’area/edificio per esigenze di carattere operativo. / Potential interaction with security personnel in the area/facility due to operational contingencies.

Rischi: interferenza con operazioni di pubblica sicurezza -fraintendimento nelle comunicazioni verbali. / Risks: interference with security forces operations - verbal communication misinterpretation.

7. Presenza deposito materiali tossici (pesticidi) all’edificio 5143. Possibile presenza di veicoli in ingresso o uscita dall’area. / Presence of toxic materials, (pesticides), at Bldg.5143. Possible presence of transports accessing or exiting the area.

Rischi: esposizione accidentale. / Risks: accidental exposure.

8. Gli edifici circondati da prato possono ospitare nelle adiacenze nidi di insetti, (vespe ad esempio), o altri animali. / Green area surrounding facilities may hide insects or other animals’ nests.

Rischi: biologico. / Risks: biological.

9. Presenza di alberi intorno i parcheggi e/o lungo le vie di passaggio. / Trees surrounding parking areas and/or along cross ways.

Rischi: esposizione alle pine che cadono dagli alberi. / Risks:

exposure to pine cones falling.

10. Incrocio a 4 vie (STOP sui quattro lati – non conforme). / 4-Way stop crossroad (not European traffic code compliant).

Rischi: fraintendimento della precedenza – collisione. / Risks: yield misinterpretation - collision.

11. Armadi chiusi riportanti l’indicazione “Materiale Infiammabile. – Flammable materials” / Closed cabinets/storage room with “Materiale Infiammabile – Flammable materials” signs.

Rischi: incendi - esposizione accidentale. / Risks: fire – accidental exposure.

12. Presenza di depositi di materiali pericolosi segnalati con la scritta “HAZARDOUS WASTE”. / Presence of dangerous materials with HAZARDOUS WASTE signs.

Rischi: esposizione accidentale. / Risks: accidental exposure.

13. Presenza di cassoni porta rifiuti e relative operazioni periodiche di svuotamento con mezzi pesanti. / Presence of trash collectors on related removal operations performed with dumpers.

Rischi: collisione – schiacciamento – interferenza con operazioni di rimozione rifiuti. / Risks: collision – crushing – interference with trash collection.

14. Segnaletica stradale orizzontale non sempre chiaramente leggibile. / Marking on the roads signs not always readable.

Rischi: collisione. / Risks: collision.

DARBY MILITARY COMMUNITY

Water and Unknown Waste Materials Edifici interessati USAG ITALY DMC VARIOUS BUILDINGS AND PLANTS Datore di lavoro richiedente COMANDO USA SETAF

ATIVITA’ SVOLTA DALL’APPALTATORE E FASI LAVORATIVE / CONTRACTOR WORK ACTIVITIES

Campionamenti eseguiti da tecnici di laboratorio di acqua potabile, acque di scarico, rifiuti e materiali sconosciuti (Stimata n 1 giornata di lavoro/mese e n.1 uomo/giorno)

Sampling made by laboratory technicians of potable water, waste water and unknown waste and materials, (Estimated 1 working day/month and 1 worker/day))

Fasi lavorative previste / Scheduled Work Phases:

a) Arrivo della ditta all’ingresso della Base presso il quale si rechera’ il COR o un suo rappresentante, che accompagnera’ la ditta nelle zone previste dal Contratto, se la ditta e’ gia’ in possesso dell’autorizzazione e dei relativi pass si rechera’ autonomamente presso tali zone. Per recarsi presso le aree dovra’ essere seguita la strada piu’ breve procedendo ad una velocita’ non superiore ai 40Km/h e rispettando tutte le regole del codice della strada incluso l’obbligo di indossare le cinture di sicurezza / Arrival of Contractor at Base where they will be met by the COR or his/her representative, who will accompany them to the Contracted zones, if the Contractor already has in its possession an authorization and relative passes it can proceed to these zones on its own. In order to reach these areas the Contractor must take the shortest route and travel at a speed not to exceed 40km/h and observe all traffic regulations including compulsory wearing of seat belts.

b) Al fine di evitare le interferenze le attivita’ saranno svolte adottando le seguenti precauzioni / In order to avoid interference work will be accomplished adopting the following precautions:

1) La ditta incaricata dovra’ provvedere a delimitare con relativa segnaletica in caso di campionamenti di terreno o in copertura / The Contractor commissioned to perform the sampling of soil or on the roof, will be responsible fo delimitation, by specific warning signs, of the work area;

2) Il responsabile di area dovra’ evitare l’esecuzione di attivita’ particolari che possano determinare rischi all’interno di ogna zona di lavoro / The person responsible for the area will prevent any particular activity that can put at ris anyone present in each work area;

3) Sara’ vietato transitare all’interno dell’area delimitata durante i lavori contrattuali / Shall be forbidden to walk during the contract operations

4) Considerando i possibili rischi dovuti a caduta di pine e rami, collisione, schiacciamento e proiezione di schegge sara’ opportuno indossare scarponi antinfortunistici con puntale rinforzato , guanti antitaglio, elmetto protettivo e visiera / Considering the possible risks present in the work area associated with falling of pine cones and tree branches, collusion, crushing, and risk of flying particles by using machines it will be necessary to swear capped safety shoes, safety gloves, elmet and protective safety shield.

5) All’interno della zona delimitata la ditta potra’ eseguire il lavoro di campionamento previsto in autonomia utilizzando le proprie attrezzature / On the inside of the delimited area the Contractor can perform the sampling work as scheduled in autonomy and with the use of its own tools;

6) Il responsabile del campionamento dovra’ evitare l’esecuzione di attivita’ che possano comportare rischi per le aree d lavoro al di fuori dell’area delimitata di propria competenza The Responsible of the sampling must avoid performing any activity which may be of risk for the work areas outside of the delimited area for which he/she is responsible.

c) Terminato l’intervento di campionamento, il Responsabile del campionamento provvedera’ a rimuovere le segnaletica usata per la delimitazione della zona / Once the sampling has been completed the Responsible of the sampling proceed to remove the signs to delimit the work area.

d) Terminati il campionamento, la ditta’ dovra’ provvedere a mettere in sicurezza le proprie attrezzature, a rimuovere tutti residui delle lavorazioni eseguite, provvedendo eventualmente a smaltirli direttamente o a posizionarli all’interno degli apposi contenitori / Once the sampling is completed, the Contractor is responsible for assuring that all his equipment is safel stowed out of harm way, he must remove all residue/rubbish created by his work, disposing of it himself or emptin into the appropriate refuse containers.

DARBY MILITARY COMMUNITY

Water and Unknown Waste Materials Edifici interessati USAG ITALY DMC VARIOUS BUILDINGS AND PLANTS Datore di lavoro richiedente COMANDO USA SETAF

ATTREZZATURE UTILIZZATE DALL’APPALTATORE / CONTRACTOR SPECIAL TOOLS

RISCHI DI INTERFERENZA DELL’ATTIVITÀ OGGETTO DELL’APPALTO, SVOLTA ALL’INTERNO DEL REPARTO/EDIFICIO 5023, DERIVANTI DA UTENSILI/ATTREZZATURE/SOSTANZE/MEZZI UTILIZZATI / SUMMARY OF RISKS DUE TO USE OF TOOLS / EQUIPMENT / CHEMICALS /

VEHICLES

N. DESCRIZIONE / HAZARD DESCRIPTION RISCHIO / RISK MISURE DI PREVENZIONE-PROTEZIONE /

PREVENTIVE-PROTECTIVE MEASURES

MOVIMENTAZIONE MANUALE DEI CARICHI /

MANUAL HANDLING OF HEAVY LOADS

Assenti / Not applicable La movimentazione manuale dei carichi non comporta interferenza

DPI / DPI

AGENTI FISICI: Rischi utilizzo utensili/attrezzature VIBRANTI PHYSICAL AGENTS: use of vibrating tools / equipment

Assenti / Not applicable Non necessarie / Not applicable

AGENTI FISICI: Rischio di utilizzo attrezzature che emettono CAMPI ELETTROMAGNETICI

PERICOLOSI

PHYSICAL AGENTS: use of tools / equipment emitting dangerous electromagnetic fields

Assenti / Not applicable Non necessarie / Not applicable

AGENTI FISICI: Rischio di utilizzo attrezzature che emettono RADIAZIONI OTTICHE

PERICOLOSE

PHYSICAL AGENTS: use of tools / equipment emitting dangerous radiation / optic fields

Assenti / Not applicable Non necessarie / Not applicable

SOSTANZE PERICOLOSE: Rischi utilizzo sostanze/preparati chimici pericolosi CHEMICALS: use of hazardous chemicals

Assenti / Not applicable Non necessarie / Not applicable

SOSTANZE PERICOLOSE: Rischi utilizzo sostanze/preparati chimici cancerogeni/mutageni CHEMICALS: use of cancerous / mutagen chemicals

Assenti / Not applicable Non necessarie / Not applicable

AGENTI BIOLOGICI: Rischi di utilizzo agenti biologici pericolosi BIOLOGICAL AGENTS: use of hazardous biological agents

Assenti / Not applicable Non necessarie / Not applicable

ATMOSFERE ESPLOSIVE: Rischi di sviluppo di atmosfere esplosive durante svolgimento attività EXPLOSIVE ATMOSPHERES: Development of explosive atmospheres during operations

Assenti / Not applicable Non necessarie / Not applicable

ATMOSFERE ESPLOSIVE: Rischio utilizzo di utensili, attrezzature, mezzi che possono innescare atmosfere esplosive EXPLOSIVE ATMOSPHERES: use of tools, equipment, vehicles that could ignite explosive atmospheres

Assenti / Not applicable Non necessarie / Not applicable

Rischi utilizzo sostanze infiammabili/facilmente combustibili Use of flammables / combustibles

Assenti / Not applicable Non necessarie / Not applicable

Scale, attrezzature varie / ladders, various tools Ogni altra attrezzatura idonea ad effettuare i cmpionamenti inerenti il servizio. / Any other equipment or tools adequate to perform the samplings under the service.

L’utilizzo delle attrezzature da parte dell’appaltatore non comporta rischi al di fuori dell’area perimetrata. Non sono previste ulteriori misure di prevenzione e protezione oltre alla perimetrazione delle aree. / Use of equipment by the Contractor do no pose any risks outside of the cordoned area. No other preventive or protective measures apart from cordoning off the work area are prospected.

DARBY MILITARY COMMUNITY

Water and Unknown Waste Materials Edifici interessati USAG ITALY DMC VARIOUS BUILDINGS AND PLANTS Datore di lavoro richiedente COMANDO USA SETAF

N. DESCRIZIONE / HAZARD DESCRIPTION RISCHIO / RISK MISURE DI PREVENZIONE-PROTEZIONE /

PREVENTIVE-PROTECTIVE MEASURES

11 Rischi caduta materiale dall’alto Risk of falling objects

Presente / Present Le attivita’ lavorative svolte nell’area e dall’appaltante possono determinare il rischio di caduta di rami-pigne dall’alto

/ The work performed in the area and by the Contractor can pose a risk of falling tree branches-pine cones from above.

Indossare appropriati dispositivi di sicurezza/wear appropriated safety protection

12 Rischi utilizzo corrente elettrica Electrical equipment

Assenti / Not applicable

Non necessarie / Not applicable

AMIANTO: Rischi utilizzo sostanze contenenti amianto ASBESTOS: use of asbestos containing material

Presente / Present Indossare appropriati dispositivi di sicurezza/wear appropriated safety protection

14 Rischio spostamento con automezzi Moving traffic

Presente / Present

Gli spostamenti all’interno della base devono essere preventivamente autorizzati dalla committente. Devono essere seguite scrupolosamente le regole di circolazione interna. In assenza di indicazioni particolari, procedere a passo d’uomo (5Km/ora). Vietato parcheggiare davanti a mezzi di salvataggio, soccorso, antincendio / All internal traffic needs to be previously authorized by the Commissioning Employer. All rules governing traffic will be observed. In the absense of signs, procede at walking pace (5 Km/h). Parking in front of emergency vehicles is prohibited

MISURE DI PREVENZIONE-PROTEZIONE AGGIUNTIVE / OTHER PREVENTIVE-PROTECTIVE MEASURES

1. Prima di accedere alle aree interessate dall’intervento, concordare con il COR dell’appalto le modalità di effettuazione delle attività e formalizzare le misure di prevenzione e protezione concordate. / Before entering the premises subject to the contract work, coordination with Contract COR must be done in order to establish the procedures of performance activities and the agreed on preventive and protective measures.

2. Esporre la tessera di riconoscimento corredata di fotografia contenente le generalità del lavoratore e l'indicazione del datore di lavoro per tutto il tempo di permanenza nell’azienda (ai sensi dell’art.26 c.8 del D.Lgs.81/08). / Wear a badge equipped with photograph, name and address of contractor during the entire permanence inside the premises (IAW art. 26 para 8 of Law 81/08).

3. Localizzare i percorsi di emergenza e le vie di uscita. / Locate emergency exits.

4. In caso di evacuazione attenersi alle procedure vigenti. / In case of evacuation of bldg follow emergency evacuation plan.

5. Indossare i dispositivi di Protezione Individuale ove siano prescritti. / Wear personal Protective Equipment as prescribed.

6. Non ingombrare le vie di fuga con strumenti e attrezzature. / Do not block emergency exits with instruments and equipment.

DARBY MILITARY COMMUNITY

Water and Unknown Waste Materials Edifici interessati USAG ITALY DMC VARIOUS BUILDINGS AND PLANTS Datore di lavoro richiedente COMANDO USA SETAF

7. Non operare su macchine, impianti e attrezzature se non autorizzati. / Do not operate machinery, equipment and tools if not authorized.

8. Evitare l’uso di cuffie o auricolari per l’ascolto della musica durante l’attività perché potrebbero impedire la corretta percezione dei segnali acustici di allarme in caso di emergenza (allarme incendio, allarme evacuazione, cicalini dei mezzi e delle macchine, ecc.). / Refrain from using headphones or earphones while working because they could prevent hearing emergency alarms (i.e. fire alarm, evacuation alarm, equipment and machinery buzzers, etc.).

9. Le attivita’ oggetto del contratto dovranno essere svolte perimetrando e isolando preventivamente la zona oggetto dell’intervento di manutenzione. / The activities object of the contract will be performed after having previously cordoned off the area object of the maintenance intervention.

10. E’ comunque vietato transitare all’interno dell’officine durante attivita’ di spostamento di mezzi o durante attivita’ di movimentazione eseguite con il carroponte. / In all cases it is forbidden to walk about the workshops when equipment/vehicles are being moved or the overhead crane is being operated.

11. Il responsabile di area dovra’ evitare l’esecuzione di attivita’ particolari che possano determinare rischi all’interno della zona di lavoro perimetrata. / The person responsible for the area will prevent any particular activity that can put at risk anyone present in the cordoned off work area.

12. Il responsabile di cantiere della ditta incaricata dovra’ evitare l’esecuzione di attivita’ che possano comportare rischi per le aree di lavoro al di fuori dell’area perimetrata di propria competenza. / The Contractor responsible for the work site must avoid performing any activity which may be of risk for the work areas outside of the cordoned off area for which he/she is responsible.

COSTI DELLA SICUREZZA

Sono quantificabili come costi della sicurezza tutte quelle misure preventive e protettive necessarie per l’eliminazione o la riduzione dei rischi interferenti individuate, così come indicativamente riportato di seguito:

• gli apprestamenti previsti nel DUVRI (come ponteggi, trabattelli, etc.);

• le misure preventive e protettive e dei dispositivi di protezione individuale eventualmente previsti nel DUVRI per lavorazioni interferenti;

• gli eventuali impianti di terra e di protezione contro le scariche atmosferiche, degli impianti antincendio, degli impianti di evacuazione fumi previsti nel DUVRI;

• i mezzi e servizi di protezione collettiva previsti nel DUVRI (come segnaletica di sicurezza, avvisatori acustici, etc.);

• le procedure contenute nel DUVRI e previste per specifici motivi di sicurezza;

• gli eventuali interventi finalizzati alla sicurezza e richiesti per lo sfasamento spaziale o temporale delle lavorazioni interferenti previsti nel DUVRI;

• le misure di coordinamento previste nel DUVRI relative all'uso comune di apprestamenti, attrezzature, infrastrutture, mezzi e servizi di protezione collettiva.

• informazione/formazione al personale dell’Appaltatore, riunioni periodiche e straordinarie di coordinamento.

DARBY MILITARY COMMUNITY

Water and Unknown Waste Materials Edifici interessati USAG ITALY DMC VARIOUS BUILDINGS AND PLANTS Datore di lavoro richiedente COMANDO USA SETAF

La stima, analitica per voci singole, a corpo o a misura (quindi NON A PERCENTUALE), viene riferita ad elenchi prezzi standard o specializzati, oppure basata su prezziari o listini ufficiali vigenti nell'area interessata, o sull'elenco prezzi delle misure di sicurezza del committente; nel caso in cui un elenco prezzi non sia applicabile o non disponibile, si farà riferimento ad analisi costi complete e desunte da indagini di mercato.

Stima dei costi della sicurezza per le situazioni di rischio interferenti (Selezionare il paragrafo pertinente tra i due sotto elencati)

PER L’APPALTO IN OGGETTO, È RAGIONEVOLE RITENERE CHE I RISCHI DA INTERFERENZA POSSONO ESSERE RESI COMPATIBILI, RIDOTTI O ELIMINATI APPLICANDO CORRETTAMENTE LE MISURE GENERALI DI TUTELA CHE L’APPALTATORE DEVE ORDINARIAMENTE ADOTTARE PER L’ESECUZIONE DELLA FORNITURA/SERVIZIO; PERTANTO I RELATIVI COSTI SONO RICONDUCIBILI AI COSTI DELLA

SICUREZZA PROPRI DELL’APPALTATORE DETERMINATI IN SEDE DI APPALTO QUINDI NON SI RILEVANO COSTI SPECIFICI DERIVANTI DALLE

MISURE PER ELIMINARE I RISCHI DA INTERFERENZA DELLE LAVORAZIONI.

PER L’APPALTO IN OGGETTO, È RAGIONEVOLE RITENERE CHE I RISCHI DA INTERFERENZA POSSONO ESSERE RESI COMPATIBILI, RIDOTTI O ELIMINATI ADOTTANDO MISURE CHE DANNO LUOGO A COSTI AGGIUNTIVI RISPETTO A QUELLI PROPRI DELL’APPALTATORE.

PERTANTO LA SEGUENTE STIMA DEI COSTI È EFFETTUATA SULLA BASE DELLE RILEVAZIONI DEI RISCHI INTERFERENTI IN FASE PROGETTUALE DI APPALTO, DI CUI ALLA MATRICE DELLE INTERFERENZE (ALLEGATO I). I COSTI SONO INDIVIDUATI FACENDO RIFERIMENTO AL PREZZARIO APPROVATO DALLA REGIONE TOSCANA. NEL CASO IN CUI NON SI RITROVINO VOCI ATTINENTI NEL PREZZARIO, LA STIMA È IN RELAZIONE AI

CORRENTI PREZZI DI MERCATO.

X

DARBY MILITARY COMMUNITY

Water and Unknown Waste Materials Edifici interessati USAG ITALY DMC VARIOUS BUILDINGS AND PLANTS Datore di lavoro richiedente COMANDO USA SETAF

GESTIONE DELLE EMERGENZE / EMERGENCY MANAGEMENT

In caso di emergenza e/o infortunio dovranno essere adottate le procedure specificate nel “Piano di pronto intervento per l’evacuazione delle persone infortunate per la comunita’ USAG Vicenza DMC di Livorno” allegato al contratto di appalto. / In case of emergency and/or injury, follow the procedures contained in the Emergency plan for the evacuation of injured people for USAG Vicenza DMC areas.

TIPO EMERGENZA

EMERGENCY TYPE

DESCRIZIONE

DESCRIPTION

RIFERIMENTI

REFERENCES

Sicurezza Security

La gestione della sicurezza è assicurata dal servizio interno di polizia militare.

Security services are the responsibility of the internal military police.

Servizi Interni/ Internal Services

MILITARY POLICE DSN 633-7575

Commercial 050-54-7575

CARABINIERI DSN633-8701/8711

Commercial 050-54-8701/8711 Servizi esterni / External Services

CARABINIERI tel. 112 Incendio-

Esplosione Fire-Explosion

La gestione delle emergenze legate agli incendi/esplosioni è affidato agli addetti alla lotta antincendio designati dall’appaltatore ai quali saranno affiancati gli addetti alla lotta antincendio presenti nei repati e al dipartimento interno per la lotta antincendio.

Fire/explosion emergency management is the responsibility of the contractor’s qualified fire wardens, supported by the building fire wardens present in the area

Servizi Interni/ Internal Services Addetti di reparto / BFW:

FIRE DEPARTEMENT DSN 117

Commercial 050-54-7117

Servizi esterni / External Services Vigili del Fuoco tel. 115

Infortunio – malore Accident – Illness

La gestione delle emergenze legate ad infortunio/malore è affidato agli addetti designati dall’appaltatore ai quali potranno essere affiancati gli addetti presenti nei repati.

Medical emergency management is the responsibility of the contractor’s first aid qualified employees, supported by the area firs aid qualified employees

Servizi Interni/ Internal Services Addetti al primo soccorso / First-Aiders Servizi esterni / External Services

Pronto Soccorto (esterno) First Aid (external)

Tel. Fisso/From fixed telephone: 118Tel Cellulare /From Cell Phone: 800011800

Others general dispositions to eliminate interference / Disposizioni generali aggiuntive per l’eliminazione delle interferenze.

Utilizzare solo le area autorizzate Non accedere in altri locali o edifici

Non presentarsi sul luogo di lavoro sotto l’influenza di alcool, medicinali o sostanze psicotrope

Non manomettere e/o escludere protezioni, dispositivi di sicurezza o sistemi di segnalazione e controllo.

Non oltrepassare o disattivare le protezioni.

Non usare fiamme libere in azienda se non ESPRESSAMENTE AUTORIZZATI (tramite form MD 00 0277 “Richiesta permesso di lavoro”)

DARBY MILITARY COMMUNITY

Water and Unknown Waste Materials Edifici interessati USAG ITALY DMC VARIOUS BUILDINGS AND PLANTS Datore di lavoro richiedente COMANDO USA SETAF

È obbligatorio:

• farsi riconoscere all’ingresso presso il gate;

• ricevere autorizzazione per l’ingresso di auto – furgoni – mezzi ed esporre il pass sul mezzo;

• camminare percorrendo solo le aree pedonali segnalate;

• rispettare la segnaletica orizzontale e verticale (percorsi pedonali e carrabili, aree di stoccaggio merci, vie di evacuazione, cartelli di divieto, d’obbligo, di segnalazione e di avvertimento, altro);

• astenersi dall’utilizzare, manutenere, verificare, oliare, registrare, ingrassare, macchine e/o impianti di Ns. proprietà;

• utilizzare esclusivamente Vs. macchine o attrezzature, previa Ns. autorizzazione scritta, conformi ai requisiti antinfortunistici;

• rispettare le procedure di sicurezza aziendali;

• mantenere ordinate e pulite le zone di passaggio, deposito e lavoro riprestinando le condizioni presenti prima dell’esecuzione degli interventi;

• provvedere in proprio al trasporto e smaltimento dei rifiuti decadenti dallo svolgimento del/i Vs. incarico/i, salvo Ns.

diversa disposizione da comunicarvi per iscritto;

• segnalare a Ns. addetto qualsiasi situazione ritenuta a rischio, oltre che di altre condizioni di pericolo di cui si è a conoscenza;

• prendersi cura della propria sicurezza e della propria salute e di quella delle altre persone presenti, conformemente alla propria formazione ed alle istruzioni e ai mezzi forniti dal datore di lavoro.;

• l’utilizzo degli idonei DPI forniti.

• Rispettare tutte le procedure di sicurezza indicate dall’Ufficio Sicurezza della Committente.

RISCHI INTRODOTTI DALL’APPALTATORE (DA COMPILARE UNA VOLTA SELEZIONATO L’APPALTATORE):

N. DESCRIZIONE / HAZARD DESCRIPTION MISURE DI PREVENZIONE-PROTEZIONE ADOTTATE / PREVENTIVE-PROTECTIVE MEASURES

DARBY MILITARY COMMUNITY

Water and Unknown Waste Materials Edifici interessati USAG ITALY DMC VARIOUS BUILDINGS AND PLANTS Datore di lavoro richiedente COMANDO USA SETAF

CONSIDERAZIONI CONCLUSIVE / CONCLUSIONS:

Il Committente dichiara di aver fornito all’Appaltatore / The Commissioning Employer provided the Contractor with:

• le informazioni tecniche relative allo stato dei luoghi sede dell’attività e dettagliate informazioni sui rischi specifici esistenti nell’ambiente dove dovrà operare e sulle misure di sicurezza e emergenza adottate; / all the technical info regarding the status of the work places and detailed information on the specific risks in the locations where the Contractor is going to work and the safety and emergency measures adopted;

• le informazioni per evitare inutili rischi e per lavorare in sicurezza in relazione alla contemporanea presenza sul luogo di lavoro o nelle immediate vicinanze di altre imprese appaltatrici e sui rischi specifici relativi. / all the information to avoid unnecessary risks and to work in safety, in relation to the contemporary presence on the work-place, or in the immediate vicinities, of other contractors and relative specific risks.

Con la firma riportata in calce la ditta appaltatrice attesta / With the following signature the contractor states:

• di aver preso atto delle dettagliate informazioni ricevute sui rischi specifici esistenti nell’ambiente in cui è chiamata ad operare e sulle misure di prevenzione e di emergenza adottate in relazione all’attività del committente; / understood the detailed information received regarding the specific risks in the workplace where is going to perform the activity and regarding the prevention measures and corrective actions adopted in relation to the Contractor’s activity.

• dell’avvenuta cooperazione in merito all’attuazione delle misure di prevenzione e protezione dai rischi sul lavoro e incidenti sull’attività lavorativa oggetto dell’appalto; / will cooperate for the implementation of the prevention and protection measusres regarding the on the job risks and injuries on the work activity subject of the contract.

• dell’avvenuto scambio reciproco di informazioni, attraverso i documenti di cui si allega copia, al fine di eliminare i rischi dovuti alle eventuali interferenze tra i lavori svolti dalle parti; / the mutual exchange of information, through the attached documents, to avoid the risks/hazards due to potential interferences between works performed by the involved contractors and committing part.

• che rimane a carico della ditta appaltatrice la valutazione e l’adozione di idonee misure di prevenzione e protezione inerenti i rischi della propria attività. / the contractor has the responsability for the evaluation and implemenatation of the required prevention and protection measusres for the own activity.

• che l’appaltatore e’ tenuto a monitorare in ogni momento la corretta esecuzione del contratto e qualora dovesse verificare la necessita’ di misure di prevenzione aggiuntive e non preventivate inizialmente, dovra’ informare immediatamente la committenza che promuovera’ tutte le azioni necessarie al fine di eliminare i potenziali rischi indicati dall’appaltatore stesso / the contractor has to monitor the correct execution of the contract and, in case of needing of additional preventive measures and not initially planned, must immediately inform the committing part; the committing part will promote all the necessary actions in order to eliminate potential risks indicated by the contractor.

In corso d’opera, se dovessero venirsi a modificare le condizioni sopra esposte, sarà cura del committente promuovere una nuova iniziativa di coordinamento e cooperazione al fine dell’eliminazione dei rischi che tale nuova situazione potrebbe comportare. / During the contract activity, in case the conditions above axplained change, the Contractor has the responsability to implement action for the coordination and cooperation in order to eliminate the risks rised from the new condition.

Data / Date: _______________

FIRME / SIGNATURES:

Per la Commitenza (POC) / For the Commissioning Employer

Per l’Appaltatore / For the Contractor

Anagrafica dell'Appaltatore
COSTI DELLA SICUREZZA
Stima dei costi della sicurezza per le situazioni di rischio interferenti
(Selezionare il paragrafo pertinente tra i due sotto elencati)
per l’appalto in oggetto, è ragionevole ritenere che i rischi da interferenza possono essere resi compatibili, ridotti o eliminati applicando correttamente le misure generali di tutela che l’appaltatore deve ordinariamente adottare per l’esecuzione d...
per l’appalto in oggetto, è ragionevole ritenere che i rischi da interferenza possono essere resi compatibili, ridotti o eliminati adottando misure che danno luogo a costi aggiuntivi rispetto a quelli propri dell’appaltatore. pertanto la seguente sti...
Gestione delle emergenze / Emergency Management
rischi introdotti dall’appaltatore (da compilare una volta selezionato l’apPaltatore):
CONSIDERAZIONI CONCLUSIVE / CONCLUSIONS:
2024-06-06T16:05:04+0200
SCAGGS.JAMIE.LYNN.1102018768

File details come from the government source that posted it. Updated .