539-19-101 ADDENDUM 1 2020.0818.pdf
PDF 98 KB Posted
- Solicitation number
- 36C25020B0064
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25020B0064 0003.docx | DOCX document | |
| RFI 8.pdf | ||
| RFI 9.pdf | ||
| 36C25020B0064 0002 - Attachment.pdf | ||
| 36C25020B0064 0002.docx | DOCX document | |
| 36C25020B0064 0001.docx | DOCX document | |
| Closet - 2.jpg | JPG image | |
| Staging and Dumpster Designated Area.png | PNG image | |
| Pre-Bid RFI 7_Response.pdf | ||
| Pre-Bid RFI 3_Response.pdf | ||
| Pre-Bid RFI 6_Response.pdf | ||
| JA - ARJO.pdf | ||
| Pre-Bid RFI 2_Response.pdf | ||
| 539-19-101 ADDENDUM 1 DRAWINGS 2020.08.pdf | ||
| Pre-Bid RFI 1_Response.pdf | ||
| Closet - 3.jpg | JPG image | |
| Pre-Bid RFI 5_Response.pdf | ||
| Closet - 1.jpg | JPG image | |
| Closet - 4.jpg | JPG image | |
| Pre-Bid RFI 4_Response.pdf | ||
| Attachment 4 - EMR Attachment.pdf | ||
| Attachment 3 - RFI Form.pdf | ||
| 36C25020B0064_1.docx | DOCX document | |
| Attachment 1 - SPECIFICATIONS.pdf | ||
| Attachment 5 - DBA WD - OH20200082.pdf | ||
| Attachment 2 - DRAWINGS.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 01
August 18, 2020
VA PROJECT # 539-19-101
RECONFIGURE PRIMARY CARE TO PACT
CINCINNATI VA MEDICAL CENTER
3200 VINE ST.
CINCINNATI, OHIO 45220
LEVIN PORTER ASSOCIATES, INC
3011 NEWMARK DRIVE
DAYTON, OHIO 45342
LPA PROJECT NO. 205612.00
TO ALL BIDDERS:
This addendum including all items listed hereinafter, shall become a part of the documents, shall be taken into account in preparing the Proposal, and shall become a part of the Contract. The work under each branch shall be in accordance with the original specifications unless excepted in this Addendum.
This Addendum consists of 3 pages plus (11) 30X42 drawing attachments:
ARCHITECTURAL
DRAWINGS
ITEM NO.1 Drawing No. A507
A. Added additional detail 11 – PATIENT LIFT DETAIL 1
B. Added additional detail 16 – PATIENT LIFT DETAIL 2
C. Added additional detail 17 – PATIENT LIFT DETAIL 3
PLUMBING
ITEM NO. 1 Drawing No. P100
A. Removed crawl space notations and added plan note 2 to new sanitary piping indicating the requirements for modifying/ repairing the existing floor slab.
HVAC
ITEM NO. 1 Drawing No. M601
A. Revised ‘Air Terminal Unit Schedule’.
ELECTRICAL
ITEM NO. 1 Drawing No. E402
A. Removed receptacle for monitor adjacent to cart in Detail 1 - ENLARGED PCR-E EXAM ROOM –
POWER.
B. Added receptacle for patient portal in Detail 6 – ENLARGED PCR-T CONSULT ROOM –
POWER.
C. Added receptacle for patient portal in Detail 9 – ENLARGED PCR-WBP ROOM – POWER.
ITEM NO. 2 Drawing No. E602
A. Revised panel schedule with load value for the existing circuit.
B. Revised existing Single-line Diagram.
C. Revised POKE-THRU SCHEDULE to FLOOR BOX SCHEDULE.
ITEM NO. 3 Drawing No. ED101
A. Added boundary line detailing deduct alternate of the west offices.
ITEM NO. 4 Drawing No. EL101
A. Revised Type A2 pedant light fixture locations over workstations at CHECK-IN C1003.
B. Revised exit signs along STAFF CORRIDOR C*1*19.
ITEM NO. 5 Drawing No. EP101
A. Revised receptacle locations at CHECK-IN C1003.
B. Revised receptacles in OFFICE C1004, C1005, C1006, and 1007.
C. Revised receptacles in PCR-E C1008 and C1009.
D. Revised receptacles in HUDDLE AREA C168.
E. Revised symbol for lift to include disconnect switch in PCR-E C1027, PCR-W/B/P C1030, and C1051.
F. Revised receptacles in ALCOVE C170.
G. Revised Plan Note #2.
H. Revised poke-thru devices to floor boxes.
ITEM NO. 6 Drawing No. EY101
A. Revised fire alarm strobe location in HUDDLE AREA C168 and C176.
B. Revised fire alarm audible/visual device near north end of STAFF CORRIDOR C*1*19 to strobe device.
C. Revised fire alarm audible/visual device near STORAGE C171 to strobe device.
TECHNOLOGY
ITEM NO. 1 Drawing No. E501
A. Corrected the plan note labeling on the CCTV details to avoid confusion.
ITEM NO. 2 Drawing No. ET101
A. Adjusted data outlets located in the office areas shown as part of Alternate #2.
B. Revised plan notes 13 and 14 to better reflect conduit routing.
C. Revised conduit routing for workstation cabling in the Team Areas to utilize full height walls.
END OF ADDENDUM NO. 02