This is a design and construction document package for the Missoula Field Office Building Renovations project, issued by the United States Department of the Interior Bureau of Land Management (BLM) in Missoula, Montana. The project consists of repairs and improvements to the BLM's Western Montana District administrative facility located at 3255 Fort Missoula Road, Missoula, Montana.
The project scope encompasses exterior and interior improvements with estimated quantities including clay tile roofing repairs (660 linear feet), exterior wall painting (8,000 square feet), exterior door painting (550 square feet), eave painting (3,600 square feet), fascia and soffit repair (60 linear feet), gutter replacement (920 linear feet), downspout replacement (12 units), and carpet tile installation (950 square yards). Roofing work involves pressure washing the entire roof, removing and replacing clay tiles along hips and ridges with proper flashing and nailer board installation, and replacing roofing felt and flashing in valleys. Exterior work includes removing and replacing the existing 5-inch K-style gutter system with a new 6-inch seamless K-style gutter system with relocated downspouts to minimize ice buildup in high-traffic areas. Interior work requires removal and replacement of 950 square yards of carpet with new carpet tile. The contractor is responsible for all methods, sequencing, safety, permitting, and compliance with local, state, and federal regulations. The contract documents were prepared by Civil Engineer Grady Anderson and issued for construction on July 6, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO
CANADA
UNITED STATES
SASKATCHEWAN
ALBERTA
BRITISH COLUMBIA
N O
R
TH
D
AK
O
TA
SO
U
TH
D
AK
O
TA
WYOMING
ALT
2 89
191 89
90 90
212 310 87
MISSOULA
KALISPELL
GREAT FALLS
HAVRE
HELENA
BUTTE
BILLINGS
MILES CITY
LEWISTOWN
MONTANACHOTEAU
MALTA
GLASGOW
CHESTER
FT BENTON
STATE REFERENCE MAP
(N.T.S)
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
MISSOULA FIELD OFFICE BUILDING RENOVATIONS
MISSOULA COUNTY
MISSOULA FIELD OFFICE
VICINITY MAP
(N.T.S)
DIRECTIONS TO SITE:
FROM I-90 RESERVE STREET EXIT HEAD SOUTH ON RESERVE STREET FOR 4.6 MILES.
TURN RIGHT ONTO DEARBORN AVE IN 0.2 MILE CONTINUE ONTO FORT MISSOULA
ROAD. DESTINATION WILL BE ON THE RIGHT IN 0.6 MILE.
ESTIMATED QUANTITIES
ITEM QUANTITY UNIT
CLAY TILE ROOFING
REPAIRS
660 LF
EXTERIOR WALL PAINTING 8000 SF
EXTERIOR DOOR PAINTING 550 SF
EAVE PAINTING 3600 SF
FASCIA & SOFFIT REPAIR 60 LF
GUTTER REPLACEMENT 920 LF
DOWNSPOUT
REPLACEMENT
12 EA
CARPET TILE
INSTALLATION
950 SY
\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG
GENERAL ENGINEER'S NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY
CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS
SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEWHERE IN THE
CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND
REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.
3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL
PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.
4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR
INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.
CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE
CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION COVERED BY
THIS PLAN.
5 THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO UTILITIES AND/OR FACILITIES
CAUSED DURING THEIR CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL
CALL 48 HOURS IN ADVANCE FOR LOCATION OF UNDERGROUND UTILITIES (811)
PRIOR TO ANY EXCAVATION.
6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL
EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW
CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN
ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER
WITH ANY DISCREPANCIES.
7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE
LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT
CONTRACTING OFFICER WITH ANY DISCREPANCIES.
8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.
9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO
WORK WITH WEATHER CONDITIONS.
10. DRAWINGS HAVE BEEN PREPARED ON AN ORIGINAL SHEET SIZE OF 34" X 22"
11. CONTRACTOR TO OBTAIN ANY REQUIRED CITY OF MISSOULA BUILDING PERMITS.
BLM ENGINEERS WILL ASSIST AS NEEDED.
PROJECT DESCRIPTION
PROJECT CONSISTS OF REPAIRS TO SECTIONS OF THE ROOFING SYSTEM
INCLUDING CLAY TILE REPLACEMENT ALONG THE VALLEYS AND RIDGES OF THE
STRUCTURE. REPAIRS ON THE EXTERIOR OF THE BUILDING INCLUDE REPLACEMENT
OF THE FASCIA, GUTTER SYSTEMS, AND PAINTING. INTERIOR REPAIRS INCLUDE
CARPET REPLACEMENT AND PLUMBING IMPROVEMENTS.
C O
VE
R
M
IS
SO
U
LA
O
FF
IC
E
BU
IL
D
IN
G
R
EP
AI
R
S
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
7/ 6/
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: DVB APPROVED BY: EC
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
M
IS
SO
U
LA
F
IE
LD
O
FF
IC
E
Drawing Index List Sheet Number Sheet Title
1 COVER
2 GUTTER PLAN
3 ROOFING PLAN
4 BUILDING FLOOR PLAN
5 PHOTOS
[1] THE QUANTITIES ARE AN ESTIMATE OF THE
ENGINEER. THE CONTRACTOR SHALL MAKE THEIR
OWN INDEPENEDENT ESTIMATE OF QUANTITIES
AND BID THEREON.
MONTANA/DAKOTAS
ENGINEERING APPROVAL:
DUSTIN V. BAKER
MONTANA/DAKOTAS
ENGINEERING
SUPERVISOR APPROVAL:
BRENDON T. DALE
FIELD OFFICE MANAGER
APPROVAL:
ERIN B. CAREY
PREPARED BY:
CIVIL ENGINEER:
GRADY ANDERSON
BUREAU OF LAND MANAGEMENT'S
WESTERN DISTRICT OFFICE
3255 FORT MISSOULA ROAD
MISSOULA, MT 59804
PROJECT LOCATION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
INTERSTATE HIGHWAY
AutoCAD SHX Text
U.S. HIGHWAY
AutoCAD SHX Text
STATE CAPITOL
AutoCAD SHX Text
BLM STATE OFFICE
AutoCAD SHX Text
BLM DISTRICT OFFICE
AutoCAD SHX Text
DOWNSPOUT LOCATIONS
PROPOSED DOWNSPOUT LOCATION
REMOVED DOWNSPOUT LOCATION
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_MISSOULA FO\_REC, ADMIN & DAMS\MISSOULA FIELD OFFICE ADMINISTRATIVE SITE L61133\2026 DM-MISSOULA FO RENOVATIONS\DESIGN\SITE
PLAN.DWG
G U
TT
ER
S
YS
TE
M
S
IT
E
PL
AN
M
IS
SO
U
LA
O
FF
IC
E
BU
IL
D
IN
G
R
EP
AI
R
S
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
7/ 6/
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: DVB APPROVED BY: EC
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
M
IS
SO
U
LA
F
IE
LD
O
FF
IC
E
PARAPET
GUTTER SYSTEM NOTES
1. REMOVE AND DISPOSE OF EXISTING GUTTER SYSTEM. PROTECT IN PLACE ALL DOWN SPOUT
DRAINAGE LOCATIONS FOR FUTURE CONNECTION.
2. PERFORM ALL FASCIA AND EAVE REPAIRS WHILE GUTTER SYSTEM HAS BEEN REMOVED.\
3. INSTALL NEW SEAMLESS 6" K-STYLE GUTTER SYSTEM WITH DOWNSPOUT LOCATIONS
AGREED UPON BETWEEN THE BLM AND CONTRACTOR. DOWNSPOUT LOCATIONS SHOULD
MINIMIZE ICE BUILD-UP IN WALKING AND VEHICULAR TRAFFIC AREAS.
3.1. INSTALL PER SPECIFICATIONS AND FASTEN PER MANUFACTURER'S INSTRUCTIONS
4. HIGHPOINTS TO BE DECIDED ON BETWEEN BLM AND CONTRACTOR AND PICTURED FOR
CONCEPTUAL PURPOSES ONLY
EXISTING DOWNSPOUT LOCATION. MOVE TO AVOID HIGH TRAFFIC WALKWAY
HIGH POINT
HIGH POINT
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_MISSOULA FO\_REC, ADMIN & DAMS\MISSOULA FIELD OFFICE ADMINISTRATIVE SITE L61133\2026 DM-MISSOULA FO RENOVATIONS\DESIGN\SITE
PLAN.DWG
M
IS
SO
U
LA
O
FF
IC
E
BU
IL
D
IN
G
R
EP
AI
R
S
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
7/ 6/
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: DVB APPROVED BY: EC
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
M
IS
SO
U
LA
F
IE
LD
O
FF
IC
E
ROOFING NOTES
1. PRESSURE WASH ENTIRE ROOF PER SPECIFICATIONS
2. REMOVE AND DISPOSE OF ALL CLAY TILES ALONG HIPS AND RIDGES
3. INSTALL NEW TILES ALONG HIPS AND RIDGES AND PROPERLY SECURE THEM WITH NAILER
BOARD, FLASHING, AND MASTIC PER SPECIFICATIONS
4. REPLACE ROOFING FELT, FLASHING, MASTIC, AND TILES IN VALLEYS WHERE IMPROPER
INSTALLATION IS CAUSING WATER INTRUSION.
M
IS
SO
U
LA
O
FF
IC
E
BU
IL
D
IN
G
R
EP
AI
R
S
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
7/ 6/
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: DVB APPROVED BY: EC
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
M
IS
SO
U
LA
F
IE
LD
O
FF
IC
E
PARAPET
INSTALL NAILER
BOARD AND FLASHING
ON ALL HIPS AND RIDGES
RIDGE
R
ID
G E
VALLEY
VALLEY
C
LA
Y
TI
LE
E D
G E
ROOFING FEATURES
ROOFING
FEATURE QUANTITY UNIT
HIP 500 LF
RIDGE 100 LF
VALLEY 60 LF
*ALL PLAN QUANTITIES ARE APPROXIMATE AND SHALL BE
VERIFIED BY THE CONTRACTOR PRIOR TO BIDDING.
FASCIA REPAIR AREA
FASCIA REPAIR AREA
FASCIA REPAIR AREA
R O
O
FI
N G
S
YS
TE
M
S
IT
E
PL
AN
101A
102A
3'-11" 5'-3" 3'-11" 5'-3" 4'-5" 5'-3" 3'-11" 5'-3" 3'-11" 5'-3" 3'-11"
101B
8"
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_MISSOULA FO\_REC, ADMIN & DAMS\MISSOULA FIELD OFFICE ADMINISTRATIVE SITE L61133\2026 DM-MISSOULA FO RENOVATIONS\DESIGN\SITE
PLAN.DWG
BU
IL
D
IN
G F
LO
O
R P
LA
N
M
IS
SO
U
LA
O
FF
IC
E
BU
IL
D
IN
G
R
EP
AI
R
S
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
7/ 6/
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: DVB APPROVED BY: EC
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
M
IS
SO
U
LA
F
IE
LD
O
FF
IC
E
CARPET INSTALLATION NOTES
1. REMOVE AND DISPOSE OF ALL EXISTING CARPET
2. PREPARE FLOOR PER SPECIFICATIONS AND INSTALL CARPET TILE THROUGHOUT AREA
DEPICTED.
CARPET QUANTITIES
CARPET QUANTITY UNIT
EXISTING CARPET
(REMOVE AND DISPOSE)
950 SY
NEW CARPET TILE 950 SY
*ALL PLAN QUANTITIES ARE APPROXIMATE AND SHALL BE
VERIFIED BY THE CONTRACTOR PRIOR TO BIDDING.
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
EAST OFFICES
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
SECURE STORAGE
AutoCAD SHX Text
REPRODUCTION
AutoCAD SHX Text
CENTRAL OFFICES
AutoCAD SHX Text
MAIN VESTIBULE
AutoCAD SHX Text
WEST OFFICES
AutoCAD SHX Text
LUNCH ROOM
AutoCAD SHX Text
MECH.
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
MEN
AutoCAD SHX Text
JAN.
AutoCAD SHX Text
FLAMMABLE STORAGE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
SIDE VESTIBULE
AutoCAD SHX Text
YARD STORAGE
AutoCAD SHX Text
HALL
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
MEN
AutoCAD SHX Text
SEED STORAGE
AutoCAD SHX Text
MECH.
AutoCAD SHX Text
SECURE STORAGE
AutoCAD SHX Text
MAIN STORAGE AREA
AutoCAD SHX Text
LOW FIRE CACHE
AutoCAD SHX Text
RAISED FIRE CACHE
AutoCAD SHX Text
OFFICE
M
IS
SO
U
LA
O
FF
IC
E
BU
IL
D
IN
G
R
EP
AI
R
S
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
7/ 6/
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: DVB APPROVED BY: EC
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
M
IS
SO
U
LA
F
IE
LD
O
FF
IC
E
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_MISSOULA FO\_REC, ADMIN & DAMS\MISSOULA FIELD OFFICE ADMINISTRATIVE SITE L61133\2026 DM-MISSOULA FO RENOVATIONS\DESIGN\SITE
PLAN.DWG
BU
IL
D
IN
G F
LO
O
R P
LA
N
BAY DOOR
EXTERIOR STUCCO.
REPAIR DAMAGED LOCATIONS AND
PAINT PER SPECIFICATIONS
EXISTING 5" K-STYLE GUTTER SYSTEM.
REMOVE AND REPLACE WITH 6"
K-STYLE GUTTER SYSTEM
EAVE AND BEAMS.
REPAINT PER SPECIFICATIONS
RAFTER. PAINT PER
SPECIFICATIONS
FASCIA. REPLACE MOISTURE DAMAGED
BOARDS AND PAINT PER SPECIFICATIONS
EXISTING CLAY TILE ROOF VALLEY.
REPLACE FLASHING AND SPACE
TILE PER SPECIFCATIONS
REPAINT ALL EXTERIOR DOORS
CLAY TILE RIDGE
REMOVE AND REPLACE
WITH PROPER FLASHING
AND NAILER BOARD PER
SPECIFICATIONS
| Sheets and Views |
| 1 COVER |
| 2 GUTTER PLAN |
| 3 ROOFING PLAN |
| 4 BUILDING FLOOR PLAN |
| 5 PHOTOS |
File details come from the government source that posted it. Updated .