Pre-Bid RFI 5_Response.pdf
PDF 120 KB Posted
- Solicitation number
- 36C25020B0064
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25020B0064 0003.docx | DOCX document | |
| RFI 8.pdf | ||
| RFI 9.pdf | ||
| 36C25020B0064 0002 - Attachment.pdf | ||
| 36C25020B0064 0002.docx | DOCX document | |
| 36C25020B0064 0001.docx | DOCX document | |
| Closet - 2.jpg | JPG image | |
| Staging and Dumpster Designated Area.png | PNG image | |
| Pre-Bid RFI 7_Response.pdf | ||
| Pre-Bid RFI 3_Response.pdf | ||
| Pre-Bid RFI 6_Response.pdf | ||
| JA - ARJO.pdf | ||
| 539-19-101 ADDENDUM 1 2020.0818.pdf | ||
| Pre-Bid RFI 2_Response.pdf | ||
| 539-19-101 ADDENDUM 1 DRAWINGS 2020.08.pdf | ||
| Pre-Bid RFI 1_Response.pdf | ||
| Closet - 3.jpg | JPG image | |
| Closet - 1.jpg | JPG image | |
| Closet - 4.jpg | JPG image | |
| Pre-Bid RFI 4_Response.pdf | ||
| Attachment 4 - EMR Attachment.pdf | ||
| Attachment 3 - RFI Form.pdf | ||
| 36C25020B0064_1.docx | DOCX document | |
| Attachment 1 - SPECIFICATIONS.pdf | ||
| Attachment 5 - DBA WD - OH20200082.pdf | ||
| Attachment 2 - DRAWINGS.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COPY TO: ATTACHMENTS:
DATE: REPLY FROM:
REPLY:
1. Date of award dependent on multiple contracting factors. Estimating award this Fall.
2. Revit/CAD drawings will be provided once a contract has been awarded to a construction contractor
3. Coordination drawings shall be provided as described in specification section 23 05 11 – 1.4 – J and other all related MEPT specification sections. KMB, HEAPY 8/14/2020
4. See specification section 013323 section 1.10
5. Structural components are for patient lifts. All structural components required to support patient lifts are to be provided and designed by lift manufacturer. Refer to forthcoming addendum details –VP, LPA 8/17/2020
6. Existing fireproofing is to remain. Scope of work is for restoring fireproofing disturbed by new mechanical, electrical and patient lift structural attachment locations.
INFORMATION NEEDED:
REQUEST FOR INFORMATION (RFI)
36C25020B0064
PROJECT NUMBER: 539-19-101 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE:
Reconfigure Primary Care to PACT Model
PROJECT LOCATION:
Cincinnati VA Medical Center
(VAMC)
SUBMITTED BY: CITY/STATE:
PHONE:
TO:
Luke A. Turner, Contract Specialist Department of Veterans Affairs Network Contracting Office (NCO) 10 260 East University Avenue Cincinnati, Ohio 45219-2637 Luke.Turner@va.gov
RFI NO.: DATE:
SPEC/DWG. REFERENCE(s):
REPLY NEEDED BY:
2 8-12-20
8-19-20
1. For planning and scheduling purposes, can you provide the expected date of award?
2. Can you please provide the drawings in Revit (preferably) or CAD (less preferred) for the coordination purposes?
3. The specifications are not clear as to the requirement for 3D coordination drawings for the MEP and Fire
Protection trades. Is this a requirement at this VA facility?
4. The specs do not specifically say the number of calendar days for RFI responses and submittal reviews and approvals. This information is necessary for an accurate CPM schedule. Can you clarify?
5. The Steel specifications 05 12 00 and 05 50 00 states Support for Wall and Ceiling Mounted Items:
(SD055000-01, SD055000-02, SD102113-01, SD102600-01, SD123100-01 & SD123100-02). However, we can find no structural details on the plans of any steel work. Is there Steel work on this project?
6. Spec 07 81 00 Applied Fireproofing is included, but we can not find any new Steel work that requires it. Is this only the patchwork at Mechanical attachment locations? or is there other structural components to be sprayed?
Specs Div 01, 05 and 07; all drawings
VA/Heapy/LPA 8/18/2020 mailto:Luke.Turner@va.gov jjohnson Typewritten Text Valiant Construction LLC jjohnson Typewritten Text Louisville, KY jjohnson Typewritten Text
(502) 415-8991