Attachment 2 - DRAWINGS.pdf

PDF 42 MB Posted

Attached to
Z1DA--Reconfigure Primary Care to PACT Model - Project # 539-19-101
Solicitation number
36C25020B0064
Issued by

View the file

Other files

File Type Posted
36C25020B0064 0003.docx DOCX document
RFI 8.pdf PDF
RFI 9.pdf PDF
36C25020B0064 0002 - Attachment.pdf PDF
36C25020B0064 0002.docx DOCX document
36C25020B0064 0001.docx DOCX document
Closet - 2.jpg JPG image
Staging and Dumpster Designated Area.png PNG image
Pre-Bid RFI 7_Response.pdf PDF
Pre-Bid RFI 3_Response.pdf PDF
Pre-Bid RFI 6_Response.pdf PDF
JA - ARJO.pdf PDF
539-19-101 ADDENDUM 1 2020.0818.pdf PDF
Pre-Bid RFI 2_Response.pdf PDF
539-19-101 ADDENDUM 1 DRAWINGS 2020.08.pdf PDF
Pre-Bid RFI 1_Response.pdf PDF
Closet - 3.jpg JPG image
Pre-Bid RFI 5_Response.pdf PDF
Closet - 1.jpg JPG image
Closet - 4.jpg JPG image
Pre-Bid RFI 4_Response.pdf PDF
Attachment 4 - EMR Attachment.pdf PDF
Attachment 3 - RFI Form.pdf PDF
36C25020B0064_1.docx DOCX document
Attachment 1 - SPECIFICATIONS.pdf PDF
Attachment 5 - DBA WD - OH20200082.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

.9

POLICE

VA

POLICE

VA

ST

O P

ST

O P

STOP

STO

P

ST

OP

ST

OP

STOP

STOP

STO

P

ST

O P

STOP

M

ER

GE

PROJECT LOCATION

S

T A T

E OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2021

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

100 E. Eighth Street, Ste. 300

Cincinnati, Ohio 45202-2129

Ph 513-241-3222

Fax 513-241-2981 www.thpltd.com

CONSTRUCTION

DOCUMENTS

SCHEMATIC DESIGN1 01/15/20191

2 85% DESIGN DEVELOPMENT 09/24/2019

100% DESIGN DEVELOPMENT3 03/16/2020

BID DOCUMENTS4 04/24/2020

JASON REEVES

/1

/2

:5

:2

P

M .0

TITLE SHEET

04/24/2020 VP SS

RECONFIGURE PRIMARY CARE

TO PACT MODEL

G001

539-19-101

Cincinnati, Ohio

VICINITY MAP

SHEET INDEX

3200 VINE STREET CINCINNATI, OH 45220

BUILDING 1 - MAIN BUILDING

RECONFIGURE PRIMARY CARE TO PACT MODEL

Sheet Number Sheet Name

1. GENERAL:

G001 TITLE SHEET

G002 GENERAL

G003 B01 FIRST FLOOR LIFE SAFETY PLAN

G004 CONSTRUCTION AREA PLAN

8. ABATEMENT

H100 FIRST FLOOR ABATEMENT PLAN

9. ARCHITECTURAL DEMOLITION

AD101 PARTIAL FIRST FLOOR DEMOLITION PLAN

AD102 PARTIAL FIRST FLOOR CEILING DEMOLITION PLAN

10. ARCHITECTURE

A101 PARTIAL FIRST FLOOR DIMENSION PLAN

A102 PARTIAL FIRST FLOOR NOTED PLAN

A103 PARTIAL FIRST FLOOR PLAN - DEDUCT ALTERNATES

A105 PARTIAL FIRST FLOOR REFLECTED CEILING PLAN

A301 PARTIAL BUILDING SECTIONS

A401 ENLARGED ROOMS AND ELEVATIONS

A402 ENLARGED ROOMS AND ELEVATIONS

A403 ENLARGED ROOMS AND ELEVATIONS

A404 ENLARGED ROOMS AND ELEVATIONS

A411 INTERIOR ELEVATIONS

A501 CHECK IN DESK

A505 WALL PROTECTION PLAN

A506 FRAMED DECORATIVE PANEL SYSTEM DETAILS

A507 ENLARGED DETAILS

A601 DOOR SCHEDULE

A602 DOOR ELEVATIONS AND DETAILS

A810 PARTIAL FIRST FLOOR FURNITURE/EQUIPMENT PLAN

EQ101 EQUIPMENT PNEUMATIC TUBE

10. Architecture

A801 PARTIAL FIRST FLOOR FINISH PLAN

12. FIRE PROTECTION

FX001 LEGEND & GENERAL NOTES

FX101 PARTIAL FIRST FLOOR PLAN - FIRE SUPPRESSION

13. PLUMBING

P001 LEGEND& GENERAL NOTES

PD100 PARTIAL BASEMENT PLAN - REMOVALS

PD101 PARTIAL FIRST FLOOR PLAN REMOVALS

15. PLUMBING

P100 PARTIAL BASEMENT NEW WORK

P101 PARTIAL FIRST FLOOR PLAN - DOMESTIC WATER - NEW

P102 PARTIAL FIRST FLOOR PLAN - SANITARY WASTE & VENT - NEW

P501 SCHEDULE & DETAILS

P901 SANITARY WASTE & VENT DIAGRAM

16.1 MECHANICAL

M001 LEGEND, SYBOLS & INDEX OF DRAWINGS

MD101 PARTIAL FIRST FLOOR - REMOVALS

MH100 PARTIAL BASEMENT PLAN

MH101 PARTIAL FIRST FLOOR PLAN - DUCTWORK

MH102 PARTIAL FLOOR PLAN - DUCTWORK

MP101 PARTIAL FIRST FLOOR PLAN - PIPING

16. MECHANICAL

M501 DETAILS

M502 DETAILS

M601 SCHEDULES

M701 CONTROLS & AUTOMATION

26.1 ELECTRICAL

E001 INDEX, LEGENDS & GENERAL NOTES

ED101 PARTIAL FIRST FLOOR - LIGHTING REMOVALS

ED102 PARTIAL FIRST FLOOR PLAN - POWER REMOVALS

ED103 PARTIAL FIRST FLOOR PLAN - TECHNOLOGY REMOVALS

ED401 ENLARGED PLANS AND ELEVATIONS - REMOVALS

EL101 PARTIAL FIRST FLOOR PLAN - LIGHTING

EP101 PARTIAL FIRST FLOOR PLAN- POWER

ET101 PARTIAL FIRST FLOOR PLAN- TECHNOLOGY

ET102 PARTIAL FIRST FLOOR PLAN - TECHNOLOGY PATHWAYS

ET105 FIRST FLOOR COMPOSITE DRAWING

EY101 PARTIAL FIRST FLOOR PLAN - SYSTEMS

27 ELECTRICAL

E401 ENLARGED PLANS AND ELEVATIONS - NEW WORK

E402 TYPICAL ROOMS

E501 SECURITY DETAILS

E502 TECHNOLOGY DETAILS

E601 LIGHTING FIXTURES

E602 PANEL SCHEDULES

CAMPUS MAP

SCALE | 1" = 100'

NORTH

Department of Veterans Affairs Medical Center

LEVIN PORTER ASSOCIATES

ARCHITECTURE PLANNING INTERIOR DESIGN

3011 NEWMARK DRIVE

MIAMISBURG, OH 45342

937.224.1931 P

937.224.3091 F

HEAPY ENGINEERING

MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY

1400 WEST DOROTHY LANE

DAYTON, OH 45409

937.224.0861 P

937.224.5777 F

# DESCRIPTION DATE

& AND

∠ ANGLE

@ AT

℄ CENTERLINE

DIAMETER OR ROUND

Ÿ SQUARE

# POUND OR NUMBER

A# AIR WITH NUMBER OF

VALVES INDICATED

A/C AIR CONDITIONING

ABI ADDITIONAL BID ITEM

ACOUS ACOUSTICAL

ACC ACCESSIBLE

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADD'L ADDITIONAL

AED AUTOMATED EXTERNAL

DEFIBRILLATOR

ADJ. ADJUSTABLE or ADJACENT

A.F.F. ABOVE FINISHED FLOOR

AGGR AGGREGATE

AL or ALUM ALUMINUM

ALT ALTERNATE

ANOD ANODIZED

APROX APPROXIMATE

ARCH ARCHITECT (URAL)

ASB ASBESTOS

ASC ACID STORAGE CABINET

ASPH ASPHALT

AUTO AUTOMATIC----------------------------------------

BBD BULLETIN BOARD

BD BOARD

BITUM BITUMINOUS

BLDG BUILDING

BLK BLOCK

BLK'G BLOCKING

BM BEAM

BOT BOTTOM

BRG BEARING

BRZ BRONZE

BSMT BASEMENT

BSC BIOSAFETY CABINET----------------------------------------

C. COURSES

CAB CABINET

C.B. CATCH BASIN or CHALKBOARD

CEM CEMENT

CER CERAMIC

CG CORNER GUARD

CHAM CHAMFER

CHK. BD. CHALK BOARD

C.I. CAST IRON

C.J. CONTROL JOINT

C.L. CENTER LINE

CLG CEILING

CLKG CAULKING

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

CO CLEAN OUT

COL COLUMN

COMB COMBINATION

CONC CONCRETE

CONF CONFERENCE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS

COR CONTRACTOR OFFICE REPRESENTATIVE

CORR CORRIDOR

CP CLOSURE PANEL OR FINISHED PANEL

CS CUPSINK, SEE SPECIFICATIONS FOR SIZE

CSMT CASEMENT

CT CERAMIC TILE

CTR CENTER

CTSK COUNTERSUNK

CW COLD WATER

D DATA

D.A. DOOR ACTUATOR

DBL DOUBLE

DEPT DEPARTMENT

DEPART DEPARTURE

DET DETAIL

DF DRINKING FOUNTAIN

DI DIONIZED WATER

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DIV DIVISION

DN DOWN

D.O. DOOR OPENING

DR DRYING RACK or DOOR

DS DOWN SPOUT

DSP DRY STANDPIPE

DW DUMBWAITER

DWR DRAWER

DWG DRAWING (S)

E EAST OR ELECTRIC OUTLET, COORDINATE

WITH ELECTRICAL CONTRACTOR

EA EACH

E.C.C. ENVIRONMENTAL CONTROL CHAMBER

EJ EXPANSION JOINT

EL or ELEV ELEVATION or ELEVATOR

ELEC ELECTRICAL

EMER EMERGENCY

ENCL ENCLOSURE

ENLRG'D ENLARGED

EP ELECTRICAL PANEL

EQ EQUAL

EQUIP EQUIPMENT

ES EMERGENCY SHOWER STATION BY PLUMBING CONTRACTOR

EW EMERGENCY EYEWASH BY PLUMBING CONTRACTOR

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EX or EXIST EXISTING

EXPO EXPOSED

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAK FIRST AID KIT

FB FIRE BLANKET or FLAT BAR

FBD FIREBOARD

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FGL FIBERGLASS

FH FUME HOOD

FHC FIRE HOSE CABINET

FHR FIRE HOSE RACK

FHS FIRE HOSE STATION

FIN FINISH

FL or FLR FLOOR

FLASH FLASHING

FLEX FLEXIBLE

FLUOR FLUORESCENT

FO FACE OF

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY (CMU)

FOS FACE OF STUDS

FP FIREPOOF

FR(T) FIRE RETARDANT (TREATED)

FS FILLER STRIP or FULL SIZE

FSC FLAMMABLE STORAGE CABINET

FT FOOT OR FEET

FTG FOOTING

FURR FURRING

FUT FUTURE

FV FIELD VERIFY

G# GAS COCK WITH NUMBER OF VALVES INDICATED

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GL GLASS or GRID LINE

GND GROUND

GR GUARD RAIL or GROUND

GT GROUT

GYP GYPSUM

HB HOSE BIBB

HBD HARDBOARD

HC HOLLOW CORE

HD HEAVY DUTY

HDR HEADER

HDWD HARDWOOD

HDWE HARDWARE

HEX HEXAGON

HGT HEIGHT

HM HOLLOW METAL

HORZ HORIZONTAL

HR HOUR

HTG HEATING

HVAC HEATING / VENTILATION / AIR CONDITIONING

HW HOT WATER

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER (DIM)

INSUL INSULATION

INT INTERIOR

ISO ISOMETRIC

JAN JANITOR

JC JANITOR'S CLOSET

JT JOINT

KIT KITCHEN

KPL KICKPLATE

KS KNEE SPACE

L LEFT

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LH LEFT HAND

LKR LOCKER

LOC LOCATION

LLD LEAD LINED DOOR

LT LIGHT

LTD LIMITED

LTL LINTEL

LVL LEVEL

LVR LOUVER

M METER

MACHINE

MAINT MAINTENANCE

MACH MACHINE

MAS MASONRY

MAX MAXIMUM

MM MILLIMETER

MECH MECHANICAL

MED MEDIUM

MEMB MEMBRANE

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIR MIRROR

MISC MISCELLANEOUS

MLD MOLDING

MO MASONRY OPENING

MOD MODIULAR or MODIFY (IED)

MOV MOVABLE

MT MOUNT

MTL or MET METAL

MTD MOUNTED

MUL MULLION

MWK MILLWORK

N NORTH

NAT NATURAL

NI NICKEL

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NON COM NON-COMBUSTABLE

NTS NOT TO SCALE

O/ OVER

OA OVERALL

OC ON CENTER

OD OUSIDE DIAMETER (DIA)

OFF OFFICE

OH OVERHEAD

OPH OPPOSITE HAND

OPN'S OPENING

OPP OPOSITE

OPS OPPOSITE SURFACE

PRCST PRE CAST

PB PANIC BAR

PBD PARTICLE BOARD

PCF POUNDS PER CUBIC FOOT

PERF PERFORATE (D)

PERI PERIMETER

PG PLATE GLASS

PL PLATE

PLF POUNDS PER LINEAL FOOT

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PNL PANEL

PORT PORTABLE

PPG POLISHED PLATE GLASS

PR PAIR

PS PULL SCREEN

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT POINT or PRESSURE TREATED

PTD/PTR PAPER TOWEL

DISPENSER/RECEPTICAL

PTN PARTITION

R RIGHT

RA RETURN AIR

RAD RADIUS

RB RUBBER BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RECEP RECEPTACLE

RECEPT RECEPTIONIST

REF REFERENCE

REFL REFLECTED

REFR or REFRIG REFRIGERATOR

REV REVISION

REINF REINFORCED

REQ ('D) REQUIRE (MENT) (S) ('D)

RESIL RESILIENT

RFS ROOM FINISH SCHEDULE

RGTR REGISTER

RH RIGHT HAND

RM ROOM

R.O. ROUGH OPENING

RS REAGENT SHELF or ROUGH SAWN

RWC RAIN WATER CONDUCTOR

RWL RAIN WATER LEADER

S SOUTH

SB SMOKE BARRIER or SINK BASE

SC SOLID CORE

SCHED SCHEDULE

SD STORM DRAIN or SOAP DISPENSER

SECT SETION

SFRM SPRAY APPLIED FIRE

REISTIVE MATERIAL

SF GL SAFETY GLASS

SG SHEET GLASS

SH SHELF

SHR SHOWER

SHT SHEET

SIM SIMILAR

SKL SKYLIGHT

SL SLOPE

SND or SNR SANITARY NAPKIN

DISPENSER/RECEPTICAL

SP SOUND PROOF

SPEC SPECIFICATION

SPK SPEAKER

SPL SPECIAL

SQ SQUARE

SS STAINLESS STEEL

STA STATION

STD STANDARD

STL STEEL

STOR STORAGE

STRL STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

SYN SYNTHETIC

SYS SYSTEM

TB TACK BOARD

TEL TELEPHONE

T&G TONGUE & GROOVE

THK THICK

TJ TOOLED JOINT

TO TOP OF

TV TELEVISION

TYP TYPICAL

UNF UNFINISHED

UON or UNOUNLESS

OTHERWISE NOTED

UR URNAL

V# VACUUM WITH NUMBER

OF VALVES INDICATED

VAR VARNISH

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VF VINYL FABRIC

VIF VERIFY IN FIELD

VNR VENEER

VT VINYL TILE

VWC VINYL WALL COVERING

W WEST

W/ WITH

WB WOOD BASE

WC WALL CABINET

WD WOOD

WG WIRED GLASS

WM WIRE MESH

W/O WITHOUT

WP WATER PROOF

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

XMFRTRANSFORMER

1.

MACH

COORD COORDINATE

STRUCTURAL WOOD

FINISHED WOOD

PLYWOOD

STEEL OR METAL

CERAMIC TILE

CEMENT, STUCCO,

PLASTER, OR STONE

RIGID INSULATION

BATT, BLANKET, OR

LOOSE

FILL INSULATION

SPRAY-APPLIED

INSULATION

GRANULAR/GRAVEL FILL

FACE BRICK

ACOUSTICAL TILE

CARPET

METAL (GREATER

THAN

1" = 1'-0" SCALE)

METAL (LESS THAN

1"

= 1'-0" SCALE)

GLASS BLOCK

CONCRETE

MASONRY

UNIT (CMU)

EARTH

CONCRETE (SECTION)

SURFACE MOUNTED

4' LIGHTING FIXTURE

2' x 4' RECESSED LIGHTING

FIXTURE

RECESSED LIGHTING

FIXTURE (CENTER IN CEILING

GRID SPACE)

DIR. LIGHTING FIXTURE

(CENTER IN CEILING GRID

SPACE)

SUPPLY GRILLE

RETURN GRILLE

2' x 4' ACOUSTICAL CEILING

2' x 2' ACOUSTICAL CEILING

GYPSUM BOARD CEILING

FULL HEIGHT WALL

CMU / BRICK

VENEER

STUD

PARTITION

CMU

STUD/ BRICK

VENEER

EXISTING

PARTITION

4"

1'-6"CLEAR

(MINIMUM)

1'-0" CLEAR

WITH

CLOSER AND

LATCH

M A

X

E Q

E

Q

D

IM

D

DOOR LOCATION DETAIL

DOOR FRAMING DETAIL

SCALE: N.T.S.

N.T.S.

20 GA. (MIN) DOUBLE

STUDS @ EACH JAMB

METAL DOOR FRAME

CONTINUOUS BRACING

WHERE STUDS ARE MORE

THAN 12'-0" LONG

RUNNER BETWEEN

JAMB STUDS

METAL STUDS @

16" O.C. MAX

3/4" HORIZ. BRACING WHEN

OPENING IS MORE THAN

3'-0"-OMIT BRACING WHEN DIM.

"D" IS 2'-0" OR LESS

STRUCTURAL

FLOOR /

ROOF

RUNNER

JAMB ANCHOR - MIN. 4

ANCHORS PER JAMB-TYP.

RUNNER

FLOOR SLAB

DETAIL NUMBER

DETAIL TITLE

SECTION I.D. NUMBER

DRAWING TITLE

SHEET WHERE

SECTION IS LOCATED

NOTE (IF

APPLICABLE)

SECTION

DETAIL (ENLARGED)

AREA TO BE ENLARGED

DETAIL I.D. NUMBER

SHEET WHERE

DETAIL IS LOCATED

ELEVATION ELEVATION I.D.

NUMBER

SHEET WHERE

ELEVATION IS LOCATED

DOOR NUMBER

? DOOR NUMBER

STOREFRONT

WINDOW

IDENTIFICATIO

N

FINISH

ACM-1 FINISH

IDENTIFICATIO

N

KEYED NOTES

KEYED NOTE

DESIGNATION

REVISIONS

REVISION AREA

REVISION DESIGNATION

ELEVATION HEIGHT

ELEVATION HEIGHT

100'-0"

T.O.S.

ELEVATION REFERENCE

SCALE |?

NOTE (IF

APPLICABLE)

ROOM ROOM NAME

ROOM NUMBER

COLUMN LINE

NEW DOOR

EXISTING DOOR

CWXX

AXXX

X

ONE SIDED STUDP2

ONE SIDED STUDP4

P1 TWO SIDED STUD P5 ONE SIDED HATCHANNEL

STRUCTURE ABOVE

FINISH CEILING

FINISH FLOOR

5/8"

20 GA. TRACK &

STUDS 24" O.C.

ACOUSTIC SEALANT

5/8"

ACOUSTIC

SEALANT

20 GA. TRACK &

STUDS 24" O.C.

SOUND ATTENUATION

BATT INSULATION

ACOUSTIC

SEALANT

ACOUSTIC

SEALANT

STUD

P3 TWO SIDED STUD

5/8" STUD

ACOUSTIC

SEALANT

ACOUSTIC

SEALANT

'-0

T

O T

O P

O F

W A

L L

GYPSUM

WALLBOARD

GYPSUM

WALLBOARD

GYPSUM

WALLBOARD

1 1/2"

HATCHANNEL

FIRE-RATED SEALANT

EACH SIDE

3 5/8" METAL STUD 25

GA @ 24" O.C.

BATT INSULATION

5/8" TYPE 'X'

GYPSUM BOARD

FIRE-RATED

SEALANT EACH SIDE

DEEP LEG

DEFLECTION TRACK

TEMPORARY WALL

NON BEARING WALL

T1

3 5/8" METAL STUDS @ 24" O.C. WITH 5/8"

TYPE "X" GWB

ON ONE SIDE EXTEND TO UNDERSIDE OF

STRUCTURE

6" METAL STUDS @ 24" O.C. WITH 5/8"

TYPE "X" GWB ON

ONE SIDE - EXTEND TO UNDERSIDE OF

STRUCTURE

6" METAL STUDS @ 24" O.C. WITH 5/8" TYPE "X" GWB ON

BOTH SIDES AND 5.5 " SOUND ATTENUATION BATTS -

EXTEND TO UNDERSIDE OF STRUCTURE.

MINIMUM WALL STC 51

3 5/8" METAL STUDS @ 24" O.C. WITH 5/8" TYPE "X" GWB

ON BOTH SIDES AND 3" SOUND ATTENUATION BATTS -

EXTEND TO UNDERSIDE OF STRUCTURE

MINIMUM WALL STC 49

RATED PARTITION :UL DESIGN : U465

1 1/2" HAT CHANNELS @ 24" O.C.

WITH 5/8" TYPE "X" GWB

ON ONE SIDE - EXTEND TO

UNDERSIDE OF STRUCTURE

SOUND ATTENUATION

BATT INSULATION

P7

5/8"

20 GA. TRACK &

STUDS 24" O.C.

SOUND ATTENUATION

BATT INSULATION

ACOUSTIC

SEALANT

ACOUSTIC

SEALANT

5/8" STUD

GYPSUM

WALLBOARD

5/8"

20 GA. TRACK &

STUDS 24" O.C.

SOUND ATTENUATION

BATT INSULATION

ACOUSTIC

SEALANT

ACOUSTIC

SEALANT

5/8" STUD

GYPSUM WALLBOARD

OVER AIR BARRIER

P9TWO SIDED STUD

5/8" SOUND REDUCING GYPSUM WALLBOARD

ON "TEAM" ROOM SIDE

3-5/8" METAL STUD AT 24 IN O.C. WITH SOUND

BATT INSULATION AND 5/8" TYPE X ON EXAM

SIDE.

MINIMUM WALL STC 55

TWO SIDED STUD

3 5/8" METAL STUDS @ 24" O.C. WITH

5/8" TYPE "X" GWB ON BOTH SIDES AND

AIR BARRIOR ON INSIDE FACE OF WALL

AND 3" SOUND ATTENUATION BATTS -

EXTEND TO UNDERSIDE OF

STRUCTURE

MINIMUM WALL STC 49

P10

TWO SIDED STUD

8" METAL STUDS @ 24" O.C. WITH 5/8" TYPE "X" GWB ON

BOTH SIDES AND 5.5 " SOUND ATTENUATION BATTS -

EXTEND TO UNDERSIDE OF STRUCTURE.

MINIMUM WALL STC 51

UL DESIGN : U465

3 5/8" METAL STUDS @ 24" O.C. WITH 5/8"

TYPE "X" GWB ON BOTH SIDES AND 3"

SOUND ATTENUATION BATTS - EXTEND TO

UNDERSIDE OF STRUCTURE

PROVIDE PARTIAL WALL

FRAMING CONNECTION TO

FLOOR: 3X3X1/8 HSS TUBE

STEEL SUPPORTS AT 48" O.C.

INSIDE EXPOSED WALL ENDS

TO FULL WALL HEIGHT AND

MOUNT TO FLOOR WITH 3/8"

PLATE STEEL

5/8" SOUND

REDUCING

GYPSUM

WALLBOAR

D ON

"TEAM"

SIDE

PX TWO SIDED STUD

ABOVE EXISTING WALL 3 5/8" METAL

STUDS @ 24" O.C. WITH 5/8" TYPE "X"

GWB ON BOTH SIDES AND 3" SOUND

ATTENUATION BATTS -

EXTEND TO UNDERSIDE OF

STRUCTURE

MINIMUM WALL STC 49

SOUND ATTENUATION

BATT INSULATION

ACOUSTIC

SEALANT

GYPSUM

WALLBOARD

5/8" STUD 5/8"

EXISTING WALL

5/8" TILE BACKER

BOARD

EXISTING WALL /

NEW WALL SEE

PLAN FOR WALL

TYPE

TILE FINISH

5/8" TILE BACKER BOARD

WITH TILE FINISH

OCCURS AT ALL TOILET

ROOMS AND AT CHECK-IN

AREA

F1 TILE FINISH

RATED PARTITION :UL DESIGN : U465

RATED PARTITION :UL DESIGN : U465

RATED PARTITION :UL DESIGN : U465RATED PARTITION :UL DESIGN : U465RATED PARTITION :UL DESIGN : U465

TEAM

ROOM

EXAM

ROOM

CONSTRUCTION BARRIER TO INCLUDE

NEGATIVE PRESSURE MONITOR

(LAMIFLOW LN102)

TEMPORARY DOORS IN TEMPORARY WALL

SHALL BE LATCHING, SELF CLOSING AND

FITTED WITH A CORBIN RUSSIN LOCK

WHICH CAN BE KEYED TO A

CONTRACTOR'S KEY BY THE VA

LOCKSMITH

P10 TEAM ROOM KNEE WALL

(2) 3 5/8" METAL STUDS @ 16"

O.C. WITH 5/8" TYPE "X" GWB

ON FINISH SIDE

P6 KNEE WALL (TYP AT ALL AREAS UNO)

3 5/8" METAL STUDS @ 16"

O.C. WITH 5/8" TYPE "X" GWB

ON BOTH SIDES

SOLID SURFACE

SILL WITH EASED EDGE

GYPSUM

WALLBOARD

20 GA. TRACK &

STUDS 16" O.C.

5/8"

3 5/8" 3 5/8"

5/8"

VARIES SEE PLAN

STRUCTURE ABOVE

FINISH CEILING

FINISH FLOOR

SOLID SURFACE

SILL

GYPSUM

WALLBOARD

20 GA. TRACK &

STUDS 16" O.C.

WALL REVEAL

4 7/8"

5 1/2"

/4

'-0

T

O T

O P

O F

W A

L L

NOTE: ALL WALLS WHICH DO NOT EXTEND TO STRUCTURE ABOVE

M

IN

1 1/2" CHANNEL

OR STEEL STUD

BRACING @ 4' O.C.

1 1/2" CHANNEL

OR STEEL STUD

BRACING @ 4' O.C.

TOP RUNNER

LINE OF CEILING

STUD PARTITION

WALL SEE PLAN

FOR HEIGHT AND

LOCATIONWALL BRACING DETAIL

SCALE: N.T.S.

ACOUSTICAL SEALANT

SCALE: N.T.S.

ACOUSTICAL

SEALANT

STUD PARTITION

WALL SEE PLAN

FOR HEIGHT AND

LOCATION

SET STUD

TRACK IN (2)

CONTINUOUS

BEADS OF

SEALANT

CORE DRILLED PIPE AT FLOOR

WALL PIPE PENETRATION

WALL ASSEMBLY

THERMAFIVER SAFING

INSULATION

FIRECODE COMPOUND

PENETRATION

WRAP STRIP

STEEL COLLAR

/1

M

IN

/1

M

A X

PENETRATION

/2

FIRE RESISTAN SEALANT.

WHERE FLOOR IS FIRE

RATED, COMBINATION OF

SEALANT, BACKING

MATERIAL AND INSULATION

SHALL MEET THIS RATING

REFER TO SPECIFICATIONS

FOR FIRE STOPPING

SYSTEM MANUFACTURERS

CORE DRILL

LARGE HOLE

MINIMUM

REQUIRED DEPTH

THROUGH SLAB

POURED IN PLACE

STEEL PIPE SLEVE

WITH INTEGRAL

WATER STOP

CORE DRILL

SMALL HOLE

THROUGH SLAB

AS REQUIRED TO

CLEAR WATER

STOP

SCALE: N.T.S.

SCALE: N.T.S.

S

T A T

E OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2021P ro je ct N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

100 E. Eighth Street, Ste. 300

Cincinnati, Ohio 45202-2129

Ph 513-241-3222

Fax 513-241-2981 www.thpltd.com

CONSTRUCTION

DOCUMENTS

SCHEMATIC DESIGN1 01/15/20191

2 85% DESIGN DEVELOPMENT 09/24/2019

100% DESIGN DEVELOPMENT3 03/16/2020

BID DOCUMENTS4 04/24/2020

JASON REEVES

/1

/2

:4

:2

P

M .0

GENERAL

04/24/2020 VP SS

RECONFIGURE PRIMARY CARE

TO PACT MODEL

G002

539-19-101

Cincinnati, Ohio

A. PATCH ALL AREAS TO MATCH ADJACENT/EXISTING FINISHES. EACH

CONTRACTOR IS RESPONSIBLE FOR ANY AREAS PREVIOUSLY

UNEXPOSED THAT WILL BE EXPOSED BY NEW WORK OR

DEMOLITION, MATCH EXISTING FINISHES.

B. CONTRACTOR IS RESPONSIBLE FOR VARIATIONS IN EQUIPMENT

SIZES, LOUVER OPENINGS, ETC. TO ACCOMMODATE ANY

VARIATIONS IN EQUIPMENT BID. SEE SPECIFICATIONS AND

DRAWINGS FOR BASIS OF DESIGN. THIS INCLUDES ANY

VARIATIONS IN STRUCTURAL REQUIREMENTS TO ACCOMMODATE

EQUIPMENT.

C. ALL INTERIOR DIMENSIONS ARE TO FINISH FACE UNLESS NOTED

OTHERWISE.

D. INTERIOR CONCRETE SLABS AND PATCHES, USE MIN. 15 MIL

REINFORCED POLYETHYLENE VAPOR BARRIER UNDER THE

CONCRETE SLAB. SMOOTH TROWEL FLUSH WITH EXISTING SLAB

ELEVATION. SEAL VAPOR BARRIER WATER TIGHT.

E. CONTRACTOR'S BID SHALL INCLUDE THE GREATEST QUANTITY

AND QUALITY OF ALL ITEMS AND ASSEMBLIES FOR A COMPLETE

AND FULLY OPERATIONAL PROJECT IN ACCORDANCE WITH

OWNERS, ARCHITECTS, AND GOVERNING AUTHORITY

REQUIREMENTS.

F. UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS,

CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION,

REMOVING, AND REPLACEMENT WORK SPECIFIED AND AS

REQUIRED TO ACCOMMODATE THE REQUIRED IMPROVEMENTS,

AND SHALL ALSO BE RESPONSIBLE FOR ANY AND ALL NECESSARY

REPLACEMENT, REPAIRING, AND PATCHING TO BE DONE BY

WORKMEN SKILLED AND REGULARLY EMPLOYED IN THE TRADES

INVOLVED - FINISHES SHALL MATCH EXISTING AND/OR ADJACENT

SURFACES AND AS SPECIFIED.

G. CONTRACTOR SHALL PROPERLY PLAN AND EXECUTE WORK

RELATIVE TO AND IN CONSIDERATION OF WORK TO BE

PERFORMED BY OTHERS IN ORDER TO MITIGATE ALL IMPACTING

ISSUES AND CONFLICTS. NO EXTRA COSTS FOR THE LACK OF

PROPER PLANNING AND EXECUTION WILL BE PERMITTED.

H. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS FOR ANY

MATERIAL DIFFERENCE PRIOR TO PERFORMING ANY WORK AND

SHALL NOTIFY ARCHITECT/COR MANAGER OF ANY

DISCREPANCIES.

I. COORDINATE FINAL PLACEMENT OF ALL WALL MOUNTED

EQUIPMENT WITH SIGNAGE. COORDINATE WITH COR AND VA

INTERIORS.

J. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE

WITH ALL GOVERNING CODES AND REGULATIONS INCLUDING THE

AMERICAN DISABILITIES ACT (ADA) .

K. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL

PROVISIONS OF THE SPECIFICATIONS INCLUDING ALL GENERAL

CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS, MATERIAL

AND CONSTRUCTION PROVISIONS WHICH APPLY TO MATERIALS

OR CONSTRUCTION METHODS REQUIRED.

L. DO NOT PAINT ANY SEALANTS OR CAULKING WHICH ARE SUBJECT

TO MOVEMENT. CONTROL JOINTS SHALL BE CAULKED AFTER

PAINTING AND SPECIAL COATING APPLICATIONS. PROVIDE

CAULKING OR SEALANTS WHICH MATCH ADJACENT FINISHED

COLORS UNLESS NOTED OTHERWISE.

M. ALL EXISTING CONSTRUCTION TO REMAIN THAT ARE DAMAGED OR

DISTURBED DURING CONSTRUCTION SHALL BE PATCHED OR

REPAIRED TO MATCH EXISTING ADJACENT CONSTRUCTION.

N. ALL INTERIOR WOOD BLOCKING, MISC. FRAMING, PANELS, ETC.

THAT ARE TO BE USED SHALL BE FIRE-RETARDANT TREATED. ALL

EXTERIOR WOOD BLOCKING SHALL BE PRESSURE TREATED.

O. ALL SUSPENDED ITEMS SHALL BE ATTACHED DIRECTLY TO

STRUCTURE AND NOT ANCHORED TO ANY NON-STRUCTURAL

ITEM, COMPONENT OR SYSTEM.

P. ALL NEW PENETRATIONS IN ALL EXISTING, MODIFIED OR NEW

CORRIDOR WALLS, SMOKE AND FIRE PARTITIONS, AND FLOOR

SLABS SHALL BE SEALED WITH FIRE RESISTANT CAULKING OR

SEALANT THAT PREVENTS THE PASSAGE OF SMOKE AND/OR FIRE

ALL COMPLYING TO THE LIFE SAFETY AND FIRE CODE AND

MEETING EXISTING CONDITIONS.

Q. NEW CORE DRILLING THROUGH EXISTING STRUCTURAL ELEMENTS

REQUIRED BY CONSTRUCTION SHALL BE COORDINATED BY THE

CONTRACTOR TO AVOID DRILLING THROUGH OR INTO ANY

STRUCTURAL ELEMENTS.

R. NEW CONSTRUCTION INSTALLED SHALL BE COORDINATED BY THE

CONTRACTOR FOR PROPER FIT, DIMENSIONS AND ACCESS TO THE

BUILDING PRIOR TO BEGINNING CONSTRUCTION AND DELIVERY OF

COMPONENTS TO THE SITE.

S. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE

COR OF ANY WORK THAT MIGHT REQUIRE INTERRUPTION OF

UTILITY SERVICES, CAUSE NOISE, OR CREATE VIBRATION PRIOR

TO COMMENCEMENT OF THIS WORK.

T. A MINIMUM OF 3 WEEKS NOTICE ( 21 CALENDAR DAYS) IS

REQUIRED FOR ANY UTILITY SHUTDOWN OR MAJOR

INTERRUPTION

U. CONTRACTOR TO PROVIDE PROTECTIVE MASKS TO BE WORN BY

ALL CONSTRUCTION STAFF IN ALL COMMON AREAS WITHIN THE

HOSPITAL.

GENERAL PROJECT NOTES:SYMBOLS CEILING SYMBOLS MATERIAL INDICATION WALL TYPES TYPICAL DOOR DETAILS

ABBREVIATIONS

TYPICAL WALL DETAILS

INTERIOR WALL PARTITIONS

TYPICAL WALL DETAILS

DN

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

LC

EP

LC

LC

5 1

1 1

3 3 3

1 1

1 1 1 1

1 1

1 1

1 1

1 1

1 1

111111 1

1-F009

1-F004

1-F005

1-F003

2 2 2 2

1-F023

1-F022

1-F024

1-F010

1-F011

1-F012

1-F013

1-F007

1-F006 1-F008

1 1

1 1

1-F019

1-F020

1-F021

1 1

1 1

1-F017

1-F015

1-F016

1-F014

1-F018

1-F002

1-F001

G003

MAIN ENTRANCE / EXIT

EXISITNG EXIT

EXISITNG EXIT

EXISITNG EXIT

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SYMBOLS LIST

1 HOUR FIRE/SMOKE BARRIER

30 MINUTE SMOKE BARRIER

SMOKE RESISTIVE HAZARDOUS

AREA

HORIZONTAL EXIT PASSAGEWAYHE

EX EXIT

EP

LC

TC

EXIT PASSAGEWAY

LINEN CHUTE

TRASH CHUTE

SUITE DESIGNATIONS

AREA OPEN TO CORRIDOR -

WITH SMOKE DETECTION

AREA OPEN TO

CORRIDOR - NO SMOKE

DETECTION REQUIRED

NR CORRIDOR

SMOKE RESISTIVE

SMOKE BARRIER

3/4 HOUR FIRE

1 1/2 HOUR FIRE

EMERGENCY LIGHTS

EXIT LIGHTS

FIRE EXTINGUISHER

CABINETS

1 1 1

1 1

1 1

1 1 1

1-F009

Mech C149

1-F008

STOR

C1057

PCR-T

C1023

PCR-T

C1039

ELEC.

C1040

LINEN

C1041

HAC

C1042

TELE.

C1043

STOR

C1044

PCR-T

C1045

PCR-T

C190

PCR-T

C189

GROUP CARE

C188

PCR-E

C1046

PCR-E

C1047

PCR-E

C1048

PCR-E

C1056

PCR-T

C1055

PCR-E

C1054

UTILITY

C1049

PCR-E

C1050

PCR-W/B/P

C1051

PCR-E

C1053 TOILET

C1052

TEAM ROOM

C173

TEAM ROOM

C175

TELE

HEALTH

C185

TEAM ROOM

C169

WAITING ROOM

C1002

OFFICE

C1005

OFFICE

C1004

OFFICE

C1006

OFFICE

C1007

PCR-E NG

C1010

PCR-RETINAL

C1011

PCR-E

C1012

PCR-E

C1013

PCR-E

C1014

PCR-E

C1015

PCR-E

C1016

PCR-E

C1017

PCR-T

C1024

PCR-E

C1026

PCR-E

C1027

PCR-W/B/P

C1030

PCR-E NG

C1031

PCR-E

C1032

TEAM ROOM

C172

TEAM ROOM

C172

PCR-E

C1033

PCR-E

C1034

PCR-E

C1035

PCR-E

C1036

PCR-E

C1037

PCR-E

C1038

CHECK-IN

C1003

OFFICE

C1018

PCR-T

C1020

ELEC.

C1022

HUDDLE AREA

C168

HUDDLE AREA

C176

ELEC.

C177

SIG

C179

OMNICELL

C181

SOILED

STOR

C182TELE

HEALTH

C183

TELE

HEALTH

C184

TEAM ROOM

C186

OFFICE

C166

PCR-E

C1009

PCR-E

C1008

FEMALE TOILET

C146

MENS RESTROOM

Voluntary Service C147

Mech.

C149Office C152

Office C153

Office C154

Exam C155

Exam C156

Exam C157

EXAM

C158

Exam C159

STOR

C188A

STOR

C187

PATIENT

CORRIDOR

C*1*14

PATIENT

CORRIDOR 3

C*1*17

Corridor

C*1*10

PATIENT

CORRIDOR 1

C*1*15

STAFF CORRIDOR

C*1*19

TOILET

C165HAC

C167

TRAVEL DISTANCE = 190'

TRAVEL DISTANCE = 145'

TRAVEL DISTANCE = 145'

VERIFY ALL EXISTING RATED WALLS EXTEND TO

STRUCTURE. SEAL ALL PENETRATIONS PER UL

BUILDING INFORMATION

USE GROUP I-2(NFPA 101, TYPE 1)

CONSTRUCTION TYPE IA

100% FULLY SPRINKLED

FLOOR RATING: 3 HR

ROOF RATING: 2 HR

SHAFT RATING: 2HR

COLUMN RATING: 2 HR

3 HOUR

UL DESIGN

#X772

3 HOUR

UL DESIGN

#D925

STL. COLUMN AS SHOWN ON STRUCTURAL DRAWINGS WITH

SPRAYED ON CEMENTITIOUS FIREPROOFING MATERIAL TO

CONFORM TO THE UL DESIGN SPECIFICATIONS

6-1/2" CONCRETE ON 1-1/2" STL. FLOOR DECKING W/ STL.

BEAMS AS SHOWN ON STRUCTURAL DRAWINGS. STRL.

BEAMS AND DECK TO BE SPRAYED W/ CEMENTITIOUS

FIREPROOFING MATERIAL CONFORMING TO THE UL DESIGN

SPECIFICATIONS

S

T A T

E OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2021

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

100 E. Eighth Street, Ste. 300

Cincinnati, Ohio 45202-2129

Ph 513-241-3222

Fax 513-241-2981 www.thpltd.com

CONSTRUCTION

DOCUMENTS

SCHEMATIC DESIGN1 01/15/20191

2 85% DESIGN DEVELOPMENT 09/24/2019

100% DESIGN DEVELOPMENT3 03/16/2020

BID DOCUMENTS4 04/24/2020

JASON REEVES

.0

B01 FIRST FLOOR LIFE SAFETY

PLAN

04/24/2020 VP SS

RECONFIGURE PRIMARY CARE

TO PACT MODEL

G003

539-19-101

Cincinnati, Ohio

SCALE | 1" = 20'-0"

FIRST FLOOR LIFE SAFETY PLAN26

SYMBOLS LIST

BLDG 16

BLDG 1

BLDG 2

CINCINNATI CAMPUS KEYPLAN

Scale: N.T.S.

AREA OF

WORK

SCALE | 1/16" = 1'-0"

PARTIAL FIRST FLOOR - LIFE SAFETY PLAN1

NORTH

NORTH

CODE ANALYSIS RATED ROOF / FLOOR ASSEMBLIES

The design Criteria for this project will comply with the following VA design Manuals and Code standards

1. VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL)

2. National Fire Protection Association (NFPA) 101 Life Safety Code – 2018

3. International Building Code (IBC) – Current edition 2018

4. Uniform Federal Accessibility Standards (UFAS) including VA Supplement, Barrier Free Design

5. Americans with Disabilities Act (ADA)

1. EXISTING STRUCTURE WILL BE OCCUPIED DURING ENTIRE CONSTRUCTION PERIOD.

CONTRACTOR TO PROTECT EXISTING STRUCTURE DURING ALL PHASES OF

CONSTRUCTION.

2. SEE G002 FOR ALL GENERAL PROJECT REQUIREMENTS.

3. REFER TO G002 FOR PARTITION TYPES.

4. THE PLANS ON THIS SHEET ARE SHOWN FOR DIAGRAMMATIC AND PHASING PURPOSE

ONLY. IT SHOULD NOT BE SCALED OR OTHERWISE USE FOR TAKE OFFS. THE SCOPE

OF WORK IS MOST ACCURATELY DETAILED IN THE ACCOMPANYING BID DOCUMENTS.

IN THE EVENT THAT THERE IS ANY AMBIGUITY OR CONFLICT BETWEEN THE SCOPE

DESCRIBED IN THIS SHEET AND THE SCOPE DETAILED IN THE ACCOMPANYING BID SET,

THE BID SET SHALL GOVERN.

5. COORDINATE ALL PHASING WITH COR.

6. EXISTING PUBLIC MEANS OF EGRESS TO BE MAINTAINED THROUGHOUT PROJECT AT

ALL TIMES.

7. FURNITURE AND EQUIPMENT ACQUIRED BY VA TO BE CONTRACTED TO BE SEQUENCED

AND DELIVERED PER PHASE.

8. CONTRACTOR TO PROVIDE PROTECTIVE MASKS TO BE WORN BY ALL CONSTRUCTION

STAFF IN ALL COMMON AREAS WITHIN THE HOSPITAL.

9. TEMPORARY FIRE SUPPRESSION SYSTEM MUST BE INSTALLED IN AREAS WHERE

SPRINKLERS ARE OUT OF COMMISSION.

10. A MINIMUM OF 3 WEEKS NOTICE ( 21 CALENDAR DAYS) IS REQUIRED FOR ANY UTILITY

SHUTDOWN OR MAJOR INTERRUPTION . CONTRACTOR TO COORDINATE APPROVAL

WITH COR.

NO WORK THIS AREA

FACILITY WILL BE OCCUPIED

DURING CONSTRUCTION

NO WORK THIS

AREA

FACILITY WILL BE

OCCUPIED

DURING

CONSTRUCTION

T1

T1

T1

T1

PROJECT CONSTRUCTION AREA

NEW WALL

DEMOLITION WALL

TEMPORARY WALL -

DESIGNATES START

OF CONSTRUCTION

AREA .

EXISTING WALL

NOT IN CONTRACT

S

T A T

E OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2021

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

100 E. Eighth Street, Ste. 300

Cincinnati, Ohio 45202-2129

Ph 513-241-3222

Fax 513-241-2981 www.thpltd.com

CONSTRUCTION

DOCUMENTS

SCHEMATIC DESIGN1 01/15/20191

2 85% DESIGN DEVELOPMENT 09/24/2019

100% DESIGN DEVELOPMENT3 03/16/2020

BID DOCUMENTS4 04/24/2020

JASON REEVES

/1

/2

:5

:0

A

M .0

CONSTRUCTION AREA PLAN

04/24/2020 VP SS

RECONFIGURE PRIMARY CARE

TO PACT MODEL

G004

539-19-101

Cincinnati, Ohio

GENERAL PHASING NOTES

SCALE | 1/8" = 1'-0"

PARTIAL PLAN WITH TEMPORARY PARTITIONS26

LEGEND

NORTH

NO WORK THIS AREA

NO WORK THIS AREA

Mens

Restroom

Office B146

Stor B145A

Vestry B163B

Stor B163C

Chaplain B163L

Pharmacy

Specialist B156

Storage B157

Storage B158

Stor.

B150A

SVC. Officer B147

SVC. Officer B148

SVC. Officer B148A

SVC. Officer B150B

SVC. Officer B149

SVC. Officer B149A

Waiting

Room B150

Corridor C*1*14

Off.

C134A

Adm. Asst.

C134B

Off.

C134C

Off.

C134D

Off.

C134E

PIV Registrar B156A

Pain School B156B

Elec.

B155

Elec.

B155A

Tlt.

C1012

Clinical

Pharm.

C1014

RN

C1015

Exam C1018

Exam C1019

Exam C1020

Exam C1021

Exam C1022

Exam C1023

Exam C1024

Exam C1025

Exam C1026

Meds C1027

Exam C1028

Exam C1029

Exam C1030

Office C1032

Clinicians

Break Rm.

C1033

Women's

Lockers C1033A

F. Tlt.

C1033B

Men's

Lockers C1033C

M. Tlt.

C1033D

Program

Assistant C1017

Care

Coordination C1013A

Dist. Pharm.

C1034

Changing

Room-MRI C1035

Reception C1036

Social

Worker C1037

RN

C1038

Tlt.

C1039

Office C1040

Exam C1041

Wrk. St.

C1042

HAC

C1043

Exam C1044

Neg. Press.

C1045

Exam C1046

Tele Exam C1047

Exam C1048

Neg. Press.

C1049

Exam C1050

Tele Exam C1051

Exam C1052

Ante C1053

Procedure C1054

Elec.

C1055

Stor.

C1057

Tele.

C1059 exam C1061

Soiled Utility C1063

Exam C1000

Exam C1001

Exam C1002

Exam C1003

Exam C1004

Office C1005

Exam C1006

Exam C1007

Exam C1008

Procedure C1009

Office C1010

Office C1011

Storage B153

Work Area C1038A

Pharmacist

Counselor C165

Reception C167

Clinical

Pharm.

C168

RN

C169

Nutrition C170

Office C171

Exam C172

Work St.

C173

Exam C175

Elec.

C176

Exam C177

Exam C178

Exam C179

Exam C180

Exam C181

Exam C182

Meds C183

Elec.

C184

Exam C185

Linen C186

Procedure C187

HAC

C188

Exam C189

Tele.

C190

Exam C191

Stor.

C192

Voluntary

Service C147

Mech.

C149

Office C152

Office C153

Office C154

Exam C155

Exam C156

Exam C157

Exam C158

Exam C159

F. Tlt.

C146

Storage C195

Blood Draw

Rm.

C193

RN

C194

Work Area C169A

Intake C196

Exam C197

Exam C198

Exam C199

Corridor C*1*12 Waiting

Room C145

Entry C-1-10L

Corridor C*1*15

Corridor C*1*19

Corridor C*1*16

Corridor C*1*17

Corridor C*1*18

Kit.

B152

Corridor C*1*4

Recreation B151

Stor.

B151L

Closet B163F

Stair 8 S*1*8

Office C1005A

Reception

Radiology C145

NO WORK THIS AREA

NO WORK THIS AREA

A507

Asbestos-containing floor tile and black mastic.

Asbestos-containing black mastic under non-asbestos-containing floor tile.

Note: Other rooms/hallways within the project area with vinyl floor tile and black mastic tested negative for asbestos as a result of the recent pre-renovation survey. These rooms with negative tile and black mastic were rooms previously abated in a 2003 renovation with tile/mastic replaced; the above indicated rooms had not been included in the 2003 renovation project).

Abate Per Specification Section 02 82 13.19 Asbestos Floor Tile & Mastic Abatement

S

T A T

E OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2021

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

100 E. Eighth Street, Ste. 300

Cincinnati, Ohio 45202-2129

Ph 513-241-3222

Fax 513-241-2981 www.thpltd.com

CONSTRUCTION

DOCUMENTS

SCHEMATIC DESIGN1 01/15/20191

2 85% DESIGN DEVELOPMENT 09/24/2019

100% DESIGN DEVELOPMENT3 03/16/2020

BID DOCUMENTS4 04/24/2020

JASON REEVES

.0

FIRST FLOOR ABATEMENT PLAN

04/24/2020 VP SS

RECONFIGURE PRIMARY CARE

TO PACT MODEL

H100

539-19-101

Cincinnati, Ohio

BLDG 16

BLDG 1

BLDG 2

CINCINNATI CAMPUS KEYPLAN

Scale: N.T.S.

AREA OF

WORK

SCALE | 1/8" = 1'-0"

PARTIAL FIRST FLOOR - ABATEMENT1

NORTH

3 3

3 3

OS

D

DD

D

D

D

D

F F

48" MH

D 48" MH

D

D

D D

D D

D

48" MH

D

48" MH

D

D

D

D

D D

D

D

D

D

D

D

D

D

D

D

D

D

DD

D

D

48" MH

D

48" MH

D

D

D D

D

D

D

D

D D

60" MH

P

D

D

D

D

D

D

CR

60" MH

P

D

BLANK

CR

D

D

60" MH

P

D

60" MH

P D

D

60" MH

P

D

60" MH

P

D

60" MH

P

D

IC

D

BLANK

D

D

60" MH

P

P

DD

D

D

D

D

D

D

D

DD

60" MH

P D

D

60" MH

P

P

60" MH

P

D

60" MH

P

P

60" MH

P D

60" MH

P D

IC

KK

CR

KP

D D

D

D

D

DM

DM

DM

DM

T

T

T T

T

T

T

T

T

T T T

T

TT

T

TT

T

T

T

T

T

NO WORK THIS AREA

NO WORK THIS AREA

34' - 5 1/2"

9' - 2 1/2"

16' - 1" 49' - 10"

38' - 7 1/2"

A301

/8

2.01

1.07

1.07

1.07

1.07 1.07

1.07

1.07

1.07

1.07

2.07

2.07

TYP

2.02

1.071.07

1.07

1.07

TYP

2.10

2.10

TYP

2.10

8'-0"

2.07

2.10. .

TYP

2.10. .

6' - 5 1/2" 7'-4 1/2" +/_ 30' - 9 1/2"

2.092.09

2.09

2.09

2.13

2.13

2.13

2.13

2.07

1.06

1.05

1.05

1.06

1.05

1.07

1.07

TYP

2.10

TYP

2.02

2.21

EXISTING WALL TO BE DEMOLISHED

EXISTING WALL TO REMAIN

HATCHED AREAS INDICATE

AREAS NOT INCLUDED IN

THE PROJECT SCOPE

EXISTING DOOR TO BE DEMOLISHED

EXISTING DOOR TO REMAIN

EXISTING WINDOW TO BE DEMOLISHED

TEMPORARY WALL

TEMPORARY DOOR

D

REFER TO

MEP

DRAWINGS

T

F

Mens

Restroom

Tlt.

C1012

Clinical

Pharm.

C1014

RN

C1015

Exam C1018

Exam C1019

Exam C1020

Exam C1021

Exam C1022

Exam C1023

Exam C1024

Exam C1025

Exam C1026

Meds C1027

Exam C1028

Exam C1029

Exam C1030

Office C1032

Clinicians

Break Rm.

C1033

Women's

Lockers C1033A

F. Tlt.

C1033B

Men's

Lockers C1033C

M. Tlt.

C1033D

Program

Assistant C1017

Care

Coordination C1013A

Dist. Pharm.

C1034

Changing

Room-MRI C1035

Reception C1036

Social

Worker C1037

RN

C1038

Tlt.

C1039

Office C1040

Exam C1041

Wrk. St.

C1042

HAC

C1043

Exam C1044

Neg. Press.

C1045

Exam C1046

Tele Exam C1047

Exam C1048

Neg. Press.

C1049

Exam C1050

Tele Exam C1051

Exam C1052

Ante C1053

Procedure C1054

Elec.

C1055

Stor.

C1057

Tele.

C1059 exam C1061

Soiled Utility C1063

Exam C1000

Exam C1001

Exam C1002

Exam C1003

Exam C1004

Office C1005

Exam C1006

Exam C1007

Exam C1008

Procedure C1009

Office C1010

Office C1011

Work Area C1038A

Pharmacist

Counselor C165

Reception C167

Clinical

Pharm.

C168

RN

C169

Nutrition C170

Office C171

Exam C172

Work St.

C173

Exam C175

Elec.

C176

Exam C177

Exam C178

Exam C179

Exam C180

Exam C181

Exam C182

Meds C183

Elec.

C184

Exam C185

Linen C186

Procedure C187

HAC

C188

Exam C189

Tele.

C190

Exam C191

Stor.

C192

F. Tlt.

C146

Storage C195

Blood Draw

Rm.

C193

RN

C194

Work Area C169A

Intake C196

Exam C197

Exam C198

Exam C199

Corridor C*1*12 Waiting

Room C145

Entry C-1-10L

Corridor C*1*15

Corridor C*1*19

Corridor C*1*16

Corridor C*1*17

Corridor C*1*18

Stair 8 S*1*8

Office C1005A

Reception

Radiology C145

Exam

Stor. Tele. HAC

Linen Elec. Exam Exam Exam Elec. Exam Nutrition Clinical

Pharm.

1.07

1.07 1.07 1.07

1.07 1.07 1.07 1.07 1.07 1.07

1.07

1.07 1.07

1.07

Reception

Radiology C145

1.07

A. SEE SHEET G002 FOR WALL PARTITION DETAILS AND GENERAL PROJECT NOTES

B. COORDINATE ADDITIONAL DEMOLITION NOT SHOWN REQUIRED FOR ABATEMENT WORK TO BE DONE

SEE DRAWING H-100

C. SEE PHASING PLAN SHEET DRAWING G004 FOR TEMPORARY PARTITION AND CONSTRUCTION

BOUNDARIES

D. WORK TO PROVIDE COMPLETE PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS SHALL OCCUR

BEYOND EXTENT OF WORK AS REQUIRED. CONTRACTOR TO PREPARE ANY EXISTING AREAS BEYOND EXTENT OF WORK FOR INSTALLATION OF SUCH SYSTEMS. (SEE ALL PLUMBING, MECHANICAL AND

ELECTRICAL DRAWINGS)

E. IF ALL WALLS OF A ROOM ARE TO BE REMOVED, THE CEILING IS TO BE REMOVED, UNLESS NOTED

OTHERWISE.

F. IF ALL WALLS OF A ROOM ARE TO BE REMOVED, FLOORING AND BASE ARE TO BE REMOVED, UNLESS

NOTED OTHERWISE

G. REMOVE ALL CORNER GUARDS, KICKPLATES, BUMPER RAILS AND WALL PROTECTION IN ALL AFFECTED

AREAS UNLESS NOTED OTHERWISE.

H. ALL DEMOLITION TO BE BY TRADE INVOLVED. SEE PLUMBING, MECHANICAL AND ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

I. REMOVE ALL EXISTING WALLS AND FURRING TO EXPOSE CONCRETE COLUMNS UNLESS NOTED

OTHERWISE.

J. CONTRACTOR IS RESPONSIBLE FOR CREATING A LEVEL FLOOR FOLLOWING REMOVAL OF EXISTING

CONSTRUCTION. PATCHING DEMOLITION AREAS MAY NOT BE ADEQUATE.

K. COORDINATE ABOVE CEILING WORK WITH PLUMBING PLAN

L. BUILDING WILL BE OCCUPIED DURING MAINTAIN ACCESS TO ROOMS NOT BEING WORKED ON

M. COORDINATE PHASE WORK WITH VA COR

N. PROTECT EXISTING STRUCTURE, ADJACENT WINDOWS, DOORS AND OTHER BUILDING ELEMENT

DURING DEMOLITION.

O. CONTRACTOR TO MAINTAIN ACCESS TO EXITS DURING DEMOLITION AND CONSTRUCTION.

P. INSTALL AND ADJUST DUST BARRIERS AND WALK OFF MATS AT ALL DOORWAYS ADJACENT TO MAIN

CORRIDOR.

Q. CONTRACTOR TO PROVIDE DURABLE TEMPORARY DIRECTION SIGNS TO EXITS AND OPERABLE

RESTROOMS DURING CONSTRUCTION PERIOD.

R. PATCH/REPAIR SURFACES AS REQUIRED FOR NEW FINISHES AS SCHEDULED, INCLUDING AREAS THAT

WERE PREVIOUSLY OUT OF VIEW THAT ARE EXPOSED BY THIS PROJECT. MATCH EXISTING FINISHES, THIS INCLUDES WORK BY ALL TRADES.

S. INSTALL A TEMPORARY DUST BARRIER BETWEEN THE CONSTRUCTION AREA AND ADJACENT OCCUPIED

SPACE.

T. DURING DEMOLITION AND CONSTRUCTION, LOCATE AND MAINTAIN SMOKE DETENTION, FIRE

EXTINGUISHERS, ILLUMINATION AND LIFE SAFETY SYSTEMS AS WOULD OTHERWISE BE REQUIRED IN AN

OCCUPIED SPACE.

U. COORDINATE SPECIFIC FIELD EGRESS REQUIREMENTS WITH THE COR AND THE FIRE OFFICIALS PRIOR

TO COMMENCING WORK.

V. REMOVE EXISTING PARTITIONS SHOWN W/ DASHED LINES. PROVIDE NEW FINISHES AS SCHEDULED AT ALL AREAS OF REMOVAL AND REPAIRS. WALL, CEILING AND FLOOR FINISHES TO MATCH ADJACENT

SURFACES.

W. REMOVE ALL EXISTING DOORS AND HOLLOW METAL FRAME WHERE INDICATED WITH DASHED LINES.

X. REMOVE ALL EXISTING WALL MOUNTED EQUIPMENT, CASEWORK AND SIGNAGE IN WALLS SLATED FOR

REMOVAL. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.

Y. CONTRACTOR TO TURN OVER ALL VA SIGNS TO VA INTERIOR DESIGNER.

Z. SEE MEP DRAWINGS FOR CEILING HUNG EQUIPMENT INFORMATION..

S

T A T

E OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2021

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

100 E. Eighth Street, Ste. 300

Cincinnati, Ohio 45202-2129

Ph 513-241-3222

Fax 513-241-2981 www.thpltd.com

CONSTRUCTION

DOCUMENTS

SCHEMATIC DESIGN1 01/15/20191

2 85% DESIGN DEVELOPMENT 09/24/2019

100% DESIGN DEVELOPMENT3 03/16/2020

BID DOCUMENTS4 04/24/2020

JASON REEVES

/1

/2

:2

:4

A

M .0

PARTIAL FIRST FLOOR

DEMOLITION PLAN

04/24/2020 VP SS

RECONFIGURE PRIMARY CARE

TO PACT MODEL

AD101

539-19-101

Cincinnati, Ohio

SCALE | 1/8" = 1'-0"

PARTIAL FIRST FLOOR - DEMOLITION26

BLDG 16

BLDG 1

BLDG 2

CINCINNATI CAMPUS KEYPLAN

Scale: N.T.S.

AREA OF

WORK

KEYNOTES

LEGEND

NORTH

1.05 TEMPORARY DOOR

1.06 TEMPORARY PARTITION

1.07 EXISTING TO REMAIN

2.01 REMOVE EXISTING STOREFRONT DOOR AND ALL ASSOCIATED

HARDWARE. CONTRACTOR TO PREP OPENING AS REQUIRED FOR

NEW WORK.

2.02 REMOVE AND DISPOSE EXISTING DOOR, FRAME AND TRIM IN ITS

ENTIRETY.

2.07 REMOVE EXISTING RECEPTION AREA, ALL COUNTERS AND

STRUCTURAL SUPPORT

2.09 REMOVE PORTION OF EXISTING PARTITION WALL. PATCH AS

NEEDED FOR INSTALLATION OF NEW WALL.

2.10 REMOVE EXISTING FLOORING AND BASE AND PREP FLOOR FOR

NEW FINISH.

2.13 REMOVE EXISTING CASEWORK AND ALL ASSOCIATED STRUCTURAL

SUPPORTS AND DISPOSE OFF SITE

2.21 REMOVE EXISTING PEVCO PNEUMATIC PANEL, PROTECT AND

RELOCATE. SEE EQ-101 PNEUMATIC TUBE PLAN DRAWING

SCALE | 1/8" = 1'-0"

BID ITEM III DEDUCT ALTERNATE #2

SCALE | 1/8" = 1'-0"

BID ITEM III, ALTERNATE #2

DEMOLITION GENERAL NOTES

F

F F

NF

F

F F

F

F

F

F

S F

S F

S F

S F

S F

SC

S F

S F

S F

S F

S F

S F

SC

SC

S F

SC

S

S F

S

FSC

S

SC

SC

S

SC

SC

S

SC

SC

S

SC

AP

SC

S AP

V

AP

A

SC

S

SC

S

APAP

V

AP

V

SC

S

SC SC

SC

S

SC

SC

S

AP

AP

A

SC

S

SC SC

SC

S

AP

SCSC

S

AP

V

AP

N

SC

S

SC

SC

SC

S

SC

SC

S

SC

S SCSC

S

AP

A

AP

SC

S

SC

SC

SC

S

AP

V

SC

SC

S

CC

CC

OSOSOSOS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OSOS

OS

OSOSOS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OSOSOSOS

OS OS

OS

OS

OSOS

OSOS

OS

OS OS OS

OSOSOSOSOS

OSOSOS

OS OS

OS OS

OS OS OS

OS OS OS

OS OSOS OS

TV

84" MH

OS

OS

OS

OS

OS

OS

OS

OS

OS OS

NO WORK THIS AREA

NO WORK THIS AREA

A301

2.15

2.15

2.15

2.15

2.16

2.16

2.15

2.152.152.152.15

2.15 2.15 2.15 2.15

2.15

2.15

2.15 2.15

2.15

2.15

2.15 2.15

2.15

2.15

2.15

2.15 2.15

2.15 2.15

2.15

2.15

2.15

2.15

2.15 2.15 2.15

2.15 2.15

2.15 2.15

2.15

2.152.15

2.15

2.15

2.15

1.07

2.15

2.152.15

2.152.15

2.152.15

2.15

2.15

2.15

2.15

2.15

2.15

2.15

2.15

2.152.15 2.15

2.15

2.15 2.15 2.15 2.15 2.15

2.17

2.15

2.15

2.15

2.15

2.15

2.15

2.15

2.15

2.15

2.15 2.15 2.15

2.15

2.15

2.152.15

2.15

2.15

2.16

2.15

EXISTING WALL TO BE DEMOLISHED

EXISTING WALL TO REMAIN

HATCHED AREAS INDICATE

AREAS NOT INCLUDED IN

THE PROJECT SCOPE

EXISTING DOOR TO BE DEMOLISHED

EXISTING DOOR TO REMAIN

EXISTING WINDOW TO BE DEMOLISHED

TEMPORARY WALL

TEMPORARY DOOR

D

REFER TO

MEP

DRAWINGS

T

F

DEMOLISHED 2X2 ACT

GYPSUM BOARD CEILING

2X2 ACT TO REMAIN

A. SEE SHEET G002 FOR WALL PARTITION DETAILS AND GENERAL PROJECT NOTES

B. COORDINATE ADDITIONAL DEMOLITION NOT SHOWN REQUIRED FOR ABATEMENT WORK TO BE DONE

SEE DRAWING H-100

C. SEE PHASING PLAN SHEET DRAWING G004 FOR TEMPORARY PARTITION AND CONSTRUCTION

BOUNDARIES

D. WORK TO PROVIDE COMPLETE PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS SHALL OCCUR

BEYOND EXTENT OF WORK AS REQUIRED. CONTRACTOR TO PREPARE ANY EXISTING AREAS BEYOND EXTENT OF WORK FOR INSTALLATION OF SUCH SYSTEMS. (SEE ALL PLUMBING, MECHANICAL AND

ELECTRICAL DRAWINGS)

E. IF ALL WALLS OF A ROOM ARE TO BE REMOVED, THE CEILING IS TO BE REMOVED, UNLESS NOTED

OTHERWISE.

F. IF ALL WALLS OF A ROOM ARE TO BE REMOVED, FLOORING AND BASE ARE TO BE REMOVED, UNLESS

NOTED OTHERWISE

G. REMOVE ALL CORNER GUARDS, KICKPLATES, BUMPER RAILS AND WALL PROTECTION IN ALL AFFECTED

AREAS UNLESS NOTED OTHERWISE.

H. ALL DEMOLITION TO BE BY TRADE INVOLVED. SEE PLUMBING, MECHANICAL AND ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

I. REMOVE ALL EXISTING WALLS AND FURRING TO EXPOSE CONCRETE COLUMNS UNLESS NOTED

OTHERWISE.

J. CONTRACTOR IS RESPONSIBLE FOR CREATING A LEVEL FLOOR FOLLOWING REMOVAL OF EXISTING

CONSTRUCTION. PATCHING DEMOLITION AREAS MAY NOT BE ADEQUATE.

K. COORDINATE ABOVE CEILING WORK WITH PLUMBING PLAN

L. BUILDING WILL BE OCCUPIED DURING MAINTAIN ACCESS TO ROOMS NOT BEING WORKED ON

M. COORDINATE PHASE WORK WITH VA COR

N. PROTECT EXISTING STRUCTURE, ADJACENT WINDOWS, DOORS AND OTHER BUILDING ELEMENT

DURING DEMOLITION.

O. CONTRACTOR TO MAINTAIN ACCESS TO EXITS DURING DEMOLITION AND CONSTRUCTION.

P. INSTALL AND ADJUST DUST BARRIERS AND WALK OFF MATS AT ALL DOORWAYS ADJACENT TO MAIN

CORRIDOR.

Q. CONTRACTOR TO PROVIDE DURABLE TEMPORARY DIRECTION SIGNS TO EXITS AND OPERABLE

RESTROOMS DURING CONSTRUCTION PERIOD.

R. PATCH/REPAIR SURFACES AS REQUIRED FOR NEW FINISHES AS SCHEDULED, INCLUDING AREAS THAT

WERE PREVIOUSLY OUT OF VIEW THAT ARE EXPOSED BY THIS PROJECT. MATCH EXISTING FINISHES, THIS INCLUDES WORK BY ALL TRADES.

S. INSTALL A TEMPORARY DUST BARRIER BETWEEN THE CONSTRUCTION AREA AND ADJACENT OCCUPIED

SPACE.

T. DURING DEMOLITION AND CONSTRUCTION, LOCATE AND MAINTAIN SMOKE DETENTION, FIRE

EXTINGUISHERS, ILLUMINATION AND LIFE SAFETY SYSTEMS AS WOULD OTHERWISE BE REQUIRED IN AN

OCCUPIED SPACE.

U. COORDINATE SPECIFIC FIELD EGRESS REQUIREMENTS WITH THE COR AND THE FIRE OFFICIALS PRIOR

TO COMMENCING WORK.

V. REMOVE EXISTING PARTITIONS SHOWN W/ DASHED LINES. PROVIDE NEW FINISHES AS SCHEDULED AT ALL AREAS OF REMOVAL AND REPAIRS. WALL, CEILING AND FLOOR FINISHES TO MATCH ADJACENT

SURFACES.

W. REMOVE ALL EXISTING DOORS AND HOLLOW METAL FRAME WHERE INDICATED WITH DASHED LINES.

X. REMOVE ALL EXISTING WALL MOUNTED EQUIPMENT, CASEWORK AND SIGNAGE IN WALLS SLATED FOR

REMOVAL. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.

Y. CONTRACTOR TO TURN OVER ALL VA SIGNS TO VA INTERIOR DESIGNER.

Z. SEE MEP DRAWINGS FOR CEILING HUNG EQUIPMENT INFORMATION..

S

T A T

E OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2021

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

100 E. Eighth Street, Ste. 300

Cincinnati, Ohio 45202-2129

Ph 513-241-3222

Fax 513-241-2981 www.thpltd.com

CONSTRUCTION

DOCUMENTS

SCHEMATIC DESIGN1 01/15/20191

2 85% DESIGN DEVELOPMENT 09/24/2019

100% DESIGN DEVELOPMENT3 03/16/2020

BID DOCUMENTS4 04/24/2020

JASON REEVES

/1

/2

:2

:5

A

M .0

PARTIAL FIRST FLOOR CEILING

DEMOLITION PLAN

04/24/2020 VP SS

RECONFIGURE PRIMARY CARE

TO PACT MODEL

AD102

539-19-101

Cincinnati, Ohio

BLDG 16

BLDG 1

BLDG 2

CINCINNATI CAMPUS KEYPLAN

Scale: N.T.S.

AREA OF

WORK

SCALE | 1/8" = 1'-0"

PARTIAL 1ST FLOOR NEW REFLECTED CEILING PLAN26

KEYNOTES

LEGEND

1.07 EXISTING TO REMAIN

2.15 REMOVE EXISTING ACOUSTICAL CEILING SYSTEM AND ALL

MECHANICAL, ELECTRICAL, PLUMBING AND TECHNOLOGY SYSTEMS

INSTALLED HEREIN. PREP FOR NEW CEILING SYSTEM.

2.16 EXISTING CEILING TO REMAIN

2.17 EXISTING CEILING GRID TO REMAIN, REMOVE EXISTING CEILING

TILE AS NEEDED, PROTECT AND REINSTALL

N O

R T

H

N O

R T

H

# DESCRIPTION DATE

BID ITEM III, ALTERNATE #2

BID ITEM III, ALTERNATE #2

DEMOLITION GENERAL NOTES

E.

D.

C.

B.

F.

2623.5

A301

28.1

27.7 27.827

28.3

28.228

F.7

A.7

AA

F.9

23.6

SIG

C179

ELEC.

C177

ELEC.

C1040

ELEC.

C1022

PCR-E

C1008

Entry C-1-10L

OFFICE

C1006

TELE.

C1043

HAC

C167

OFFICE

C166

TEAM ROOM

C186

STOR

C1044

TOILET

C165

TEAM ROOM

C175

PCR-RETINAL

C1011

PCR-E NG

C1010

OFFICE

C1018

PCR-W/B/P

C1030

LINEN

C1041PCR-T

C1045

PCR-T

C1024

WEIGHT

STATION

C1019PCR-T

C1020

TOILET

C1021

PCR-E

C1014

PCR-E

C1015

PCR-E

C1016

PCR-E

C1017

PCR-E

C1027

PCR-E

C1032

PCR-E

C1033

PCR-E

C1034

PCR-E

C1035

PCR-E

C1036

PCR-E

C1037

PCR-E

C1038

UTILITY

C1049

PCR-E

C1048

PCR-E

C1047

PCR-E NG

C1031

PCR-E

C1026

PCR-E

C1012

PCR-W/B/P

C1051

PCR-E

C1054

PCR-E

C1050

PCR-T

C1039

PCR-T

C1023

PCR-E

C1053

GROUP

CARE

C188

TOILET

C1025

PCR-E

C1013

TEAM ROOM

C169

PATIENT

CORRIDOR 2

C*1*16

TEAM ROOM

C173

PATIENT

CORRIDOR

C*1*14

PATIENT

CORRIDOR 3

C*1*17

STORAGE

ALCOVE

C*1*14B

STOR

C1057

OMNICELL

C181

SOILED

STOR

C182

NO WORK THIS AREA

NO WORK THIS AREA

CORRIDOR

C*1*12

CHECK-IN

C1003

P A

T

IE

N T

IN

O

R M

A T

IO

N

E Q

U

IP

M E

N

S

O

R A

G E

HAC

C1042

PATIENT

CORRIDOR

C*1*18

HUDDLE

AREA

C176

WAITING

ROOM

C1002

STOR

C187

PCR-T

C1055

PCR-E

C1056

TOILET

C1052

PCR-T

C190

PCR-T

C189

WEIGHT

STATION

ALCOVE

C*1*14A

TELE

HEALTH

C185

PCR-E

C1046

OFFICE

C1004

STOR

C180

STORAGE

C171

TELE

HEALTH

C184

GREETING

C1001

STOR

C178

WEIGHT

STATION

ALCOVE

C*1*14C

104 SF

PCR-E

C1009

(125 SF)

WORKROOM

WORKROOM

OFFICE

C1005

OFFICE

C1007

FUTURE LOCKER &

BREAKROOM BY

OTHERS

EXISTING

CONFERENCE

ROOM

HUDDLE

AREA

C168

STOR

C188A 5

TELE

HEALTH

C183

EQUIPMENT STORAGE

TEAM ROOM

C172

STAFF

CORRIDOR

C*1*19

22.1022.1122.1222.1322.14

PATIENT

CORRIDOR 1

C*1*15

TOILET

C1028

TOILET

C1029

10' - 3 3/4" 30' - 7 1/2" 20' - 0 3/4" 20' - 7" 27' - 2" 22' - 5 1/2" 15' - 11 1/2" 10' - 2" 11' - 7" 2' - 1 1/4"

/4

/8

/8

/8

/2

8' - 2" 20' - 0" 7' - 6" 13' - 0" 19' - 2" 13' - 0" 7' - 6" 13' - 11"

4' - 10"

17' - 8" 13' - 0" 7' - 2"

13' - 0" 7' - 6" 13' - 0" 19' - 2"

/4

/4

/4

/8

/8

/4

/8

/4

/4

6' - 9" 6' - 9" 6' - 9 3/8" 6' - 7" 8' - 0 1/8"

A301

A301

10"

/8

/2

10' - 8 1/4"

6' - 6"

/8

/2

/8

1' - 9 1/2" 3' - 11 3/4"

1' - 9" 8' - 10 3/8" 7' - 6"

4' - 3"

4' - 3"

5' - 6 3/4"

1' - 9"

2' - 10 3/4" 4' - 4" 10' - 6 17/32"

3' - 3" 10' - 2"

10' - 2"

/2

/2

7' - 9 1/2"

10' - 0" 10' - 0"

15' - 3 1/2"

3' - 9"

7' - 0"

10' - 0" 10' - 5 1/2" 10' - 4" 7' - 6" 13' - 9 3/4" 6' - 10" 10' - 1 3/4"

/8

ALIGN

ALIGNALIGNALIGN

ALIGN

ALIGN

ALIGN

ALIGN

10' - 7"

9' - 2"

A301

A301

A507 8' - 4"

/8

/8

/2

/8

4' - 3" 10' - 2 1/2"

/2

/2

4' - 3" 10' - 2 1/2"

2 1/2"

ALIGN

ALIGN

8' - 10"

8' - 10"

.0

0°

5' - 0"

" 1

/2

/2

P2

P2

P2

P2

P2

P2

P2

P2

P2

P2

P5

P5 P5 P5

P2

P5

P5

P2 P2

P5 P2

P2

P7

P2

P2 P5

P2

P2

P5

P5

P2

P2

P2

P2P2

P2

P2

P2

P5P5

P2

P2

P2 P2P2

P5

P2

P2

P5

P5

P2

P5

P5

P5 P2

P2

P5

P2

P2

P2 P2

P2

P5

P5

P10

P10

P5P5

P5P5

P10P10 P5

P6

P6

3' - 9 1/4"

P10 P10

P5

P5

P2

P5

P6

P6

P10 P5

P5

P5

P2

P3

P9 P9

P9 P9

P7

P9

P9

P9

P9P2

P7

P7

P10

P2

P5P5

P6P6

P1

P6

9' - 9 3/4" 1' - 9" 7' - 7 1/4"

P5

P2

P5

P5

P5

P5

P6 P5

P5

P5

P5

P7

P7

P7 P7

P7

P3

P7

P2

"3

/2

/4

P2

P5

P2

P2

P2

P2

P5

P2

P2

P2

PX

PX

PX

PX

PX PX PX

PX

PX

F1

F1

F1

7' - 6"

P1

13'-5"

P7

P7

P3

P7

P7

P7

P

P7

P7

P7

P7

P7

P7

PX

P7

' - 4

5' - 10 1/4" 5' - 8"

A507

Sim

A507

Sim

4' - 0"

P5

P5P5 P6

ALCOVE

C170

P6

2' - 10" 4' - 0" 3' - 4"

A. ALL DIMENSIONS ARE TAKEN TO FACE OF GYPSUM WALLBOARD OR UNIT MASONRY.

B. WORK TO PROVIDE COMPLETE PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS.

SHALL OCCUR BEYOND EXTENT OF WORK AS REQUIRED. GENERAL CONTRACTOR TO

REPAIR ANY EXISTING AREAS BEYOND EXTENT OF WORK LINE DUE TO INSTALLATION OF

SUCH SYSTEMS. (SEE ALL PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS)

C. EDGE OF ALL DOOR JAMBS AT HINGE SIDE NOT OTHERWISE INDICATED ARE TO BE 6"

FROM THE FACE OF INTERSECTING WALLS. EDGE OF ALL DOOR JAMBS AT STRIKE SIDE

NOT OTHERWISE LOCATED ARE TO BE 18" MINIMUM FROM THE FACE OF INTERSECTING

WALLS.

D. ALL WOOD BLOCKING TO BE FIRE RETARDANT TREATED

E. COORDINATE FINAL PLACEMENT OF ALL WALL MOUNTED EQUIPMENT WITH SIGNAGE BY

OWNER.

F. PRIOR TO GYPSUM BOARD INSTALLATION AND ELECTRICAL ROUGH-IN INSPECTION,

GENERAL CONTRACTORS, ELECTRICAL/DATA CONTRACTORS, ARCHITECT, AND COR

SHALL REVIEW IN-PLACE LOCATIONS OF ALL SWITCH BOXES, RECEPTACLE BOXES, FIRE

ALARM BOXES, ETC. FINAL LOCATIONS MAY BE ADJUSTED AT THIS TIME TO ALIGN OR

COORDINATE WITH DESIGN INTENT.

G. ALL WALLS ARE FULL HEIGHT TO DECK ABOVE, UNLESS NOTED OTHERWISE.

H. PROVIDE CORNER PROTECTION AT ALL OUTSIDE CORNERS PER TYPICAL DETAIL.

COORDINATE FINAL LOCATION WITH PROJECT ENGINEER. CG = CORNERGUARD, 8'-0"

HIGH, MOUNTED DIRECTLY ABOVE THE BASE. CORNER GUARDS TO BE INSTALLED ON

EVERY OUTSIDE CORNER. SEE WALL PROTECTION PLAN

I. SEE SHEET G002 FOR TYPICAL MOUNTING HEIGHTS.

J. ALL EXISTING AND NEW STRUCTURE ARE TO BE FIREPROOFED TO MEET RATING

REQUIREMENTS - REFER TO CODE EVALUATION.

K. EXISTING STRUCTURE WILL BE OCCUPIED DURING ENTIRE CONSTRUCTION PERIOD.

CONTRACTOR TO PROTECT EXISTING STRUCTURE DURING ALL PHASES OF

CONSTRUCTION.

L. SEE G002 FOR ALL GENERAL PROJECT REQUIREMENTS.

M. REFER TO G002 FOR PARTITION TYPES.

N. ALL WALL TYPES TO BE "P1" UNLESS NOTED OTHERWISE

S

T A T

E OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2021

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

100 E. Eighth Street, Ste. 300

Cincinnati, Ohio 45202-2129

Ph 513-241-3222

Fax 513-241-2981 www.thpltd.com

CONSTRUCTION

DOCUMENTS

SCHEMATIC DESIGN1 01/15/20191

2 85% DESIGN DEVELOPMENT 09/24/2019

100% DESIGN DEVELOPMENT3 03/16/2020

BID DOCUMENTS4 04/24/2020

JASON REEVES

/1

/2

:2

:4

P

M .0

PARTIAL FIRST FLOOR DIMENSION

PLAN

04/24/2020 VP SS

RECONFIGURE PRIMARY CARE

TO PACT MODEL

A101

539-19-101

Cincinnati, Ohio

SCALE | 1/8" = 1'-0"

PARTIAL 1ST FLOOR PLAN DIMENSIONED26

GENERAL NOTES FLOOR PLAN

BLDG 16

BLDG 1

BLDG 2

CINCINNATI CAMPUS KEYPLAN

Scale: N.T.S.

AREA OF

WORK

NORTH NORTH

D.

C.

B.

F.

2623.5

PCR-E

C1009

OFFICE

C166

TEAM ROOM

C186

STOR

C1044

TOILET

C165

PCR-E NG

C1010

OFFICE

C1018

PCR-W/B/P

C1030

LINEN

C1041

PCR-T

C1024

WEIGHT

STATION

C1019

PCR-T

C1020

PCR-E

C1014

PCR-E

C1015

PCR-E

C1016

PCR-E

C1017

PCR-E

C1027

PCR-E

C1032

PCR-E

C1033

PCR-E

C1034

PCR-E

C1035

PCR-E

C1036

PCR-E

C1037

PCR-E

C1038

UTILITY

C1049

PCR-E

C1048

PCR-E

C1047

PCR-E NG

C1031

PCR-E

C1026

PCR-E

C1012

PCR-W/B/P

C1051

PCR-E

C1054

PCR-E

C1050

PCR-T

C1039

PCR-T

C1023

PCR-E

C1053

GROUP

CARE

C188

TOILET

C1025

TEAM ROOM

C169

PATIENT

CORRIDOR 2

C*1*16

TEAM ROOM

C173

PATIENT

CORRIDOR

C*1*14

PATIENT

CORRIDOR 3

C*1*17

STORAGE

ALCOVE

C*1*14B

STOR

C1057

A411

A411

A411

A411

A301

28.127.727.827

28.3

28.228

F.7

A.7

AA

F.9

23.6

NO WORK THIS AREA

NO WORK THIS AREA

PCR-T

C190

PCR-T

C189

PCR-E

C1046

PCR-E

C1056

PCR-T

C1055

TELE

HEALTH

C185

TELE

HEALTH

C184

TOILET

C1052

OFFICE

C1004

STOR

C180

STORAGE

ALCOVE

C*1*15A

PCR-E

C1013

PCR-RETINAL

C1011

HUDDLE

AREA

C176

TEAM ROOM

C175

A4111

22.1022.1122.1222.1322.14

423 SF

CHECK-IN

C1003

829 SF

WAITING

ROOM

C1002

896 SF

CORRIDOR

C*1*12

36 SF

GREETING

C1001

693 SF

PATIENT

CORRIDOR 1

C*1*15

1,094 SF

Corridor C*1*10

75 SF

PATIENT

CORRIDOR

C*1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .